38 boards hardi
wall angle 11560 2 23120 furring 6800
wall angle 8600 2 17200 furring 9640
wall angle 6800 4 27200 furring 900
wall angle 9670 4 38680 furring 900
106200 furring 8600
furring 11560
total pcs 13.49333 say 14 pcs total pcs 16.625 say 17 pcs
4mm
17 1 115600 carrying c 9640 1 17 163880
13 1 125320
8 4 28800
9 4 32400
4 1 34400
4 1 46240
382760
23180
17300
40480
spa. Gutter 18" 19 pcs 710 13490
ridge cap 18" 13 pcs 710 9230
Panel hi rib .5mm 130.164 LM 536 69767.9
delivery charge 4000
installation 15000
touch up paint 2 can 350
hardwares 3500
Total cost 115337.9 80736.53
Panel dimensions
4267.1 4 17068.4
3298.7 4 13194.8
2330.3 4 9321.2
1361.9 4 5447.6
4770.8 4 19083.2
4770.8 4 19083.2
4770.8 4 19083.2
3565 4 14260
2323.6 4 9294.4
1082.1 4 4328.4
40 130164.4
18244.46
8709.3 2 17418.6 6069.1 4 24276.4
11662.8 2 23325.6 4057.3 1 4057.3
40744.2 133.6752 28333.7 92.9583
16.7094 11.61979
Column1 0.75 0.25 0.25 0.046875 Cement bags
Column2 0.75 0.25 0.25 0.046875 crusher
Column3 3.55 0.25 0.25 0.221875 sand
Beam 13.7 0.25 0.25 0.85625 HBC
foundation 0.2 0.85 0.85 0.1445 2"x2"x12' coco lumber
1.316375 cu.m plyboard 1 ply
10mm rsb
Walls 3.5 sq.m 12mm rsb
tie wire
nail 1"
nail 3"
Concrete nail 3"
20 bags
2 cu.m
1 cu.m
100 pcs
25 pcs
4 pcs
20 pcs
18 pcs
2 bundle
1 kilo
3 kilo
2 kilo
Flooring 57 0.04 2.28 sand 3 cu.m
crusher 3 cu.m
cement 25 bags
sn Item Description Dimension Qty UOM Unit Price Total Price Remarks
Trusses
1 Channel bar 2"x3"x1/4" 32 pcs
2 C-Purlins 2"x3"x2.5 34 pcs
3 Angle Bar 2"x2"x3/16" 2 pcs
4 Angle Bar 1"x1"x1/8" 15 pcs
5 Flat Bar 1-1/2"x1/8" 12 pcs
6 Facia Board 10" 17 pcs
7 Welding Rod 5/32 8 box
8 Welding Rod 3/32 3 box
9 Cut Off Wheel (steel) 2 pcs
10 Grinding Disc 15 pcs
11 Cutting Disc 20 pcs
12 welding Rod handle 2 units
13 Epoxy Primer 6 gallon
15 Roller Paint Brush 3" 2 pcs
16 Paint Brush 1-1/2" 3 pcs
17 Lacquer thinner 2 gallon
18 Tarpaulin
19 Nylon Rope 1/2" 35 meter
20 Nylon string 25 meter
21 leveling hose 20 meter
22 Electrical tape 6 pack
Concreting/Extension
23 Sand 2 cu.m
24 Crusher 2 cu.m
25 Cement 20 bags
26 HBC 100 pcs
27 Coco Lumber 2"x2" 25 pcs
28 plywood 3 pcs
29 Rebar 10mm 20 pcs
30 Rebar 12mm 18 pcs
31 Tie wire 3 bundle
32 Nail 3" 3 kilo
33 Nail 1" 1 kilo
34 Concrete Nail 3" 1 kilo
35 PVC pipe 3" 10 pcs
36 pVC elbow 3" 25 pcs
37 vulcaseal 1 qtz
Ceiling
38 Hardiflex 1/4" thick 40 boards
39 metal furring double 85 pcs
40 carrying channel 35 pcs
41 furring clip 100 pcs
42 wall angle 1"x1" 40 pcs
43 riveter 1 unit
44 rivets 1/8x1/2" 14 box
45 rivets 1/8x1" 6 box
46 drill bit 5/32 12 pcs
Electrical
47 junction box
48 utility box
49 flexible 1/2"
50 2 gang outlet
51 3 gang outlet
52 2 gang switch
53 3 gang switch
54 single switch
55 THHN #14
56 THHN #12
57 THHN #10
58 PVC clamp 1/2"
59 PVC Pipe 1/2"
Date: 23-Jan-18
Client Name: Mr. Dan Maynard
Project title: Roofing Rehabilitation
Project Location: Jose Panganiban, Cam. Norte
Item
No. Item Description Dimension Qty UOM Unit Price Total Price Remarks
Note:
sn Item Description Dimension Qty UOM Unit Price Total Price Remarks
Steel gate
1 G.i Pipe 1-1/2Dia. 1/8 3 pcs 1100 3300
2 Angle Bar 1-1/2 x1/8 7 pcs 404 2828
3 Hinge 6 pcs 0
Welding Rod 1/8 1 box 180
4 Welding Rod 3/32 1 box 120 120
5 Grinding disc 3 pcs 70 210
6 cutting disc 2 pcs 90 180
7 G.i Sheet G-22 1 sheets 1800 1800
8 epoxy primer 1liter 2 can 400 800
9 paint brush 3" 1 pc 60 60
10 cement 10 kl 80
11 labor
12 9378
13
15
16
17
18
19
20
21
22