SUMMARY OF COST

Material Labour
No Particular Total
Price Price

1 (100)nos Lecture Theater #REF! #REF! #REF!

2 Apron & drain 2,246,134 1,639,978 3,886,112

3 Cycle stand 20,208,143 9,285,813 29,493,956

4 Internal electrical work 17,836,870 2,719,435 20,556,305

5 Water supply & sanitation work 5,149,427 1,197,000 6,346,427

6 Concrete road (200'x18'x6") 4,387,762 2,039,440 6,427,202

7 Septic tank Bio tank (2000 Liter x 5 Nos) (10M 3) 6,500,000 500,000 7,000,000

8 Wifi & CCTV (Spot (Completed) 2,000,000 500,000 2,500,000

9 Passage Lighting (Sensor Control System) 1,400,000 350,000 1,750,000

10 Interior Lighting Supply With Solar System 27,750,000 2,250,000 30,000,000

11 Evoxy Paint Floor (4368 Sqft x (2000MMK +1000MMK) 8,736,000 4,368,000 13,104,000

12 Echo Smooth Sound Proof System 5,000,000 1,000,000 6,000,000

Sub Total = #REF! #REF! #REF!

Commercial Tax (5%) = #REF! #REF! #REF!

Total = #REF! #REF! #REF!

Service Charges (3%) = #REF! #REF! #REF!

GRAND TOTAL COST = #REF! #REF! #REF!


BILL OF QUANTITY

Name of work …..100 Nos Lecture Theater

Sr
Particular Quantity Unit Rate(kyat) Per Amount(kyat) Remark
no
MATERIAL
1 cement #REF! bag 8000 bag #REF!
2 brick #REF! nos 90 nos #REF!
3 sand #REF! sud 12000 sud #REF!
4 chipping #REF! sud 50000 sud #REF!
6 hard core #REF! sud 30000 sud #REF!
7 fuel #REF! gal 5000 gal #REF!
8 timber scantling #REF! ton 550000 ton #REF! 3 times use
9 5 layer plywood #REF! nos 25000 nos #REF! 3 times use
10 bamboo 258.271 nos 1000 nos 258,271.00
11 coinyan 18.448 viss 3500 viss 64,568.00
12 nail #REF! viss 3800 viss #REF!
13 hard wood 0.000 ton 1100000 ton -
5"x2" U-beam #REF! rft 2500 rft #REF!
3"x1.5" C-channel #REF! rft 1500 rft #REF!
15 guessed plate #REF! sft 3500 sft #REF!
16 bolt & nut #REF! nos 300 nos #REF!
17 roofing screw #REF! nos 50 nos #REF!
18 4 angle sheet (0.42mm) #REF! rft 1400 rft #REF!
19 ready mixed paint #REF! gal 18000 gal #REF!
20 putty #REF! lb 500 lb #REF!
21 emulsion paint (exterior) #REF! gal 40000 gal #REF!
22 emulsion paint (interior) #REF! gal 40000 gal #REF!
23 sand paper #REF! doz 800 doz #REF!
24 paint roller #REF! nos 1500 nos #REF!
25 floorl tile (8"x8") 880.362 nos 450 nos 396,162.90
26 wall tile (8"x12") 1185.188 nos 550 nos 651,853.40
27 reinforcing steel
16MM #REF! ton 1810000 ton #REF!
10MM 2.195 ton 1850000 ton 4,060,750.00
8MM #REF! ton 1900000 ton #REF!
sub total = #REF! ton
28 binding wire #REF! viss 3000 viss #REF!
#REF!

LABOUR
1 e-worker #REF! nos 9000 nos #REF!
2 mason #REF! nos 10000 nos #REF!
3 machine driver #REF! nos 8000 nos #REF!
4 m-worker #REF! nos 8000 nos #REF!
5 carpenter #REF! nos 10000 nos #REF!
6 c-worker #REF! nos 8000 nos #REF!
7 painter #REF! nos 10000 nos #REF!
8 p-worker #REF! nos 8000 nos #REF!
9 steel fixer #REF! nos 10000 nos #REF!

Page 2 of 29
BILL OF QUANTITY

Name of work …..100 Nos Lecture Theater

Sr
Particular Quantity Unit Rate(kyat) Per Amount(kyat) Remark
no
10 s-worker #REF! nos 8000 nos #REF!
11 labour for steel structure #REF! sft 600 sft #REF!
#REF!

LUMP SUM ITEM


1 Making & fixing of aluminium window & fanlight
300.500 sft 5000 sft 1,502,500.00
4 Making & fixing of teak panelled door 131.170 sft 8000 sft 1,049,360.00
8 Making & fixing of iron grill work at do 489.500 sft 3000 sft 1,468,500.00
10 Making & fixing of shear board ceiling 2916.000 sft 1500 sft 4,374,000.00
8,394,360

Total cost = #REF!

Page 3 of 29
ABSTRACT OF COST

Name of work …..100 Nos Lecture Theater

Sr
Particular Quantity Unit Rate Per Amount Remark
no

1 Site clearing 6642.00 sft 22.50 sft 149,445.00


2 Staking work for preparation work for foundation 6642.00 sft 24.81 sft 164,755.20
3 Earthwork in excavating foundation in medium soil 2646.00 cft 180.00 cft 476,280.00
4 Earthwork in excavating retaining wall 1890.00 cft 180.00 cft 340,200.00
5 9" thk hardcore filling with sand under footing 330.75 cft 410.06 cft 135,628.00
6 3" thick 1:3:6 lean concrete work under footing 320.25 cft 2286.11 cft 732,127.00
7 Timber shuttering formwork for footing 270.00 sft 1824.44 sft 492,600.00
8 1:2:4 r.c.c work for footing 168.75 cft 3053.96 cft 515,355.00
9 Timber shuttering formwork for foundation column 630.00 sft 1824.48 sft 1,149,425.00
10 1:2:4 r.c.c work for foundation column 101.25 cft 3054.05 cft 309,223.00
### #REF!
#REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
13 Brick work with 1:3 cement mortor for retaining wall 1316.17 cft 2683.34 cft 3,531,736.55
14 Timber shuttering formwork for plinth beam 958.50 sft 1824.48 sft 1,748,764.40
15 1:2:4 r c c work for plinth beam 359.44 cft 3053.79 cft 1,097,653.00
16 Sand filling work within footing & retaining wall (up to ground level)
2298.83 cft 230.00 cft 528,724.00
17 Timber shuttering formwork for ground floor column 414.00 sft 1824.46 sft 755,325.00
18 1:2:4 r c c work for ground floor column 77.62 cft 3053.65 cft 237,024.00
19 Sand filling work within building 2320.31 cft 230.00 cft 533,672.00
20 4.5" thick 1:3:6 cement concrete for floor 1419.62 cft 2286.16 cft 3,245,472.00
21 Timber shuttering formwork for theater slab
594.99 sft 1824.16 sft 1,085,355.40
22 1:2:4 r.c.c work for theater slab 304.32 cft 3053.82 cft 929,338.00
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
28 Brick work with 1:3 cement mortor
1887.80 sft 2683.34 sft 5,065,613.00
29 Making & fixing of chowket
0.00 0.0 #DIV/0! 0 -
30 Timber shuttering formwork for sill 67.63 sft 1823.11 sft 123,297.20
31 1:2:4 r.c.c work for sill at ground floor 12.68 cft 3055.21 cft 38,740.00
32 Timber shuttering formwork for lintel 84.13 sft 1823.46 sft 153,407.80
33 1:2:4 r.c.c work for lintel at ground floor 15.77 cft 3053.58 cft 48,155.00
34 Scaffolding with bamboo (single layer) 5313.00 sft 107.93 sft 573,425.60

