Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

DEMO - A350 - Line Maintenance - 01-Jul-2021 - A350-A-24-71-XX-0A0… of the Electrical Power Distribution System (EPDS) (System Test) 20/9/21

21 0:20

AIRCRAFT REVISION REVISION


CUSTOMIZATION DOCTYPES TITLE
TYPES DATE NUMBER
A350-A-24-71-XX-0A001-343A-A - BITE Test of the
Line 01-Jul-
DEMO A350 000 Electrical Power Distribution System (EPDS)
Maintenance 2021
(System Test)
TAIL NUMBER - MSN - FSN:
Print date: 2021-09-20 00:19:29

DM status information

DM Code : A350-A-24-71-XX-0A001-343A-A
Airline : DEMO
Issue Number : 000
Issue Date : Jul 01/21
Breakdown Title : Electrical Power Distribution Center (EPDC) Interface
BITE Test of the Electrical Power Distribution System (EPDS)
DM Title :
(System Test)
Applicability : ON A/C MSN ALL
Aircraft Type : A350
DM Producer : FAPE3
Language : Simplified English
Copyright : A350-A-00-65-XX-10000-021A-D

ON A/C MSN ALL


TASK A350-A-24-71-XX-0A001-343A-A
BITE Test of the Electrical Power Distribution System (EPDS) (System Test)
1. General

A. Reason for the Job


Self Explanatory

B. Additional information
This procedure gives the instructions necessary to do a check of the system test of the
EPDS, that follow:
- System test — Side 1
- System test — Side 2.

2. Job Set-Up Information

A. Work Zones.

ZONE ZONE DESCRIPTION


COCKPIT FROM FORWARD PRESSURE BULKHEAD TO AFT
210
PARTITION.

https://w3.airbus.com/1T40/document/520418_S1KD_C/toc?itemId=…&wc=actype:A350;customization:DEMO;doctype:Line%20Maintenance Página 1 de 3
DEMO - A350 - Line Maintenance - 01-Jul-2021 - A350-A-24-71-XX-0A0… of the Electrical Power Distribution System (EPDS) (System Test) 20/9/21 0:20

B. Referenced Information.

REFERENCE DESIGNATION
A350-A-24-41-XX-00ZZZ- MP - De-energize the Aircraft Electrical Circuits from
561Z-A External Power Receptacle 1
A350-A-24-41-XX-00ZZZ- MP - Energize the Aircraft Electrical Circuits from External
761Z-A Power Receptacle 1
A350-A-24-71-XX-00ZZZ-
MP - Get Access to "C/B Management"
170Z-A
A350-A-45-XX-XX-00ZZZ- MP - Get Access to the "MAINTENANCE HOME PAGE"
132Z-A Page and to the Maintenance Applications
A350-A-45-XX-XX-00ZZZ-
MP - Close Maintenance Session
133Z-A

3. Job Set-Up
SUBTASK 2471XX-10100040001
A. Aircraft Maintenance Configuration

(1) Before you start the EPDS test:


- Make sure that the APU start procedure is not launched.
- If the APU start procedure is launched, wait the end of the procedure
before to do the EPDS test.

(2) Energize the aircraft electrical circuits


Ref. MP A350-A-24-41-XX-00ZZZ-761Z-A.

(3) On a maintenance terminal, get access to the “MAINTENANCE HOME PAGE”


Ref. MP A350-A-45-XX-XX-00ZZZ-132Z-A .

(4) On the “MAINTENANCE HOME PAGE”, select “C/B Management”


Ref. MP A350-A-24-71-XX-00ZZZ-170Z-A.

SUBTASK 2471XX-86500180001
B. Make sure that this(these) circuit breaker(s) is(are) closed:

PANEL DESIGNATION FIN LOCATION


CBP1 C/B-CPIOM J71 3211TF 5AC07
EPDC2 SSPC-CPIOM J72 3120TF SSPC

4. Procedure
SUBTASK 2471XX-50000020001
A. BITE Test of the Electrical Power Distribution System (EPDS) (System Test)
EPDS AND EXT LT - System test - EPDC - Side 1
EPDS AND EXT LT - System test - EPDC - Side 2

NOTE: If an error message is shown, it is necessary to record the related fault code
and then do the related Fault Isolation procedure.

NOTE: If an interruption of the BITE test occurs, you must ignore the pop-up

https://w3.airbus.com/1T40/document/520418_S1KD_C/toc?itemId=…&wc=actype:A350;customization:DEMO;doctype:Line%20Maintenance Página 2 de 3
DEMO - A350 - Line Maintenance - 01-Jul-2021 - A350-A-24-71-XX-0A0… of the Electrical Power Distribution System (EPDS) (System Test) 20/9/21 0:20

message that comes into view.

ACTION RESULT
1. On the maintenance terminal, on the On the maintenance terminal:
“MAINTENANCE HOME PAGE”, select:
- “System Report/Test & Scanning”. - The “SYSTEM REPORT/TEST &
SCANNING” page comes into view.

2. On the “SYSTEM REPORT/TEST &


SCANNING” page, select:
- “ATA 24”
- “EPDS & EXT LT”.

3. On the "SYSTEM REPORT/TEST &


SCANNING" page, in the "Interactive
BITE" window, click:
- “Add” - “EPDS & EXT LT” comes into view in
the “Interactive BITE” window.

- “Start Interactive BITE”. - The “Interactive Mode” page comes


into view.

4. On the “Interactive Mode” page,


select:
- “EPDS tests”.

- “System test — Side 1”. - A progress bar comes into view.

- “System test — Side 2”. - A progress bar comes into view.

5. On the maintenance terminal: On the maintenance terminal:


- Click “Back to function selection” to - The “Interactive BITE-Function
start a new BITE Selection” page comes into view.
test/report/function on the same
system/side.

Or
- Click “CLOSE” to stop the - The “MAINTENANCE HOME PAGE”
interactive mode. comes into view.

Table - TAR (Action/Result)

5. Close-Up
SUBTASK 2471XX-10206140001
A. Put the aircraft back to its initial configuration.

(1) Close the maintenance session


Ref. MP A350-A-45-XX-XX-00ZZZ-133Z-A .

(2) De-energize the aircraft electrical circuits


Ref. MP A350-A-24-41-XX-00ZZZ-561Z-A.

© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

https://w3.airbus.com/1T40/document/520418_S1KD_C/toc?itemId=…&wc=actype:A350;customization:DEMO;doctype:Line%20Maintenance Página 3 de 3

You might also like