25 M CONDENSER

(TUBE SIDE HYDORTEST )


CLIENT: BINDER JAT HOLDING PLC
2
HYDORTEST PRSSURE: 5 KG / CM
DATE OF TEST: 08.08.2023
PRESSURE RETENTION TIME : 60 MIN
RESULT:NO LEAKAGE OR PRESSURE DROP
CONDENSATE COLLECTION VESSEL
CAPACITY: 250 LITERS.
CLIENT: JUBILANT AGRI AND CONSUMER
PRODUCTS LTD.
2
HYDROTEST PRESSURE: 6 KGS /CM
DATE OF TEST: 19.04.2023
PRESSURE RETENTION TIME: 45 MINS
RESULT: NO LEAKAGE OR DROP IN PRESSURE
FLUSH BOTTOM VALVE
CLIENT: SREECHEM RESINS LIMTED
DATE: 14.05.2023
HYDORTEST PRESSURE: 10 KG/ SQ.M
HOLDING TIME: 1 HOUR
INTERNAL COOLING COIL FOR 3KL ALKYD REACTOR
MOC: SS 316 L 40 NB SCH 40
PNUEMATIC TEST: 1.5 KGS/ CM2 G.
2
HYDROTEST: 15 KGS/ CM G.
PRESSURE HOLDING TIME: 60 MINS
OBSERAVATION: NO LEAKAGE ON
ANY WELD JOINT AND NO DROP IN PRESSURE.
DATE OF TEST:13.06.2023
CLIENT: ASIA COATINGS PVT.LTDBANGLADESH.
INTERNAL COOLING COIL FOR 3KL ALKYD REACTOR
MOC: SS 316 L 40 NB SCH 40
PNUEMATIC TEST: 1.5 KGS/ CM2 G.
2
HYDROTEST: 15 KGS/ CM G.
PRESSURE HOLDING TIME: 60 MINS
OBSERAVATION: NO LEAKAGE ON
ANY WELD JOINT AND NO DROP IN PRESSURE.
DATE OF TEST:13.06.2023
CLIENT: ASIA COATINGS PVT.LTDBANGLADESH.
INTERNAL COOLING COIL FOR 3KL ALKYD REACTOR
MOC: SS 316 L 40 NB SCH 40
PNUEMATIC TEST: 1.5 KGS/ CM2 G.
2
HYDROTEST: 15 KGS/ CM G.
PRESSURE HOLDING TIME: 60 MINS
OBSERAVATION: NO LEAKAGE ON
ANY WELD JOINT AND NO DROP IN PRESSURE.
DATE OF TEST:13.06.2023
CLIENT: ASIA COATINGS PVT.LTDBANGLADESH.

8 KL STRIPPER VESSEL
MOC: SS 316L
HYDRO TEST:06 KGS/ CM2
PRESSURE HOLDING TIME: 60 MINS
OBSERVATION: NO LEAKAGEOR DROP IN PRESSURE.
DATE OF TEST:06.07.2023.
CLIENT: JUBILANT AGRI & CONS. PRODUCT DIVN.