Material Labour
No Particular Total
Price Price
7 Septic tank Bio tank (2000 Liter x 5 Nos) (10M 3) 6,500,000 500,000 7,000,000
11 Evoxy Paint Floor (4368 Sqft x (2000MMK +1000MMK) 8,736,000 4,368,000 13,104,000
Sr
Particular Quantity Unit Rate(kyat) Per Amount(kyat) Remark
no
MATERIAL
1 cement #REF! bag 8000 bag #REF!
2 brick #REF! nos 90 nos #REF!
3 sand #REF! sud 12000 sud #REF!
4 chipping #REF! sud 50000 sud #REF!
6 hard core #REF! sud 30000 sud #REF!
7 fuel #REF! gal 5000 gal #REF!
8 timber scantling #REF! ton 550000 ton #REF! 3 times use
9 5 layer plywood #REF! nos 25000 nos #REF! 3 times use
10 bamboo 258.271 nos 1000 nos 258,271.00
11 coinyan 18.448 viss 3500 viss 64,568.00
12 nail #REF! viss 3800 viss #REF!
13 hard wood 0.000 ton 1100000 ton -
5"x2" U-beam #REF! rft 2500 rft #REF!
3"x1.5" C-channel #REF! rft 1500 rft #REF!
15 guessed plate #REF! sft 3500 sft #REF!
16 bolt & nut #REF! nos 300 nos #REF!
17 roofing screw #REF! nos 50 nos #REF!
18 4 angle sheet (0.42mm) #REF! rft 1400 rft #REF!
19 ready mixed paint #REF! gal 18000 gal #REF!
20 putty #REF! lb 500 lb #REF!
21 emulsion paint (exterior) #REF! gal 40000 gal #REF!
22 emulsion paint (interior) #REF! gal 40000 gal #REF!
23 sand paper #REF! doz 800 doz #REF!
24 paint roller #REF! nos 1500 nos #REF!
25 floorl tile (8"x8") 880.362 nos 450 nos 396,162.90
26 wall tile (8"x12") 1185.188 nos 550 nos 651,853.40
27 reinforcing steel
16MM #REF! ton 1810000 ton #REF!
10MM 2.195 ton 1850000 ton 4,060,750.00
8MM #REF! ton 1900000 ton #REF!
sub total = #REF! ton
28 binding wire #REF! viss 3000 viss #REF!
#REF!
LABOUR
1 e-worker #REF! nos 9000 nos #REF!
2 mason #REF! nos 10000 nos #REF!
3 machine driver #REF! nos 8000 nos #REF!
4 m-worker #REF! nos 8000 nos #REF!
5 carpenter #REF! nos 10000 nos #REF!
6 c-worker #REF! nos 8000 nos #REF!
7 painter #REF! nos 10000 nos #REF!
8 p-worker #REF! nos 8000 nos #REF!
9 steel fixer #REF! nos 10000 nos #REF!
Page 2 of 29
BILL OF QUANTITY
Sr
Particular Quantity Unit Rate(kyat) Per Amount(kyat) Remark
no
10 s-worker #REF! nos 8000 nos #REF!
11 labour for steel structure #REF! sft 600 sft #REF!
#REF!
Page 3 of 29
ABSTRACT OF COST
Sr
Particular Quantity Unit Rate Per Amount Remark
no
Page 4 of 29
ABSTRACT OF COST
Sr
Particular Quantity Unit Rate Per Amount Remark
no
Page 5 of 29
BUILDER ESTIMATE
5 9" thk hardcore filling with sand under footing 330.750 cft
material
hard core 3.308 sud 30000 sud 99,240.00 P-38/Sr.1
sand 0.827 sud 12000 sud 9,924.00 P-3/Sr.12
labour P-3/Sr.12
m-worker 3.308 nos 8000 nos 26,464.00
135,628.00
6 3" thick 1:3:6 lean concrete work under footing 320.250 cft
material P-28/Sr.1
cement 41.175 bag 8000 bag 329,400.00
sand 1.537 sud 12000 sud 18,444.00
chipping 3.074 sud 50000 sud 153,700.00
fuel 6.405 gal 5000 gal 32,025.00
labour P-28/Sr.1
mason 3.203 nos 10000 nos 32,030.00
machine driver 1.601 nos 8000 nos 12,808.00
m-worker 19.215 nos 8000 nos 153,720.00
732,127.00
Page 6 of 29
BUILDER ESTIMATE
### #REF!
#REF! #REF!
material P-3/Sr.12
sand #REF! sud 12000 sud #REF!
Page 7 of 29
BUILDER ESTIMATE
labour P-3/Sr.12
m-worker #REF! nos 8000 nos #REF!
#REF!
