WH-WHG-629-0000-SAK-NCR-QL-000001 - Non-Conformance related to Daily & Weekly Progress Report
WH-WHG-629-0000-SAK-NCR-QL-000001 - Non-Conformance related to Daily & Weekly Progress Report
NCR No:
000001
Revision: 00
Date: 04 July 2024
Page: 1 of 3
NCR Classification:
Type of Discipline
Civil / Structural
SAK has identified the following non-conformities related to the progress report submissions by the Contractor:
1. Daily progress reports are consistently delayed and not submitted on a timely basis.
2. No weekly progress reports have been submitted to date.
The Contractor is required to investigate the root cause of these non-conformities and promptly present a corrective
action plan.
No. of
H
Reference 0 Zone Area Level Grid / Location CWM02
CWM02
Attached
Package PM
Adnan Al Aqel Signature:
Authorisation:
Signature: Signature:
WH-WHG-629-0000-SAK-NCR-QL-
NCR No:
000001
Revision: 00
Date: 04 July 2024
Page: 2 of 3
Part 2 – First Action to be taken (To be filled out by Contractor and returned to Construction Supervisor)
Cause of Non-Conformance
Name (Contractor)
Signature Date
WH-WHG-629-0000-SAK-NCR-QL-
NCR No:
000001
Revision: 00
Date: 04 July 2024
Page: 3 of 3
Verified by:
[ Name & Signature] Date:
(Discipline Engr.)
Authorised by:
[ Name & Signature] Date:
(Package PM)
Note: If NCR is still “REJECTED”, previous comment/s must be attached by the Contractor on the next response action.
‒ Action/s for the Non-Conformance has been verified and closed. YES NO
‒ Further action is required YES NO
Name: Name:
Role: PROJECT MANAGER Role: PROJECT MANAGER
Signature: Signature: