Professional Documents
Culture Documents
1-1_CNS Policy of the ROK_final (C. Yang)
1-1_CNS Policy of the ROK_final (C. Yang)
2019
MOLIT
I. General Overview
II. CNS Implementation
III. CNS Managements
IV. Future Plan
MOLIT
I. General Overview
805
5.7% 764 7.0% 3.4%
739
556
675 515
626
495
442 249 249
412 243
233
213
’14 ’15 ’16 ’17 ’18 ’14 ’15 ’16 ’17 ’18 ’14 ’15 ’16 ’17 ’18
MOLIT
MOLIT
General Overview
1st 3rd
2018
12 Year 2.86 million tons
5th 17 Year
Non Stop
2018 67.8 million
Service
MOLIT
MOLIT
General Overview
MOLIT
Organization (Minister)
KOCA
(Deputy Minister of Civil Aviation)
Aviation Policy Bureau Aviation Safety Policy Bureau Airport & ANF Bureau
Air Traffic
Seoul Regional Busan Regional Jeju Regional Management Office
Office of Aviation Office of Aviation Office of Aviation
(Northern Part of ROK) (Southern Part of ROK) (Jeju Island)
Incheon Daegu
ATC ATC &CC
MOLIT
II. CNS Implementation
MOLIT
II. CNS Implementation
Air Traffic Center(IC, DC)
PSR/SSR(15)
ATC System Control Office
Flight inform
FDP GPS Time
AFTN
EDP
MMS
E-Interface RM
AMO
TTS
MOLIT
CNS Implementation
Incheon FIR
36,000ft
14,000ft
MOLIT
CNS Implementation
MOLIT
CNS Implementation
MOLIT
CNS Implementation
JEJU
TCA
JEJU
MOLIT
CNS Implementation
ETCAS
Emergency Terminal Control Area System(2019)
Incheon airport
Sensor Seoul TCA
ETCAS(Chungju)
Gimhe airport
Sensor Gimhe TCA
Jeju airport
Sensor Jeju TCA
MOLIT
CNS Implementation
GBAS system
1 GBAS Test bed(Passed CAT-I Flight Inspection, 2014)
MOLIT
CNS Implementation
MOLIT
CNS Implementation
Airports
Communication
2 AFTN/AMHS(Gimpo), 92 Clients locations
11 PDC/D-ATIS , 13 ATIS
11 VDL
Surface Movement
4 ASDE & MLAT/ADS-B(Incheon, Gimpo, Gimhae, Jeju)
2 MLAT(Yangyang, Pohang)
MOLIT
CNS Implementation
SBAS(KASS) Development
KASS Service
GPS GPS
MOLI MOLIT
T
CNS Implementation
SBAS(KASS) Development
7 Reference
2 Navigation Up-Link Station(Yeongju, Geumsan)
2 Central Processing Center(Cheongju, Incheon)
APV-I Service
16m(H), 20m(V)
APV-I
MOLIT
CNS Implementation
MOLIT
III. CNS Managements
Flight Inspection
2 Aircraft, 2 AFIS(Automatic Flight Inspection System)
3 Flight Inspector, 4 Pilot
2 Aircraft 2 AFIS
MOLIT
CNS Managements
MOLIT
CNS Managements
• ILS Radio wave check • Use for VOR site simulation • Use for VOR/ILS Failure Recovery
MOLIT
IV. Future Plan
Strategies Key Focusing Areas ‘19 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25
ASDE-X(MLAT/ADS-B/A-SMGCS) Management
I. Airport Infra. Aero-MACS, Data-Link Communication(AVS > VDL)
GNSS(S/GBAS) Air Navigation Infra
A/DMAN Management
II. Air Traffic Man. Enhanced GNSS-based Approach Procedure
SWIM, Aeronautical Data Exchange & Sharing
ADS-B, Use to SBAS- based location
III. Enhanced
Enhanced Surveillance Sensor System
Aviation Infra.
Enhanced Meteorological Info Management
MOLIT
Future Plan
SBAS(KASS) Implementation
KASS Service
GPS GPS
MOLI MOLIT
T
MOLIT