Tendor No.

: CPCLH24028

Schedule of Rates
Service Required for Plant: 9910 ,CPCL-Manali Refinery
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

RFQ ITEM NO.00010 PART-A: UNIT RATE JOBS

00010
PART-A: UNIT RATE JOBS:
Carrying out maintenance activities as
per the enclosed scope of work,
detailed work package and all other
annexures. Refer work package for
list of jobs excluded from lumpsum
scope.

00020
SUPPLY, ERECTION & DISMANTLING OF
STEEL SCAFFOLDING- For External
purpose - NDT requirement, surface
cleaning, Painting work (Furnace
radiant section, Convection, Flue gas
ducts, Hot air ducts, Stack):
The job includes supply, transportaiton
of scaffolding materials is in
contractors scope of supply , erection
of scaffolding at site covering
the areas specified including providing
vertical posts of pipes at inter
distance of 1.5m and horizontal numbers
at a inter distance of 0.5 to
0.75 meter, providing rods at corners
to give sufficient strength to the
structure, placing the steel planks /
FRP gratings on top for making
sufficient area. Dismantling
scaffolding after completion of job.
Necessary quantity of scaffolding pipes
at various lengths, rolling /
fixed clamps, metal jolley including
all tools, tackles, consumables,
labours and contractor's supervision to
be mobilised for completion of
the jobs scope.
NOTE:
i) For measurement in SQM : 2( Length +
Width) x height area covered by
the scaffolding is to be taken.

page 3
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

ii) Scaffolding measurement to be done


by breaking the height into parts
as per height slab mentioned below and
adopting respective rates against
mentioned height slabs.
Remarks:
(i) Mode of measurement for the above
items shall be in meter square.
Measurement shall be taken as 2 times
length + bredth multiplied by
height. This shall be applicable for
outside of the confined space.
(ii) For scaffolding erected from any
platform,height of the scaffolding
shall be taken from the platform i.e
platform shall be taken as zero
meter level.
(iii) In addition to above for any
other locations the measurement of
EIC shall be final and binding to
contractor.
(iv) Erection of scaffolding and
removal / dismantling of the same
scaffolding after completion of job
shall be considered as completed
job. No separate payment for removal of
scaffolding shall be made.

00030
Supply, Scaffolding Erection &
Dismantling (External):
00040 1,000.000 M2 119.00 119,000.00
Up to 6m height. Rs.ONE HUNDRED Rs.ONE LAC
NINETEEN ONLY NINETEEN
THOUSAND ONLY
00050 746.000 M2 169.00 126,074.00
Above 6m up to 10m height. Rs.ONE HUNDRED Rs.ONE LAC
SIXTY-NINE ONLY TWENTY-SIX
THOUSAND
SEVENTY-FOUR
ONLY
00060 500.000 M2 237.00 118,500.00
Above 10m up to 20m height. Rs.TWO HUNDRED Rs.ONE LAC
THIRTY-SEVEN EIGHTEEN
ONLY THOUSAND FIVE
HUNDRED ONLY
00070 500.000 M2 395.00 197,500.00
Above 20m up to 30m height. Rs.THREE Rs.ONE LAC

page 4
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

HUNDRED NINETY-SEVEN
NINETY-FIVE ONLY THOUSAND FIVE
HUNDRED ONLY
00080 100.000 M2 593.00 59,300.00
Above 30m up to 40m height. Rs.FIVE HUNDRED Rs.FIFTY-NINE
NINETY-THREE THOUSAND THREE
ONLY HUNDRED ONLY
00090 100.000 M2 1,186.00 118,600.00
Above 40m up to 50m height. Rs.ONE THOUSAND Rs.ONE LAC
ONE HUNDRED EIGHTEEN
EIGHTY-SIX ONLY THOUSAND SIX
HUNDRED ONLY
00100 100.000 M2 2,371.00 237,100.00
Above 50m up to 90m height. Rs.TWO THOUSAND Rs.TWO LAC
THREE HUNDRED THIRTY-SEVEN
SEVENTY-ONE ONLY THOUSAND ONE
HUNDRED ONLY
00110 500.000 M2 198.00 99,000.00
intermediate platform. Rs.ONE HUNDRED Rs.NINETY-NINE
NINETY-EIGHT THOUSAND ONLY
ONLY

00120
Supply, Scaffolding Erection &
Dismantling (internal):
00130 1,000.000 M3 254.00 254,000.00
Erection & dismantling - Upto 10 mtr Rs.TWO HUNDRED Rs.TWO LAC
height of scaffolding (Internal). FIFTY-FOUR ONLY FIFTY-FOUR
THOUSAND ONLY
00140 1,000.000 M3 279.00 279,000.00
Above 10m up to 20m height - Volumetric. Rs.TWO HUNDRED Rs.TWO LAC
SEVENTY-NINE SEVENTY-NINE
ONLY THOUSAND ONLY
00150 500.000 M3 305.00 152,500.00
Above 20Mtr.but upto 30Mtr. - Rs.THREE Rs.ONE LAC
Volumetric. HUNDRED FIVE FIFTY-TWO
ONLY THOUSAND FIVE
HUNDRED ONLY
00160 100.000 M3 330.00 33,000.00
Above 30Mtr but upto 40Mtr. - Rs.THREE Rs.THIRTY-THREE
Volumetric. HUNDRED THIRTY THOUSAND ONLY
ONLY

