YAFRA ENGINEERING

SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under

1. TECHNICAL CONSIDERATIONS
The price is based on the following assumptions:

√ The shoring works will be performed at a location in Addis Ababa, around Betel Keraniyo Square Area

√ This Quotation is Valid for 10 Calendar days.

The below proforma Invoice is based on preliminary design result which is based on the geotechnical investigation report,
Architectural & Structural drawings as well as Topographic data provided by the Client/Consultant side and it shall be

subjected to change based on actual data and its subsequent final design, that will be provided at or after the signing of
contract and/or depending on the actual geological & site condition findings during shoring work execution.

The quantities given in the BOQ are only for reference and shall make no contractual sense during any dispute settlement, and
√ the actual quantity shall only determined by the approved design or its amendments and actual measurements taken during
the actual work.

√ The shoring pile drilling work will be conducted in Soil formation as per the captioned project soil investigation report.

The Offer includes the drilling of boreholes to the depth required as per the proposed shoring system based on the information
provided by the client. Accordingly, we assumed that the Maximum bulk excavation level up to bottom of

foundation is 8.00 M from the Natural Ground level [NGL]. We considered that drilling of bore holes is not
to exceed beyond the depth of 12.00 M from Average NGL or reduced excavation level.
If there is any underground obstruction (Septic Tank, Stone masonry…) the client has the responsibility to remove all the

obstruction for the drilling work.

We have not considered the over break concrete volume in the offer and the over break concrete volume shall be

incorporated during the payment process.

We considered that supply of fresh water; Temporary Store and Electricity for the execution of drilling will be provided by the

client.

The client is responsible for the staged bulk excavation work, including access to the site and machine working platform

preparations before drilling work begins. This responsibility extends to each layer of bulk excavation execution.

The contractor assumed that 69 No. of piles is going to be executed for total perimeter 108 M length of

All Sides of the project site. The Actual measurement will be taken after site clearing.

√ If Supply of Raw Material is the responsibility of the Client, Check (Section 2A).

√ Please Carefully evaluate the preamble to BOQ submitted for further information on assumptions.
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under

2. BILL OF QUANTITY [BOQ] Betel Keraniyo Square Area Project


Section 2A: BOQ for Anchored Shoring Pile Works With Out Material Offer 69 No. of Total piles
All prices are expressed in ETB (Ethiopian Birr) and are net prices which are subject to 15% VAT
Item

Description Unit Quantity Unit Rate Total Amount


No

1 Mobilization
Mobilization & demobilization of staff and equipment's & Machinery for
Ls 1.00 177,600.00 177,600.00
pile shoring
Drilling, Rebar Preparation & Installation and Concreting of
2
Shoring Pile Work
2.1 Installation of Shoring Pile with a maximum depth of 12.0 M
price includes Drilling of pile auger Diamete 600 mm pile
in Soil formation and Fabricate & Installation of
Reinforcement cages in to borehole shoring piles and C-25 Ready-Mix
Concrete Pouring Works to the bored Shoring Pile works by Provision of
ML 771.38 2,699.87 2,082,615.41
Trieme Pipes. Supply of C-25 Ready-Mix concrete & Rinforcement bars
are Fully Clients Responsibility.
3 Anchor Work
The price for the installation of inclined temporary 2Pcs of grouted anchors
includes anchor drilling and installation works, grouted body with grouting
mix, supply of anchor heads, anchor strands, grouting pipe materials, and
stressing works. However, it is the client's responsibility to provide the ML 45.50 4,900.75 222,984.13
cement.
4 Shot Crete Work
Perform Shot Crete membrane between the installed reinforced concrete
piles with a thickness of approximately 10cm. The price includes the
preparation and fixing of the reinforcement mesh to the shotcrete wall
between the shoring piles, as well as the supply of the Shot Crete machine
with conveying hose and heavy-duty air compressor. However, please note
that the provision of raw materials such as reinforcement bar, cement, sand,
and aggregates is the full responsibility of the client. M2 484.88 2,206.15 1,069,706.97

5 Bracing Beam Work


Prepare and fix the reinforcement work, supply and prepare the formwork,
and carry out the concreting work for the top bracing beam. However, it is
5.1
important to note that the supply of C-25 Ready-Mix concrete and
reinforcement bar is the client's responsibility. ML 32.00 2,163.24 69,223.71
Prepare and fix the reinforcement work, supply and prepare the formwork,
and carry out the concreting work for Anchor bracing beam. However, it is
5.2
important to note that the supply of C-25 Ready-Mix concrete and
reinforcement bar is the client's responsibility. ML 81.00 2,563.45 207,639.54

GRAND SUMMARY BEFORE VAT…........BIRR 3,829,769.76


15% VAT….........BIRR 574,465.46
GRAND SUMMARY INCLUDING 15% VAT…..........BIRR 4,404,235.22

3. Basic Material Quantity


Total Basic Material Supply Quantity for All sides of Anchored Shoring Works
Total Reinforcement Bar required 16,626.00 Kg
Total C-25 Concrete required for the Project 243.00 M3
Cement [OPC] required for Anchor Grouting 14.00 Qtl.
Cement [PPC] required for Shotcrete works 213.00 Qtl.

