SECTIONAL DETAILS Note:

PAY ITEM

1.1.1
SYM DESCRIPTION
Clearing & Grubbing
UNITS
m
LHS
1.922
RHS
2.402
CH : 0+110 1.
2.
3.
4.
Concrete Pavement thick - 150mm
GE - Gravel Edge
EOP - Edge of Pavement
CE - Concrete edge
2.1.1 Road Way Excavation - (Unsuitable soil & spoil to waste) m2
0.000 0.000 CL 5. RE - Road edge

2.2.1 Trimming & Leveling m 1.922 2.402


LHS RHS
2.2.2 Embankment Construction Type - I m2 0.564 0.791
SOFT SOFT
3.1.1 Soil Sub base (Gravel) m2 0.227 0.230
CARRIAGEWAY CARRIAGEWAY
SHOULDERS SHOULDERS
3.2.1 Soil Shoulder Material m2 0.168 0.168

3.3.1 Concrete Pavement m2 0.300 0.300

6.1.1 Top soil; Furnished Turfing m 0.751 1.330

-1% -1% -4%


-4%

.5

-1
:1

:1
-1

.5
48.50

48.00

47.50

47.00

46.50

Datum (m) : 46.0

DESIGN LEVEL (m)

DESIGN OFFSET (m)

EXISTING LEVEL (m)

EXISTING OFFSET (m)

SCALE: H - 1:50 , V - 1:20


CLIENT PREPARED BY-CONTRACTOR CHECKED BY -CONSULTANT - JOINT VENTURE OF NO REVISION DATE
CONSTRUCTION OF PANKULAM CONCRETE ROAD IN MORAWEWA DIVISIONAL
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA 01 REV- 01 24.10.2021 SECRETARIAT DIVISION OF TRINCOMALEE DISTRICT IN EASTERN PROVINCE
NAZEEHA - SIRIDANTHA Joint Venture MG Consultants (Pvt) Ltd. Engineering Consultants Ltd.
STATE MINISTRY OF PROVINCIAL COUNCIL 02 REV- 02 02.11.2021 SL-P116/EP/RR/2020/07 DRAWING TITLE
& LOCAL GOVERNMENT AFFAIRS. DATE : 13.10.2021 NAME SIGNATURE CHECKED BY ARE : APPROVED BY RE : DESIGN CROSS SECTION DRAWING
ROAD NAME : (Ch : 0+110 )
DRAWN BY: MSM. Jaufar.Qs NAME : NAME :
TRACK 06 DRAWING NO.
CHECKED BY: Eng. ASM. Rikkas SIGNATURE : SIGNATURE :
SCHOOL ROAD P07/NCC/T06/DCS/12
FUNDED BY JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) SUBMITTED BY: DATE : DATE :