00170
BLINDING AND DE-BLINDING( For
furnaces isolation / Entry):
The job includes collection &
transportation of required quantity of

page 5
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

materials like blinds, gaskets,


fasteners, etc., from owner's storage
point, loosening & tightening of studs
(cold / gas cutting if required),
wedge opening, cleaning of flanges,
insertions and removal of blind &
gaskets, providing new gaskets after
removal of blinds, overhauling of
fasteners using oil, replacing the
defective studs / nuts to ensure zero
leak of joints including hot bolting.
The job also includes supplying of all
types of tools & tackles, lifting
arrangements like chain pulley blocks,
machineries, all consumables and
labour to complete the job in all
respects, transportation of unused
materials to owner's storage point and
dumping the generated scrap
material to designated area as per EIC
instructions.
NOTE:
(1) Nominal diameter of the flanges
shall be taken for all measurements.
(2) In case of either one of the
activity like Blinding or de-blinding
arise, 50% of the applicable rate shall
be paid for the single activity.

00180
Blinding and deblinding for 150# &
300# ratings:
00190 10.000 EA 362.00 3,620.00
Blinding & Deblinding - Size Upto Rs.THREE Rs.THREE
1-1/2 inch dia. HUNDRED THOUSAND SIX
SIXTY-TWO ONLY HUNDRED TWENTY
ONLY
00200 6.000 EA 672.00 4,032.00
Blinding & Deblinding - Size 2 inch Rs.SIX HUNDRED Rs.FOUR
dia. to 5 inch dia. SEVENTY-TWO ONLY THOUSAND
THIRTY-TWO ONLY
00210 5.000 EA 1,536.00 7,680.00
Blinding & Deblinding - Size 6 inch Rs.ONE THOUSAND Rs.SEVEN
dia. to 10 inch dia. FIVE HUNDRED THOUSAND SIX
THIRTY-SIX ONLY HUNDRED EIGHTY
ONLY
00220 3.000 EA 2,824.00 8,472.00
Blinding & Deblinding - Size 12 inch Rs.TWO THOUSAND Rs.EIGHT

page 6
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

dia. to 16 inch dia. EIGHT HUNDRED THOUSAND FOUR


TWENTY-FOUR ONLY HUNDRED
SEVENTY-TWO ONLY
00230 2.000 EA 4,167.00 8,334.00
Blinding & Deblinding - Size 18 inch Rs.FOUR Rs.EIGHT
dia. to 24 inch dia. THOUSAND ONE THOUSAND THREE
HUNDRED HUNDRED
SIXTY-SEVEN ONLY THIRTY-FOUR ONLY
00240 2.000 EA 5,556.00 11,112.00
Blinding & Deblinding - Size 26 inch Rs.FIVE Rs.ELEVEN
dia. To 32 inch dia. THOUSAND FIVE THOUSAND ONE
HUNDRED HUNDRED TWELVE
FIFTY-SIX ONLY ONLY
00250 2.000 EA 6,945.00 13,890.00
Blinding & Deblinding - Size 34 nch Rs.SIX THOUSAND Rs.THIRTEEN
dia. To 40 inch dia. NINE HUNDRED THOUSAND EIGHT
FORTY-FIVE ONLY HUNDRED NINETY
ONLY

00260
OPENING & BOXING OF MANWAYS / COVERS
/ PANELS / HEADER PLUGS / ELBOW
SWINGING:
The job involves opening of manways,
covection panels, header box
covers, header plugs, etc., by
de-bolting (cold / gas cutting if
required), cleaning, and finally boxing
up with proper gasket, packing,
servicing of bolts & nuts, replacing
defective bolts / nuts to ensure
zero leak of joints including hot
bolting.
The job also includes supplying of all
types of tools & tackles, lifting
arrangements like chain pulley blocks,
etc., machineries, all
consumables and labour to complete the
job in all respects,
transportation of material from owner's
storage point to the work site &
unused materials back to the storage
point and dumping the generated
scrap material to the designated area
as per EIC instructions.

