Transmittal Response

Date:13-Sep-2022 08:26 AM

Transmittal Number TR-P03411-16942.01-CV-8929

Description Concrete Mix Design for C40-20

Project P03411 - Replacement Of MOL 1.2 and 3.5

Contract 16942.01 - EPC for Replacement of MOL 1.2 and 3.5

Discipline CV

Review Type For Review/Approval

Issued For Issued for AFC

Submission Date 05-Sep-2022 09:07 AM

Due Date 16-Sep-2022

Overall Transmittal Status Fully Responded

ADNOC Onshore PM ShekharPundir

Contractor CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED - ABU


DHABI

Contractor Comments Issued as final

Contractor Contact cpp_mol@cppmde.com


Review Results:

Document Number Subject Revision Review Response Response Lifecycle Comments


Date State

P03411-30-99-83-1623- Concrete Mix Design for 01 Approved - no 13-Sep-2022 AFC


1 C40-20 comments
Legend:

Approved - no comments The contractor shall proceed with work

Approved with comments-resubmit The contractor may proceed with work complying with the
comments provided by ADNOC Onshore

Revise and Resubmit The contractor shall not proceed with work. See the comments
provided by ADNOC Onshore for detail instruction about further
actions. Resubmit for Review/Approval

Rejected The contractor shall not proceed with work. See the comments
provided by ADNOC Onshore for detail instruction about further
actions

For the markups please refer to the attached PDF documents

This is an automatically generated response


Company: Project Title: Contractor:

GS226-EPC WORKS FOR CLOSE CIRCUIT COOLING WATER


(CCCW) RELIABILITY IMPROVEMENT IN U&O-1 BOROUGE

Agreement No. 70002446

Contractor Document Transmittal

To : Mr. Mohamed Al Darmaki (Manager, PED RSI) Transmittal Date:

Mr.Faisal Ahmed Al Ghassani , Project


Attention : DES: GS226-DES-BOR-T-0455 23-Nov-20
Manager

COMPANY Document Transmittal


To : DESCON ENGINEERING Transmittal Date:

Attention Mr. Muhammad Shoaib Hameed (PM) Borouge: GS226-BOR-DES-T-0481 9-Dec-20


TYPE OF DOCUMENT Reference List

Prequalification Material Submittal Contract : TBA

Reports / Certificate Other: (XXX) Specification : NA

Calculation MOM Method Statement BOQ Reference : NA

Technical Test Copy of Letters/


Drawing Ref: :
Details Results Specification Guarantees

Compliance Sample Other


Certificates
Statement Tag (Brochure)

By CONTRACTOR

Document
S.No. Document No. Rev Description Code Discipline
Class
1 GS226-MAR-DES-C-0002 L 1 MAR-002 for Concrete Mix Design A CIVIL

For DESCON -
Sign: Date: 23-Nov-20
Muhammad Shoaib Hameed(PM)

By Borouge Approval Status (By Borouge)

“No Comments” Code A- No comments work may


proceed

Code B- Comments As Noted work


may proceed subject to compliance
with and incorporation of comments

Code C- Rejected, Resubmit

Code D- Information, Record

Code E- Incomplete, Resubmit

Code F- Company Response for TQ


and CR.

For Borouge : Faisal Ahmed Al Ghassani (PM) Sign Date: 9-Dec-20

Colour Code: Filled by DESCON Filled by Borouge Date:


CCCW Borouge

From: Arun Prakash (ADNOC Refining - RAS) <arunp@adnoc.ae>


Sent: Tuesday, December 8, 2020 11:39 PM
To: CCCW Borouge
Cc: Subhash Penmetsa (ADNOC Refining - RAS); Faisal Ahmed Al Ghassani (ADNOC
Refining - RAS)
Subject: RE: GS226 B1 CCCW Reliability U&O-1 : Transmittal # GS226-DES-BOR-T-0455 -
MAR-002 for Concrete Mix Design , REV L

No comments.