Page 4 of 29
ABSTRACT OF COST

Name of work …..100 Nos Lecture Theater

Sr
Particular Quantity Unit Rate Per Amount Remark
no

### #REF! #REF! ### #REF! ### #REF!


### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF!
#REF! ### #REF! ### #REF!
43 Making & fixing of teak panelled door 131.17 sft 8000.00 sft 1,049,360.00
44 Making & fixing of aluminium window & fanlight 300.50 sft 5000.00 sft 1,502,500.00
45 Making & fixing of iron grill work at door & window 489.50 sft 3000.00 sft 1,468,500.00
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
### #REF! #REF! ### #REF! ### #REF!
50 Tiling work for building 1125.14 sft 1443.29 sft 1,623,898.30
52 Making & fixing of shear board ceiling 2916.00 sft 1500.00 sft 4,374,000.00

1 Steelwork for footing 22.49 cwt 109382.57 cwt 2,460,014.00


2 Steelwork for foundation column #REF! cwt #REF! cwt #REF!
3 Steelwork for plinth beam 83.31 cwt 110322.25 cwt 9,190,947.00
4 Steelwork for theater slab 37.86 cwt 111474.91 cwt 4,220,440.00
5 Steelwork for ground floor column 116.33 cwt 114796.24 cwt 13,354,247.00
6 Steelwork for tie beam & roof beam 87.93 cwt 110185.47 cwt 9,688,608.00
7 Steelwork for lintel beam at ground floor 3.25 cwt 111918.77 cwt 363,736.00
8 Steelwork for sill at ground floor 2.25 cwt 111934.22 cwt 251,852.00

Total cost = #REF!

Page 5 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

1 Site clearing 6642.000 sft


labour
e-worker 16.605 nos 9000 nos 149,445.00
149,445.00

2 Staking work for preparation work for foundation 6642.000 sft


material P-5/Sr.23
timber scantling 0.133 ton 550000 ton 73,150.00
nail 1.384 viss 3800 viss 5,259.20
labour
carpenter 3.321 nos 10000 nos 33,210.00
c-worker 6.642 nos 8000 nos 53,136.00
164,755.20

3 Earthwork in excavating foundation in medium soil 2646.000 cft


labour P-1/Sr.3
e-worker 52.920 nos 9000 nos 476,280.00
476,280.00

4 Earthwork in excavating retaining wall 1890.000 cft


labour P-1/Sr.3
e-worker 37.800 nos 9000 nos 340,200.00
340,200.00

5 9" thk hardcore filling with sand under footing 330.750 cft
material
hard core 3.308 sud 30000 sud 99,240.00 P-38/Sr.1
sand 0.827 sud 12000 sud 9,924.00 P-3/Sr.12
labour P-3/Sr.12
m-worker 3.308 nos 8000 nos 26,464.00
135,628.00

6 3" thick 1:3:6 lean concrete work under footing 320.250 cft
material P-28/Sr.1
cement 41.175 bag 8000 bag 329,400.00
sand 1.537 sud 12000 sud 18,444.00
chipping 3.074 sud 50000 sud 153,700.00
fuel 6.405 gal 5000 gal 32,025.00
labour P-28/Sr.1
mason 3.203 nos 10000 nos 32,030.00
machine driver 1.601 nos 8000 nos 12,808.00
m-worker 19.215 nos 8000 nos 153,720.00
732,127.00

7 Timber shuttering formwork for footing 270.000 sft


material P-124/Sr.1

Page 6 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

5 layer plywood 3.234 nos 25000 nos 80,850.00


timber scantling 0.360 ton 550000 ton 198,000.00
nail 2.250 viss 3800 viss 8,550.00
labour P-124/Sr.1
carpenter 16.200 nos 10000 nos 162,000.00
c-worker 5.400 nos 8000 nos 43,200.00
492,600.00

8 1:2:4 r.c.c work for footing 168.750 cft


material P-28/Sr.2
cement 31.189 bag 8000 bag 249,512.00
sand 0.776 sud 12000 sud 9,312.00
chipping 1.553 sud 50000 sud 77,650.00
fuel 3.375 gal 5000 gal 16,875.00
labour P-28/Sr.2
mason 3.375 nos 10000 nos 33,750.00 P-30/Sr.6a
machine driver 0.844 nos 8000 nos 6,752.00
m-worker 15.188 nos 8000 nos 121,504.00 P-30/Sr.6a
515,355.00

9 Timber shuttering formwork for foundation column 630.000 sft


material P-124/Sr.1
5 layer plywood 7.547 nos 25000 nos 188,675.00
timber scantling 0.840 ton 550000 ton 462,000.00
nail 5.250 viss 3800 viss 19,950.00
labour P-124/Sr.1
carpenter 37.800 nos 10000 nos 378,000.00
c-worker 12.600 nos 8000 nos 100,800.00
1,149,425.00

10 1:2:4 r.c.c work for foundation column 101.250 cft


material P-28/Sr.2
cement 18.713 bag 8000 bag 149,704.00
sand 0.466 sud 12000 sud 5,592.00
chipping 0.932 sud 50000 sud 46,600.00
fuel 2.025 gal 5000 gal 10,125.00
labour P-28/Sr.2
mason 2.025 nos 10000 nos 20,250.00 P-30/Sr.6a
machine driver 0.506 nos 8000 nos 4,048.00
m-worker 9.113 nos 8000 nos 72,904.00 P-30/Sr.6a
309,223.00

### #REF!
#REF! #REF!
material P-3/Sr.12
sand #REF! sud 12000 sud #REF!

Page 7 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

labour P-3/Sr.12
m-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material
hard core #REF! sud 30000 sud #REF! P-38/Sr.1
sand #REF! sud 12000 sud #REF! P-3/Sr.12
labour P-3/Sr.12
m-worker #REF! nos 8000 nos #REF!
#REF!

13 Brick work with 1:3 cement mortor for retaining wal 1316.170 cft
material P-33/Sr.2
brick 17768.295 nos 90 nos 1,599,146.55
cement 91.662 bag 8000 bag 733,296.00
sand 3.422 sud 12000 sud 41,064.00
labour P-33/Sr.2
mason 52.647 nos 10000 nos 526,470.00
m-worker 78.970 nos 8000 nos 631,760.00
3,531,736.55

14 Timber shuttering formwork for plinth beam 958.500 sft


material P-124/Sr.1
5 layer plywood 11.482 nos 25000 nos 287,050.00
timber scantling 1.278 ton 550000 ton 702,900.00
nail 7.988 viss 3800 viss 30,354.40
labour P-124/Sr.1
carpenter 57.510 nos 10000 nos 575,100.00
c-worker 19.170 nos 8000 nos 153,360.00
1,748,764.40

15 1:2:4 r c c work for plinth beam 359.440 cft


material P-28/Sr.2
cement 66.432 bag 8000 bag 531,456.00
sand 1.653 sud 12000 sud 19,836.00
chipping 3.307 sud 50000 sud 165,350.00
fuel 7.189 gal 5000 gal 35,945.00
labour P-28/Sr.2
mason 7.189 nos 10000 nos 71,890.00 P-30/Sr.6a
machine driver 1.797 nos 8000 nos 14,376.00
m-worker 32.350 nos 8000 nos 258,800.00 P-30/Sr.6a
1,097,653.00

16 Sand filling work within footing & retaining wall (up to ground level)
2298.830 cft

Page 8 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

material P-3/Sr.12
sand 28.735 sud 12000 sud 344,820.00
labour P-3/Sr.12
m-worker 22.988 nos 8000 nos 183,904.00
528,724.00

17 Timber shuttering formwork for ground floor colum 414.000 sft


material P-124/Sr.1
5 layer plywood 4.959 nos 25000 nos 123,975.00
timber scantling 0.552 ton 550000 ton 303,600.00
nail 3.450 viss 3800 viss 13,110.00
labour P-124/Sr.1
carpenter 24.840 nos 10000 nos 248,400.00
c-worker 8.280 nos 8000 nos 66,240.00
755,325.00

18 1:2:4 r c c work for ground floor column 77.620 cft


material P-28/Sr.2
cement 14.346 bag 8000 bag 114,768.00
sand 0.357 sud 12000 sud 4,284.00
chipping 0.714 sud 50000 sud 35,700.00
fuel 1.552 gal 5000 gal 7,760.00
labour P-28/Sr.2
mason 1.552 nos 10000 nos 15,520.00 P-30/Sr.6a
machine driver 0.388 nos 8000 nos 3,104.00
m-worker 6.986 nos 8000 nos 55,888.00 P-30/Sr.6a
237,024.00

19 Sand filling work within building 2320.310 cft


material P-3/Sr.12
sand 29.004 sud 12000 sud 348,048.00
labour P-3/Sr.12
m-worker 23.203 nos 8000 nos 185,624.00
533,672.00

20 4.5" thick 1:3:6 cement concrete for floor 1419.620 cft


material P-28/Sr.1
cement 182.523 bag 8000 bag 1,460,184.00
sand 6.814 sud 12000 sud 81,768.00
chipping 13.628 sud 50000 sud 681,400.00
fuel 28.392 gal 5000 gal 141,960.00
labour P-28/Sr.1
mason 14.196 nos 10000 nos 141,960.00
machine driver 7.098 nos 8000 nos 56,784.00
m-worker 85.177 nos 8000 nos 681,416.00
3,245,472.00

Page 9 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

21 Timber shuttering formwork for theater slab


594.990 sft
material P-124/Sr.1
5 layer plywood 7.127 nos 25000 nos 178,175.00
timber scantling 0.793 ton 550000 ton 436,150.00
nail 4.958 viss 3800 viss 18,840.40
labour P-124/Sr.1
carpenter 35.699 nos 10000 nos 356,990.00
c-worker 11.900 nos 8000 nos 95,200.00
1,085,355.40

22 1:2:4 r.c.c work for theater slab


304.320 cft
material P-28/Sr.2
cement 56.245 bag 8000 bag 449,960.00
sand 1.400 sud 12000 sud 16,800.00
chipping 2.800 sud 50000 sud 140,000.00
fuel 6.086 gal 5000 gal 30,430.00
labour P-28/Sr.2
mason 6.086 nos 10000 nos 60,860.00 P-30/Sr.6a
machine driver 1.522 nos 8000 nos 12,176.00
m-worker 27.389 nos 8000 nos 219,112.00 P-30/Sr.6a
929,338.00

### #REF! #REF! #REF!


material P-124/Sr.1
5 layer plywood #REF! nos 25000 nos #REF!
timber scantling #REF! ton 550000 ton #REF!
nail #REF! viss 3800 viss #REF!
labour P-124/Sr.1
carpenter #REF! nos 10000 nos #REF!
c-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-28/Sr.2
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
chipping #REF! sud 50000 sud #REF!
fuel #REF! gal 5000 gal #REF!
labour P-28/Sr.2
mason #REF! nos 10000 nos #REF! P-30/Sr.6a
machine driver #REF! nos 8000 nos #REF!
m-worker #REF! nos 8000 nos #REF! P-30/Sr.6a
#REF!

Page 10 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

### #REF! #REF! #REF!


material
5"x2" U-beam #REF! rft 2500 rft #REF!
3"x1.5" C-channel #REF! rft 1500 rft #REF!
guessed plate #REF! #REF! 3500 ### #REF!
bolt & nut #REF! #REF! 300 ### #REF!
Labour for steel structure #REF! #REF! 600 ### #REF!
#REF!

