8.

00 m
PLANTERS SIDEWALK C&G ROADWAY CL ROADWAY C&G SIDEWALK PLANTERS
0.60 m 0.40 m 0.50 m 2.50 m 2.50 m 0.50 m 0.40 m 0.60 m

0.76 m 0.76 m 0.3 m

Prop. 150mmØ uPVC


WATERLINE 2" PE CASING 3/4" PE PIPE

TYPICAL SECTION FOR A WATER SERVICE CONNECTION


PIPE ALIGNMENT AT SECTION C-C

8.00 m
12.00 m

0.60 m 0.40 m 0.50 m 2.50 m 2.50 m 0.50 m 0.40 m 0.60 m


1.20 m 0.80 m 0.50 m 3.50 m 3.50 m 0.50 m 0.80 m 1.20 m

0.76 m 0.3 m
0.3 m 0.76 m
Prop. 150mmØ uPVC
Prop. 100mmØ uPVC

PIPE ALIGNMENT AT SECTION A-A PIPE ALIGNMENT AT SECTION D-D

12.00 m 0.60 m 0.40 m 0.50 m 3.50 m 3.50 m 0.50 m 0.40 m 0.60 m

1.20 m 0.80 m 0.50 m 3.50 m 3.50 m 0.50 m 0.80 m 1.20 m

0.3 m 0.76 m

0.3 m 0.76 m
Prop. 100mmØ uPVC
Prop. 100mmØ uPVC

PIPE ALIGNMENT AT SECTION B-B PIPE ALIGNMENT AT SECTION E-E

PROJECT TITLE: PREPARED BY: CHECKED BY: REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.

AS-BUILT PLAN FOR

DIAMOND HEIGHTS PHASE 1 - 3 5


BARANGAY COMMUNAL, BUHANGIN DISTRICT, DAVAO CITY CIVIL ENGINEER LUCKY CHAMP O. ALMONIA JOSIE E. MAMAC REU A. ASESOR RONALD A. MUÑOZ OSCAR C. DELA CRUZ MILDRED G. AVILES, CPA, DM-HRM

DAVAP SOUTHPRIME DEVELOPERS, INC.


PRC NO.:
ISSUED AT:
ISSUED ON:
PTR. NO.:
TIN NO.:
OIC
QUALITY ASSURANCE UNIT
OIC
DEVELOPMENT RESEARCH UNIT
Manager
SURVEYING, INVESTIGATION AND QUALITY ASSURANCE DIVISION
OIC
ENGINEERING DEPARTMENT
OIC AGM FOR TECHNICAL SERVICES GENERAL MANAGER
6