Arun Prakash Babu


Senior Engineer, Civil (Civil & Structur
Ruwais Area Services (RAS)

PO Box 11885, Abu Dhabi, UAE


T (+971) 2 70 28292
arunp@adnoc.ae

adnoc.ae ADNOC Refining

From: CCCW Borouge <CCCW.Borouge@descon.com>


Sent: Sunday, December 6, 2020 10:42 AM
To: Arun Prakash (ADNOC Refining - RAS) <arunp@adnoc.ae>
Cc: Subhash Penmetsa (ADNOC Refining - RAS) <subhashp@adnoc.ae>; Faisal Ahmed Al Ghassani (ADNOC Refining -
RAS) <falghassani@adnoc.ae>
Subject: [External] RE: GS226 B1 CCCW Reliability U&O-1 : Transmittal # GS226-DES-BOR-T-0455 - MAR-002 for
Concrete Mix Design , REV L

This email is from an external sender. Be cautious with links and attachments.

Dear Mr. Faisal Ahmed Al Ghassani ,

Please find the below-attached revised documents with Transmittal # GS226-DES-BOR-T-0455 -


MAR-002 for Concrete Mix Design , REV L of ”GS226 B1 CCCW Reliability in U&O-1" for your review.

KINDLY DISCARD PREVIOUS EMAIL AND ALSO CONSIDER THIS EMAIL ATTACHMENT.
ISSUED
S/N DOCUMENT NO. DESCRIPTION REV. DISCIPLINE
FOR
1 GS226-MAR-DES-C-0002 MAR-002 for Concrete Mix Design L IFR CIVIL

Regards,
Antony

From: Arun Prakash (ADNOC Refining - RAS) <arunp@adnoc.ae>


Sent: Friday, December 4, 2020 5:42 AM
To: CCCW Borouge <CCCW.Borouge@descon.com>

1
Subject: RE: GS226 B1 CCCW Reliability U&O-1 : Transmittal # GS226-DES-BOR-T-0455 - MAR-002 for Concrete Mix
Design , REV L

No comments

Arun Prakash Babu


Senior Engineer, Civil (Civil & Structur
Ruwais Area Services (RAS)

PO Box 11885, Abu Dhabi, UAE


T (+971) 2 70 28292
arunp@adnoc.ae

adnoc.ae ADNOC Refining

From: CCCW Borouge <CCCW.Borouge@descon.com>


Sent: Monday, November 23, 2020 8:40 PM
To: Arun Prakash (ADNOC Refining - RAS) <arunp@adnoc.ae>; Zahid Khan (ADNOC Refining - RAS)
<zahidk@adnoc.ae>
Cc: Subhash Penmetsa <Subhash.Penmetsa@borouge.com>; Faisal Ahmed Al Ghassani (ADNOC Refining - RAS)
<falghassani@adnoc.ae>; Hamdan Al Shehhi (ADNOC Refining - RAS) <hamdan.alshehhi@adnoc.ae>
Subject: FW: GS226 B1 CCCW Reliability U&O-1 : Transmittal # GS226-DES-BOR-T-0455 - MAR-002 for Concrete Mix
Design , REV L

Dear Sir,

Please find the below-attached documents with Transmittal # GS226-DES-BOR-T-0455 - MAR-002


for Concrete Mix Design , REV L of ”GS226 B1 CCCW Reliability in U&O-1" for your review.

ISSUED
S/N DOCUMENT NO. DESCRIPTION REV. DISCIPLINE
FOR
1 GS226-MAR-DES-C-0002 MAR-002 for Concrete Mix Design L IFR CIVIL

Kindly provide your response as soon as possible.

Regards,
Antony George
Document Controller
Borouge Projects
RAS-ADNOC Refining
M (+971) 54 792 22 30
DISCLAIMER: “The contents of this email including any file attached thereto are intended for the recipients
and are confidential and proprietary to Descon. No part of this email’s material should be reproduced,
published in any form by any means, electronic or mechanical including photocopy or any information
storage or retrieval system nor should the material be disclosed to third parties. If you have received the
email in error, please intimate the sender and delete the email from your system.”