### #REF! #REF! #REF!


material P-119/Sr.32
ready mixed paint #REF! gal 18000 gal #REF!
putty #REF! lb 500 lb #REF!
#REF!

### #REF! #REF! #REF!


material P-100/Sr.7
4 angle sheet (0.42mm) #REF! rft 1400 rft #REF!
roofing screw #REF! nos 50 nos #REF!
#REF!

28 Brick work with 1:3 cement mortor


1887.800 sft
material P-33/Sr.2
brick 25485.300 nos 90 nos 2,293,677.00
cement 131.472 bag 8000 bag 1,051,776.00
sand 4.908 sud 12000 sud 58,896.00
labour P-33/Sr.2
mason 75.512 nos 10000 nos 755,120.00
m-worker 113.268 nos 8000 nos 906,144.00
5,065,613.00

29 Making & fixing of chowket 0.000 0.00


material P-64/Sr.28f
hard wood 0.000 ton 1100000 ton -
nail 0.000 viss 3800 viss -
labour P-64/Sr.28f
carpenter 0.000 nos 10000 nos -
-

30 Timber shuttering formwork for sill 67.630 sft


material P-124/Sr.1
5 layer plywood 0.810 nos 25000 nos 20,250.00
timber scantling 0.090 ton 550000 ton 49,500.00
nail 0.564 viss 3800 viss 2,143.20

Page 11 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

labour P-124/Sr.1
carpenter 4.058 nos 10000 nos 40,580.00
c-worker 1.353 nos 8000 nos 10,824.00
123,297.20

31 1:2:4 r.c.c work for sill at ground floor 12.680 cft


material P-28/Sr.2
cement 2.344 bag 8000 bag 18,752.00
sand 0.058 sud 12000 sud 696.00
chipping 0.117 sud 50000 sud 5,850.00
fuel 0.254 gal 5000 gal 1,270.00
labour P-28/Sr.2
mason 0.254 nos 10000 nos 2,540.00 P-30/Sr.6a
machine driver 0.063 nos 8000 nos 504.00
m-worker 1.141 nos 8000 nos 9,128.00 P-30/Sr.6a
38,740.00

32 Timber shuttering formwork for lintel 84.130 sft


material P-124/Sr.1
5 layer plywood 1.008 nos 25000 nos 25,200.00
timber scantling 0.112 ton 550000 ton 61,600.00
nail 0.701 viss 3800 viss 2,663.80
labour P-124/Sr.1
carpenter 5.048 nos 10000 nos 50,480.00
c-worker 1.683 nos 8000 nos 13,464.00
153,407.80

33 1:2:4 r.c.c work for lintel at ground floor 15.770 cft


material P-28/Sr.2
cement 2.915 bag 8000 bag 23,320.00
sand 0.073 sud 12000 sud 876.00
chipping 0.145 sud 50000 sud 7,250.00
fuel 0.315 gal 5000 gal 1,575.00
labour P-28/Sr.2
mason 0.315 nos 10000 nos 3,150.00 P-30/Sr.6a
machine driver 0.079 nos 8000 nos 632.00
m-worker 1.419 nos 8000 nos 11,352.00 P-30/Sr.6a
48,155.00

34 Scaffolding with bamboo (single layer) 5313.000 sft


material P-125/Sr.7
bamboo 258.271 nos 1000 nos 258,271.00
coinyan 18.448 viss 3500 viss 64,568.00
nail 7.687 viss 3800 viss 29,210.60
labour P-125/Sr.7
m-worker 27.672 nos 8000 nos 221,376.00

Page 12 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

573,425.60

### #REF! #REF! #REF!


labour P-1/Sr.3
e-worker #REF! nos 9000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-3/Sr.12
sand #REF! sud 12000 sud #REF!
labour P-3/Sr.12
m-worker #REF! nos 8000 nos #REF!
#REF!
### #REF! #REF! #REF!
material P-28/Sr.1
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
chipping #REF! sud 50000 sud #REF!
fuel #REF! gal 5000 gal #REF!
labour P-28/Sr.1
mason #REF! nos 10000 nos #REF!
machine driver #REF! nos 8000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-33/Sr.2
brick #REF! nos 90 nos #REF!
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
labour P-33/Sr.2
mason #REF! nos 10000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-41/Sr.4
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
labour P-41/Sr.4
mason #REF! nos 10000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-41/Sr.4

Page 13 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

cement #REF! bag 8000 bag #REF!


sand #REF! sud 12000 sud #REF!
labour P-41/Sr.4
mason #REF! nos 10000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-41/Sr.4
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
labour P-41/Sr.4
mason #REF! nos 10000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!

### #REF!
#REF! #REF!
material P-70/Sr.8
cement #REF! bag 8000 bag #REF!
sand #REF! sud 12000 sud #REF!
chipping #REF! sud 50000 sud #REF!
labour P-70/Sr.8
mason #REF! nos 10000 nos #REF!
m-worker #REF! nos 8000 nos #REF!
#REF!

43 Making & fixing of teak panelled door 131.170 sft


material+labour
131.170 sft 8000 sft 1,049,360.00
1,049,360.00

44 Making & fixing of aluminium window & fanlight 300.500 sft


material+labour
300.500 sft 5000 ### 1,502,500.00
1,502,500.00

45 Making & fixing of iron grill work at door & windo 489.500 sft
material+labour
489.500 sft 3000 sft 1,468,500.00
1,468,500.00

### #REF! #REF! #REF!


material P-122/Sr.45
putty #REF! lb 500 lb #REF!
sand paper #REF! doz 800 doz #REF!

Page 14 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

labour P-122/Sr.45
painter #REF! nos 10000 nos #REF!
p-worker #REF! nos 8000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-122/Sr.47
paint roller #REF! nos 1500 nos #REF!
emulsion paint (exterior) #REF! gal 40000 gal #REF!
labour P-122/Sr.47
painter #REF! nos 10000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-122/Sr.47
paint roller #REF! nos 1500 nos #REF!
emulsion paint (interior) #REF! gal 40000 gal #REF!
labour P-122/Sr.47
painter #REF! nos 10000 nos #REF!
#REF!

### #REF! #REF! #REF!


material P-119/Sr.33
ready mixed paint #REF! gal 18000 gal #REF!
putty #REF! lb 500 lb #REF!
labour P-119/Sr.33
painter #REF! nos 10000 nos #REF!
p-worker #REF! nos 8000 nos #REF!
#REF!

