NON DESTRUCTIVE EXAMINATION REQUEST

PROJECT TITLE : SUPPLY, DELIVERY, INSTALLATION AND INSULATION OF PIPE (TA 2022) RESET PROJECT WP20B2 (CLUSTER 3) : DOM/NDT/RT/011
:
CLIENT : MALAYSIAN REFINING COMPANY SDN BHD : ASME B31.3 2019

REQUESTED DATE : 23/5/2022 : DOMINANT WORKSHOP


REQUESTED TIME : 1200am

WELDER NO. VISUAL NDE REQUIREMENT


NO DRAWING NO LINE NO SHEET NO JOINT NO PROCESS WELD TYPE MATERIAL SIZE THK REMARKS
ROOT CAP ACC REJ RT UT MPI HARDNESS DPT PMI PWHT UTTM

1 D-400-30-52-0001 HG310028-1 (CLUSTER 3) 4"-HG310028-15107Z-IH50 1 OF 1 SW 16 GTAW BW CS 3" SCH 160 DOM 058 DOM 058 ✓ ✓

SW 19 GTAW BW CS 3" SCH 160 DOM 058 DOM 058 ✓ ✓

SW22 GTAW BW CS 3" SCH 160 DOM 058 DOM 058 ✓ ✓

SW09 GTAW BW CS 1/2" SCH 160 DOM 058 DOM 058 ✓ ✓

SW13 GTAW BW CS 1/2" SCH 160 DOM 058 DOM 058 ✓ ✓

REQUESTED BY, RECEIVED BY,

NAME : FAIDZUL NAME :


POSITION : QA/QC POSITION :
DATE : 23/05/2022 DATE :