00270
Opening and boxing up:

page 7
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00280 5.000 EA 1,653.00 8,265.00


Opening and boxing up of Manways. Rs.ONE THOUSAND Rs.EIGHT
SIX HUNDRED THOUSAND TWO
FIFTY-THREE ONLY HUNDRED
SIXTY-FIVE ONLY

00290
INSPECTION & TESTING:

00300
SURFACE PREPARATION - POWER TOOL
CLEANING / BUFFING:
The job includes mechanical cleaning of
metal surfaces to SSPC - SP-2 /
St3 Power tool cleaning standards using
power tools like buffing wheels
/ grinding machine / rotating steel
wire brush, etc., to make the
surface free of rust, scales, dirt,
grease / oil, etc., for the purpose
of painting / conducting Wet
flourescent magnetic particle testing or
dye penetrant inspection or diesel
chalk testing on welds / HAZ's.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects including assistance during
Wet flourescent magnetic particle
testing inspection or dye penetrant
inspection or diesel chalk testing
on welds / HAZ's, if required.
00310 500.000 M2 236.00 118,000.00
Power tool cleaning / Buffing to SSPC - Rs.TWO HUNDRED Rs.ONE LAC
SP-2 / St3 standards - Bulk THIRTY-SIX ONLY EIGHTEEN
area. THOUSAND ONLY
00320 100.000 M 105.00 10,500.00
Power tool cleaning / Buffing to SSPC - Rs.ONE HUNDRED Rs.TEN THOUSAND
SP-2 / St3 standards - 150 mm FIVE ONLY FIVE HUNDRED
width of Weld seams / HAZ. ONLY
00330 3,000.000 M2 51.00 153,000.00
Hand tool cleaning to the requirement Rs.FIFTY-ONE Rs.ONE LAC
of St-2 / SSPC-SP-2 for painting ONLY FIFTY-THREE
jobs. THOUSAND ONLY

00340
SURFACE PREPARATION - GRIT BLASTING

page 8
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

to Sa2-1/2:
The job includes blast cleaning of
metal surfaces to SSPC - SP-10 /
Sa-2-1/2 Blast cleaning standards using
steel grits to make the surface
free of rust, scales, mill scales,
dirt, grease / oil, etc.
The job also includes supplying of all
types of tools & tackles,
machineries, transportation of suitable
steel grits, all consumables &
labour to complete the job in all
respects and dumping the generated
scrap material to designated area as
per EIC instructions.
NOTE:
(1) For weld seam buffing the width of
buffing shall be 150mm (i.e) 75mm
on both sides of the weld seam.
00350 100.000 M2 417.00 41,700.00
Grit blasting to SSPC - SP-10 / Sa2-1/2 Rs.FOUR HUNDRED Rs.FORTY-ONE
Blast cleaning standards - SEVENTEEN ONLY THOUSAND SEVEN
Mobile Air compressor is provided by HUNDRED ONLY
Contractor.

00360
Supply and Application of
Painting:
Carryout Supply and application of
painting including Surfacepreparation
as per CPCL Painting system by Air less
spray method.
00370 1,000.000 M2 590.00 590,000.00
Supply and application of CPCL Painting Rs.FIVE HUNDRED Rs.FIVE LAC
system-X. NINETY ONLY NINETY THOUSAND
Primer : Self Priming Epoxy Paint ( 1 ONLY
Coat) 100 DFT per coat.
Inter : Polyamide cured HB Epoxy MIO
Paint (1 C oat) 75 DFT per coat.
Finish : Acrylic Polyeurethene Paint (
2 Coat) 35 DFT per coat.
00380 2,000.000 M2 153.00 306,000.00
Supply and application of Painting as Rs.ONE HUNDRED Rs.THREE LAC
per CPCL Painting system -I. FIFTY-THREE ONLY SIX THOUSAND
ONLY

00390
Plate Rolling:

page 9
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

The job includes spreading the required


plate for marking, cutting,
marking of plates, edge preparation,
chipping, shifting of plate to
rolling machine, rolling of plates
including transportation and shifting
of rolled plates to work site.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects, transportation of unused
materials to owner's storage point
and dumping the generated scrap
material to designated area as per EIC
instructions.
NOTE:
(1) The contractor can have the rolling
facility made available inside
the refinery premises or shall get the
job done through his
sub-contractor outside the refinery
premises. In case of
transportation involved to shift the
plates outside the refinery
premises, the cost of transportation at
actuals shall be paid
additionally as per EIC.
(2) The finished rolled plate
dimensions shall be taken for
measurement
purposes.
(3) Cutting of plates on sides after
rolling is included in the above
scope of work and there is no
additional payment. However, rates for
cutting shall be paid additionally, in
case the required size of plates
are cut from a bigger size plate
provided by CPCL.

