Conventional Metal Formwork for Drainage Wall
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 24 KN/m3
Height of column, H= 2100 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I = 437756 mm4
Loading computation
Spacing above 1st tie rod = 0 mm = 0.00 m
Spacing above 2nd tie rod = 600 mm = 0.60 m
Spacing above 3rd tie rod = 600 mm = 0.60 m
Spacing above 4th tie rod = 600 mm = 0.60 m
Spacing above base = 300 mm = 0.30 m
Max Horizontal Force (1st tie rod) Pupper = 0.00 Ptie rod = 0 Plower = 7.20 KN/m2
Max Horizontal Force (2nd tie rod) Pupper = 7.20 Ptie rod = 14.4 Plower = 21.60 KN/m2
Max Horizontal Force (3rd tie rod) Pupper = 21.60 Ptie rod = 28.8 Plower = 36.00 KN/m2
Max Horizontal Force (4th tie rod) Pupper = 36.00 Ptie rod = 43.2 Plower = 50.40 KN/m2
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 24 KN/m3
Height of column, H= 2100 mm
Tie rod diameter, d= 16 mm
Tie rod cross area, A= 201.1 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 100 mm = 0.10 m
Spacing above 2nd tie rod = 1100 mm = 1.10 m
Spacing above 3rd tie rod = 600 mm = 0.60 m
Spacing above base = 300 mm = 0.30 m
Max Horizontal Force (1st tie rod) Pupper = 0 Ptie rod = 2.4 Plower = 15.60 KN/m2
Max Horizontal Force (2nd tie rod) Pupper = 15.6 Ptie rod = 28.8 Plower = 36.00 KN/m2
Max Horizontal Force (3rd tie rod) Pupper = 36 Ptie rod = 43.2 Plower = 50.40 KN/m2
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 24 KN/m3
Height of column, H= 2400 mm
Tie rod diameter, d= 16 mm
Tie rod cross area, A= 201.1 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 150 mm = 0.15 m
Spacing above 2nd tie rod = 750 mm = 0.75 m
Spacing above 3rd tie rod = 600 mm = 0.60 m
Spacing above 4th tie rod = 600 mm = 0.60 m
Spacing above base = 300 mm = 0.30 m
= 1.4 KN.m
Plastic Modulus, Wpl Wpl = 14060 mm3
Bending moment resistant, R = 2Wpl*fy/γmo
= 7.7 KN.m
Factor of safety, = R/M
= 2.6 ok!
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 KN/m3
Height of column, H= 2600 mm
Tie rod diameter, d= 13 mm
Tie rod cross area, A= 132.7 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I = 437756 mm4
Loading computation
Spacing above 1st tie rod = 100 mm = 0.10 m
Spacing above 2nd tie rod = 900 mm = 0.90 m
Spacing above 3rd tie rod = 750 mm = 0.75 m
Spacing above 4th tie rod = 600 mm = 0.60 m
Spacing above base = 250 mm = 0.25 m
Max Horizontal Force (1st tie rod) Pupper = 0.00 Ptie rod = 2.6 Plower = 14.30 KN/m2
Max Horizontal Force (2nd tie rod) Pupper = 14.30 Ptie rod = 26 Plower = 35.75 KN/m2
Max Horizontal Force (3rd tie rod) Pupper = 35.75 Ptie rod = 45.5 Plower = 53.30 KN/m2
Max Horizontal Force (4th tie rod) Pupper = 53.30 Ptie rod = 61.1 Plower = 67.60 KN/m2
Max Horizontal Force (1st prop) Pupper = 0.00 Ptie rod = 2.6 Plower = 14.30 KN/m2
Max Horizontal Force (2nd prop) Pupper = 14.30 Ptie rod = 26 Plower = 43.55 KN/m2
Max Horizontal Force (3rd prop) Pupper = 43.55 Ptie rod = 61.1 Plower = 67.60 KN/m2
Code of practice
Eurocode 3 Design of Steel Structures
Design Information
Density of steel = 7850 kg/m3
Plate Properties
Grade = S275
Plate Width, Bp Bp = 55 mm
Plate Length, Dp Dp = 600 mm
Plate Thickness, tp t = 2.75 mm
Hole diameter,do do = 13 mm
Proposed Lug Dimension Proposed a = 24 mm
Proposed Lug Dimension Proposed c = 290 mm
Yield Strength of Plate, fy fy = 265 N/mm2
Ultimate Strength of Plate, fu fu = 410 N/mm2
Material safety factor for steel ϒM2 = 1.25
Geometrical Requirements for Pin Ended Members
Material safety factor for steel, gM0 = 1 SS EN1993-1-8
Pin Connections
Grade = S275
Material safety factor for steel, gM2 = 1.25
Pin diameter dpin = 13 mm
Pin Shear Area Av = 132.7 mm2
Pin Effective Shear Area Av,eff = 0.9*Av = 119.5 mm2
Section Modulus Wel = 216 mm3
Pin Yield Strength fy,pin = 265
Pin Tensile Strength fu,pin = 410
Pin Shear Resistance, Fv,Rd=0.6*Av,eff*fu,pin/γM2 = 23.5 kN Ok!
