PROJECT NO: 115.

REV-1 Date : 18-03-2024

PROJECT NAME : STOCK DADDY


CLIENT NAME : Mr.Madhukiran
S.no DESCRIPTION MATERIAL AREA IN SFT UNIT PRICE PRICE Price with Gst

SECTION- A (GLASS WORK)

Glass Partition 10mmToughened Glass with


1 Saint Gobain 1180 290 342200 342200
Accessories

Glass 8mm elevation area Saint Gobain 165 220 36300 42834

SECTION-B (FALSE CEILING) ;


1 Gypsum Ceiling as per 3d drawing Oman board/equi 1923 58 0
SECTION-C (PAINTING)

2 2 Coats Putty + 1 Coat Primer + 2 Coats paint ASIAN PAINTS 3322 15 49830 58799.4

SECTION- E ( ELECTRICAL)
FALSE CEILING LIGHTS (2x2) - 20watt SYSKA /EQUI
12 2300 5520.00 6513.6
FALSE CEILING LIGHTS (2x2) - 20watt SYSKA /EQUI
6 2685 16110.00 19009.8
Switchboard - Anchor/Equi
4 12module,8Module,6Module,4Module,2Module 30 1000 30000.00 35400

Wiring Lump sum LS 15000 15000 17700

Labor Lump sum LS 10000 10000 11800

SECTION F ( FURNITURE)
Directors TABLE INDIAN MAKE 1 13000 13000.00 15340
Directors CHAIR 1 12000 12000.00 14160
3 Seater Sofa Set 2 16000 32000.00 37760
Table (Round) 2 8000 0
MEETING Table 4 10000 40000.00 47200
6
Student Table & Chair 10 8000 80000.00 94400
Reception Table 1 8500 8500.00 10030
Reception Chair 1 4600 4600.00 5428
Staff Chair without wheels 15 3600 54000.00 63720
Bar Stool 20 2800 56000.00 66080
Merchandise Stands 2 8000 16000 18880
Box TypeStorage unitFor Library 1 8000 8000 8000
Counselling table 3 10000 30000 30000
Glass wall unit 1 15000 15000 15000
SECTION F (PLUMBING)
Tile installation
160 80 12800.00 15104
Plumbing water line installation within the washroom
7 LS Lump Sum 12000.00 14160

Drain Line Installation within the washroom. 10000.00 11800


Manpower Brick wall de,olition & installation 1 13000 13000.00 15340

TOTAL AMOUNT in RS. 921860.00 1016658.8

TERMS AND CONDITIONS :

1) 35% advance to be paid before manpower mobilisation


2) 30% payment release after 35% work completion
3) 25% payment to be released after 70% work completion. .
4) 10% payment to be made during handover.
5) Quotation is based on provided information in case of any deviation charges will be levied extra.
6) All measurements are appx final billing will be as per final measurements.
7) any additional work will be charged extra.
8) False Ceiling area considered only as plain area as per drawing in case of any design (area x 1.5 ) will be charged.