00400
Plate rolling CS/AS - above 1500 mm
dia:
00410 250.000 KG 40.00 10,000.00
Plate Rolling - Carbon steel / Alloy Rs.FORTY ONLY Rs.TEN THOUSAND
Steel - 3mm to 5 mm thickness. ONLY

page 10
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00420 500.000 KG 50.00 25,000.00


Plate Rolling - Carbon steel / Alloy Rs.FIFTY ONLY Rs.TWENTY-FIVE
Steel - 6 to 10 mm thickness. THOUSAND ONLY
00430 500.000 KG 53.00 26,500.00
Plate Rolling - Carbon steel / Alloy Rs.FIFTY-THREE Rs.TWENTY-SIX
Steel - 12 to 14 mm thickness. ONLY THOUSAND FIVE
HUNDRED ONLY

00440
Gas Cutting of Plates - Carbon
Steel / Alloy steel:
The job includes gas cutting of carbon
steel / Alloy steel plates at all
heights & grades including area
preparation for hot work.
The job also includes supplying of all
types of tools & tackles,
machineries, gas, all consumables and
labour to complete the job in all
respects and dumping the generated
scrap material to designated area as
per EIC instructions.
00450 100.000 M 78.00 7,800.00
Gas Cutting of Plates - Carbon Steel / Rs.SEVENTY-EIGHT Rs.SEVEN
Alloy steel - Thickness upto 6 ONLY THOUSAND EIGHT
mm. HUNDRED ONLY
00460 100.000 M 90.00 9,000.00
Gas Cutting of Plates-Carbon Steel / Rs.NINETY ONLY Rs.NINE
Alloy steel-Thickness 8 mm. THOUSAND ONLY
00470 100.000 M 102.00 10,200.00
Gas Cutting of Plates-Carbon Rs.ONE HUNDRED Rs.TEN THOUSAND
Steel/Alloy steel-Thickness 10 mm. TWO ONLY TWO HUNDRED ONLY
00480 100.000 M 114.00 11,400.00
Gas Cutting of Plates-Carbon Rs.ONE HUNDRED Rs.ELEVEN
Steel/Alloy steel-Thickness 12 mm. FOURTEEN ONLY THOUSAND FOUR
HUNDRED ONLY

00490
FILLET WELDING:

00500
Fillet welding - Carbon Steel (Using
E-6013 Electrode):
The job includes flushing, preparing
work area for executing hot work,
grinding, fillet welding on plate
surfaces using E 6013 electrodes at
all grades & elevations.

page 11
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

The job also includes supplying of all


types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00510 50.000 M 502.00 25,100.00
Fillet welding - Carbon Steel - Upto 4 Rs.FIVE HUNDRED Rs.TWENTY-FIVE
mm thickness using E 6013 TWO ONLY THOUSAND ONE
electrodes. HUNDRED ONLY
00520 50.000 M 803.00 40,150.00
Fillet welding - Carbon Steel - 5 to 6 Rs.EIGHT Rs.FORTY
mm thickness using E 6013 HUNDRED THREE THOUSAND ONE
electrodes. ONLY HUNDRED FIFTY
ONLY
00530 50.000 M 1,003.00 50,150.00
Fillet welding - Carbon Steel - 8 mm Rs.ONE THOUSAND Rs.FIFTY
thickness using E 6013 electrodes. THREE ONLY THOUSAND ONE
HUNDRED FIFTY
ONLY
00540 50.000 M 1,254.00 62,700.00
Fillet welding - Carbon Steel - 10 mm Rs.ONE THOUSAND Rs.SIXTY-TWO
thickness using E 6013 electrodes. TWO HUNDRED THOUSAND SEVEN
FIFTY-FOUR ONLY HUNDRED ONLY
00550 50.000 M 1,505.00 75,250.00
Fillet welding - Carbon Steel - 12 mm Rs.ONE THOUSAND Rs.SEVENTY-FIVE
thickness using E 6013 electrodes. FIVE HUNDRED THOUSAND TWO
FIVE ONLY HUNDRED FIFTY
ONLY

00560
Fillet welding - Carbon Steel (Using
E-7018 Electrode):
The job includes flushing, preparing
work area for executing hot work,
grinding, fillet welding on plate
surfaces using E 7018
electrodes at all grades & elevations.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00570 100.000 M 505.00 50,500.00
Fillet welding - Carbon Steel - Upto 4 Rs.FIVE HUNDRED Rs.FIFTY
mm thickness using E 7018 FIVE ONLY THOUSAND FIVE
electrodes. HUNDRED ONLY
00580 100.000 M 808.00 80,800.00
Fillet welding - Carbon Steel - 5 to 6 Rs.EIGHT Rs.EIGHTY

page 12
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

mm thickness using E 7018 HUNDRED EIGHT THOUSAND EIGHT


electrodes. ONLY HUNDRED ONLY
00590 100.000 M 1,010.00 101,000.00
Fillet welding - Carbon Steel - 8 mm Rs.ONE THOUSAND Rs.ONE LAC ONE
thickness using E 7018 electrodes. TEN ONLY THOUSAND ONLY
00600 100.000 M 1,263.00 126,300.00
Fillet welding - Carbon Steel - 10 mm Rs.ONE THOUSAND Rs.ONE LAC
thickness using E 7018 electrodes. TWO HUNDRED TWENTY-SIX
SIXTY-THREE ONLY THOUSAND THREE
HUNDRED ONLY
00610 100.000 M 1,515.00 151,500.00
Fillet welding - Carbon Steel - 12 mm Rs.ONE THOUSAND Rs.ONE LAC
thickness using E 7018 electrodes. FIVE HUNDRED FIFTY-ONE
FIFTEEN ONLY THOUSAND FIVE
HUNDRED ONLY

