COPT's Safety alarms - 3 MONTH
COPT's Safety alarms - 3 MONTH
COPT's Safety alarms - 3 MONTH
CARGO PUMPS SAFETY DEVICES, ALARMS AND TRIPS TEST, EVERY 3 MONTHS
Item Alarm description Set point Alarm Trip Remarks Test date
COPT N1
1 Overspeed Trip (Electrical 1st) 113% RPM X X 05.08.17
2 Overspeed Trip (Electrical 2nd) 115% RPM X X 05.08.17
3 Emergency Stop (Remote) X X 05.08.17
4 Emergency Stop (Local) X X 05.08.17
5 Lub Oil LOW pressure Alarm 0.61 kg/cm2 X 05.08.17
6 Lub Oil LOW pressure Trip 0.51 kg/cm2 X X 05.08.17
7 Excess Back Pressuere Trip 0.7 kg/cm2 X X 05.08.17
8 Rotor axial movement Trip 0.8 X X 05.08.17
9 Pump Overpressure Alarm 15.0 kg/cm2 X 05.08.17
10 Pump Overpressure Trip 16.0 kg/cm2 X X 05.08.17
11 Pump Casing Overheating Alarm/Trip 75*/80*C X X 05.08.17
12 Pump Upper/Lower Bearings Overheating Alarm/Trip 85*/90*C X X 05.08.17
13 Bulkhead Stuffing Box Overheating Alarm/Trip 85*/90*C X X 05.08.17
14 Excess L.O. Temperature Alarm 53*C X 05.08.17
15 L.O. Tank Low Level Alarm 25 mm under NL X 05.08.17
CARGO PUMPS SAFETY DEVICES, ALARMS AND TRIPS TEST, EVERY 3 MONTHS
Item Alarm description Set point Alarm Trip Remarks Test date
COPT N2
1 Overspeed Trip (Electrical 1st) 113% RPM X X 05.08.17
2 Overspeed Trip (Electrical 2nd) 115% RPM X X 05.08.17
3 Emergency Stop (Remote) X X 05.08.17
4 Emergency Stop (Local) X X 05.08.17
5 Lub Oil LOW pressure Alarm 0.61 kg/cm2 X 05.08.17
6 Lub Oil LOW pressure Trip 0.51 kg/cm2 X X 05.08.17
7 Excess Back Pressuere Trip 0.7 kg/cm2 X X 05.08.17
8 Rotor axial movement Trip 0.8 X X 05.08.17
9 Pump Overpressure Alarm 15.0 kg/cm2 X 05.08.17
10 Pump Overpressure Trip 16.0 kg/cm2 X X 05.08.17
11 Pump Casing Overheating Alarm/Trip 75*/80*C X X 05.08.17
12 Pump Upper/Lower Bearings Overheating Alarm/Trip 85*/90*C X X 05.08.17
13 Bulkhead Stuffing Box Overheating Alarm/Trip 85*/90*C X X 05.08.17
14 Excess L.O. Temperature Alarm 53*C X 05.08.17
15 L.O. Tank Low Level Alarm 25 mm under NL X 05.08.17
CARGO PUMPS SAFETY DEVICES, ALARMS AND TRIPS TEST, EVERY 3 MONTHS
Item Alarm description Set point Alarm Trip Remarks Test date
COPT N3
1 Overspeed Trip (Electrical 1st) 113% RPM X X 05.08.17
2 Overspeed Trip (Electrical 2nd) 115% RPM X X 05.08.17
3 Emergency Stop (Remote) X X 05.08.17
4 Emergency Stop (Local) X X 05.08.17
5 Lub Oil LOW pressure Alarm 0.61 kg/cm2 X 05.08.17
6 Lub Oil LOW pressure Trip 0.51 kg/cm2 X X 05.08.17
7 Excess Back Pressuere Trip 0.7 kg/cm2 X X 05.08.17
8 Rotor axial movement Trip 0.8 X X 05.08.17
9 Pump Overpressure Alarm 15.0 kg/cm2 X 05.08.17
10 Pump Overpressure Trip 16.0 kg/cm2 X X 05.08.17
11 Pump Casing Overheating Alarm/Trip 75*/80*C X X 05.08.17
12 Pump Upper/Lower Bearings Overheating Alarm/Trip 85*/90*C X X 05.08.17
13 Bulkhead Stuffing Box Overheating Alarm/Trip 85*/90*C X X 05.08.17
14 Excess L.O. Temperature Alarm 53*C X 05.08.17
15 L.O. Tank Low Level Alarm 25 mm under NL X 05.08.17
BALLAST PUMPS SAFETY DEVICES, ALARMS AND TRIPS TEST, EVERY 3 MONTHS
Item Alarm description Set point Alarm Trip Remarks Test date