Bearing Resistance of Plate/Pin Fb,Rd=1.5*t*dpin*fy/γM0 = 14.21 kN Ok!
SGT Engineering Consultancy Pte Ltd
Project: Geyland Planning area
Job No 2301
Subject: Design of Pilecap Formwork_43PC1A
Design by: SK
Checked by: LJJ
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 kN/m3
Height of concrete, H= 2900 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 350 mm = 0.35 m
Spacing above 2nd tie rod = 700 mm = 0.70 m
Spacing above 3rd tie rod = 600 mm = 0.60 m
Spacing above 4th tie rod = 400 mm = 0.40 m
Spacing above 5th tie rod = 300 mm = 0.30 m
Spacing above 6th tie rod = 300 mm = 0.30 m
Spacing above base = 250 mm = 0.25 m
Loading computation:
Loading on each pipe (unfactored) Ned = 1.6 KN
Section Classification: =
Ɛ = 0.92
d/t = 19.32 <55Ɛ2 = 47
Section is class 1!
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 KN/m3
Height of concrete, H= 2300 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 600 mm = 0.60 m
Spacing above 2nd tie rod = 750 mm = 0.75 m
Spacing above 3rd tie rod = 400 mm = 0.40 m
Spacing above 4th tie rod = 300 mm = 0.30 m
Spacing above base = 250 mm = 0.25 m
Design Resistance per unit length of Weld, F w,Rd = 0.49 kN/mm > Fw,Ed, Ok!
SGT Engineering Consultancy Pte Ltd
Project: Geyland Planning area
Job No 2301
Subject: Design of Pilecap Formwork_2PC2A-2_With slope excavation
Design by: SK
Checked by: LJJ
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 kN/m3
Height of concrete, H= 2900 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 400 mm = 0.40 m
Spacing above 2nd tie rod = 800 mm = 0.80 m
Spacing above 3rd tie rod = 500 mm = 0.50 m
Spacing above 4th tie rod = 350 mm = 0.35 m
Spacing above 5th tie rod = 300 mm = 0.30 m
Spacing above 6th tie rod = 250 mm = 0.25 m
Spacing above base = 300 mm = 0.30 m
Load on GI Pipe
Width of pile cap, = 2570 mm
Length of pile cap, = 6000 mm
Load distribution, = 1 way
Total weight of concrete pile cap, = 1162.7 KN
Horizontal force on props, = 14.5 KN (consider 2.5% of vertical force)
Spacing of props = 1200 mm
Number of props, = 6
Compression force on upper prop, = 3.4 KN (consider 45o to horizontal plane)
Checking of GI pipe 48.3 x 2.5mm
Pipe Property:
Diameter of pipe d = 48.3 mm
Thickness of pipe t = 2.5 mm
Area of pipe A = 360.0 mm2
Young Modulus, E = 205000 N/mm2
Yeild strength, S275 material fy = 275 N/mm2 (t<16mm)
Second moment of area (inertia) I = 94600 mm4
Radius of Gyration r = 16.2 mm
Elastic section modulus z = 3920 mm3
Plastic section modulus S = 5250 mm3
Loading computation:
Loading on each pipe (unfactored) Ned = 3.4 KN
Section Classification: =
Ɛ = 0.92
d/t = 19.32 <55Ɛ2 = 47
Section is class 1!
Checking of 12mm dia U-Clip and Pin details during concrete casting
Let's do the checking for U-clip at lowest bottom where the concrete horizontal force will be
maximum.
Length of one panel 300 mm
=
Width of one panel = 150 mm
Unit weight of concrete, γ = 26 KN/m3
Height of concrete h = 2.9 m
Max. lateral concrete pressure = 75.4 KN/m
2
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 kN/m3
Height of concrete, H= 4900 mm
Tie rod diameter, d= 15 mm
Tie rod cross area, A= 176.7 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 3.0 mm
Plastic Modulus, Wpl Wpl = 17942 mm3
Section area A= 714 mm2
Second moment of area (inertia) I= 553279 mm4
Loading computation
Spacing above 1st tie rod = 550 mm = 0.55 m
Spacing above 2nd tie rod = 600 mm = 0.60 m
Spacing above 3rd tie rod = 600 mm = 0.60 m
Spacing above 4th tie rod = 600 mm = 0.60 m
Spacing above 5th tie rod = 600 mm = 0.60 m
Spacing above 6th tie rod = 600 mm = 0.60 m
Spacing above 7th tie rod = 600 mm = 0.60 m
Spacing above 8th tie rod = 500 mm = 0.50 m
Spacing above base = 250 mm = 0.25 m
Load on GI Pipe
Width of skin wall, = 300 mm
Length of skin wall, = 5100 mm
Load distribution, = 1 way
Total weight of concrete skin wall, = 194.9 KN
Horizontal force on props, = 1.6 KN (consider 2.5% of vertical force)
Spacing of props = 4300 mm
Number of props, = 2
Compression force on upper prop, = 1.8 KN (consider 65o to horizontal plane)
Loading computation:
Loading on each pipe (unfactored) Ned = 1.8 KN
Section Classification: =
Ɛ = 0.92
d/t = 14.861538 <55Ɛ2 = 47
Section is class 1!