00620
Cutting of Stainless steel Plates -
By grinding:
The job includes cutting of SS plates
by grinding wheel at all heights &
grades including area preparation for
hot work.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects and dumping the generated
scrap material to designated area as
per EIC instructions.
00630 150.000 M 588.00 88,200.00
Cutting of Plate-Stainless Rs.FIVE HUNDRED Rs.EIGHTY-EIGHT
steel-Thickness Above 2 mm & upto 4 mm. EIGHTY-EIGHT THOUSAND TWO
ONLY HUNDRED ONLY
00640 100.000 M 783.00 78,300.00
Cutting of Plate-Stainless Rs.SEVEN Rs.SEVENTY-EIGHT
steel-Thickness Above4 mm & upto 6 mm. HUNDRED THOUSAND THREE
EIGHTY-THREE HUNDRED ONLY
ONLY

00650
Fillet welding - Stainless steel -
using electrodes of grades - E -
309, 309 Mo, 316, 316L:
The job includes flushing, preparing
work area for executing hot work,
grinding, fillet welding on plate
surfaces using suitable stainless

page 13
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

steel electrodes at all grades &


elevations.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects as per EIC instructions.
NOTE:
(1) The above rates are applicable for
all external welding jobs and
internal welding jobs in heat
exchangers, furnaces using suitable SS
electrodes.
00660 150.000 M 1,313.00 196,950.00
Fillet welding - Stainless steel - Upto Rs.ONE THOUSAND Rs.ONE LAC
4mm mm thickness using THREE HUNDRED NINETY-SIX
electrodes of grades - E - 309, 309 Mo, THIRTEEN ONLY THOUSAND NINE
316, 316L. HUNDRED FIFTY
ONLY
00670 100.000 M 1,815.00 181,500.00
Fillet welding - Stainless steel - 5 mm Rs.ONE THOUSAND Rs.ONE LAC
to 6 mm thickness using EIGHT HUNDRED EIGHTY-ONE
electrodes of grades - E - 309, 309 Mo, FIFTEEN ONLY THOUSAND FIVE
316, 316L. HUNDRED ONLY

00680
Patch plate welding - Carbon steel -
using E 7018 electrodes:
The job includes collection &
transportation of required materials
from
owner's storage point, marking to the
required size, cutting, bending to
the desired curvature wherever
required, edge preparation, fit up &
fillet welding on all four sides using
E 7018 electrodes, flushing the
finished weld surface by grinding and
offering DPT at all grades &
elevations.
The job also includes supplying of all
types of tools & tackles, lifting
arrangements like chain pulley blocks,
machineries, all consumables and
labour to complete the job in all
respects, transportation of unused
materials to owner's storage point and
dumping the generated scrap

page 14
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

material to designated area as per EIC


instructions.
00690 100.000 M 981.00 98,100.00
Patch plate welding - Carbon steel - Rs.NINE HUNDRED Rs.NINETY-EIGHT
Upto 6 mm thickness using E 7018 EIGHTY-ONE ONLY THOUSAND ONE
electrodes. HUNDRED ONLY
00700 100.000 M 1,219.00 121,900.00
Patch plate welding - Carbon steel - Rs.ONE THOUSAND Rs.ONE LAC
8mm thickness using E 7018 TWO HUNDRED TWENTY-ONE
electrodes. NINETEEN ONLY THOUSAND NINE
HUNDRED ONLY
00710 200.000 M 1,515.00 303,000.00
Patch plate welding - Carbon steel - 10 Rs.ONE THOUSAND Rs.THREE LAC
mm thickness using E 7018 FIVE HUNDRED THREE THOUSAND
electrodes. FIFTEEN ONLY ONLY

00720
Dismantling & Removal of Structurals
/ Gratings:
The job involves removal of existing
above ground, overhead structurals
including platforms, ladders, GI &
steel gratings by unfastening / cold
cutting / gas cutting / grinding,
etc., from various locations at all
grades & elevations without damaging
any other portion of the existing
unit, lowering down the same to ground
level, transportation of the same
to the designated area or scrap yard as
per the instructions of
Engineer-in-charge including weighment
of the material at the
appropriate place within the refinery
premises, if required.
The job also includes supplying of all
types of tools & tackles,
lifting arrangements like chain pulley
blocks, machineries, all
consumables and labour to complete the
job in all respects.
NOTE:
(1) For scaffolding work wherever
required, rates shall be paid
separately as per General category jobs
under SOR Sl. Nos.1.1.

