ROAD EDGE

BC - 40

DBM I&II -105

WMM II - 125 COPING BEAM TOP LEVEL


(REFER TABLE-1)
SIDE VIEW OF 16Ø 'U' BOLT
WMM I - 125
GSB II -100
GSB I -100

REINFORCEMENT DETAIL OF FRICTION


DIMENSION DETAIL OF FRICTION SLAB WITH CRASH BARRIER
SLAB WITH CRASH BARRIER

DETAIL OF LIFTING HOOK


PLAN OF PRECAST FRICTION SLAB

CLIENT : EPC CONTRACTOR: AUTHORITY ENGINEERS: DESIGN DIRECTOR : RE WALL PREPARED BY: DRAWING TITLE : STAMP & SIGNATURE
NATIONAL HIGHWAYS AUTHORITY M/s Shiv India Pvt. Ltd. JV ELEVATION OF RE WALL
OF INDIA Kaluwala Construction Pvt. M/S LN MALVIYA INFRA V.S.
ROB CH.@ 20+399
DESIGN
R4 AS PER REVISED GAD 20.08.2021 S.R.
Ltd. PROJECTS PVT. LTD. IN TRANZROAD CONSULTING DRAWING NO.-
SH. NO.-
ASSOCIATION WITH ENGINEER S.S. NHAI/SBI-KCC/NH-444A/TR/ELE/01 05/09
R3 AS PER REVISED GAD 15.06.2021 S.R. DRAWN
PROJECT : PROOF CONSULTANT: HIGHWAYS ENGINEERING
R2 AS PER REVISED GAD 08.06.2021 S.R. SAFETY CONSULTANT:
CONSULTANT S.R.
SCALE :
CHECKED.
R1 AS PER CHANGE BACKFILL 02.06.2021 S.R. STARV FORGIVING ROADS LLP 2M 1 0 2 4M
R0 SUBMISSION FOR APPROVAL 18.05.2021 S.R.
APPROVED. V.S.
REV. DESCRIPTION DATE CHECKED DATE 18.05.2021

You might also like