Professional Documents
Culture Documents
SAP_S4CON_Certification_Dump
SAP_S4CON_Certification_Dump
1) A table has been chosen for ICNV. How are database operations synchronized between the
source and the target table?
Right Answer: -
2) You are running an SAP ECC System. For which of the following activities does SUM allow
you to use NZDM Capabilities.?
Right Answers:-
3) You want to use the downtime-optimized data conversion for your SAP S/4 HANA
conversion. What is the main difference from SAP Standard S/4HANA conversion?
Right Answer:-
4) You are performing an upgrade of an SAP ECC development System with SUM. What is the
earliest point when upgrade is considered complete and you allow all dialog users to log on
the system?
Right Answer:-
During the SUM Roadmap step ‘Postprocessing’, after the post procedure steps are complete.
Right Answer:-
The upgrade of the PRD must be finished before you import any transports from the upgraded DEV
system into the PRD.
6) You are planning an S/4HANA conversion. Which conversion specific tasks need to be
performed during the preparation phase ?
Right Answers:-
Right Answers:-
Import the transport request from development system that contains the recording of the
activation.
8) You want to execute Unicode conversion only. Which approach do you need to follow?
Right Answer:-
Right Answer:-
13) SUM was registered at the SAP Host Agent. Based on which information does the SAP Host
agent determine the path to the SUM directory?
Right Answer:-
The path was stored in file sumabap.conf during registration.
Topic—Modification Adjustments
14) How does SUM recognize modification adjustment transports from predecessor system?
Right Answer:-
15) Which steps should be performed during the adjustment of dictionary objects in the
development system, before SUM continues?
Right Answers:-
16) You are performing an SAP S/4HANA conversion for your development system. Which
credentials do you use in which system to perform the adjustment of dictionary
objects(SPDD) ?
Right Answer:-
17) During the upgrade of your development system , you run into the adjustment of non-
dictionary objects, handled by transaction SPAU. There you find programs that are shown in
status ‘automatic adjustment’ (green traffic light). What will happen with these programs
when you continue with your upgrade without performing any other actions inside your SAP
System?
Right Answer:-
SUM continues with next phase and your modifications are lost.
Right Answers:-
19) What do you need to consider when performing pre-checks for an SAP S4HANA conversion.?
Right Answers:-
Depending on the SAP S4HANA version, there are different pre-check frameworks.
20) You performed a custom code check for an SAP s4HANA conversion. In which transaction
can you review the results?
Right Answers:-
SE80(object navigator).
21) In which scenarios do you need to use SUM 2.0 instead SUM1.0 ?
Right Answers:-
22) You want to use custom code migration worklist via remote code analysis using ABAP Test
cockpit. How can you get the latest content of the simplification database?
Right Answer:-
23) You want to perform custom code check via ABAP test cockpit in preparation of your SAP
S/4HANA conversion? What kind of SAP System can you use to generate the custom code
migration worklist ?
Right Answers:-
24) Which preparational steps must be performed for an SAP S4HANA conversion?
Right Answers:-
Right Answers:-
Unicode conversion is a part of DMO only in case of target version AS ABAP 7.40 or 7.31.
26) What phases of SUM will be executed during an s4HANA conversion including DMO?
Right Answers:-
Phases EU_IMPORT.
Phase DOWNCONF_DTTRANS.
Phases DIFF.
27) What is the difference between benchmarking and repetition option of DMO of SUM?
Right Answer:-
28) What are the benefits of using the benchmarking option of the DMO for sUM ?
Right Answers:-
You can find the optimal number of parallel R3load processes by monitoring host performance. You
can verify that the content of the download directory matched stack.xml file.
You can obtain migration duration files that can be used to optimize the next runs.
29) You have chosen the advanced option during the main configuration of SUM tool. Which
steps take place via shadow instance?
Right Answers:-
Modification adjustment(SPDD).
Right Answer:-
These are 40 pairs of R3Load Processes,so there are 80 R3Load processes running.
31) What are the valid options to check the progress of the database migration in a standard
DMO Procedure?
Right Answers:-
32) During the SUM Procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see
the reason for the error?
Right Answers:-
In the latest log files in the SUM Directory, subdirectory ABAP, subdirectory Log.
33) During a SUM run, you want to check if the phase SHADOW_IMPORT_INC is still running
properly. Where can you find information about this?
Right Answers:-
Check latest log files in the SUM Directory, subdirectory ABAP, subdirectory tmp.
Check for running R3Trans processes on the host of the primary application server.
Right Answer:-
A change of the database type is performed, without changing the software components.
35) You are using the maintenance planner to calculate the required software components for
your SAP S4HANA conversion. What do you need to know regarding sUM?
Right Answer:-
As soon as the next SP level of SUM is available, the current version of SUM passes into “patch on
request mode” immediately .
36) You are performing an upgrade with SUM using DMO. You entered a specific number of
R3load processes during roadmap step ‘Extraction’. Where can you change this during the
migration via the ‘More-utilities’ option of the SUM UI ?
Right Answers:-
In SUM Parameters.
37) When using the DMO of SUM, which files can be handled by SUM in the download directory.
Right Answers:-
38) What is the benefit of using the file UPGANA.XML from a previous SUM run?
Right Answer:-
39) Which additional configuration options are offered by SUM when selecting ‘Switch expert
mode on’ in main configuration option standard?
Right Answers:-
Right Answer:-
41) During the configuration of DMO for SUM, how does the tool behave if option ‘do not
compare table contents’ is selected regarding table comparison?
Right Answer:-
42) You are performing a upgrade with SUM. You are in BIND_Patch phase of the roadmap step
configuration. For some software components you find entries in the calculated level
column. What does the calculated level indicate for those software components?
Right Answer:-
43) Which circumstances will allow SUM to run without the creation of a shadow system?
Right Answer:-
Using the main configuration option ‘Single system’ when installing an Add-on.
44) During a dMO Procedure with SUM,after which phase repository available on the target
database?
Right Answer:-
Uptime Migration(EU_CLONE_MIG_UT_RUN).
45) You want to perform an SAP S4HANA conversion using SUM with DMO. Which steps run
before the beginning of the technical downtime,independent of your SUM configuration ?
Right Answers:-