WEEKLY,MONTHLY ROUTINE

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

MT "MARLIN SILKEBORG"

WEEKLY SAFETY ROUTINE CHECK


DATE: 11.05.2019

No. JOB DESCRIPTION RESULT PERFORMED BY:


1 EM'CY GEN. RUNNING TEST
-BAT. START 2nd Engineer
-SPRING. START 2nd Engineer
2 QUANTITY OF FOAM LIQUID IN STORAGE TANKS
-DECK FOAM STATION 2nd Engineer
3 FIRE DAMPERS MOVING TEST 2nd Engineer
4 LIFE BOAT -1 ENGINE RUN TEST 3rd Engineer
5 LIFE BOAT -1 BATTERY & EL.SYST. CHECK El. Engineer
6 LIFE BOAT -2 ENGINE RUN TEST 3rd Engineer
7 LIFE BOAT -2 BATTERY & EL.SYST. CHECK El. Engineer
8 EMERGENCY SUPPLY BATTERY CHECK El. Engineer
9 GMDSS EMERGENCY SUPPLY BATTERY CHECK El. Engineer
10 15 PPM ALARM SYSTEM TEST:
-OWS White Box OMD Ch.Engineer
-OWS OCM Ch.Engineer
-Clean Bilger OCM Ch.Engineer
11 BILGE WELLS HIGH LEVEL ALARM TEST
-E/R FWD STB. 3rd Engineer
-E/R FWD PORT 3rd Engineer
-E/R AFT 3rd Engineer
-E/R ENG. RECESSED 3rd Engineer
-E'CY FIRE PUMP SPACE 3rd Engineer
-S/G STB 3rd Engineer
-S/G PORT 3rd Engineer
12 EM'CY FIRE PUMP RUNNING TEST 2nd Engineer
13 FIRE DETECTION SYST. FUNCT. TEST El. Engineer
14 EMERGENCY COMPRESSOR RUN TEST 2nd Engineer

REMARKS:
Ch.Engineer____________________ 2nd Engineer _______________
3rd Engineer _______________ El. Engineer _______________
MT "MARLIN SILKEBORG"

MONTHLY SAFETY ROUTINE CHECK


23.02.2019

No. JOB DESCRIPTION RESULT PERFORMED BY:

1 WEEKLY SAFETY ROUTINE CHECK 2nd Engineer


2 EM'CY STOP OF MACHINERY
- AUX. BOILERS 3rd Engineer
- INERT GAS SYSTEM 2nd Engineer
- INCINERATOR 3rd Engineer
- C.O.P.T. No. 1 2nd Engineer
'- C.O.P.T. No. 2 2nd Engineer
- C.O.P.T. No. 3 2nd Engineer
- BALLAST PUMP 2nd Engineer
- BILGE/SLUDGE PUMP 3rd Engineer
- SEWAGE DISCH. PUMP 3rd Engineer
-SEPARATORS 2nd Engineer & 3rd Engineer
- HOSE HANDLING CRANE 3rd Engineer
3 ST.GEAR HYDR. OIL L.LEV. ALARM TEST 2nd Engineer
4 M.E OIL MIST. DETECTION El. Engineer
5 M.E AND D.G. FUEL PIPE LEAK DEVICES 2nd Engineer
6 X-MIST FIRE FIGHTING SYSTEM 2nd Engineer
7 M.E HYDRAULIC PIPE LEAK DEVICES 2nd Engineer
13 PROVISION STORE ALARM TEST
- MEAT ROOM 2nd Engineer
- FISH ROOM 2nd Engineer
- VEG. ROOM 2nd Engineer
14 DEAD MAN ALARM TEST 2nd Engineer
15 ENGINEER CALL ALARM TEST 2nd Engineer
16 EMERGENCY CALL ALARM TEST 2nd Engineer
18 LEAK MONITOR PANEL TEST El. Engineer
19 HYDRO P/P OIL MIST DETECTION SYSTEM TEST El. Engineer
20 ME OIL MIST DETECTOR TEST 2nd Engineer
21 STEERING GEAR SAFETY SYSTEM TEST Ch.Engineer
23 STP HIGH LEVEL ALARM TEST 3rd Engineer
24 CO2 RELEASE ALARM TEST 2nd Engineer

REMARKS:

Ch.Engineer___________________ 2nd Engineer _______________


3rd Engineer _______________
El. Engineer _______________
MT "MARLIN SILKEBORG"

CRITICAL EQUIPMENT 3 MONTH CHECKS


07.01.2019

No. JOB DESCRIPTION RESULT PERFORMED BY:

1 Main engin emergency trip and overriding function test Ch.Eng / 2nd Eng
2 Fire foam and compaund pumps test 2nd Eng
3 Emergency Generator onload test El. Eng / 2nd Eng
4 Quick closing valves test 2nd Eng
5 Em'cy stop of machinery

- Accomadation fan El. Eng / 2nd Eng


- Engine room fan El. Eng / 2nd Eng
6 Em'cy stop button of pumps

- Sludge pump remote stop button El. Eng / 4th Eng


- Bilge pump remote stop button El. Eng / 4th Eng
- Sewage plant pumpremote stop button El. Eng / 4th Eng

REMARKS:

Ch.Engineer___________________ 2nd Engineer _______________


4th Engineer _______________
El. Engineer _______________