2
ABU DHABI GAS INDUSTRIES LTD. TECTON ENGINEERING & CONSTRUCTION.
Ruwais- Pavement and Drainage System for Tanks (EPC)

Project No.: 5610


COMPANY EPC CONTRACTOR
Agreement No.: OMR.15.046
REQUEST FOR INSPECTION (RFI)
(For Non routine, Hold / Witness point only)
No RFI will be raised / needed for normal - routine (daily) construction activities.

Discipline: Civil Date: 24-11-2016


Request No.: 5610-RFI-06-CA-0005 Revision: A1

To:
PM-COMPANY (GASCO) Executed By:
Contractor: TECTON ENGINEERING & CONSTRUCTION LLC
For your information and necessary action please

Sub Contractor: Ready Mix Beton


PM-CONTRACTOR - (TECTON)

Work Location: Ready Mix Beton plant -Ruwais

Ref Document No.: 5610-MAR-CA-06-0003


Ref. Spec. No. : DGS 1783 001 Rev 2
Ref Drawing No.: N/A

Description / Work to be inspected : Laboratory Trial Mix at Ready Mix Beton Plant-Ruwais

Section / Activity:
Ref. ITP No: 5610-ITP-06-CA-8404_Rev B1
3/Trial mix  WITNESS HOLD

* Tentative Schedule :
Requested by : BALA NAGARAJ
Site Engineer Work ready for inspection by: 27-11-2016 & 29-11-2016 09.00 AM
DD / MM /YY Time
W = CONTRACTOR MAY CONTINUE THE ACTIVITIES WITHOUT THE PRESENCE OF COMPANY / PMTC
Raised by: ANISH.PS INSPECTOR ONLY IF AGREED VIA DISCUSSION. H = CONTRACTOR SHALL NOT PROCEED WITHOUT
TECTON QA/QC WRITTEN CLEARANCE OF THE COMPANY / TPI INSPECTOR.

This RFI follows the scheduled notification already issued Day Prior to COMPANY and any stoppage of work by COMPANY shall be effective on written
instructions only.

Received by: Date: _____________ ________


COMPANY / TPI DD / MM / YY Time

Remarks if any :-

COMPANY / TPI Findings ( X As Applicable): Original RFI must be returned back to CONTRACTOR within 24 hours of completion of inspection. If this
RFI not returned, CONTRACTOR will consider that the inspection carried out is accepted.

Accepted Accepted with comments Rejected NOT READY for Inspection Rejected not complying

CONTRACTOR's receiving date &


COMPANY / TPI
acknowledgement

Name:

Title:

Signature:

Date:
5610-PP-06-AA-8426/F1; Rev B1
LIST OF G A S C O PROJECTS Date: Dec 2017
Rev : 06
AWARDED AND EXECUTED BY READY MIX BETON
MAIN
NO PROJECT NAME LOCATION QUANTITY M3 FROM TO CLIENT CONTRACTOR REPRESENTATIVE TEL FAX
CONTRACTOR
CIVIL WORKS FOR PROVISION OF 3RD INSTRUMENT AIR Nasser al Hajri
1 BUHASA 1,500 Nov-17 Apr-18 GASCO Mr. Bipin Prasanan 04 438 9580 04 438 9579
COMPRESSOR PACKAGE - BUHASA contractors

2 5610 - EPC WORKS FOR PAYMENT & DRAINAGE SYSTEM FOR TANKS RUWAIS 13,500 Nov-16 Jan-18 GASCO Tecton Engineering Mr. Nazeer 06 7422022 06 7422011

3 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) Phase 1 HABSHAN 10,000 Nov-16 Jan-18 GASCO C.C.I.C. Mr. Sayed Abdul Sattar 02 654 9801 02 884 2271

Al Husam General
4 GROUND SLAB FOR STOP FOR MOSQUES & TOILETS HABSHAN 1,150 Jan-16 Nov-16 GASCO Mr. Waleed Skaka 02 645 5227 02 645 5228
Contg
BAB / RUWAIS
5 BLACK POWER MANAGEMENT (BAB/HABSHAN/RUWAIS 2,500 Oct-15 May-16 GASCO Al Hassan Engineering Shabeer Abdul 02 5868550 02 5868530
HABSHAN /
BAB / ASAB
6 POWER GENERATION UNIT RETIREMENT PROJECT P-5283 17,000 Apr-15 Mar-16 GASCO ETA Granite Const. Co. Mr. Armik Khosrofian 02 677 0080 02 677 4729
HABSHAN /
Essar Construction
7 REPLACEMENT OF 16" CONDENSATE PIPELINE HABSHAN 1,500 Sep-14 Jul-15 GASCO Mr. Jason Miranda 02 628 1930 02 628 1950
Overseas

8 BASKETBALL COURT/MAINTENACE OF OHM/C/E PLANT BUHASA 1,500 Jul-14 Jul-15 GASCO GASCO Mr. Faisal Al Amoudi 02 603 5518 02 6035217

9 CIVIL MAINTENANCE SUPPORT SERVICES RUWAIS / ASAB 3,000 Jun-14 Feb-15 GASCO Granite Const Co., Mr. Armik Khosrofian 02 677 0080 02 677 4729

HABSHAN /
10 GASCO - REPLACEMENT OF 16" CONDENSATE PIPELINE 5,000 Apr-14 Apr-15 GASCO Obeid El Qubaisi Mr. Mohamed Ragheb 02 884 2111 02 884 2114
RUWAIS
EPC ASAB 1 MAIN CONTROL BUILDING ENHANCEMENT &
11 ASAB 400 Jan-14 Jun-14 GASCO Actco Gen Contg Mr. Bashar Kamal 02 681 2255 02 681 5881
REFURBISHMENT

12 OIL WATER SUUMP 72 SU 702 GASCO HABSHAN 500 Sep-12 Mar-13 GASCO Obeid El Qubaisi Mr. Mohamed Ragheb 02 884 2111 02 884 2114

HABSHAN
13 HABSHAN RUWAIS SHUWEIHAT GAS PIPELINE PROJECT 4,000 Sep-12 Mar-13 GASCO Larsen & Toubro Mr. V C Gohil 02 672 9136 02 672 9873
RUWAIS
HABSHAN
14 HABSHAN RUWAIS SHUWEIHAT GAS PIPELINE PROJECT 1,000 Sep-12 Jan-13 GASCO Spark Building Cont Mr. Anders Varghese 02 443 7545 02 441 9173
RUWAIS

15 MIRFAA RUWAIS NITROGEN PIPELINE PROJECT HABSHAN 2,000 May-12 Apr-13 GASCO ALSA Engg Trans Middle East Mr. Usman Ahmed 02 559 9816 02 559 9817

16 NEW ASAB ACCOMMODATION COMPLEX ASAB 5,000 Feb-12 Nov-12 GASCO EMCO Mr. Rahim Shek Beri 02 634 0600 02 632 9491

17 NEW FIRE TRAINING CENTRE FOR GASCO ASAB 4,500 Jan-12 Nov-12 GASCO Granite Const. Co., Mr. Rasmik K. 02 677 0080 02 677 4729

18 NEW LABORATORY BLDG FOR GASCO HABSHAN 2,200 Jan-12 Sep-12 GASCO EMCO Mr. Rahim Shek Beri 02 634 0600 02 632 9491

19 NEW AVENUE B PLANT ACCESS ROAD & MISC WORKS RUWAIS 5,000 Feb-12 Mar-13 GASCO Granite Const. Co., Mr. Rasmik K. 02 677 0080 02 677 4729

20 HABSHAN FLARE GAS RECOVERY PROJECT HABSHAN 9,500 May-10 Jan-12 GASCO C.C.I.C. Mr. Hanna Ghawi 02 884 2230 02 884 2271

21 IGD - HABSHAN 5 PROJECT HABSHAN 43,000 May-10 Nov-12 GASCO Descon Engineering Mr. Aman Ullah Khan 02 555 5807 02 555 5784