page 15
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00730
Dismantling & Removal of Structurals
/ Gratings:
00740 100.000 TO 15,656.00 1,565,600.00
Dismantling & Removal of Structurals / Rs.FIFTEEN Rs.FIFTEEN LAC
Gratings. THOUSAND SIX SIXTY-FIVE
HUNDRED THOUSAND SIX
FIFTY-SIX ONLY HUNDRED ONLY

00750
Fabrication & erection of
structurals / Chequered plate
Replacement:

The job includes fabrication and


erection of carbon steel structurals in
position such as platforms, ladders,
stairs, brackets, pipe supports,
pipe shoe, using the structural
materials like angles, flats, channels,
beams, rounds, plates , chequered
plates, etc. at all grades &
elevations.
The job also includes transportation of
the required structural
materials from owner's storage point to
worksite, cutting to the
required size, bolting and / or welding
of joints etc. as per drawings,
specifications & instructions of EIC
and preparing the area for hot
work.
The job also includes supplying of all
types of tools & tackles,
lifting arrangements like chain pulley
blocks, machineries, all
consumables and labour to complete the
job in all respects, returning
back the unused materials to owner's
storage point and dumping the
generated scrap material to designated
area as per EIC instructions.
The job also includes mobilisation of
necessary lifiting arrangement
like winch mechanism / chain pulley
blocks/ fabrication of temporary
structure for lifting of the structural
materials to be required

page 16
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

elevation.
NOTE:
(1) For scaffolding work wherever
required, rates shall be paid
separately as per General category jobs
under SOR.

00760
Fabrication and erection of
structurals / Chequered plate:
00770 10.000 TO 30,743.85 307,438.50
Fabrication and erection of structurals Rs.THIRTY Rs.THREE LAC
upto 15 m elevation(Unit of THOUSAND SEVEN SEVEN THOUSAND
Measurement Tonne = Metric tonne). HUNDRED FOUR HUNDRED
FORTY-THREE & THIRTY-EIGHT &
PAISE PAISE FIFTY ONLY
EIGHTY-FIVE ONLY
00780 35.000 TO 36,892.61 1,291,241.35
Fabrication and erection of structurals Rs.THIRTY-SIX Rs.TWELVE LAC
Above 15m elevation to 25m THOUSAND EIGHT NINETY-ONE
elevation(Unit of Measurement Tonne = HUNDRED THOUSAND TWO
Metric tonne). NINETY-TWO & HUNDRED
PAISE SIXTY-ONE FORTY-ONE &
ONLY PAISE
THIRTY-FIVE ONLY
00790 2.000 TO 40,581.86 81,163.72
Fabrication and erection of structurals Rs.FORTY Rs.EIGHTY-ONE
Above 25m elevation to 50m THOUSAND FIVE THOUSAND ONE
elevation (Unit of Measurement Tonne = HUNDRED HUNDRED
Metric tonne). EIGHTY-ONE & SIXTY-THREE &
PAISE PAISE
EIGHTY-SIX ONLY SEVENTY-TWO ONLY
00800 50.000 TO 44,640.02 2,232,001.00
Fabrication and erection of structurals Rs.FORTY-FOUR Rs.TWENTY-TWO
Above 50m to 75m THOUSAND SIX LAC THIRTY-TWO
elevation(Unitof Measurement Tonne = HUNDRED FORTY & THOUSAND ONE
Metric tonne). PAISE TWO ONLY ONLY
00810 1.000 TO 49,104.02 49,104.02
Fabrication and erection of structurals Rs.FORTY-NINE Rs.FORTY-NINE
Above 75m to 100m elevation THOUSAND ONE THOUSAND ONE
(Unit of HUNDRED FOUR & HUNDRED FOUR &
Measurement Tonne = Metric tonne). PAISE TWO ONLY PAISE TWO ONLY
00820 1.000 TO 54,014.39 54,014.39
Fabrication and erection of structurals Rs.FIFTY-FOUR Rs.FIFTY-FOUR
Above 100 m (Unit of Measurement THOUSAND THOUSAND
Tonne = Metric tonne). FOURTEEN & FOURTEEN &
PAISE PAISE
THIRTY-NINE ONLY THIRTY-NINE ONLY