4. PERIOD OF PERFORMANCE
● Mobilization : 20 days after signing of contract agreement and advance Payment.
● Execution Period : 50 Working days will be the period to execute the work. [Excluding Bulk Excavation period of time]
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under

5. TERMS OF PAYMENT
A. With out Material Offer Terms of Payment
1 . About 40% of the contract amount shall be released after Signing of contract agreement.
2 . About 30% of the contract amount shall be released upon 100% Completion of Piling Work
3 . About 20% of the contract amount shall be released upon 100% Completion of Anchoring Work
4 . About 10% of the contract amount upon completion of Final Layer of Shotcrete works.
√ Payment shall be prepared based on the work executed considering the unit rate of each item of work as detailed in this contract

6. REFERENCES [Completed Projects]


Completion of 2B+6SB+G+8 Mixed -Use Building Anchore Installation & Shotcrete Application Works Project for Gullele Tigist
1.
Lefere Traders S.Co. with Project amount of 40,853,870.13 Birr Winget-Taiwan area, Addis Ababa.
(Contact Person: Ato Abayl, Client Counterpart Tel: +251-911-233157)

Completion of 2B+SB+G+22 Sky Tower Building Anchored Shoring and Excavation & Cart Away Works Project of Tajir Trading
2.
with Project amount of 8,320,677.77 Birr behined Bole-Medehaniyalem Mall area, Addis Ababa.
(Contact Person: Ato Michael, Project Coordinator Tel: +251-913-566924)
Completion of Shot Crete and Anchoring Work Project for FLINTSTONE ENGINEERING S.Co, Bole Classic project behind Mega
3.
Building, Addis Ababa with total Project Amount of 7,519,077.49 Birr.
(Contact Person: Ato Temesgen (ENG.), project Manager for Flintstone Bole-Classic project, Tel: +251-913-656305)

Completion of 2B+G+12 Mixed Use Building around Sar-Bet area and 2B+G+10 Mixed Use Building around Aroge-Kera Shoring
4. Pile, Anchoring with Grouting & Shotcrete Works for Mesay Oli General Contractor , Addis Ababa with Total project Amount of
6,581,511.35 Birr
(Contact Person: Ato Alemayehu D/Manager for Mesay Oli G.C, Tel: +251-935-402256 and Ato Abdulselam Project coordinator of Mesay
Oli G.C, Tel: +251-929-088320)

Completion of Anchor Installation Work for JEROCCIA Geotechnical Services & Engineering Plc. with total Project Amount of
5.
6,647,580.75 Birr around Hager Fikir Theater area, Addis Ababa.
(Contact Person: Ato Eyasu G/Manager for JEROCCIA Geotechnical Services & Engineering plc., Tel: +251-911-554928)

Completion of 2B+G+11 Shoring project including Bulk Excavation work with Project Amount of 5,704,000.00 Birr for Tilksew
6.
Gedamu Apartment building Kazanchis, Addis Ababa.
(Contact Person: Wro Tilksew Gedamu, Owner Tel: +251911209127)

Completion of 2B+G+10 Shotcrete, Anchoring and Soil Nailing Work for Denova Engineering for Federal House Agency mixed
7.
Use Building at Miserak Atekalay, Addis Ababa with project Amount of 4,232,117.65 Birr
(Contact Person: Ato Alamerew Project Manager for Denova Construction Plc., Tel: +251-911-151226)

Completion of 2B+G+10 Shoring project for AZ Addis Real Estate Apartment building with Project amount of 4,135,320.00 birr
8.
Bole, Addis Ababa.
(Contact Person: Ato Yonatan, G/Manager for Taurus Trading plc. G/manager Tel: +251911233207)

Completion of 3B+G+15 Penthouse Apartment Building Anchoring, Grouting and Proof-Testing Work for JEROCCIA
9.
Geotechnical Services & Engineering Plc. with total Project Amount of 3,686,923.00 Birr around Bole Brass area, Addis Ababa.

(Contact Person: Ato Eyasu G/Manager for JEROCCIA Geotechnical Services & Engineering plc., Tel: +251-911-554928)

10 . Completion of B+G+9 Shoring project for Kadisko Hospital Expansion with Project Amount of 3,594,356.35 birr at Addis Ababa.

(Contact Person: Ato Ismael (ENG), Engineering Department Head For Kadisko Hospital Tel: +251911200654)

Completion of Anchoring & Grouting Work for BH Trading & Manufacturing Plc. with total Project Amount of 3,477,485.00 Birr
11
around Bole-Matemiya area, Addis Ababa.
(Contact Person: Ato Essayas Project coordinator of BH Trading & Manufacturing plc., Tel: +251-911-517986)
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under

7. SOME OF OUR PROJECTS PHOTOGRAPH DURING WORK IN PROGRESS


YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under
YAFRA ENGINEERING
SOLUTIONS PLC
Shoring Works Offer
Date of Quotation: January 10, 2024 Quotation Reference No.: YFE/OF/008/01/2024

Client: Ene Reshid Ibrahim Consultant:


Project: 2B+G+18 MUBuilding Shoring Project Contractor: YAFRA ENGINEERING SOLUTIONS PLC
Location: Addis Ababa around Betel Keraniyo Square Offer Validity Till: January 20, 2024

Further to your enquiry Ref: we would like to offer our most commutative prices for the above-mentioned project as detailed here under