Date:13-Sep-2022 08:26 AM
Discipline CV
Approved with comments-resubmit The contractor may proceed with work complying with the
comments provided by ADNOC Onshore
Revise and Resubmit The contractor shall not proceed with work. See the comments
provided by ADNOC Onshore for detail instruction about further
actions. Resubmit for Review/Approval
Rejected The contractor shall not proceed with work. See the comments
provided by ADNOC Onshore for detail instruction about further
actions
By CONTRACTOR
Document
S.No. Document No. Rev Description Code Discipline
Class
1 GS226-MAR-DES-C-0002 L 1 MAR-002 for Concrete Mix Design A CIVIL
For DESCON -
Sign: Date: 23-Nov-20
Muhammad Shoaib Hameed(PM)
No comments.
This email is from an external sender. Be cautious with links and attachments.
KINDLY DISCARD PREVIOUS EMAIL AND ALSO CONSIDER THIS EMAIL ATTACHMENT.
ISSUED
S/N DOCUMENT NO. DESCRIPTION REV. DISCIPLINE
FOR
1 GS226-MAR-DES-C-0002 MAR-002 for Concrete Mix Design L IFR CIVIL
Regards,
Antony
1
Subject: RE: GS226 B1 CCCW Reliability U&O-1 : Transmittal # GS226-DES-BOR-T-0455 - MAR-002 for Concrete Mix
Design , REV L
No comments
Dear Sir,
ISSUED
S/N DOCUMENT NO. DESCRIPTION REV. DISCIPLINE
FOR
1 GS226-MAR-DES-C-0002 MAR-002 for Concrete Mix Design L IFR CIVIL
Regards,
Antony George
Document Controller
Borouge Projects
RAS-ADNOC Refining
M (+971) 54 792 22 30
DISCLAIMER: “The contents of this email including any file attached thereto are intended for the recipients
and are confidential and proprietary to Descon. No part of this email’s material should be reproduced,
published in any form by any means, electronic or mechanical including photocopy or any information
storage or retrieval system nor should the material be disclosed to third parties. If you have received the
email in error, please intimate the sender and delete the email from your system.”
2
ABU DHABI GAS INDUSTRIES LTD. TECTON ENGINEERING & CONSTRUCTION.
Ruwais- Pavement and Drainage System for Tanks (EPC)
To:
PM-COMPANY (GASCO) Executed By:
Contractor: TECTON ENGINEERING & CONSTRUCTION LLC
For your information and necessary action please
Description / Work to be inspected : Laboratory Trial Mix at Ready Mix Beton Plant-Ruwais
Section / Activity:
Ref. ITP No: 5610-ITP-06-CA-8404_Rev B1
3/Trial mix WITNESS HOLD
* Tentative Schedule :
Requested by : BALA NAGARAJ
Site Engineer Work ready for inspection by: 27-11-2016 & 29-11-2016 09.00 AM
DD / MM /YY Time
W = CONTRACTOR MAY CONTINUE THE ACTIVITIES WITHOUT THE PRESENCE OF COMPANY / PMTC
Raised by: ANISH.PS INSPECTOR ONLY IF AGREED VIA DISCUSSION. H = CONTRACTOR SHALL NOT PROCEED WITHOUT
TECTON QA/QC WRITTEN CLEARANCE OF THE COMPANY / TPI INSPECTOR.
This RFI follows the scheduled notification already issued Day Prior to COMPANY and any stoppage of work by COMPANY shall be effective on written
instructions only.
Remarks if any :-
COMPANY / TPI Findings ( X As Applicable): Original RFI must be returned back to CONTRACTOR within 24 hours of completion of inspection. If this
RFI not returned, CONTRACTOR will consider that the inspection carried out is accepted.
