1705916892
: CPCLH24028
Schedule of Rates
Service Required for Plant: 9910 ,CPCL-Manali Refinery
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00010
PART-A: UNIT RATE JOBS:
Carrying out maintenance activities as
per the enclosed scope of work,
detailed work package and all other
annexures. Refer work package for
list of jobs excluded from lumpsum
scope.
00020
SUPPLY, ERECTION & DISMANTLING OF
STEEL SCAFFOLDING- For External
purpose - NDT requirement, surface
cleaning, Painting work (Furnace
radiant section, Convection, Flue gas
ducts, Hot air ducts, Stack):
The job includes supply, transportaiton
of scaffolding materials is in
contractors scope of supply , erection
of scaffolding at site covering
the areas specified including providing
vertical posts of pipes at inter
distance of 1.5m and horizontal numbers
at a inter distance of 0.5 to
0.75 meter, providing rods at corners
to give sufficient strength to the
structure, placing the steel planks /
FRP gratings on top for making
sufficient area. Dismantling
scaffolding after completion of job.
Necessary quantity of scaffolding pipes
at various lengths, rolling /
fixed clamps, metal jolley including
all tools, tackles, consumables,
labours and contractor's supervision to
be mobilised for completion of
the jobs scope.
NOTE:
i) For measurement in SQM : 2( Length +
Width) x height area covered by
the scaffolding is to be taken.
page 3
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00030
Supply, Scaffolding Erection &
Dismantling (External):
00040 1,000.000 M2 119.00 119,000.00
Up to 6m height. Rs.ONE HUNDRED Rs.ONE LAC
NINETEEN ONLY NINETEEN
THOUSAND ONLY
00050 746.000 M2 169.00 126,074.00
Above 6m up to 10m height. Rs.ONE HUNDRED Rs.ONE LAC
SIXTY-NINE ONLY TWENTY-SIX
THOUSAND
SEVENTY-FOUR
ONLY
00060 500.000 M2 237.00 118,500.00
Above 10m up to 20m height. Rs.TWO HUNDRED Rs.ONE LAC
THIRTY-SEVEN EIGHTEEN
ONLY THOUSAND FIVE
HUNDRED ONLY
00070 500.000 M2 395.00 197,500.00
Above 20m up to 30m height. Rs.THREE Rs.ONE LAC
page 4
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
HUNDRED NINETY-SEVEN
NINETY-FIVE ONLY THOUSAND FIVE
HUNDRED ONLY
00080 100.000 M2 593.00 59,300.00
Above 30m up to 40m height. Rs.FIVE HUNDRED Rs.FIFTY-NINE
NINETY-THREE THOUSAND THREE
ONLY HUNDRED ONLY
00090 100.000 M2 1,186.00 118,600.00
Above 40m up to 50m height. Rs.ONE THOUSAND Rs.ONE LAC
ONE HUNDRED EIGHTEEN
EIGHTY-SIX ONLY THOUSAND SIX
HUNDRED ONLY
00100 100.000 M2 2,371.00 237,100.00
Above 50m up to 90m height. Rs.TWO THOUSAND Rs.TWO LAC
THREE HUNDRED THIRTY-SEVEN
SEVENTY-ONE ONLY THOUSAND ONE
HUNDRED ONLY
00110 500.000 M2 198.00 99,000.00
intermediate platform. Rs.ONE HUNDRED Rs.NINETY-NINE
NINETY-EIGHT THOUSAND ONLY
ONLY
00120
Supply, Scaffolding Erection &
Dismantling (internal):
00130 1,000.000 M3 254.00 254,000.00
Erection & dismantling - Upto 10 mtr Rs.TWO HUNDRED Rs.TWO LAC
height of scaffolding (Internal). FIFTY-FOUR ONLY FIFTY-FOUR
THOUSAND ONLY
00140 1,000.000 M3 279.00 279,000.00
Above 10m up to 20m height - Volumetric. Rs.TWO HUNDRED Rs.TWO LAC
SEVENTY-NINE SEVENTY-NINE
ONLY THOUSAND ONLY
00150 500.000 M3 305.00 152,500.00
Above 20Mtr.but upto 30Mtr. - Rs.THREE Rs.ONE LAC
Volumetric. HUNDRED FIVE FIFTY-TWO
ONLY THOUSAND FIVE
HUNDRED ONLY
00160 100.000 M3 330.00 33,000.00
Above 30Mtr but upto 40Mtr. - Rs.THREE Rs.THIRTY-THREE
Volumetric. HUNDRED THIRTY THOUSAND ONLY
