JSA Title: General Civil Works & Trench Cleaning in Well pad JSA No.: JSA-2008-214 Date: 21.07.15
Work Location: ISSFD Project Company: CTCO Supervisor: Abdelaziz Benyahia
Risk Rating
Likelihood
Likelihood
Residual
Severity
Severity
Risk
Step Activity Hazards Risk / Consequences Control Measures
1. Work Preparation
1.1 Communication No clear instruction Personnel Injury 2 2 4 PTW shall be raised by the appropriate 1 2 2
Language barrier Fatality supervisor
Asset Damage A pre task meeting shall be held with all
personnel involved in the activity to
ensure that all are aware & understand
the contents of the R.A. (time out for
condition change) & the PTW, including
actions to be taken in the event of an
emergency.
Supervisor shall ensure that all personnel
understand their duties and
responsibilities.
Workforce shall be aware of Emergency
Response Plan SF ERP UU00-P-XXXA-000-
1021(raised in TBT)
Supervisor to ensure all personnel
understand in English/French/Arabic.
1.2 Accessing Worksite Slips Trips and Falls Personnel injury 3 2 6 Site shall be visited by supervisor prior to 1 2 2
work commencing and shall ensure that
the area is clear of tripping hazards. High
standard of housekeeping shall be
maintained throughout the task
1.3 Vehicle Movements, in and Personnel Struck by Personnel injury 4 2 8 LTMS policy must be adhered to. 1 2 2
Around Worksite Vehicles. Signs and barriers shall be erected to
Vehicles Not prevent vehicles from entering area where
Adhering to work is ongoing.
Established Routes. All vehicles movements near work site
shall be monitored by a flagman. Vehicles
Doc No.: JSA-2008-214 Page 2 of 8
JOB SAFETY ANALYSIS / RISK ASSESSMENT Petrofac
should be parked in dedicated parking
area (outside Well pad)
1.4 General Work Activities Simultaneous Personnel Injury SIMOPS shall be identified & controlled by 1 2 2
Operations (SIMOPS) Asset Damage PIUL Area Authority
PH should be aware of SIMOPS in his work
area
3 2
6 SIMOPS shall be discussed during TBT
1.5 Equipment being Impact on facilities Personnel Injury Access route shall be assessed and 1 2 2
approached to the task while approaching Asset Damage predefined
location to the location Necessary permits shall be obtained
Run over Equipment should be inspected and
3 2
6 certified
Toolbox talks shall be conducted prior to
work start
2. Lifting/unloading of
materials (formworks/
rebars/shuttering materials)
2.1 Equipment being Impact on facilities Damage to the Access route shall be assessed and
approached to the task while approaching facilities, predefined
location. Work to the location personal injury Lift plan review for critical lift shall be
preparation Run over made
2 2 4 Operator should be qualified and certified 1 2 2
Only trained operators shall be deployed
2.2 Positioning of crane Uneven/ unstable Leads to tilt/ 2 2 4 Ensure that the base of the crane is firm 1 2 2
and stable
Doc No.: JSA-2008-214 Page 3 of 8
JOB SAFETY ANALYSIS / RISK ASSESSMENT Petrofac
soil condition topple of the Use solid and sufficient size out rigger
Underground equipment pads
facilities Personnel injury
Damage to assets
2.3 Extending of out-riggers Blocked/ struck up Topple of the Ensure out riggers are fully extended
of out rigger may equipment 2 2 4 Crane should be levelled properly 1 2 2
lead to topple of Personnel injury
crane
2.4 Slinging & Rigging Slip Personnel injury Slings are inspected and approved for use.
Trip Colour code of the month is visible
Uncontrolled load SWL of the slings shall be identified and
Equipment failure compared against the weight of the load
2 2 4 If required, rigging arrangement shall be 1 2 2
checked as per drawing
Personnel involved shall use required PPE
Only trained personnel shall be deployed
3 2 6 1 2 2
2.5 Lifting/unloading of Struck by Restricted duty Ground shall be checked for stability
materials (formworks/ Run over cases before positioning the crane.
rebars/ shuttering Slip Wooden outrigger pad shall be used every
First Aid
materials) Trip time the crane is set up on the ground
Repetitive Near Miss Crane shall be in good condition and no
movement Damage to assets signs of oil leak
Equipment failure Crane outrigger shall be fully extended,
Overload levelled when in use, and wheels are off
the ground at least 2”.
Load weights shall be ascertained before
lifting, and the cranes load chart will be
checked for capacity
No crane shall be set up near open
excavations. A minimum of 2 meters
clearance from the edge of the excavation
3. Loading/ unloading activities Struck By Personnel Injury 4 2 8 Trucks and moving equipment used shall 1 2 2
(using equipment other than Run over Fatality be in good condition and no signs of oil
crane) Fall Environmental leaks.
Slip Issues A spotter/banksman shall be assigned to
Trip direct the reversing equipment.
Repetitive Spotter shall keep a safe distance from
Movement the equipment when it is moving.
Oil Spill (Due to All mobile equipment and trucks shall be
defective equipped with reversing alarm.
equipment) Supervisor shall monitor the job progress
Dropped object from time to time.
4. Operation of earth moving Poor visibility due to Roll over, struck 4 2 8 Banksman shall be provided 1 2 2
equipment (Loader, Dump Fog/ dust /other by/ fatality Head lights /Hazard lights shall be kept
truck etc.) obstruction Hitting/Striking/ on. Warning devices/ back up horns etc.
including blind/ damage to assets/ shall be used
screens etc. facilities. Water shall be sprayed to reduce dust.
Personnel injury. Operator shall ensure 360 degree vision at
all times.
6. Mechanical excavation Collapsing of side Serious Personnel 3 2 6 Shoring, Shielding, bench cutting or slope 1 2 2
walls into the injury cutting shall be provided to prevent soil
excavated area collapse.
Site staff of Petrofac and subcontractor
must have combined inspection to assess
the risk of each trench prior to sending
workers in to the trench
Supervisor shall assess soil condition to
establish extent of benching or shoring.
Collapsing of stored Serious Personnel 3 2 6 Excavated soil shall be stored away from 1 2 2
soil into excavated injury the edges of trench by 1 to 1.5 meters.
area