50 Tiling work for building 1125.140 sft


material P-69/Sr.6
floorl tile (8"x8") 880.362 nos 450 nos 396,162.90
wall tile (8"x12") 1185.188 nos 550 nos 651,853.40
cement 13.562 bag 8000 bag 108,496.00
sand 0.506 sud 12000 sud 6,072.00
labour P-69/Sr.6
mason 28.129 nos 10000 nos 281,290.00
m-worker 22.503 nos 8000 nos 180,024.00
1,623,898.30

52 Making & fixing of shear board ceiling 2916.000 sft


material+labour
2916.000 sft 1500 sft 4,374,000.00
4,374,000.00

Page 15 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

1 Steelwork for footing 22.493 cwt


material P-133/Sr.9
16MM 1.181 ton 1810000 ton 2,137,610.00
binding wire 6.248 viss 3000 viss 18,744.00
labour P-133/Sr.9
steel fixer 16.870 nos 10000 nos 168,700.00
s-worker 16.870 nos 8000 nos 134,960.00
2,460,014.00

2 Steelwork for foundation column #REF! cwt


material P-133/Sr.10
16MM #REF! ton 1810000 ton #REF!
8MM #REF! ton 1900000 ton #REF!
binding wire #REF! viss 3000 viss #REF!
labour P-133/Sr.10
steel fixer #REF! nos 10000 nos #REF!
s-worker #REF! nos 8000 nos #REF!
#REF!

3 Steelwork for plinth beam 83.314 cwt


material P-133/Sr.9
16MM 3.487 ton 1810000 ton 6,311,470.00
8MM 0.887 ton 1900000 ton 1,685,300.00
binding wire 23.143 viss 3000 viss 69,429.00
labour P-133/Sr.9
steel fixer 62.486 nos 10000 nos 624,860.00
s-worker 62.486 nos 8000 nos 499,888.00
9,190,947.00

4 Steelwork for theater slab 37.859 cwt


material P-133/Sr.9
10MM 1.988 ton 1850000 ton 3,677,800.00
binding wire 10.516 viss 3000 viss 31,548.00
labour P-133/Sr.9
steel fixer 28.394 nos 10000 nos 283,940.00
s-worker 28.394 nos 8000 nos 227,152.00
4,220,440.00

5 Steelwork for ground floor column 116.334 cwt


material P-133/Sr.10
16MM 4.889 ton 1810000 ton 8,849,090.00
8MM 1.218 ton 1900000 ton 2,314,200.00
binding wire 32.315 viss 3000 viss 96,945.00

Page 16 of 29
BUILDER ESTIMATE

Name of work …..100 Nos Lecture Theater

Sr no Particular Quantity Unit Rate Per Amount Remark

labour P-133/Sr.10
steel fixer 116.334 nos 10000 nos 1,163,340.00
s-worker 116.334 nos 8000 nos 930,672.00
13,354,247.00

6 Steelwork for tie beam & roof beam 87.933 cwt


material P-133/Sr.9
16MM 3.823 ton 1810000 ton 6,919,630.00
8MM 0.794 ton 1900000 ton 1,508,600.00
binding wire 24.426 viss 3000 viss 73,278.00
labour P-133/Sr.9
steel fixer 65.950 nos 10000 nos 659,500.00
s-worker 65.950 nos 8000 nos 527,600.00
9,688,608.00

7 Steelwork for lintel beam at ground floor 3.246 cwt


material P-133/Sr.9
10MM 0.116 ton 1850000 ton 214,600.00
8MM 0.054 ton 1900000 ton 102,600.00
binding wire 0.902 viss 3000 viss 2,706.00
labour P-133/Sr.9
steel fixer 2.435 nos 10000 nos 24,350.00
s-worker 2.435 nos 8000 nos 19,480.00
363,736.00

8 Steelwork for sill at ground floor 2.246 cwt


material P-133/Sr.9
10MM 0.091 ton 1850000 ton 168,350.00
8MM 0.027 ton 1900000 ton 51,300.00
binding wire 0.624 viss 3000 viss 1,872.00
labour P-133/Sr.9
steel fixer 1.685 nos 10000 nos 16,850.00
s-worker 1.685 nos 8000 nos 13,480.00
251,852.00

Total cost = #REF!

Page 17 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In
1 Site clearing
1 81 0 82 0 1 0 6642.00
6642.00 sft

2 Staking work for preparation work for foundation


1 81 0 82 0 1 0 6642.00
6642.00 sft

3 Earthwork in excavating foundation in medium soil


F1 36 3 6 3 6 6 0 2646.00

36 2646.00 cft

4 Earthwork in excavating retaining wall


12'-0" span 30 8 6 2 0 2 3 1147.50
10'-0" span 24 6 6 2 0 2 3 702.00
5'-0" span 6 1 6 2 0 2 3 40.50
1890.00 cft

5 9" thk hardcore filling with sand under footing


F1 36 3 6 3 6 0 9 330.75

330.75 cft

6 3" thick 1:3:6 lean concrete work under footing


F1 36 3 6 3 6 0 3 110.25
12'-0" span 30 8 6 2 0 0 3 127.50
10'-0" span 24 6 6 2 0 0 3 78.00
5'-0" span 6 1 6 2 0 0 3 4.50
320.25 cft

7 Timber shuttering formwork for footing


F1 36 10 0 0 9 270.00

270.00 sft

8 1:2:4 r.c.c work for footing


F1 36 2 6 2 6 0 9 168.75

168.75 cft

9 Timber shuttering formwork for foundation column


C1(9''x9'') 36 3 6 5 0 630.00
630.00 sft

10 1:2:4 r.c.c work for foundation column

Page 18 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In
C1(9''x9'') 36 0 9 0 9 5 0 101.25
101.25 cft

13 Brick work with 1:3 cement mortor for retaining wall


12' span 30 11 3 1 1.5 0 6 189.84
30 11 3 0 9 2 3 569.53
10' span 24 9 3 1 1.5 0 6 124.9
24 9 3 0 9 2 3 374.6
5' span 6 4 3 1 1.5 0 6 14.3
6 4 3 0 9 2 3 43.0
1316.17 cft

