1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

0.

38

0.38
7.45 7.45
2:1 SMB 2:1 SMB

0.40
9.00 Total Volume at
Total Volume at 9.05
Station 0+050.00
Station 0+025.00
Cut Area 0.00 Cut Area 0.00

Fill Area 3.11 Fill Area 3.11

5059.97

5060.38

5060.44

5060.38

5059.95
5059.96

5060.35

5060.42

5060.37

5060.05
5059.95
Proposed Level Proposed Level

-4.51

-2.50

4.54
-2.81

0.00

2.50
-4.49

0.00

2.19

4.32
4.52
Proposed Offsets
Proposed Offsets

-12.00 5059.98

5059.97
5059.97

5059.96

5059.96
5059.95

5059.94
5059.98

5059.96

5059.96

5059.96

5059.96

5059.96

5059.96

5059.95

5059.94
Ground Levels Ground Levels

-4.51
-3.72
-12.00

12.00
12.00
-4.49

-3.73

-2.45

0.00

3.73
4.54
0.00

3.72

4.51

7.43
G.L. Offsets G.L. Offsets

0.41
0.00

0.48

0.42

0.00
0.41
0.00

0.39

0.46

0.10
0.00
Level Difference Level Difference

0.40
0.38

7.45 7.45
2:1 2:1
SMB SMB

Total Volume at Total Volume at


9.16 9.27
Station 0+075.00 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 0+100.00 Engaging


Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Cut Area 0.00 Cut Area 0.00

Fill Area 3.47 Fill Area 3.75


5060.41

5059.94

5060.40

5060.48

5060.40

5059.95
5059.96

5060.46

5060.39

5059.95

Proposed Level Proposed Level

-4.64

-3.12
-4.57

-2.19

2.81

0.00

3.12

4.63
0.00

4.60

Proposed Offsets Proposed Offsets

5059.96

5059.94

5059.94

5059.94

5059.94

5059.95
5059.95

5059.95

5059.96
5059.98

5059.96

5059.96

5059.96

5059.95

5059.95

5059.94
5059.94

Ground Levels Ground Levels

-12.00
-12.00

-4.64

-3.72
-4.56

-3.73

12.00
11.57
12.00

-2.60

0.00

3.46
3.73

4.63
0.00

3.73

4.58

G.L. Offsets G.L. Offsets

0.00

0.46

0.54

0.45

0.00
0.00

0.45

0.50

0.44

0.00

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+025 TO 0+100
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 1 OF 102
CHEDKED BY :-
7.45 7.45 SMB

SMB 2:1

0.45
0.45
Total Volume at 9.25 Total Volume at

0.98
Station 0+125.00 Station 0+150.00
Cut Area 0.00 Cut Area 0.13

Fill Area 3.69 Fill Area 3.21

5060.02

5060.52
5059.97

5060.43

5060.50

5060.45

5059.98

5060.46

5060.46

5060.63
Proposed Level Proposed Level

-2.81
-4.64

-4.57

-2.50
4.61
2.19

2.50

4.58
0.00

0.00
Proposed Offsets Proposed Offsets
5059.96

5059.97

5059.97

5059.97

5059.98

5059.98

5059.99

5059.99

5059.99

5059.99

5059.99

5059.99
5059.99

5060.00

5060.40

5060.59

5061.65
Ground Levels Ground Levels
-12.00

-12.00

-10.08
-4.64

-3.73

-4.62

-3.72
-3.11
12.00

12.00
-5.75
0.00

3.73

4.61

0.00

3.73

4.95
G.L. Offsets G.L. Offsets
0.00

0.46

0.53

0.47

0.00

0.03

0.46

0.52

0.24

0.10
Level Difference Level Difference

7.45 7.45

2.31
1.92

65°
SMB
65°

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
9.32 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at Total Volume at 9.81


