Daily Quality Report (DQR)

Date: 04/07/2024 SAT SUN MON TUE


DQR Number:
Day:
220 WED THU FRI

Program Title Developmental Housing Project of Saudi Arabia


Project Title Developmental Housing Program – Hajar
Client National Housing Company
PM Consultant Dar Al Riyadh
Engineer Omran Engineering Consultants
Contractor Katerra Saudi Arabia LLC

A. Details of QA/QC Staff at Site:

Attendance
S.N. Name Designation
Present Absent
1. Khalid Ismail QA/QC Manager Yes
2. Mohsin Aslam QC Inspector Yes
3. Sanjay Kumar Matu Ram Lab Technician Yes

B. Quality Assurance / Quality Control Activities Performed on Previous Day:

S.
Achieved QA/QC Activities on Previous Day Remarks
N.
1
2
3

C. Quality Assurance / Quality Control Activities Planned for Today:

S.N. Planned QA/QC Activities for Today Remarks


1
2
3

Form Ref: …………… Page 1 of 2


Form Rev (………….)
Form Issue Date: ……
D. Non – Conformities:

NCR Correction/ Corrective/


S.N. Details of NCR
Number Preventive Actions Taken
- - - -

E. Other Remarks including any obstacles or difficulties facing implementation


of Quality Assurance / Quality Control procedures at site:

Consultant’s Comments
1-The contractor must maintain proper storage for delivered materials at the site,
especially UG Tanks.

PMs Comments

Contractor CS Consultant PM Consultant


Mohsin Aslam ELSADIG THABIT Ahmed Aman
Resident Engineer Quality Engineer

Form Ref: …………… Page 2 of 2


Form Rev (………….)
Form Issue Date: ……