ONLY
00170
BLINDING AND DE-BLINDING( For
furnaces isolation / Entry):
The job includes collection &
transportation of required quantity of
page 5
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00180
Blinding and deblinding for 150# &
300# ratings:
00190 10.000 EA 362.00 3,620.00
Blinding & Deblinding - Size Upto Rs.THREE Rs.THREE
1-1/2 inch dia. HUNDRED THOUSAND SIX
SIXTY-TWO ONLY HUNDRED TWENTY
ONLY
00200 6.000 EA 672.00 4,032.00
Blinding & Deblinding - Size 2 inch Rs.SIX HUNDRED Rs.FOUR
dia. to 5 inch dia. SEVENTY-TWO ONLY THOUSAND
THIRTY-TWO ONLY
00210 5.000 EA 1,536.00 7,680.00
Blinding & Deblinding - Size 6 inch Rs.ONE THOUSAND Rs.SEVEN
dia. to 10 inch dia. FIVE HUNDRED THOUSAND SIX
THIRTY-SIX ONLY HUNDRED EIGHTY
ONLY
00220 3.000 EA 2,824.00 8,472.00
Blinding & Deblinding - Size 12 inch Rs.TWO THOUSAND Rs.EIGHT
page 6
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00260
OPENING & BOXING OF MANWAYS / COVERS
/ PANELS / HEADER PLUGS / ELBOW
SWINGING:
The job involves opening of manways,
covection panels, header box
covers, header plugs, etc., by
de-bolting (cold / gas cutting if
required), cleaning, and finally boxing
up with proper gasket, packing,
servicing of bolts & nuts, replacing
defective bolts / nuts to ensure
zero leak of joints including hot
bolting.
The job also includes supplying of all
types of tools & tackles, lifting
arrangements like chain pulley blocks,
etc., machineries, all
consumables and labour to complete the
job in all respects,
transportation of material from owner's
storage point to the work site &
unused materials back to the storage
point and dumping the generated
scrap material to the designated area
as per EIC instructions.
00270
Opening and boxing up:
page 7
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00290
INSPECTION & TESTING:
00300
SURFACE PREPARATION - POWER TOOL
CLEANING / BUFFING:
The job includes mechanical cleaning of
metal surfaces to SSPC - SP-2 /
St3 Power tool cleaning standards using
power tools like buffing wheels
/ grinding machine / rotating steel
wire brush, etc., to make the
surface free of rust, scales, dirt,
grease / oil, etc., for the purpose
of painting / conducting Wet
flourescent magnetic particle testing or
dye penetrant inspection or diesel
chalk testing on welds / HAZ's.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects including assistance during
Wet flourescent magnetic particle
testing inspection or dye penetrant
inspection or diesel chalk testing
on welds / HAZ's, if required.
00310 500.000 M2 236.00 118,000.00
Power tool cleaning / Buffing to SSPC - Rs.TWO HUNDRED Rs.ONE LAC
SP-2 / St3 standards - Bulk THIRTY-SIX ONLY EIGHTEEN
area. THOUSAND ONLY
00320 100.000 M 105.00 10,500.00
Power tool cleaning / Buffing to SSPC - Rs.ONE HUNDRED Rs.TEN THOUSAND
SP-2 / St3 standards - 150 mm FIVE ONLY FIVE HUNDRED
width of Weld seams / HAZ. ONLY
00330 3,000.000 M2 51.00 153,000.00
Hand tool cleaning to the requirement Rs.FIFTY-ONE Rs.ONE LAC
of St-2 / SSPC-SP-2 for painting ONLY FIFTY-THREE
jobs. THOUSAND ONLY
00340
SURFACE PREPARATION - GRIT BLASTING
page 8
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
to Sa2-1/2:
The job includes blast cleaning of
metal surfaces to SSPC - SP-10 /
Sa-2-1/2 Blast cleaning standards using
steel grits to make the surface
free of rust, scales, mill scales,
dirt, grease / oil, etc.