Station 0+175.00 Station 0+200.00
Cut Area 6.36 Cut Area 9.86

Fill Area 0.01 Fill Area 0.00


5060.59

5060.48

5060.54

5060.47

5061.88

5060.68

5060.48

5060.56

5060.48

5062.29
Proposed Level Proposed Level
-4.22

-4.34

-3.12
-2.19

2.81
0.00

5.14

0.00

3.12

5.54
Proposed Offsets Proposed Offsets
5060.00

5060.00

5060.62
5060.69

5061.19

5061.69

5061.88

5062.80

5060.03

5061.03
5061.10

5061.58

5062.06

5062.29

5063.13
Ground Levels Ground Levels
-12.00

-12.00
-4.18
-3.73

-4.27
-3.73
12.00

12.00
-8.82

0.00

3.73

5.14

0.00

3.73

5.54
G.L. Offsets G.L. Offsets
-0.41
-0.03

-0.65

-1.09

-0.34

-0.69

-1.02

-1.50
0.00

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+100 TO 0+200
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 2 OF 102
CHEDKED BY :-
7.45
SMB 2:1 2:1 SMB

65°
1.05
0.50
Total Volume at 5.22 3.79 9.18
Total Volume at
Station 0+225.00
Station 0+250.00
Cut Area 1.15
Cut Area 0.00
Fill Area 1.10
Fill Area 4.22

5060.11

5060.51

5060.58

5060.52

5061.07

5060.21
5060.00

5060.54

5060.60

5060.54
Proposed Level
Proposed Level

-4.51

-2.81

4.40
0.00

2.19
Proposed Offsets

-4.77

-2.50

4.34
0.00

2.50
Proposed Offsets
5060.00

5060.00

5060.00
5060.03

5060.50

5060.98
5061.06

5062.05

5060.00

5060.00

5060.00

5060.00

5060.00

5060.18

5061.44
Ground Levels
Ground Levels
-12.00

12.00
-4.72

-3.90
-3.68

0.00

3.71
4.29

-12.00

-4.77

-3.68
G.L. Offsets

12.00
0.00

3.32

4.41
G.L. Offsets

-0.26
0.11

0.37

0.08

0.00
Level Difference

0.00

0.54

0.60

0.54

0.04
Level Difference

7.45 7.45
2:1
SMB 2:1 SMB 2:1
SMB
0.54

0.53

9.59

0.56

0.56
Total Volume at Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

9.70
Total Volume at
Station 0+275.00
Station 0+300.00 3.72
Cut Area 0.00 3.73
Cut Area 0.00 4.85 4.85
Fill Area 4.55
Fill Area 4.75
5060.01
5060.00

5060.56

5060.62

5060.55

5060.00

5060.56

5060.64

5060.56

5060.00
Proposed Level
Proposed Level
-4.81

-2.19

2.81
0.00

4.78

Proposed Offsets

-4.85

-3.12

0.00

3.12

4.85
Proposed Offsets
5060.00

5060.00

5060.00

5060.00

5060.00

5060.00

5060.00

5061.00

5059.99

5060.00

5060.00

5060.00

5060.00

5060.00

5060.00

5060.56
Ground Levels
Ground Levels
-12.00

-4.81

-3.70

12.00
0.00

3.73

4.81

5.97

-.3.72
-12.00

-4.85
G.L. Offsets

12.00
8.61
0.00

3.73

4.85
G.L. Offsets
0.01
0.00

0.57

0.62

0.55

Level Difference

0.00

0.56

0.64

0.56

0.00
Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+225 TO 0+300
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 3 OF 102
CHEDKED BY :-
7.45
2:1
SMB