14 Timber shuttering formwork for plinth beam


60' span 12 60 9 0 9 546.75
45' span 12 45 9 0 9 411.75
958.50 sft

15 1:2:4 r c c work for plinth beam


60' span 6 60 9 0 9 0 9 205.03
45' span 6 45 9 0 9 0 9 154.41
359.44 cft

16 Sand filling work within footing & retaining wall (up to ground level)
excavatd volume
retaining wall 1890.00
footing 2646.00

deduction
9" thk hardcore filling with sand under footing -330.75
3" thick 1:3:6 lean concrete work -320.25
1:2:4 r.c.c work for footing -168.75
1:2:4 r.c.c work for foundation column -101.25

Brick work with 1:3 cement mortor for retaining wall -1316.17
2298.83 cft

19 Sand filling work within building


10'0"x12'0" 20 9 3 11 3 1 0 2081.25
5'0"x12'0" 5 4 3 11 3 1 0 239.06
2320.31 cft

20 4.5" thick 1:3:6 cement concrete for floor


10'0"x12'0" 20 9 3 11 3 0 4.5 780.47
5'0"x12'0" 5 4 3 11 3 0 4.5 89.65
2 68 9 8 0 0 4.5 412.50

Page 19 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In
1 45 8 8 0 4.5 137.00
1419.62 cft

15 1:2:4 r c c work for floor


10'0"x12'0" 20 9 3 11 3 0 1.5 260.16
5'0"x12'0" 5 4 3 11 3 0 1.5 29.88
2 68 9 8 0 0 1.5 137.50
1 45 8 8 0 0 1.5 45.67
473.21 cft

17 Timber shuttering formwork for ground floor column


C1(9''x9'') 24 0 9 2 3 40.50
24 0 9 4 9 85.50
48 0 9 8 0 288.00
414.00 sft

18 1:2:4 r c c work for ground floor column


C1(9''x9'') 6 0 9 0 9 2 3 7.59
6 0 9 0 9 4 9 16.03
12 0 9 0 9 8 0 54.00
77.62 cft

14 Timber shuttering formwork for floor beam


60' span 6 60 9 0 9 273.38
45' span 18 45 9 0 9 617.63
5'3" span 24 5 3 0 9 94.50
11'8" span 24 11 8 0 9 210.00
11'6" span 12 11 6 0 9 103.50
1299.01 sft

15 1:2:4 r c c work for floor beam


60' span 2 60 9 0 9 0 9 68.34
45' span 6 45 9 0 9 0 9 154.41
5'3" span 8 5 3 0 9 0 9 23.63
11'8" span 8 11 8 0 9 0 9 52.50
11'6" span 4 11 6 0 9 0 9 25.88
324.76 cft

17 Timber shuttering formwork for Long column


C1(9''x9'') 80 0 9 8 0 480.00

480.00 sft

18 1:2:4 r c c work for ground floor column


C1(9''x9'') 20 0 9 0 9 8 0 90.00

Page 20 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In
90.00 cft

17 Timber shuttering formwork for roof beam & Stiffner column


60' span 6 65 11 0 9 296.63
12 65 11 1 0 791.00
45' span 6 50 11 0 9 229.13
12 50 11 1 0 611.00
Stiffner Column 96 0 9 3 0 216.00
2143.76 sft

15 1:2:4 r c c work for roof beam


60' span 6 65 11 0 9 1 0 296.63
45' span 6 50 11 0 9 1 0 229.13
Stiffner Column 24 0 9 0 9 3 0 40.50
566.26 cft

21 Timber shuttering formwork for theater slab


slab 4 9 3 5 3 194.25
3 4 3 5 3 66.94
step 42 5 5.25 0 5.25 99.91
waist 2 5 5.25 18 2 197.56
4 18 2 0 6 36.33
594.99 sft

22 1:2:4 r.c.c work for theater slab


slab 4 9 3 5 3 0 6 97.13
3 4 3 5 3 0 6 33.47
step 42 5 5.25 0 9 0 5.25 74.94
waist 2 5 5.25 18 2 0 6 98.78
304.32 cft

21 Timber shuttering formwork for roof slab


12'x10' 20 9 3 11 3 2081.25
12'x5' 5 4 3 11 3 239.06
12'x2'7" 10 2 7 11 3 290.63
2'7"x2'7" 4 2 7 2 7 26.69
10'x2'7" 8 2 7 9 3 191.17
2828.80 sft

22 1:2:4 r.c.c work for roof slab


12'x10' 20 9 3 11 3 0 5 867.19
12'x5' 5 4 3 11 3 0 5 99.61
12'x2'7" 10 2 7 11 3 0 5 121.09
2'7"x2'7" 4 2 7 2 7 0 5 11.12
10'x2'7" 8 2 7 9 3 0 5 79.65 1178.66 cft

Page 21 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In

28 Brick work with 1:3 cement mortor


Ground Floor
12'0" span 10 11 3 8 3 928.13
10'0" span 12 9 3 8 3 915.75
5'3" span 3 5 3 8 3 129.94
5'9" span 2 5 9 6 0 69.00
detuction
MD -2 5 0 7 0 -70.00
D1 -2 3 0 7 0 -42.00
FL -10 1 6 1 6 -22.50
window sill
FL -2 11 3 0 3 -5.63
-2 9 3 0 3 -4.63
lintel
MD -2 11 3 0 3 0.00
D1 -2 5 3 0 3 0.00
FL -2 11 3 0 3 -5.63
-2 9 3 0 3 -4.63
1887.80 sft

First Floor
12'0" span 10 11 3 8 3 928.13
10'0" span 8 9 3 8 3 610.50
5'3" span 2 5 3 8 3 86.63

detuction
W1 -8 7 9 6 6 -403.00
Glass Block -1 3 0 6 0 -18.00

window sill
W1 -8 11 3 0 3 -22.50
Glass Block -1 4 3 0 3 -1.06
lintel
W1 -8 11 3 0 3 -22.50
Glass Block -1 4 3 0 3 -1.06
1157.14 sft

Parapet 2 61 5 3 0 368.50
2 46 5 3 0 278.50
647.00 sft

Total 3691.94 sft

38 Brick work with 1:3 cement mortor for step


2 6 6 1 6 0 6 9.75

Page 22 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In
1 5 9 2 6 0 6 7.19

16.94 cft

39 1/2'' tk; plastering work at step


thread 2 6 6 1 6 19.50
riser 2 6 6 0 6 6.50
side 4 1 6 0 6 3.00
thread 1 5 9 2 6 14.38
riser 1 5 9 0 6 2.88
side 2 2 6 0 6 2.50

