Ewoyaa Ss Boq

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

MATERIAL SCHEDULE FOR PROPOSED EWOYAA SS

S.NO

1
2
3
4
5
6
7
9
10

11
12
13
14
15

16
17
18
19
20
21
22
MATERIAL SCHEDULE FOR PROPOSED EWOYAA SS
MATERIAL DESCRIPTION
Incoming Side (34.5kV)
30kV 10kA Lightening Arrester (00-VS-001, 002 & 004)
800A Isolator with One Earth Switch (00-IS-001)
800A Isolator without Earth Switch (00-IS-002, 004)
34.5kV 600-300/5 Incomer CTs (XXX/XA)
36kV 800A Outdoor PTR VCB (00-CB-001, 002, 004)
34.5kV C&R Panel (00-CP-001,002)
34.5kV Voltage Transformer (00-VT-001,002,003) with Voltmeter
34.5kV 600/5A or 900/5A PTR CT (Differential) / NCT (XXX/XA)
34.5kV 200A HG Fuse (XXXA)
Secondary Side (11kV)
9kV 10kA Lightening Arrester (00-VS-003, 005, 006 & 007)
630A Isolator without Earth Switch (00-IS-003, 005)
12kV 630A Outdoor VCB (00-CB-003, 005)
11kV 300/5A or 600/5A PTR CT (Differential) / NCT (XXX/XA)
Neutral Earthing Resistor
Other Substation Materials
Substation Steel Structures
Conductor
Clamps & Connectors
Power cable: 1x630 sqmm incl. termination Kit
Power cable: 3x300 sqmm incl. termination kit
Unarmoured Cu Control Cables
Substation Earthing Material (150Sq.mm Conductor, Rods, Clamps, Connectors/Lugs,etc.)
UNIT Qty

Nos 3
Set 1
Set 2
Nos 2
Nos 3
Nos 2
Nos 3
Nos 2
Set 3

Nos 4
Set 6
Nos 2
Nos 4
Nos 1

MT 8
Mtrs 300
LS 1
Mtrs 300
Mtrs 100
Mtrs 2000
Ls 1