ITEM *CONTRACTOR - COMMENTS / RECOMMENDATIONS ITEM *ENGINEER's - COMMENTS / RECOMMENDATIONS ITEM PM's - COMMENTS / RECOMMENDATIONS
1 Katerra is conducting weekly tool box talk to all workers 1 Contractor has to provide Rest Facilities and provide potable water near working areas. 1 Contractor should update Project specific HSE Plan
KATERRA should provide an adequate number of toilets for number of existing workers
2 First Aid room provided with first aid kit and supplies. 2 2 Contractor should ensure availability of emergency vehicle
3 Regular Housekeeping is being maintained on site. 3 PPE must be worn all the times at site specially during panel erection . 3 Contractor should assign sufficient fire wardens on site
4 Mobilization of Offices and Welfare facility in progress. 4 KATERRA has to follow the approved HSSE Plan. 4 Contractor should provide COSHH Store
5 Safety Signages being posted on site as well as offices area. 5 proper housekeeping at site is required as well as inside the villas. 5 Contractor should submit 3rd party competency log
6 Waste skip provided on site. 6 Contractor has to provide detergents in the toilets and regular cleaning personnel. 6 Contractor should follow waste management plan
Contractor should provide approved lifting plan for precast boundary wall and soak
7 6 Fire wardens trained and their names displayed on notice boards. 7 Safety orientation / Induction & Random Toolbox talk and Task safety Briefing is recommended 7
pit chamber installtions
8 Lifting Permit followed for all crane lifting activities. 8 eye protection, safety glasses and face shield has to be provided when needed 8
9 Installing edge protection for roof Activity. 9 KAT is instructed to provide qualified safety officer, male nurse and 1st Aid kits at the site.
Periodic Maintenance of diesel denerator conducted by the dupplier
10 10 The contractor has been instructed to conduct safety drills, inductions, toolbox talks..etc.
technician.
Manpower (Day- Staff-21 , Workers- 92=Total 93 Manpower (Staff - 06) Manpower (Staff - 04)
(Night- Staff- 0, Workers-0=Total 0) Cumulative- 113 Grand Total - 113
Form Ref:.....................
Form Rev: (...........)
Form Issue Date:........... Page 1 of 2
Site Area cleaning Excavated Area Barrigation & Warning Tape Installing Site Area cleaning
Form Ref:.....................
Form Rev: (...........)
Form Issue Date:........... Page 2 of 2