240 N/mm
2
Fty =
240 N/mm
2
Compression, Fcy =
165 N/mm
2
Shear, Fsu =
138 N/mm
2
Fsy =
Ms = w l2 /8
= 2.7 kNm
Vs = w x l/2
= 18.1 kN
Design Criteria
Code of Practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
CP7:1978 Singapore Standard
Design Information
Unit Weight of Concrete, γc = 26 kN/m3 (including reinforcement)
Height of Concrete, H= 3450 mm
Tie Rod Diameter, d= 12 mm
Tie Rod Cross-Sectional Area, A= 113.1 mm2
205000 N/mm
2
Steel Grade 275 Young Modulus, Es =
RHS Information
Outer Width, b= 50 mm
Outer Depth, h= 75 mm
Thickness, t= 3.0 mm
Plastic Modulus, Wpl = 17942 mm3
Sectional Area, A= 714 mm2
Second Moment of Area (Inertia), I= 553279 mm4
Design Calculation
Loading Computation
Spacing above 1st tie rod = 200 mm = 0.20 m
Spacing above 2nd tie rod = 750 mm = 0.75 m
Spacing above 3rd tie rod = 750 mm = 0.75 m
Spacing above base = 300 mm = 0.30 m
1 1
2 2
Triangle Pressure from 1.325m to 2.0m, σh ' = 4.61 kN/m2
Total Rectangle Pressure, σh ' = 39.06 kN/m2
Max UDL on the RHS, q= 29.3 kN/m
RHS Vertical Span, L1 = 500 mm
Bending Moment, M = q.L12 / 8 M= 0.92 kN.m
RHS Vertical Span (Cantilever), L2 = 300 mm
Bending Moment (Cantilever), M = q.L / 2
2
2
M= 1.32 kN.m
Plastic Modulus, Wpl = 17942 mm3
Bending Moment Resistant, MRd = 2.Wpl.fy / γmo MRd = 4.93 kN.m
Factor of Safety, FOS = MRd / M FOS = 3.7 > 2 OK!
Loading computation:
Maximum Pressure, σh ' = 39.06 kN/m
2
Span, L= 0.25 m
Load per m Length w= 39.06 kN/m
Max. Bending Moment, M = w.L2 / 10 M= 0.244 kN.m
Max Shear Force, F = 0.5w.L F= 4.88 kN
Section Modulus Z = Bt2 / 6 Z= 54000 mm3
Second Moment of Area (Inertia), I = Bt p3 / 12 I= 486000 mm4
Number of plywood, n= 1 nos
Bending Stress, τ= 4.52 N/mm
2
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 kN/m3
Height of concrete, H= 2500 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 350 mm = 0.35 m
Spacing above 2nd tie rod = 700 mm = 0.70 m
Spacing above 3rd tie rod = 500 mm = 0.50 m
Spacing above 4th tie rod = 400 mm = 0.40 m
Spacing above 5th tie rod = 300 mm = 0.30 m
Spacing above base = 250 mm = 0.25 m
Load on GI Pipe
Width of pile cap, = 2100 mm
Length of pile cap, = 56360 mm
Load distribution, = 1 way
Total weight of concrete pile cap, = 7693.1 KN
Horizontal force on props, = 64.1 KN (consider 2.5% of vertical force)
Spacing of props = 1200 mm
Number of props, = 48
Compression force on upper prop, = 3.2 KN (consider 65o to horizontal plane)
Checking of GI pipe 48.3 x 2.5mm
Pipe Property:
Diameter of pipe d = 48.3 mm
Thickness of pipe t = 2.5 mm
Area of pipe A = 360.0 mm
2
Loading computation:
Loading on each pipe (unfactored) Ned = 3.2 KN
Section Classification: =
Ɛ = 0.92
d/t = 19.32 <55Ɛ2 = 47
Section is class 1!
Checking of 12mm dia U-Clip and Pin details during concrete casting
Let's do the checking for U-clip at lowest bottom where the concrete horizontal force will be
maximum.