2.31
7.45
2:1
SMB
14.03
11.05 3.72 3.73

1.18
Total Volume at Total Volume at
Station 0+325.00 Station 0+350.00 7.93 5.69
Cut Area 0.00 Cut Area 0.00

Fill Area 8.18 Fill Area 16.69

5059.43

5059.93

5060.59

5060.66

5060.60

5060.15
5059.88

5058.50

5059.58

5060.62

5060.68

5060.62

5060.16

5059.62
Proposed Level Proposed Level

-2.81

-2.51
-6.03

-5.03

-7.93

-5.77

4.61
4.59
0.00

2.19

5.12

0.00

2.49

5.69
Proposed Offsets Proposed Offsets
5059.12

5060.00

5060.00

5060.12

5057.94

5060.00
5059.40

5059.51

5059.69

5059.89

5059.96

5058.29

5058.73

5059.08

5059.43

5059.62

5060.35
Ground Levels Ground Levels
-12.00

-12.00
-6.08

-3.73

-7.93

-3.72
11.25

12.00

12.00
0.00

3.70

4.97

0.00

3.73

5.69

9.70
5.68
G.L. Offsets G.L. Offsets

-0.09
0.21
0.02

0.96

0.64

0.00
0.47

0.79

0.17
1.03

1.04

1.77

1.60

1.30
Level Difference Level Difference

7.45
7.45
2:1
SMB 2:1
SMB

1.85
Total Volume at
13.05 Total Volume at
Station 0+375.00

0.18
Station 0+400.00 12.22
Cut Area 0.00
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
Cut Area 0.00 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Fill Area 13.52


Fill Area 10.88
5058.60

5060.62

5060.70

5060.62

5059.86
5059.84
5058.65

5058.79

5060.64

5060.72

5060.64

5060.10
Proposed Level
Proposed Level
-7.77
-7.67

-3.12

0.00

3.10

5.29
5.25

Proposed Offsets

-7.42

-3.12

4.79
0.00

3.13
Proposed Offsets
5058.20

5058.60

5058.98

5059.34

5059.69

5059.84

5060.00

5060.76

5058.30

5059.58

5059.18

5059.58

5059.97
5060.00

5060.10

5061.02
Ground Levels
Ground Levels
-12.00

12.00
7.77

3.72

0.00

3.73

5.29

7.00

-12.00
G.L. Offsets

-7.42

-3.73

12.00
0.00

3.72
3.99

4.79
G.L. Offsets
0.00
0.04

0.99

0.02
0.00
1.58

1.36

Level Difference

0.00

0.73

0.00
1.39

1.14
Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+325 TO 0+400
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 4 OF 102
CHEDKED BY :-
0.54
1.13
7.45
7.45
SMB
2:1 SMB 2:1

65°
SMB 4.97 4.19

0.62
Total Volume at 9.75 Total Volume at 3.73
Station 0+425.00 Station 0+450.00 4.82
Cut Area 0.17 Cut Area 1.44 3.72
4.34
Fill Area 4.44 Fill Area 0.76

5060.61

5060.61

5060.51
5059.92
5059.47

5060.66

5060.63

5060.45

5060.47

5060.75
5061.08
Proposed Level Proposed Level

-5.83

-2.06

-4.58

-2.33
2.31
0.00

4.22

0.00

2.04

4.20
4.53
Proposed Offsets Proposed Offsets

5061.61
5058.83

5059.46

5060.10

5060.10

5060.59
5060.57

5059.10

5059.90

5060.00
5060.02

5060.50

5060.98
5061.06

5062.04
Ground Levels Ground Levels
-12.00

-12.00
-5.99

-3.73

-4.85

-3.73
12.00

12.00
-3.90
0.00

3.72
3.76

0.00

3.72
4.34
G.L. Offsets G.L. Offsets
-0.01

-0.29

-0.29
0.01
0.74

0.56

0.22

0.00

0.00

0.25

0.00
Level Difference Level Difference

0.50

0.37
7.45

0.51
65°

7.45
SMB 2:1
SMB 2:1
5.39 3.56
0.50

Total Volume at 6.00 2.83


Total Volume at
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 0+500.00 Engaging


Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 0+475.00 Cut Area 0.62


Cut Area 0.99

Fill Area 1.03 Fill Area 1.17


5060.21

5060.71
5059.70

5060.29

5060.24

5060.65

5059.37

5059.88

5059.96

5059.88

5060.25
Proposed Level Proposed Level
-4.70

-2.98

-4.74

-3.12
4.20
4.26

4.10
0.00

2.02

0.00

3.12
Proposed Offsets Proposed Offsets

5058.71

5059.37

5059.47

5059.81

5060.21
5060.25
5059.05

5059.71

5059.80

5060.19

5060.65
5060.71

5061.66

5060.00

5061.24
Ground Levels Ground Levels
-12.00

-12.00
-4.72

-3.72

-4.74

-3.73
12.00

12.00
2.06
0.00

3.72
4.22

0.00

3.72
4.10
G.L. Offsets G.L. Offsets
-0.01

-0.01
-0.20

-0.06

-0.25
0.34

0.10

0.00

0.36

0.15

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+425 TO 0+500
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 5 OF 102
CHEDKED BY :-
7.45

0.45
7.45

65°
SMB 2:1

65°
Total Volume at 2.29 5.85 2:1

0.12
Total Volume at SMB
Station 0+525.00

0.39
0.21
Station 0+550.00 3.90 4.36
Cut Area 1.45
Cut Area 1.06
Fill Area 0.06
Fill Area 0.26

5059.51
5059.40

5059.50

5059.57

5059.97

5058.89

5059.10

5059.18

5059.12

5059.49
Proposed Level
Proposed Level

-3.77

-2.69

2.31
0.00

4.33
Proposed Offsets

-4.10

-2.83

4.16
0.00

2.17
Proposed Offsets
5058.88

5059.14

5059.37
5059.39

5059.44

5059.65

5059.91
5059.94

5060.00

5060.68

5058.32

5058.89
5059.08

5059.19

5059.46
5059.49

5060.00

5060.08
Ground Levels
Ground Levels
-12.00

-3.70
-3.95

12.00
-7.56

-2.84

4.99
0.00

3.73
4.18
G.L. Offsets

-12.00

-4.15
-3.72

11.18

12.00
0.00

3.70
4.12
G.L. Offsets

-0.08

-0.30

0.01
0.02

0.04

Level Difference

-0.01

-0.22
0.00

0.12

0.00
Level Difference

7.45
0.46
65°
7.45
SMB 2:1
2:1
0.14

SMB
2.36 5.82
9.39

0.93
Total Volume at Total Volume at
Station 0+575.00 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
Station 0+600.00 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Cut Area 1.42 Cut Area 0.12

Fill Area 0.09 Fill Area 4.23

5058.41

5058.41
5058.57

5058.72

5058.78

5058.72

5059.17

5057.49

5058.49

5058.37
Proposed Level Proposed Level
-4.00

-2.50

-5.58

-3.13
0.00

2.50

4.19

0.00

3.13
3.82
Proposed Offsets Proposed Offsets
5057.98

5058.57
5058.59

5058.86

5059.14
5059.17

5059.74

5057.05

5057.49

5057.62

5057.94

5058.60
5058.37

5059.29
Ground Levels Ground Levels
-12.00

-12.00
-4.00
-3.72

-5.58

-3.73
12.00

12.00
0.00

3.73
4.19

0.00

3.72
3.82
G.L. Offsets G.L. Offsets
-0.08

-0.32
0.00

0.04

0.00

0.00

0.76

0.56

0.12
0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+525 TO 0+600
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 6 OF 102
CHEDKED BY :-
7.45 7.45
SMB
2:1

1.37

1.80
SMB 2:1
Total Volume at Total Volume at SMB
Station 0+625.00 10.53 Station 0+650.00 11.76
Cut Area 0.00 Cut Area 0.00