Accepted Accepted with comments Rejected NOT READY for Inspection Rejected not complying
Name:
Title:
Signature:
Date:
5610-PP-06-AA-8426/F1; Rev B1
LIST OF G A S C O PROJECTS Date: Dec 2017
Rev : 06
AWARDED AND EXECUTED BY READY MIX BETON
MAIN
NO PROJECT NAME LOCATION QUANTITY M3 FROM TO CLIENT CONTRACTOR REPRESENTATIVE TEL FAX
CONTRACTOR
CIVIL WORKS FOR PROVISION OF 3RD INSTRUMENT AIR Nasser al Hajri
1 BUHASA 1,500 Nov-17 Apr-18 GASCO Mr. Bipin Prasanan 04 438 9580 04 438 9579
COMPRESSOR PACKAGE - BUHASA contractors
2 5610 - EPC WORKS FOR PAYMENT & DRAINAGE SYSTEM FOR TANKS RUWAIS 13,500 Nov-16 Jan-18 GASCO Tecton Engineering Mr. Nazeer 06 7422022 06 7422011
3 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) Phase 1 HABSHAN 10,000 Nov-16 Jan-18 GASCO C.C.I.C. Mr. Sayed Abdul Sattar 02 654 9801 02 884 2271
Al Husam General
4 GROUND SLAB FOR STOP FOR MOSQUES & TOILETS HABSHAN 1,150 Jan-16 Nov-16 GASCO Mr. Waleed Skaka 02 645 5227 02 645 5228
Contg
BAB / RUWAIS
5 BLACK POWER MANAGEMENT (BAB/HABSHAN/RUWAIS 2,500 Oct-15 May-16 GASCO Al Hassan Engineering Shabeer Abdul 02 5868550 02 5868530
HABSHAN /
BAB / ASAB
6 POWER GENERATION UNIT RETIREMENT PROJECT P-5283 17,000 Apr-15 Mar-16 GASCO ETA Granite Const. Co. Mr. Armik Khosrofian 02 677 0080 02 677 4729
HABSHAN /
Essar Construction
7 REPLACEMENT OF 16" CONDENSATE PIPELINE HABSHAN 1,500 Sep-14 Jul-15 GASCO Mr. Jason Miranda 02 628 1930 02 628 1950
Overseas
8 BASKETBALL COURT/MAINTENACE OF OHM/C/E PLANT BUHASA 1,500 Jul-14 Jul-15 GASCO GASCO Mr. Faisal Al Amoudi 02 603 5518 02 6035217
9 CIVIL MAINTENANCE SUPPORT SERVICES RUWAIS / ASAB 3,000 Jun-14 Feb-15 GASCO Granite Const Co., Mr. Armik Khosrofian 02 677 0080 02 677 4729
HABSHAN /
10 GASCO - REPLACEMENT OF 16" CONDENSATE PIPELINE 5,000 Apr-14 Apr-15 GASCO Obeid El Qubaisi Mr. Mohamed Ragheb 02 884 2111 02 884 2114
RUWAIS
EPC ASAB 1 MAIN CONTROL BUILDING ENHANCEMENT &
11 ASAB 400 Jan-14 Jun-14 GASCO Actco Gen Contg Mr. Bashar Kamal 02 681 2255 02 681 5881
REFURBISHMENT
12 OIL WATER SUUMP 72 SU 702 GASCO HABSHAN 500 Sep-12 Mar-13 GASCO Obeid El Qubaisi Mr. Mohamed Ragheb 02 884 2111 02 884 2114
HABSHAN
13 HABSHAN RUWAIS SHUWEIHAT GAS PIPELINE PROJECT 4,000 Sep-12 Mar-13 GASCO Larsen & Toubro Mr. V C Gohil 02 672 9136 02 672 9873
RUWAIS
HABSHAN
14 HABSHAN RUWAIS SHUWEIHAT GAS PIPELINE PROJECT 1,000 Sep-12 Jan-13 GASCO Spark Building Cont Mr. Anders Varghese 02 443 7545 02 441 9173
RUWAIS
15 MIRFAA RUWAIS NITROGEN PIPELINE PROJECT HABSHAN 2,000 May-12 Apr-13 GASCO ALSA Engg Trans Middle East Mr. Usman Ahmed 02 559 9816 02 559 9817
16 NEW ASAB ACCOMMODATION COMPLEX ASAB 5,000 Feb-12 Nov-12 GASCO EMCO Mr. Rahim Shek Beri 02 634 0600 02 632 9491
17 NEW FIRE TRAINING CENTRE FOR GASCO ASAB 4,500 Jan-12 Nov-12 GASCO Granite Const. Co., Mr. Rasmik K. 02 677 0080 02 677 4729
18 NEW LABORATORY BLDG FOR GASCO HABSHAN 2,200 Jan-12 Sep-12 GASCO EMCO Mr. Rahim Shek Beri 02 634 0600 02 632 9491
19 NEW AVENUE B PLANT ACCESS ROAD & MISC WORKS RUWAIS 5,000 Feb-12 Mar-13 GASCO Granite Const. Co., Mr. Rasmik K. 02 677 0080 02 677 4729
20 HABSHAN FLARE GAS RECOVERY PROJECT HABSHAN 9,500 May-10 Jan-12 GASCO C.C.I.C. Mr. Hanna Ghawi 02 884 2230 02 884 2271
21 IGD - HABSHAN 5 PROJECT HABSHAN 43,000 May-10 Nov-12 GASCO Descon Engineering Mr. Aman Ullah Khan 02 555 5807 02 555 5784
Arabian Construction
22 RUWAIS IGD 4TH NGL PROJECT RUWAIS 139,786 Apr-10 Aug-12 GASCO PETROFAC Mr. Raed Azcoul 02 677 1225 02 679 2051
Co.