Arabian Construction
22 RUWAIS IGD 4TH NGL PROJECT RUWAIS 139,786 Apr-10 Aug-12 GASCO PETROFAC Mr. Raed Azcoul 02 677 1225 02 679 2051
Co.
LIST OF G A S C O PROJECTS Date: Dec 2017
Rev : 06
AWARDED AND EXECUTED BY READY MIX BETON
MAIN
NO PROJECT NAME LOCATION QUANTITY M3 FROM TO CLIENT CONTRACTOR REPRESENTATIVE TEL FAX
CONTRACTOR

23 NAPTHA STORAGE TANKS CIVIL WORKS RUWAIS 60,870 Feb-10 Jun-12 GASCO HYUNDAI / CB&I Granite Const. Co. Mr. Rasmik K. 02 677 0080 02 677 4729

24 ASAB ACCOMMODATION FACILITIES PHASE 2 ASAB 9,220 Feb-10 Dec-10 GASCO Granite Const. Co. Mr. Rasmik K. 02 677 0080 02 677 4729

25 NON PROCESS BUILDING FOR GASCO RUWAIS 8,800 Sep-09 Feb-11 GASCO ASCON MR. ABID HUSSAIN 02 634 0600 02 621 7891

26 ACCOMMODATION FOR CATERING STAFF BUHASA 1,800 Jul-08 Apr-09 GASCO EMCO Mr. Raheem Shek 02 634 0600 02 632 9491

HABSHAN
27 REPLACEMENT OF NGL PIPELINES NETWORK 4,150 Aug-08 Jul-10 GASCO Dodsal Pte Limited Mr. Yogen Shah 02 612 9100 02 612 9250
ASAB

28 GASCO 5236 & 5238 OAG PIPELINE PROJECT HABSHAN 4,500 Mar-08 Jan-10 GASCO C.C.I.C. Mr. Marwan Anas 02 884 2230 02 884 2271

29 ASAB ACCOMMODATION FACILITIES ASAB 24,000 Aug-07 Dec-10 GASCO Granite Const. Co. Mr. P. Selvaraj 02 677 0080 02 677 4729

Al Jaber Energy
30 AGD - II GASCO PROJECT ASAB 45,000 May-06 Apr-09 GASCO Mr. Farouq A Baki 02 554 6550 02 554 6106
Services
Al Hamed
31 CIVIL WORKS LPG TANKS GASCO RUWAIS 30,000 Nov-05 Dec-07 GASCO CB&I Mr. Mahmoud Khaled 02 667 2200 02 667 3234
Development

32 RUWAIS 3RD NGL PROJECT (CIVIL WORKS) RUWAIS 110,000 Oct-05 Apr-09 GASCO PETROFAC C.C.I.C. Mr. Salim Khamis 02 582 6642 02 582 2761

33 ONSHORE GAS DEVELOPMENT (OGD III) EPC BUILDING HABSHAN 10,900 Dec-05 Apr-07 GASCO Abu Dhabi J&P Mr. Simon Kalaris 02 622 1533 02 622 1536
ONSHORE GAS DEVELOPMENT (OGD III)
Al Jaber Energy
34 CIVIL WORKS PROJECT 5208 GASCO HABSHAN 145,000 Sep-05 May-07 GASCO INT'L BECHTEL Mr. Farouk A. Baqi 02 5546550 02 5546106
Services
HABSHAN
35 HABSHAN MAQTA TAWEELAH (HMT) PIPELINE PROJECT 5,000 Sep-13 Mar-14 GASCO Dodsal Pte Limited Mr. B M Shetty 02 612 9110 02 612 9250
ABU DHABI

36 CONST OF 24" LEAN GAS PIPELINE GASCO PROJECT BUHASA 8,500 Dec-13 Nov-14 GASCO Al Asab Gen Contg Mr. Mohamed Naimur 02 555 0163 02 553 8809