Fill Area 6.20 Fill Area 9.38

5057.00

5058.37

5058.45

5058.39

5058.19

5056.66

5057.47

5058.47

5058.53

5058.47

5058.02
Proposed Level Proposed Level
-6.46

-2.90

-7.32

-5.70

-2.37
0.00

2.10

4.07

0.00

2.63

4.59
Proposed Offsets Proposed Offsets
5056.37

5057.00

5057.31

5057.73

5058.15
5058.19

5059.09

5056.17

5056.71

5057.12

5057.53

5057.95

5058.04

5058.89
Ground Levels Ground Levels
-12.00

-12.00
-6.46

-3.73

12.00

12.00
0.00

3.71
4.07

7.21

3.65

0.00

3.72

4.55
G.L. Offsets G.L. Offsets

-0.04

-0.03
0.71

1.21
0.00

0.97

0.42

0.00

0.59

0.64
1.00
Level Difference Level Difference

7.45 7.45

2:1
SMB
2.27

2.48
2:1 2:1

0.93
SMB SMB
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

13.40 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

14.27
3.73
Total Volume at Total Volume at
3.91
Station 0+675.00 Station 0+700.00
8.69 5.58
Cut Area 0.00 Cut Area 0.00

Fill Area 14.21 Fill Area 17.84

5056.10

5058.66
5058.58

5058.58

5057.65
5056.27

5058.55

5058.62

5058.54

5057.84

Proposed Level Proposed Level

-8.69

-3.13
-3.11
-8.27

0.00

3.12

5.58
0.00

3.13

5.14

Proposed Offsets Proposed Offsets

5055.83

5056.10

5056.35

5056.57

5057.00

5057.44

5057.65

5058.40
5055.84

5056.27

5056.80

5057.24

5057.68

5057.84

5058.64

Ground Levels Ground Levels

-12.00

-8.69

-3.91
-12.00

12.00
-8.27

-3.72

-5.57
12.00

0.00

3.73

5.58
0.00

3.74

5.14

G.L. Offsets G.L. Offsets

1.21
0.00

0.00
1.94

1.66
0.00

0.94

0.00
1.67

1.38

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+625 TO 0+700
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 7 OF 102
CHEDKED BY :-
7.45
7.45

65°
2:1
2:1

1.43
2:1 SMB

0.28
0.46

0.34
3.78 6.07 2.65
SMB

0.49
Total Volume at 11.23 Total Volume at
4.94
0.97

0.94
0.33
Station 0+725.00 Station 0+750.00
Cut Area 0.00 3.78 3.64 Cut Area 0.52 3.72 3.72
6.67 4.65
Fill Area 8.28 Fill Area 1.20

5058.41

5058.61
5057.08

5058.52

5058.59

5058.52

5058.05

5057.84

5058.37

5058.35
Proposed Level Proposed Level

-6.67

-2.83

-4.89

-2.04
4.55
0.00

2.64

0.00

2.33

3.90
Proposed Offsets Proposed Offsets

5057.21
5056.62

5057.08

5057.33

5057.66

5057.97

5058.05

5058.69

5057.84

5057.94

5058.27

5058.34
5058.61

5059.33
Ground Levels Ground Levels
-12.00

-12.00
-6.67

-3.78

12.00

12.00
0.00

3.64

4.65

4.74

3.72

0.00

3.72
4.00
G.L. Offsets G.L. Offsets

-0.12
1.11
0.00

0.93

0.64

0.00

0.00

0.28

0.14

0.00
Level Difference Level Difference

7.45 7.45
65°

65°
1.06

0.66

1.10
Total Volume at 8.78 Total Volume at 8.42

0.67
Station 0+775.00 Station 0+800.00
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Cut Area 5.30 Cut Area 4.10

Fill Area 0.00 Fill Area 0.00


5058.31

5058.08

5058.14

5058.08

5059.12

5057.67
5057.69

5057.77

5057.69

5058.79
Proposed Level Proposed Level
-4.04

-2.47

-3.77
-3.13
2.54

4.74

4.83
0.00

0.00

3.13
Proposed Offsets Proposed Offsets
5057.56

5058.20

5058.31
5058.36

5058.70

5059.03

5059.12

5059.78

5056.59

5057.67
5057.67

5058.16

5058.66

5058.76
5058.79

5059.77
Ground Levels Ground Levels
-12.00

-12.00
-3.72
-3.99

-3.77
-3.72
12.00

12.00
-5.56

4.56
0.00

3.73

4.78

0.00

3.73

4.83
G.L. Offsets G.L. Offsets
-0.02

-0.39

-0.55

-0.85

-0.06

-0.39

-0.88
0.00

0.00

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+725 TO 0+800
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 8 OF 102
CHEDKED BY :-
7.45