The job also includes supplying of all
types of tools & tackles,
machineries, transportation of suitable
steel grits, all consumables &
labour to complete the job in all
respects and dumping the generated
scrap material to designated area as
per EIC instructions.
NOTE:
(1) For weld seam buffing the width of
buffing shall be 150mm (i.e) 75mm
on both sides of the weld seam.
00350 100.000 M2 417.00 41,700.00
Grit blasting to SSPC - SP-10 / Sa2-1/2 Rs.FOUR HUNDRED Rs.FORTY-ONE
Blast cleaning standards - SEVENTEEN ONLY THOUSAND SEVEN
Mobile Air compressor is provided by HUNDRED ONLY
Contractor.
00360
Supply and Application of
Painting:
Carryout Supply and application of
painting including Surfacepreparation
as per CPCL Painting system by Air less
spray method.
00370 1,000.000 M2 590.00 590,000.00
Supply and application of CPCL Painting Rs.FIVE HUNDRED Rs.FIVE LAC
system-X. NINETY ONLY NINETY THOUSAND
Primer : Self Priming Epoxy Paint ( 1 ONLY
Coat) 100 DFT per coat.
Inter : Polyamide cured HB Epoxy MIO
Paint (1 C oat) 75 DFT per coat.
Finish : Acrylic Polyeurethene Paint (
2 Coat) 35 DFT per coat.
00380 2,000.000 M2 153.00 306,000.00
Supply and application of Painting as Rs.ONE HUNDRED Rs.THREE LAC
per CPCL Painting system -I. FIFTY-THREE ONLY SIX THOUSAND
ONLY
00390
Plate Rolling:
page 9
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00400
Plate rolling CS/AS - above 1500 mm
dia:
00410 250.000 KG 40.00 10,000.00
Plate Rolling - Carbon steel / Alloy Rs.FORTY ONLY Rs.TEN THOUSAND
Steel - 3mm to 5 mm thickness. ONLY
page 10
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00440
Gas Cutting of Plates - Carbon
Steel / Alloy steel:
The job includes gas cutting of carbon
steel / Alloy steel plates at all
heights & grades including area
preparation for hot work.
The job also includes supplying of all
types of tools & tackles,
machineries, gas, all consumables and
labour to complete the job in all
respects and dumping the generated
scrap material to designated area as
per EIC instructions.
00450 100.000 M 78.00 7,800.00
Gas Cutting of Plates - Carbon Steel / Rs.SEVENTY-EIGHT Rs.SEVEN
Alloy steel - Thickness upto 6 ONLY THOUSAND EIGHT
mm. HUNDRED ONLY
00460 100.000 M 90.00 9,000.00
Gas Cutting of Plates-Carbon Steel / Rs.NINETY ONLY Rs.NINE
Alloy steel-Thickness 8 mm. THOUSAND ONLY
00470 100.000 M 102.00 10,200.00
Gas Cutting of Plates-Carbon Rs.ONE HUNDRED Rs.TEN THOUSAND
Steel/Alloy steel-Thickness 10 mm. TWO ONLY TWO HUNDRED ONLY
00480 100.000 M 114.00 11,400.00
Gas Cutting of Plates-Carbon Rs.ONE HUNDRED Rs.ELEVEN
Steel/Alloy steel-Thickness 12 mm. FOURTEEN ONLY THOUSAND FOUR
HUNDRED ONLY
00490
FILLET WELDING:
00500
Fillet welding - Carbon Steel (Using
E-6013 Electrode):
The job includes flushing, preparing
work area for executing hot work,
grinding, fillet welding on plate
surfaces using E 6013 electrodes at
all grades & elevations.
page 11
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00560
Fillet welding - Carbon Steel (Using
E-7018 Electrode):
The job includes flushing, preparing
work area for executing hot work,
grinding, fillet welding on plate
surfaces using E 7018
electrodes at all grades & elevations.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00570 100.000 M 505.00 50,500.00
Fillet welding - Carbon Steel - Upto 4 Rs.FIVE HUNDRED Rs.FIFTY
mm thickness using E 7018 FIVE ONLY THOUSAND FIVE
electrodes. HUNDRED ONLY
00580 100.000 M 808.00 80,800.00
Fillet welding - Carbon Steel - 5 to 6 Rs.EIGHT Rs.EIGHTY
page 12
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00620
Cutting of Stainless steel Plates -
By grinding:
The job includes cutting of SS plates
by grinding wheel at all heights &
grades including area preparation for
hot work.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects and dumping the generated
scrap material to designated area as
per EIC instructions.