page 17
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00830
REPLACEMENT OF COKE DRUM (86R-01A/B)
# COKE OUTLET CHUTE BOTTOM
PLATEREPLACEMENT:
Carryout replacement of the coke drum
outlet coke outlet chute bottom
plate replacement job as per the
enclosed scope of work and EIC
instruction. The job includes supply of
all necessary tools and tackles,
welding machines, consumables, Safety
fall arresters since the job to be
carried out at an elevation of 25 meter
and the surface is tapper.
Necessary external scaffolding &
internal scaffolding has to be done as
per standards.
Job includes supply of necessary chain
pulley blocks, fall arester,
sling, lifting devices for plate
dismantling and erection job, hydraulic
jacks, alignment kit, grinding
machines,etc.
00840 15.000 TO 15,170.39 227,555.85
Dismantling by gas cutting & removalof Rs.FIFTEEN Rs.TWO LAC
damaged coke bottom chute plate THOUSAND ONE TWENTY-SEVEN
as per SOW. (Unit of Measurement Tonne HUNDRED SEVENTY THOUSAND FIVE
= Metric tonne). & PAISE HUNDRED
THIRTY-NINE ONLY FIFTY-FIVE &
PAISE
EIGHTY-FIVE ONLY
00850 15.000 TO 45,686.21 685,293.15
Erection of newly fabricated 19mm Thk. Rs.FORTY-FIVE Rs.SIX LAC
ABRASO 400 coke bottom chuteplate THOUSAND SIX EIGHTY-FIVE
as per SOW. (Unit of Measurement Tonne HUNDRED THOUSAND TWO
= Metric tonne). EIGHTY-SIX & HUNDRED
PAISE NINETY-THREE &
TWENTY-ONE ONLY PAISE FIFTEEN
ONLY
00860 300.000 M 5,859.44 1,757,832.00
Welding of Chute line plates with E8018 Rs.FIVE Rs.SEVENTEEN
welding electrode and as per THOUSAND EIGHT LAC FIFTY-SEVEN
Inspection welding procedure. HUNDRED THOUSAND EIGHT
FIFTY-NINE & HUNDRED
PAISE THIRTY-TWO ONLY
FORTY-FOUR ONLY

page 18
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00870 200.000 "2 186.38 37,276.00


Weld overlay of existing eroded butt Rs.ONE HUNDRED Rs.THIRTY-SEVEN
welds of bottom chute liner EIGHTY-SIX & THOUSAND TWO
plateswith E8018 welding electrode and PAISE HUNDRED
as per Inspection welding THIRTY-EIGHT SEVENTY-SIX ONLY
procedure. ONLY
00880 200.000 "2 186.38 37,276.00
Weld crack repair of plates as Rs.ONE HUNDRED Rs.THIRTY-SEVEN
recommended by Inspection / EIGHTY-SIX & THOUSAND TWO
EICinstruction using E8018 welding PAISE HUNDRED
electrode and as per Inspection THIRTY-EIGHT SEVENTY-SIX ONLY
weldingrepair procedure. ONLY

00890
Erection and welding of Platform /
ladder gratings:
The job includes erection & welding of
gratings in position under the
support structure in columns, vessels,
tanks, staircase, platforms, step
ladders, etc., at all grades &
elevations with necessary corrections at
work site on the supplied grating to
fit to the site requirements.
The job also includes transportation of
the required structural
materials from owner's storage point to
worksite, cutting to the
required size, bolting and / or welding
of joints etc. as per drawings,
specifications & instructions of EIC
and preparing the area for hot
work.
The job also includes supplying of all
types of tools & tackles,
lifting arrangements like chain pulley
blocks, machineries, all
consumables and labour to complete the
job in all respects, returning
back the unused materials to owner's
storage point and dumping the
generated scrap material to designated
area as per EIC instructions.
NOTE:
(1) For scaffolding work wherever
required, rates shall be paid
separately as per General category jobs
under SOR Sl. Nos.1.1.

page 19
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00900
Erection and welding of Gratings:
00910 5.000 TO 20,925.00 104,625.00
Erection and welding of Gratings upto Rs.TWENTY Rs.ONE LAC FOUR
15 m elevation. THOUSAND NINE THOUSAND SIX
HUNDRED HUNDRED
TWENTY-FIVE ONLY TWENTY-FIVE ONLY
00920 5.000 TO 25,110.00 125,550.00
Erection and welding of Gratings above Rs.TWENTY-FIVE Rs.ONE LAC
15 m elevation. THOUSAND ONE TWENTY-FIVE
HUNDRED TEN ONLY THOUSAND FIVE
HUNDRED FIFTY
ONLY

00930
Concrete dismantling (PLAIN and
REINFORCED):
Demolishing plain cement concrete in
foundation and super structure
including disposal of unserviceable
material upto 3KM lead as directed
and serviceable materials to stores
including scaffolding, all labour,
tools supervision, safety permits,
safety precaution etc. complete.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00940 5.000 M3 2,484.00 12,420.00
Dismantling Plain cement concrete Rs.TWO THOUSAND Rs.TWELVE
(PCC). FOUR HUNDRED THOUSAND FOUR
EIGHTY-FOUR ONLY HUNDRED TWENTY
ONLY

00950
The job involves dismantling of
reinforced cement concrete pavements
including cutting of reinforcement
bars, returning of scrap steels
to designated area, breaking the RCC
work into pieces and disposal of
unserviceable material upto 3.0km lead
as directed , etc. as per the
direction of the Engineer-in-charge.

page 20
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

00960 5.000 M3 4,968.00 24,840.00


Dismantling Reinforced cement Rs.FOUR Rs.TWENTY-FOUR
concrete (RCC). THOUSAND NINE THOUSAND EIGHT
HUNDRED HUNDRED FORTY
SIXTY-EIGHT ONLY ONLY