1.23
65°
1.14
65°
7.45
8.73
0.19
Total Volume at Total Volume at
8.69
0.17

Station 0+825.00 Station 0+850.00


3.73
Cut Area 4.16 Cut Area 4.87
3.71 4.83
Fill Area 0.00 3.82
Fill Area 0.00

5057.21

5057.21
5057.16

5057.29

5058.35

5056.71

5057.91
5056.69

5056.75

5056.69
Proposed Level Proposed Level

-3.82

-3.08

-3.77

-2.50
4.86
0.00

3.13

4.96
0.00

2.50
Proposed Offsets Proposed Offsets
5056.04

5057.16
5057.17

5057.68

5058.19

5058.35

5059.32

5055.59

5056.71
5056.72

5057.23

5057.23

5057.91

5058.87
Ground Levels Ground Levels
-12.00

-3.82
-3.71

-12.00
12.00

12.00
0.00

3.73

4.83

3.77
3.72

0.00

3.68

4.96
G.L. Offsets G.L. Offsets
-0.05

-0.40

-0.90

-0.20

-0.48

-0.88
0.00

0.00

0.00

0.00
Level Difference Level Difference

7.45

0.33
1.13

1.59

65°
2:1
65°

0.640.94
0.11

SMB 9.22 1.74


8.80
Total Volume at Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

3.21 Total Volume at Engaging


Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

3.65
Station 0+875.00 3.94 4.86 Station 0+900.00
3.71 3.80
Cut Area 4.07 Cut Area 0.40 6.84
4.13
Fill Area 0.00 Fill Area 4.79
5055.90

5056.16

5056.22

5056.14

5057.14

5054.08

5055.67

5055.75

5055.67

5056.00
Proposed Level Proposed Level

-6.91

-3.12
-4.25

-2.15

4.73

4.05
0.00

2.85

0.00

3.13
Proposed Offsets Proposed Offsets
5054.94

5056.05

5056.60

5056.60

5057.11

5057.14

5058.26

5053.35

5053.95

5054.08

5054.64

5055.29

5055.94
5056.00

5057.39
Ground Levels Ground Levels
-12.00

-12.00
-3.94

-3.21

12.00

12.00
-7.65
0.00

3.71

4.86

6.84

3.65

0.00

3.80
4.13
G.L. Offsets G.L. Offsets
-0.11

-0.11
-0.14

-0.38

-0.85

-0.16
0.00

0.93

0.46

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+825 TO 0+900
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 9 OF 102
CHEDKED BY :-
7.45 7.45

2:1 2:1

2.08

1.66

0.03
0.36

SMB SMB
0.07

Total Volume at Total Volume at 10.63 0.22


11.73
0.33

Station 0+925.00 Station 0+950.00


Cut Area 0.12 3.66 3.73 Cut Area 0.15
7.88
Fill Area 8.05 3.85 Fill Area 6.15

5055.41

5055.21
5055.42
5053.46

5054.93

5055.43

5055.49

5053.54
5053.79

5055.23

5055.28

5055.24
Proposed Level Proposed Level
-7.63

-4.68

-2.19

-6.57

-2.03
-7.05
2.81

3.81

2.97
0.00

0.00

3.80
Proposed Offsets Proposed Offsets

5060.360
5052.61

5054.71

5054.07

5054.71

5055.41

5056.81

5052.77

5054.65

5056.52
Ground Levels Ground Levels
-12.00

-12.00
-7.88

-3.66

12.00

12.00
0.00

3.73
3.85

0.00
G.L. Offsets G.L. Offsets

0.21
0.08

0.78

0.03

0.00
0.17

0.90

0.64

0.10

0.00
1.04

1.10

Level Difference Level Difference

0.53 7.45
1.02

2:1
65°

2:1

65°
0.22
SMB
6.85 3.16 SMB 8.45 1.51

1.14
Total Volume at Total Volume at
Station 0+975.00 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 1+000.00
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Cut Area 0.90 Cut Area 0.31