00630 150.000 M 588.00 88,200.00
Cutting of Plate-Stainless Rs.FIVE HUNDRED Rs.EIGHTY-EIGHT
steel-Thickness Above 2 mm & upto 4 mm. EIGHTY-EIGHT THOUSAND TWO
ONLY HUNDRED ONLY
00640 100.000 M 783.00 78,300.00
Cutting of Plate-Stainless Rs.SEVEN Rs.SEVENTY-EIGHT
steel-Thickness Above4 mm & upto 6 mm. HUNDRED THOUSAND THREE
EIGHTY-THREE HUNDRED ONLY
ONLY
00650
Fillet welding - Stainless steel -
using electrodes of grades - E -
309, 309 Mo, 316, 316L:
The job includes flushing, preparing
work area for executing hot work,
grinding, fillet welding on plate
surfaces using suitable stainless
page 13
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00680
Patch plate welding - Carbon steel -
using E 7018 electrodes:
The job includes collection &
transportation of required materials
from
owner's storage point, marking to the
required size, cutting, bending to
the desired curvature wherever
required, edge preparation, fit up &
fillet welding on all four sides using
E 7018 electrodes, flushing the
finished weld surface by grinding and
offering DPT at all grades &
elevations.
The job also includes supplying of all
types of tools & tackles, lifting
arrangements like chain pulley blocks,
machineries, all consumables and
labour to complete the job in all
respects, transportation of unused
materials to owner's storage point and
dumping the generated scrap
page 14
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00720
Dismantling & Removal of Structurals
/ Gratings:
The job involves removal of existing
above ground, overhead structurals
including platforms, ladders, GI &
steel gratings by unfastening / cold
cutting / gas cutting / grinding,
etc., from various locations at all
grades & elevations without damaging
any other portion of the existing
unit, lowering down the same to ground
level, transportation of the same
to the designated area or scrap yard as
per the instructions of
Engineer-in-charge including weighment
of the material at the
appropriate place within the refinery
premises, if required.
The job also includes supplying of all
types of tools & tackles,
lifting arrangements like chain pulley
blocks, machineries, all
consumables and labour to complete the
job in all respects.
NOTE:
(1) For scaffolding work wherever
required, rates shall be paid
separately as per General category jobs
under SOR Sl. Nos.1.1.
page 15
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00730
Dismantling & Removal of Structurals
/ Gratings:
00740 100.000 TO 15,656.00 1,565,600.00
Dismantling & Removal of Structurals / Rs.FIFTEEN Rs.FIFTEEN LAC
Gratings. THOUSAND SIX SIXTY-FIVE
HUNDRED THOUSAND SIX
FIFTY-SIX ONLY HUNDRED ONLY
00750
Fabrication & erection of
structurals / Chequered plate
Replacement:
page 16
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
elevation.
NOTE:
(1) For scaffolding work wherever
required, rates shall be paid
separately as per General category jobs
under SOR.