00970
Dewatering - with Contractor's own
pump:
The job involves pumping out of water
including dewatering oily water
mixed with muck / sludge etc. from
trenches, pits etc. by contractor's
own pump as per the direction of the
Engineer-in-charge.
The job also includes supplying of all
types of pumps, tools & tackles,
hoses, fuel, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00980 5.000 EA 6,654.00 33,270.00
Hire charges for 5 HP Diesel driven Rs.SIX THOUSAND Rs.THIRTY-THREE
dewatering pump with all accessories SIX HUNDRED THOUSAND TWO
including hoses along with one operator FIFTY-FOUR ONLY HUNDRED SEVENTY
- For 12 Hrs. (One Unit EA ONLY
= One Shift
(12 Hrs)).
Total Value of item 00010 (Rs.): 13,635,979.98
Rs.ONE CRORE THIRTY-SIX LAC THIRTY-FIVE THOUSAND NINE HUNDRED SEVENTY-NINE &
PAISE NINETY-EIGHT ONLY

RFQ ITEM NO.00020 PART-B EQUIPMENTS / MACHINERIES HIRING

00010
PART-B EQUIPMENTS / MACHINERIES
HIRING:
The contractor shall mobilise the
following equipments for completion of
the entrire job in all respects. The
contractor shall de mobilise the
equipment on completion of the job with
approval from EIC. If there is
any extension of days the contractor
shall obtain prior approval from
EIC for retaining the equipements. For
the extended days the rate will

page 21
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

be paid on pro rata basis.Entry and


exist Gate passes including the
operators time sheet (duly signed by
CPCL in charge on daily basis ) for
all the below mentioned equipments to
be enclosed along with bill for
processing.
00020 1.000 LS 148,044.00 148,044.00
Provide Tractor Trailer 20 feet , 10 Rs.ONE LAC Rs.ONE LAC
Ton on hire basis along with FORTY-EIGHT FORTY-EIGHT
operator for material shifting ,etc. THOUSAND THOUSAND
For round the clock work basis FORTY-FOUR ONLY FORTY-FOUR ONLY
(24Hrs/Day for 30 Days).
Necessary Diesel is in contractor scope.
00030 1.000 LS 296,088.00 296,088.00
Provide Hydra Crane along with valid Rs.TWO LAC Rs.TWO LAC
operator on hire basis. NINETY-SIX NINETY-SIX
Minimum capacity : 12 Tons. THOUSAND THOUSAND
for a period of 30 Days ( 24 hrs / Day). EIGHTY-EIGHT EIGHTY-EIGHT
New Generation Hydra to be mobilised. ONLY ONLY
Necessary Diesel for running crane is
in contractor scope.
00040 20.000 DAY 89,311.00 1,786,220.00
Provide 120 Tonnes capacity Crane for Rs.EIGHTY-NINE Rs.SEVENTEEN
piping replacement and valve THOUSAND THREE LAC EIGHTY-SIX
dismantling & erection and (Min boom HUNDRED ELEVEN THOUSAND TWO
length-50m) and other jobs with ONLY HUNDRED TWENTY
operator on round the clock basis ( 24 ONLY
hrs / Day). for a period of 20
Days (24 hrs / Day).
Necessary Diesel for running crane is
in contractor scope.
00050 1.000 LS 9,923.00 9,923.00
Mobilization and Demobilization charges Rs.NINE Rs.NINE
for 120tonnes capacity crane. THOUSAND NINE THOUSAND NINE
HUNDRED HUNDRED
TWENTY-THREE TWENTY-THREE
ONLY ONLY
00060 5.000 DAY 7,463.00 37,315.00
Hiring of machineries on demand basis. Rs.SEVEN Rs.THIRTY-SEVEN
The quoted rate is inclusive THOUSAND FOUR THOUSAND THREE
ofcharges towards mobilization if any, HUNDRED HUNDRED FIFTEEN
hire charges, consumables fuel SIXTY-THREE ONLY ONLY
/oils / lubricants, operator crew's
costs,
supervision, overhead &profit, safety
permits, safety precaution etc.
complete.

page 22
Tendor No.: CPCLH24028

______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________

Hire Charges for wheeled back hoe


loader with backfill blade attachment
(JCB).
Total Value of item 00020 (Rs.): 2,277,590.00
Rs.TWENTY-TWO LAC SEVENTY-SEVEN THOUSAND FIVE HUNDRED NINETY ONLY

_________________________________________________________________
Total Estimated Value(Rs.): 15,913,569.98
Rs.ONE CRORE FIFTY-NINE LAC THIRTEEN THOUSAND FIVE HUNDRED
SIXTY-NINE & PAISE NINETY-EIGHT ONLY

Total Excluding GST = Rs. 1,59,13,569.98


Total Incl 18% GST = Rs. 1,87,78,012.58