Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SAN MIGUEL FOODS Quotation no: Q23-0085

SMF - BPG February 11, 2023


100 E. Rodriguez Jr. Avenue C5 Road, Brgy. Ugong, Pasig City

Attention to: MR. JAYZIE M. GRANDE

Dear Ma'am,

We are pleased to submit our quotation listed hereunder in accordance with the terms condition and deliveries noted hereon.

NO QTY UNIT DESCRIPTION UNIT PRICE TOTAL AMOUNT

1 30 UNITS GYRO CUTTER MACHINE 95,000.00 2,850,000.00


Overall size: 680 mm x 460 mm x 1750mm
Table size: 680 mm x 460 mm x 800mm
Materials: All Stainless (SUS304)
Emergency switches
ON-OFF switch
Safety cover for cutter blade, SUS 304 sheet
Table top – SUS 304 sheet, 2 mm thick
Induction Motor, 0.75 kW, 220V, 3 Phase
Hardness of Blade: HRC: 35-40
Power connector - 3 pins
Type of Finish: Hairline

2 1 LOT DELIVERY COST 15,000.00 15,000.00


Magnolia Poultry Processing Plant - Quezon
Brgy. Ilayang Palsabangon, Pagbilao, Quezon.

3 1 LOT INSTALLATION COST CUSTOMER'S ACCOUNT


- not included in the proposal

SUBTOTAL PHP 2,865,000.00


PLUS 12% VAT PHP 343,800.00

TOTAL PROJECT COST AFTER VAT PHP 3,208,800.00

Completion of Equipment: 45 working days upon signing of contract / proposal and receipt of purchased order
Terms: 50% DOWNPAYMENT AND 50% BEFORE DELIVERY

Bank:
Unless agreed otherwise, check payment must be payable only to CLP Industries Co. or telegraphic transfer to our account with

Bank: Branch: Account No:


RCBC Commercial Bank San Pedro, Laguna 09020568815

Offer validity: 2 weeks from offer date

Quotation Notes:
By accepting this quotation, the customer agrees that;
1
a. Any unforeseen works or design modifications or parts to be done aside from listed above will be billed and
charged accordingly.
e. Cancellation of P.O.
i. To cancel an Official P.O., please submit written notice duly signed by authorized persons.
ii. For cancelled P.O., customer agrees to pay CLP Industries an equivalent amount of 30% of Total Project Cost
in addition to cost of procured materials. CLP Industries shall deliver all procured materials at customer's site
together with corresponding Delivery Receipt and Sales Invoice payable at the same terms of payment
applied in this project.

Thank you very much for giving us the opportunity to quote on your requirement and we look forward to serve this order
as soon as possible. We hope this offer would merit your immediate approval.

Penalty for late payment:


In the event that the buyer does not punctually fulfills its payment obligations as specified in this quotation, CLP shall be
entitled to claim a penalty for late payment of 0.1% of the outstanding balance per day the payment is delayed. This
penalty for late payment does not interfere or replace CLP's right to claim full damages and losses caused by the late
payment.

Respectfully yours, Conformed By:

MR. JONATHAN PROFUGO MR. JAYZIE M. GRANDE


VP Operations

2