LIST OF G A S C O PROJECTS Date: Dec 2017
Rev : 06
AWARDED AND EXECUTED BY READY MIX BETON
MAIN
NO PROJECT NAME LOCATION QUANTITY M3 FROM TO CLIENT CONTRACTOR REPRESENTATIVE TEL FAX
CONTRACTOR
23 NAPTHA STORAGE TANKS CIVIL WORKS RUWAIS 60,870 Feb-10 Jun-12 GASCO HYUNDAI / CB&I Granite Const. Co. Mr. Rasmik K. 02 677 0080 02 677 4729
24 ASAB ACCOMMODATION FACILITIES PHASE 2 ASAB 9,220 Feb-10 Dec-10 GASCO Granite Const. Co. Mr. Rasmik K. 02 677 0080 02 677 4729
25 NON PROCESS BUILDING FOR GASCO RUWAIS 8,800 Sep-09 Feb-11 GASCO ASCON MR. ABID HUSSAIN 02 634 0600 02 621 7891
26 ACCOMMODATION FOR CATERING STAFF BUHASA 1,800 Jul-08 Apr-09 GASCO EMCO Mr. Raheem Shek 02 634 0600 02 632 9491
HABSHAN
27 REPLACEMENT OF NGL PIPELINES NETWORK 4,150 Aug-08 Jul-10 GASCO Dodsal Pte Limited Mr. Yogen Shah 02 612 9100 02 612 9250
ASAB
28 GASCO 5236 & 5238 OAG PIPELINE PROJECT HABSHAN 4,500 Mar-08 Jan-10 GASCO C.C.I.C. Mr. Marwan Anas 02 884 2230 02 884 2271
29 ASAB ACCOMMODATION FACILITIES ASAB 24,000 Aug-07 Dec-10 GASCO Granite Const. Co. Mr. P. Selvaraj 02 677 0080 02 677 4729
Al Jaber Energy
30 AGD - II GASCO PROJECT ASAB 45,000 May-06 Apr-09 GASCO Mr. Farouq A Baki 02 554 6550 02 554 6106
Services
Al Hamed
31 CIVIL WORKS LPG TANKS GASCO RUWAIS 30,000 Nov-05 Dec-07 GASCO CB&I Mr. Mahmoud Khaled 02 667 2200 02 667 3234
Development
32 RUWAIS 3RD NGL PROJECT (CIVIL WORKS) RUWAIS 110,000 Oct-05 Apr-09 GASCO PETROFAC C.C.I.C. Mr. Salim Khamis 02 582 6642 02 582 2761
33 ONSHORE GAS DEVELOPMENT (OGD III) EPC BUILDING HABSHAN 10,900 Dec-05 Apr-07 GASCO Abu Dhabi J&P Mr. Simon Kalaris 02 622 1533 02 622 1536
ONSHORE GAS DEVELOPMENT (OGD III)
Al Jaber Energy
34 CIVIL WORKS PROJECT 5208 GASCO HABSHAN 145,000 Sep-05 May-07 GASCO INT'L BECHTEL Mr. Farouk A. Baqi 02 5546550 02 5546106
Services
HABSHAN
35 HABSHAN MAQTA TAWEELAH (HMT) PIPELINE PROJECT 5,000 Sep-13 Mar-14 GASCO Dodsal Pte Limited Mr. B M Shetty 02 612 9110 02 612 9250
ABU DHABI
36 CONST OF 24" LEAN GAS PIPELINE GASCO PROJECT BUHASA 8,500 Dec-13 Nov-14 GASCO Al Asab Gen Contg Mr. Mohamed Naimur 02 555 0163 02 553 8809