00760
Fabrication and erection of
structurals / Chequered plate:
00770 10.000 TO 30,743.85 307,438.50
Fabrication and erection of structurals Rs.THIRTY Rs.THREE LAC
upto 15 m elevation(Unit of THOUSAND SEVEN SEVEN THOUSAND
Measurement Tonne = Metric tonne). HUNDRED FOUR HUNDRED
FORTY-THREE & THIRTY-EIGHT &
PAISE PAISE FIFTY ONLY
EIGHTY-FIVE ONLY
00780 35.000 TO 36,892.61 1,291,241.35
Fabrication and erection of structurals Rs.THIRTY-SIX Rs.TWELVE LAC
Above 15m elevation to 25m THOUSAND EIGHT NINETY-ONE
elevation(Unit of Measurement Tonne = HUNDRED THOUSAND TWO
Metric tonne). NINETY-TWO & HUNDRED
PAISE SIXTY-ONE FORTY-ONE &
ONLY PAISE
THIRTY-FIVE ONLY
00790 2.000 TO 40,581.86 81,163.72
Fabrication and erection of structurals Rs.FORTY Rs.EIGHTY-ONE
Above 25m elevation to 50m THOUSAND FIVE THOUSAND ONE
elevation (Unit of Measurement Tonne = HUNDRED HUNDRED
Metric tonne). EIGHTY-ONE & SIXTY-THREE &
PAISE PAISE
EIGHTY-SIX ONLY SEVENTY-TWO ONLY
00800 50.000 TO 44,640.02 2,232,001.00
Fabrication and erection of structurals Rs.FORTY-FOUR Rs.TWENTY-TWO
Above 50m to 75m THOUSAND SIX LAC THIRTY-TWO
elevation(Unitof Measurement Tonne = HUNDRED FORTY & THOUSAND ONE
Metric tonne). PAISE TWO ONLY ONLY
00810 1.000 TO 49,104.02 49,104.02
Fabrication and erection of structurals Rs.FORTY-NINE Rs.FORTY-NINE
Above 75m to 100m elevation THOUSAND ONE THOUSAND ONE
(Unit of HUNDRED FOUR & HUNDRED FOUR &
Measurement Tonne = Metric tonne). PAISE TWO ONLY PAISE TWO ONLY
00820 1.000 TO 54,014.39 54,014.39
Fabrication and erection of structurals Rs.FIFTY-FOUR Rs.FIFTY-FOUR
Above 100 m (Unit of Measurement THOUSAND THOUSAND
Tonne = Metric tonne). FOURTEEN & FOURTEEN &
PAISE PAISE
THIRTY-NINE ONLY THIRTY-NINE ONLY
page 17
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00830
REPLACEMENT OF COKE DRUM (86R-01A/B)
# COKE OUTLET CHUTE BOTTOM
PLATEREPLACEMENT:
Carryout replacement of the coke drum
outlet coke outlet chute bottom
plate replacement job as per the
enclosed scope of work and EIC
instruction. The job includes supply of
all necessary tools and tackles,
welding machines, consumables, Safety
fall arresters since the job to be
carried out at an elevation of 25 meter
and the surface is tapper.
Necessary external scaffolding &
internal scaffolding has to be done as
per standards.
Job includes supply of necessary chain
pulley blocks, fall arester,
sling, lifting devices for plate
dismantling and erection job, hydraulic
jacks, alignment kit, grinding
machines,etc.
00840 15.000 TO 15,170.39 227,555.85
Dismantling by gas cutting & removalof Rs.FIFTEEN Rs.TWO LAC
damaged coke bottom chute plate THOUSAND ONE TWENTY-SEVEN
as per SOW. (Unit of Measurement Tonne HUNDRED SEVENTY THOUSAND FIVE
= Metric tonne). & PAISE HUNDRED
THIRTY-NINE ONLY FIFTY-FIVE &
PAISE
EIGHTY-FIVE ONLY
00850 15.000 TO 45,686.21 685,293.15
Erection of newly fabricated 19mm Thk. Rs.FORTY-FIVE Rs.SIX LAC
ABRASO 400 coke bottom chuteplate THOUSAND SIX EIGHTY-FIVE
as per SOW. (Unit of Measurement Tonne HUNDRED THOUSAND TWO
= Metric tonne). EIGHTY-SIX & HUNDRED
PAISE NINETY-THREE &
TWENTY-ONE ONLY PAISE FIFTEEN
ONLY
00860 300.000 M 5,859.44 1,757,832.00
Welding of Chute line plates with E8018 Rs.FIVE Rs.SEVENTEEN
welding electrode and as per THOUSAND EIGHT LAC FIFTY-SEVEN
Inspection welding procedure. HUNDRED THOUSAND EIGHT
FIFTY-NINE & HUNDRED
PAISE THIRTY-TWO ONLY
FORTY-FOUR ONLY
page 18
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00890
Erection and welding of Platform /
ladder gratings:
The job includes erection & welding of
gratings in position under the
support structure in columns, vessels,
tanks, staircase, platforms, step
ladders, etc., at all grades &
elevations with necessary corrections at
work site on the supplied grating to
fit to the site requirements.
