ENGINE BORESCOPE INSPECTION REPORT
Location Port EA Finding Remarks
COMBUSTION • Environmental and carbon
CHAMBER-INNER & S13 N/A buildup noted. SERVICABLE
OUTER LINER •Coating loss noted
Page 2 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 3 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 4 of 23
ENGINE BORESCOPE INSPECTION REPORT
09-NOV-2023
Page 5 of 23
ENGINE BORESCOPE INSPECTION REPORT
Location Port EA Finding Remarks
COMBUSTION • Environmental and carbon
CHAMBER-DOME & S13 N/A buildup noted. SERVICABLE
SPECTACLE PLATES •Coating loss noted
Page 6 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 7 of 23
ENGINE BORESCOPE INSPECTION REPORT
09-NOV-2023
Page 8 of 23
ENGINE BORESCOPE INSPECTION REPORT
Location Port EA Finding Remarks
COMBUSTION
• Environmental and
CHAMBER-FUEL
S13 N/A carbon buildup noted SERVICABLE
SPRAY NOZZLE &
•Edge erosion noted
DEFLECTOR
Page 9 of 23
ENGINE BORESCOPE INSPECTION REPORT
09-NOV-2023
Page 10 of 23
ENGINE BORESCOPE INSPECTION REPORT
Location Port EA Finding Remarks
HPT NOZZLE • Environmental and
GUIDE VANE- LE, S13 N/A carbon buildup noted SERVICABLE
TE & SHROUD Coating loss noted
Page 11 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 12 of 23
ENGINE BORESCOPE INSPECTION REPORT
09-NOV-2023
Page 13 of 23
ENGINE BORESCOPE INSPECTION REPORT
Location Port EA Finding Remarks
STAGE 1 LPT • Environmental and
NOZZLE GUIDE carbon buildup noted.
VANE- LE & TE
• 01 axial cracks in LE
S17 N/A extending one full SERVICABLE
face of the airfoil and WITH 1600
some part to the CYCLES
other face. (Max REPEAT
crack length=1.117”). INSPECTION
Also found another
crack on the same
orientation at TE of
the same airfoil with
potential to join and
form a full crack in
near future. (Max
crack length=0.288”).
Page 14 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 15 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 16 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 17 of 23
ENGINE BORESCOPE INSPECTION REPORT
09-NOV-2023
Page 18 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 19 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 20 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 21 of 23
ENGINE BORESCOPE INSPECTION REPORT
Page 22 of 23
ENGINE BORESCOPE INSPECTION REPORT
09-NOV-2023