Length of one panel 300 mm
=
Width of one panel = 150 mm
Unit weight of concrete, γ = 26 KN/m3
Height of concrete h = 2.5 m
Max. lateral concrete pressure = 65.0 KN/m
2
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 kN/m3
Height of concrete, H= 2600 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 350 mm = 0.35 m
Spacing above 2nd tie rod = 700 mm = 0.70 m
Spacing above 3rd tie rod = 500 mm = 0.50 m
Spacing above 4th tie rod = 400 mm = 0.40 m
Spacing above 5th tie rod = 300 mm = 0.30 m
Spacing above base = 250 mm = 0.25 m
Load on GI Pipe
Width of pile cap, = 2100 mm
Length of pile cap, = 43735 mm
Load distribution, = 1 way
Total weight of concrete pile cap, = 6208.6 KN
Horizontal force on props, = 51.7 KN (consider 2.5% of vertical force)
Spacing of props = 1200 mm
Number of props, = 37
Compression force on upper prop, = 3.5 KN (consider 65o to horizontal plane)
Checking of GI pipe 48.3 x 2.5mm
Pipe Property:
Diameter of pipe d = 48.3 mm
Thickness of pipe t = 2.5 mm
Area of pipe A = 360.0 mm
2
Loading computation:
Loading on each pipe (unfactored) Ned = 3.5 KN
Section Classification: =
Ɛ = 0.92
d/t = 19.32 <55Ɛ2 = 47
Section is class 1!
Checking of 12mm dia U-Clip and Pin details during concrete casting
Let's do the checking for U-clip at lowest bottom where the concrete horizontal force will be
maximum.
Length of one panel 300 mm
=
Width of one panel = 150 mm
Unit weight of concrete, γ = 26 KN/m3
Height of concrete h = 2.6 m
Max. lateral concrete pressure = 67.6 KN/m
2
Code of practice
Eurocode 3 Design of Steel Structures
SS580 Design of Formwork
Design Information
Unit weight of concrete, γ= 26 kN/m3
Height of concrete, H= 2500 mm
Tie rod diameter, d= 10 mm
Tie rod cross area, A= 78.5 mm2
For a RHS,
Outer Width b= 50 mm
Outer Depth h= 75 mm
Thickness t= 2.3 mm
Plastic Modulus, Wpl Wpl = 14060 mm3
Section area A= 554 mm2
Second moment of area (inertia) I= 437756 mm4
Loading computation
Spacing above 1st tie rod = 350 mm = 0.35 m
Spacing above 2nd tie rod = 700 mm = 0.70 m
Spacing above 3rd tie rod = 500 mm = 0.50 m
Spacing above 4th tie rod = 400 mm = 0.40 m
Spacing above 5th tie rod = 300 mm = 0.30 m
Spacing above base = 250 mm = 0.25 m
Load on GI Pipe
Width of pile cap, = 2100 mm
Length of pile cap, = 56360 mm
Load distribution, = 1 way
Total weight of concrete pile cap, = 7693.1 KN
Horizontal force on props, = 64.1 KN (consider 2.5% of vertical force)
Spacing of props = 1200 mm
Number of props, = 48
Compression force on upper prop, = 3.2 KN (consider 65o to horizontal plane)
Checking of GI pipe 48.3 x 2.5mm
Pipe Property:
Diameter of pipe d = 48.3 mm
Thickness of pipe t = 2.5 mm
Area of pipe A = 360.0 mm
2
Loading computation:
Loading on each pipe (unfactored) Ned = 3.2 KN
Section Classification: =
Ɛ = 0.92
d/t = 19.32 <55Ɛ2 = 47
Section is class 1!
Checking of 12mm dia U-Clip and Pin details during concrete casting
Let's do the checking for U-clip at lowest bottom where the concrete horizontal force will be
maximum.
Length of one panel 300 mm
=
Width of one panel = 150 mm
Unit weight of concrete, γ = 26 KN/m3
Height of concrete h = 2.5 m
Max. lateral concrete pressure = 65.0 KN/m
2
Code of practice
Eurocode 3 Design of Steel Structures
Design Information
Density of steel = 7850 kg/m3
Plate Properties
Grade = S275
Plate Width, Bp Bp = 55 mm
Plate Length, Dp Dp = 300 mm
Plate Thickness, tp t = 2.45 mm
Hole diameter,do do = 13 mm
Proposed Lug Dimension Proposed a = 26 mm
Proposed Lug Dimension Proposed c = 60 mm
Yield Strength of Plate, fy fy = 265 N/mm2
Ultimate Strength of Plate, fu fu = 410 N/mm2
Material safety factor for steel ϒM2 = 1.25
(2) Checking for vertical U-clip at top most where the clip will carry the maximum self weight of panel
Design Information
Density of steel = 7850 kg/m3