The job also includes transportation of
the required structural
materials from owner's storage point to
worksite, cutting to the
required size, bolting and / or welding
of joints etc. as per drawings,
specifications & instructions of EIC
and preparing the area for hot
work.
The job also includes supplying of all
types of tools & tackles,
lifting arrangements like chain pulley
blocks, machineries, all
consumables and labour to complete the
job in all respects, returning
back the unused materials to owner's
storage point and dumping the
generated scrap material to designated
area as per EIC instructions.
NOTE:
(1) For scaffolding work wherever
required, rates shall be paid
separately as per General category jobs
under SOR Sl. Nos.1.1.
page 19
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00900
Erection and welding of Gratings:
00910 5.000 TO 20,925.00 104,625.00
Erection and welding of Gratings upto Rs.TWENTY Rs.ONE LAC FOUR
15 m elevation. THOUSAND NINE THOUSAND SIX
HUNDRED HUNDRED
TWENTY-FIVE ONLY TWENTY-FIVE ONLY
00920 5.000 TO 25,110.00 125,550.00
Erection and welding of Gratings above Rs.TWENTY-FIVE Rs.ONE LAC
15 m elevation. THOUSAND ONE TWENTY-FIVE
HUNDRED TEN ONLY THOUSAND FIVE
HUNDRED FIFTY
ONLY
00930
Concrete dismantling (PLAIN and
REINFORCED):
Demolishing plain cement concrete in
foundation and super structure
including disposal of unserviceable
material upto 3KM lead as directed
and serviceable materials to stores
including scaffolding, all labour,
tools supervision, safety permits,
safety precaution etc. complete.
The job also includes supplying of all
types of tools & tackles,
machineries, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00940 5.000 M3 2,484.00 12,420.00
Dismantling Plain cement concrete Rs.TWO THOUSAND Rs.TWELVE
(PCC). FOUR HUNDRED THOUSAND FOUR
EIGHTY-FOUR ONLY HUNDRED TWENTY
ONLY
00950
The job involves dismantling of
reinforced cement concrete pavements
including cutting of reinforcement
bars, returning of scrap steels
to designated area, breaking the RCC
work into pieces and disposal of
unserviceable material upto 3.0km lead
as directed , etc. as per the
direction of the Engineer-in-charge.
page 20
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
00970
Dewatering - with Contractor's own
pump:
The job involves pumping out of water
including dewatering oily water
mixed with muck / sludge etc. from
trenches, pits etc. by contractor's
own pump as per the direction of the
Engineer-in-charge.
The job also includes supplying of all
types of pumps, tools & tackles,
hoses, fuel, all consumables and labour
to complete the job in all
respects as per EIC instructions.
00980 5.000 EA 6,654.00 33,270.00
Hire charges for 5 HP Diesel driven Rs.SIX THOUSAND Rs.THIRTY-THREE
dewatering pump with all accessories SIX HUNDRED THOUSAND TWO
including hoses along with one operator FIFTY-FOUR ONLY HUNDRED SEVENTY
- For 12 Hrs. (One Unit EA ONLY
= One Shift
(12 Hrs)).
Total Value of item 00010 (Rs.): 13,635,979.98
Rs.ONE CRORE THIRTY-SIX LAC THIRTY-FIVE THOUSAND NINE HUNDRED SEVENTY-NINE &
PAISE NINETY-EIGHT ONLY
00010
PART-B EQUIPMENTS / MACHINERIES
HIRING:
The contractor shall mobilise the
following equipments for completion of
the entrire job in all respects. The
contractor shall de mobilise the
equipment on completion of the job with
approval from EIC. If there is
any extension of days the contractor
shall obtain prior approval from
EIC for retaining the equipements. For
the extended days the rate will
page 21
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
page 22
Tendor No.: CPCLH24028
______________________________________________________________
O.Lev. Item No Quantity Unit Rate Amount
Sr.No. Item Description
______________________________________________________________
_________________________________________________________________
Total Estimated Value(Rs.): 15,913,569.98
Rs.ONE CRORE FIFTY-NINE LAC THIRTEEN THOUSAND FIVE HUNDRED
SIXTY-NINE & PAISE NINETY-EIGHT ONLY
page 23