48.76 sft

40 1/2'' tk; plastering up to plinth


2 60 9 1 0 1 6 182.25
2 45 9 1 0 1 6 137.25
319.50 sft

41 1/2'' tk; plastering walling

2*brickwork 7383.88
Column
40 0 4.5 1 0 8 3 123.75
7507.63 sft

47 Painting on plastered surface Walling 7842.01 sft

49 Painting on wooden surface


1 418.00 0 7 243.83
243.83 sft

29 Making & fixing of chowket


MD 2 21 0 42.00
D1 2 19 0 38.00
W1 8 31 0 248.00
FL 10 9 0 90.00
418.00 rft

29 Making & installation of Doors and Windows


MD 10 5 0 7 0 350.00
D1 8 3 0 7 0 168.00
W1 8 7 9 6 6 403.00
FL 10 1 6 1 6 22.50
943.50 sft

Page 23 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In

30 Timber shuttering formwork for sill


FL 4 11 3 0 3 11.25
4 9 3 0 3 9.25
W1 16 11 3 0 3 45.00
Glass Block 2 4 3 0 3 2.13
67.63 sft

31 1:2:4 r.c.c work for sill at ground floor


FL 2 11 3 0 4.5 0 3 2.11
2 9 3 0 4.5 0 3 1.73
W1 8 11 3 0 4.5 0 3 8.44
Glass Block 1 4 3 0 4.5 0 3 0.40
12.68 cft

32 Timber shuttering formwork for lintel


MD 4 11 3 0 3 11.25
D1 4 5 3 0 3 5.25
FL 4 11 3 0 3 11.25
4 9 3 0 3 9.25
W1 16 11 3 0 3 45.00
Glass Block 2 4 3 0 3 2.13
84.13 sft

33 1:2:4 r.c.c work for lintel at ground floor


MD 2 11 3 0 4.5 0 3 2.11
D1 2 5 3 0 4.5 0 3 0.98
FL 2 11 3 0 4.5 0 3 2.11
2 9 3 0 4.5 0 3 1.73
W1 8 11 3 0 4.5 0 3 8.44
Glass Block 1 4 3 0 4.5 0 3 0.40
15.77 cft

34 Scaffolding with bamboo (single layer)


2 70 9 21 0 2971.50
2 55 9 21 0 2341.50
5313.00 sft

43 Making & fixing of teak panelled door


MD 2 5 3 1 0 9 0 94.50
D1 2 2 9 1 0 6 8 36.67
131.17 sft

44 Making & fixing of aluminium window & fanlight


FL 4 4 3 1 0 4 6 76.50

Page 24 of 29
DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater


Measurement
Sr Total of
Particular No L B H Content Unit Remark
no each
Ft In Ft In Ft In
W1 16 2 9 1 0 2 0 88.00
Glass Block 2 8 0 1 0 8 6 136.00
300.50 sft

45 Making & fixing of iron grill work at door & window


MD 2 5 3 1 0 9 0 94.50
D1 2 5 3 1 0 9 0 94.50
FL 4 4 3 1 0 4 6 76.50
W1 16 2 9 1 0 2 0 88.00
Glass Block 2 8 0 1 0 8 6 136.00
489.50 sft

50 Tiling work for building


Floor (8"x8")
toilet 2 11 7 11 8 1 0 270.28
wc 1 9 2 11 2 1 0 102.36
372.64 sft
Wall(8"x12")
Ground floor
toilet 4 11 7 1 0 6 0 278.00
4 11 8 1 0 6 0 280.00
wc 2 9 2 1 0 6 0 110.00
2 11 2 1 0 6 0 134.00
detuction
D2 -3 2 9 1 0 6 0 -49.50
752.50 sft
Total area = 1125.14 sft

51 Flooring epoxy paint


2 78 0 56 0 1 0 8736.00
8736.00 sft

52 Making & fixing of shear board ceiling


1 54 0 54 0 1 0 2916.00
2916.00 sft

Page 25 of 29
STEEL DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater

Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)

1 Steelwork for footing


F1 36 2 8 1 576 4.130 0 2378.880 1.059 16
0 0 2 10 1 0 5.130 0 0.000 1.059 16

sub total
16 2378.880 1.059 16 2519.234
2519.234

2 Steelwork for foundation column


main bar
C1(9''x9'') 36 1 8 1 288 10.245 0 2950.560 1.059 16
#REF! #REF! 1 8 1 #REF! 10.245 0 #REF! 1.059 16
#REF! #REF! 1 8 1 #REF! 10.245 0 #REF! 1.059 16
#REF! #REF! 1 8 1 #REF! 10.245 0 #REF! 1.059 16
tie bar
C1(9''x9'') 36 1 13 1 468 3.315 0 1551.420 0.265 8
#REF! #REF! 1 13 1 #REF! 4.315 0 #REF! 0.265 8
#REF! #REF! 1 13 1 #REF! 4.315 0 #REF! 0.265 8
#REF! #REF! 1 13 1 #REF! 4.315 0 #REF! 0.265 8

sub total
16 #REF! 1.059 16 #REF!
8 #REF! 0.265 8 #REF!
#REF!

3 Steelwork for plinth beam


x-direction
line 1, 6
top bar 2 1 3 1 6 72.289 0 433.734 1.059 16
2 1 1 1 2 64.289 0 128.578 1.059 16
bottom bar 2 1 3 1 6 71.659 0 429.954 1.059 16
2 1 1 1 2 63.659 0 127.318 1.059 16
stirrup (10"x12") 2 1 18 1 36 2.982 0 107.352 0.265 8
stirrup (10"x15") 2 1 135 1 270 3.482 0 940.140 0.265 8
line 2, 3, 4, 5
top bar 4 1 3 1 12 84.651 0 1015.812 1.059 16
4 1 1 1 4 64.289 0 257.156 1.059 16
bottom bar 4 1 3 1 12 84.021 0 1008.252 1.059 16
4 1 1 1 4 63.659 0 254.636 1.059 16
stirrup (10"x12") 4 1 40 1 160 2.982 0 477.120 0.265 8
stirrup (10"x15") 4 1 135 1 540 3.482 0 1880.280 0.265 8
y-direction
line A
top bar 1 1 3 1 3 60.289 0 180.867 1.059 16
bottom bar 1 1 3 1 3 59.659 0 178.977 1.059 16