13 Brick work with 1:3 cement mortor for retaining wal 1316.170 cft
material P-33/Sr.2
brick 17768.295 nos 90 nos 1,599,146.55
cement 91.662 bag 8000 bag 733,296.00
sand 3.422 sud 12000 sud 41,064.00
labour P-33/Sr.2
mason 52.647 nos 10000 nos 526,470.00
m-worker 78.970 nos 8000 nos 631,760.00
3,531,736.55
16 Sand filling work within footing & retaining wall (up to ground level)
2298.830 cft
Page 8 of 29
BUILDER ESTIMATE
material P-3/Sr.12
sand 28.735 sud 12000 sud 344,820.00
labour P-3/Sr.12
m-worker 22.988 nos 8000 nos 183,904.00
528,724.00
Page 9 of 29
BUILDER ESTIMATE
Page 10 of 29
BUILDER ESTIMATE
Page 11 of 29
BUILDER ESTIMATE
labour P-124/Sr.1
carpenter 4.058 nos 10000 nos 40,580.00
c-worker 1.353 nos 8000 nos 10,824.00
123,297.20
Page 12 of 29
BUILDER ESTIMATE
573,425.60
Page 13 of 29
BUILDER ESTIMATE
### #REF!
#REF! #REF!
material P-70/Sr.8
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
chipping #REF! sud 50000 sud #REF!
labour P-70/Sr.8
mason #REF! nos 10000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!
45 Making & fixing of iron grill work at door & windo 489.500 sft
material+labour
489.500 sft 3000 sft 1,468,500.00
1,468,500.00
Page 14 of 29
BUILDER ESTIMATE
labour P-122/Sr.45
painter #REF! nos 10000 nos #REF!
p-worker #REF! nos 8000 nos #REF!
#REF!
Page 15 of 29
BUILDER ESTIMATE
Page 16 of 29
BUILDER ESTIMATE
labour P-133/Sr.10
steel fixer 116.334 nos 10000 nos 1,163,340.00
s-worker 116.334 nos 8000 nos 930,672.00
13,354,247.00
Page 17 of 29
DETAILED MEASUREMENT
36 2646.00 cft
330.75 cft
270.00 sft
168.75 cft
Page 18 of 29
DETAILED MEASUREMENT
16 Sand filling work within footing & retaining wall (up to ground level)
excavatd volume
retaining wall 1890.00
footing 2646.00
deduction
9" thk hardcore filling with sand under footing -330.75
3" thick 1:3:6 lean concrete work -320.25
1:2:4 r.c.c work for footing -168.75
1:2:4 r.c.c work for foundation column -101.25
Brick work with 1:3 cement mortor for retaining wall -1316.17
2298.83 cft
Page 19 of 29
DETAILED MEASUREMENT
480.00 sft
Page 20 of 29
DETAILED MEASUREMENT
Page 21 of 29
DETAILED MEASUREMENT
First Floor
12'0" span 10 11 3 8 3 928.13
10'0" span 8 9 3 8 3 610.50
5'3" span 2 5 3 8 3 86.63
detuction
W1 -8 7 9 6 6 -403.00
Glass Block -1 3 0 6 0 -18.00
window sill
W1 -8 11 3 0 3 -22.50
Glass Block -1 4 3 0 3 -1.06
lintel
W1 -8 11 3 0 3 -22.50
Glass Block -1 4 3 0 3 -1.06
1157.14 sft
Parapet 2 61 5 3 0 368.50
2 46 5 3 0 278.50
647.00 sft
Page 22 of 29
DETAILED MEASUREMENT
16.94 cft
48.76 sft
2*brickwork 7383.88
Column
40 0 4.5 1 0 8 3 123.75
7507.63 sft
Page 23 of 29
DETAILED MEASUREMENT
Page 24 of 29
DETAILED MEASUREMENT
Page 25 of 29
STEEL DETAILED MEASUREMENT
Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)
sub total
16 2378.880 1.059 16 2519.234
2519.234
sub total
16 #REF! 1.059 16 #REF!
8 #REF! 0.265 8 #REF!
#REF!
Page 26 of 29
STEEL DETAILED MEASUREMENT
Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)
sub total
16 7023.71 1.059 16 7438.109
8 7143.77 0.265 8 1893.099
9331.208
sub total
10 10242.150 0.414 10 4240.250
4240.250
sub total
16 9849.600 1.059 16 10430.726
8 9806.496 0.265 8 2598.721
13029.447
Page 27 of 29
STEEL DETAILED MEASUREMENT
Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)
sub total
16 3850.352 1.059 16 4077.523
8 3195.180 0.265 8 846.723
4924.246
Page 28 of 29
STEEL DETAILED MEASUREMENT
Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)
9848.492
sub total
10 599.000 0.414 10 247.986
8 435.940 0.265 8 115.524
363.510
sub total
10 467.000 0.414 10 193.338
8 219.880 0.265 8 58.268
251.606
Page 29 of 29