Professional Documents
Culture Documents
SBC Terms & Condition-2
SBC Terms & Condition-2
INVESTIGATION
3 Carrying out SPT or dynamic cone penetration tests as per IS requirement for each
different type of strata met with at an interval of 1.5 m or change of strata whichever is
earlier.
Page 1 | 1