Page 26 of 29
STEEL DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater

Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)

stirrup (10"x12") 1 1 122 1 122 2.982 0 363.804 0.265 8


line B, C, D, E, F, G
top bar 6 1 3 1 18 60.289 0 1085.202 1.059 16
6 1 1 1 6 52.289 0 313.734 1.059 16
bottom bar 6 1 3 1 18 59.659 0 1073.862 1.059 16
6 1 1 1 6 51.659 0 309.954 1.059 16
stirrup (10"x12") 6 1 18 1 108 2.982 0 322.056 0.265 8
stirrup (10"x15") 6 1 135 1 810 3.482 0 2820.420 0.265 8
line I
top bar 1 1 3 1 3 37.927 0 113.781 1.059 16
bottom bar 1 1 3 1 3 37.297 0 111.891 1.059 16
stirrup (10"x12") 1 1 78 1 78 2.982 0 232.596 0.265 8

sub total
16 7023.71 1.059 16 7438.109
8 7143.77 0.265 8 1893.099
9331.208

4 Steelwork for theater slab


bottom bar
horizontal direction 1 1 45 1 45 57.537 0 2589.165 0.414 10
vertical direction 1 1 111 1 111 22.810 0 2531.910 0.414 10
top bar
horizontal direction 1 1 45 1 45 57.537 0 2589.165 0.414 10
vertical direction 1 1 111 1 111 22.810 0 2531.910 0.414 10

sub total
10 10242.150 0.414 10 4240.250
4240.250

5 Steelwork for ground floor column


main bar
C1(9''x9'') 24 1 6 1 144 17.100 0 2462.400 1.059 16
0 24 1 6 1 144 17.100 0 2462.400 1.059 16
0 48 1 6 1 288 17.100 0 4924.800 1.059 16
tie bar
C1(9''x9'') 24 1 28 1 672 2.648 0 1779.456 0.265 8
0 24 1 28 1 672 3.315 0 2227.680 0.265 8
0 48 1 28 1 1344 4.315 0 5799.360 0.265 8

sub total
16 9849.600 1.059 16 10430.726
8 9806.496 0.265 8 2598.721
13029.447

Page 27 of 29
STEEL DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater

Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)

6 Steelwork for tie beam & roof beam


x-direction
line 1, 6
top bar 2 1 3 1 6 72.289 0 433.734 1.059 16
2 1 1 1 2 64.289 0 128.578 1.059 16
bottom bar 2 1 3 1 6 71.659 0 429.954 1.059 16
2 1 1 1 2 63.659 0 127.318 1.059 16
stirrup (10"x12") 2 1 18 1 36 2.982 0 107.352 0.265 8
stirrup (10"x15") 1 1 135 1 135 3.482 0 470.070 0.265 8
line 2, 3, 4
top bar 3 1 3 1 9 19.927 0 179.343 1.059 16
bottom bar 3 1 3 1 9 19.297 0 173.673 1.059 16
stirrup (10"x12") 3 1 40 1 120 2.982 0 357.840 0.265 8
line 5
top bar 1 1 3 1 3 84.651 0 253.953 1.059 16
1 1 1 1 1 64.289 0 64.289 1.059 16
bottom bar 1 1 3 1 3 84.021 0 252.063 1.059 16
1 1 1 1 1 63.659 0 63.659 1.059 16
stirrup (10"x12") 1 1 40 1 40 2.982 0 119.280 0.265 8
stirrup (10"x15") 1 1 135 1 135 3.482 0 470.070 0.265 8
y-direction
line A
top bar 1 1 3 1 3 60.289 0 180.867 1.059 16
bottom bar 1 1 3 1 3 59.659 0 178.977 1.059 16
stirrup (10"x12") 1 1 122 1 122 2.982 0 363.804 0.265 8
line B, G
top bar 2 1 3 1 6 60.289 0 361.734 1.059 16
2 1 1 1 2 52.289 0 104.578 1.059 16
bottom bar 2 1 3 1 6 59.659 0 357.954 1.059 16
2 1 1 1 2 51.659 0 103.318 1.059 16
stirrup (10"x12") 2 1 18 1 36 2.982 0 107.352 0.265 8
stirrup (10"x15") 2 1 108 1 216 3.482 0 752.112 0.265 8
line C, D, E, F
top bar 4 1 3 1 12 9.927 0 119.124 1.059 16
bottom bar 4 1 3 1 12 9.297 0 111.564 1.059 16
stirrup (10"x12") 4 1 18 1 72 2.982 0 214.704 0.265 8
line I
top bar 1 1 3 1 3 37.927 0 113.781 1.059 16
bottom bar 1 1 3 1 3 37.297 0 111.891 1.059 16
stirrup (10"x12") 1 1 78 1 78 2.982 0 232.596 0.265 8

sub total
16 3850.352 1.059 16 4077.523
8 3195.180 0.265 8 846.723
4924.246

Page 28 of 29
STEEL DETAILED MEASUREMENT

Name of work …..100 Nos Lecture Theater

Sr L diamete
Particular number nos Content lb/ft sketch
no Ft In r (mm)

9848.492

7 Steelwork for lintel beam at ground floor


MD 4 2 1 1 8 11 3 90.000 0.414 10
D1 4 2 1 1 8 5 3 42.000 0.414 10
FL 4 2 1 1 8 11 3 90.000 0.414 10
W1 16 2 1 1 32 11 3 360.000 0.414 10
Glass Block 2 2 1 1 4 4 3 17.000 0.414 10
stirrup
MD 4 23 1 1 92 0.710 0 65.320 0.265 8
D1 4 11 1 1 44 0.710 0 31.240 0.265 8
FL 4 23 1 1 92 0.710 0 65.320 0.265 8
W1 16 23 1 1 368 0.710 0 261.280 0.265 8
Glass Block 2 9 1 1 18 0.710 0 12.780 0.265 8

sub total
10 599.000 0.414 10 247.986
8 435.940 0.265 8 115.524
363.510

8 Steelwork for sill at ground floor


FL 4 2 1 1 8 11 3 90.000 0.414 10
W1 16 2 1 1 32 11 3 360.000 0.414 10
Glass Block 2 2 1 1 4 4 3 17.000 0.414 10
stirrup
FL 4 23 1 1 92 0.460 0 42.320 0.265 8
W1 16 23 1 1 368 0.460 0 169.280 0.265 8
Glass Block 2 9 1 1 18 0.460 0 8.280 0.265 8

sub total
10 467.000 0.414 10 193.338
8 219.880 0.265 8 58.268