Fill Area 2.31 Fill Area 3.52


5055.01

5055.41
5053.98

5054.33

5055.08

5055.03

5053.66

5054.80

5054.88

5054.80

5055.02
Proposed Level Proposed Level
-2.81
-5.76

-5.06

4.13

-6.00

-3.12
0.00

2.19

0.00

3.12

3.95
Proposed Offsets Proposed Offsets
5053.01

5054.88

5055.39

5056.59

5052.84

5054.48

5056.13
Ground Levels Ground Levels
-12.00

-12.00
12.00

12.00
0.00

3.22

0.00
G.L. Offsets G.L. Offsets
-0.20

-0.10

-0.11
0.00

0.24

0.57

0.20

0.00

0.75

0.40

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-0+925 TO 1+000
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 10 OF 102
CHEDKED BY :-
7.45
7.45

65°

65°
2:1

1.11
2:1

0.22
SMB

0.20
0.93
SMB
Total Volume at Total Volume at 8.61 1.36
Station 1+025.00 7.94 1.72 Station 1+050.00
Cut Area 0.33 Cut Area 0.23

Fill Area 2.71 Fill Area 3.81

5054.61
5053.59

5054.19

5054.67

5054.60

5054.80

5053.15

5053.82

5054.34

5054.37

5054.32

5054.46
Proposed Level Proposed Level

-5.81

-4.62

-2.52

-6.35

-5.02

-2.20
0.00

2.48

3.84

0.00

2.16

3.57
Proposed Offsets Proposed Offsets
5052.81

5052.41
5053.88

5054.35

5055.77

5053.99

5055.57
Ground Levels Ground Levels
-12.00

-12.00
12.00

12.00
-3.99

0.00

0.00
G.L. Offsets G.L. Offsets

-0.01
-0.05

-0.04
0.31
0.39

0.55

0.00

0.49

0.64

0.39

0.05

0.00
Level Difference Level Difference

7.45
7.45
1.85

2:1 2:1

1.06
65°
SMB SMB

1.14
5.94 4.86
11.90
Total Volume at Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
Total Volume at Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 1+075.00 Station 1+100.00


Cut Area 0.00 Cut Area 2.20

Fill Area 9.63 Fill Area 1.86


5052.06

5053.20

5053.94

5054.00

5053.94

5053.70

5052.32

5053.47

5053.55

5053.47

5054.53
Proposed Level Proposed Level

-6.02

-3.12
-7.55

-5.28

-2.67

2.46

4.08

4.78
0.00

0.00

3.12
Proposed Offsets Proposed Offsets
5054.91
5051.50

5053.00

5053.59

5051.10

5056.00
5053.55
Ground Levels Ground Levels
-12.00

-12.00
12.00

12.00
0.00

4.67

0.00
G.L. Offsets G.L. Offsets

-0.72
0.00

0.63

0.18

0.00

0.56

0.00

0.00
0.85

1.27

1.00

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+025 TO 1+100
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 11 OF 102
CHEDKED BY :-
7.45
7.45

1.97
65°

1.55
SMB

2:1

65°
2.69
2:1
SMB 9.68 5.78 SMB

Total Volume at Total Volume at 9.62 4.77


Station 1+125.00 Station 1+150.00
Cut Area 3.78 Cut Area 2.73

Fill Area 5.49 Fill Area 8.86


5050.72

5051.43

5053.04

5053.09

5053.04

5055.17

5054.11
5049.86
5050.14

5052.55

5052.63

5052.56
Proposed Level Proposed Level
-7.01
-8.43

-2.00

-9.11
-8.56

-3.13
2.06
0.00

5.76

0.00

3.00

5.28
Proposed Offsets Proposed Offsets

5053.12

5056.92
5049.90

5050.00

5057.00

5049.74

5050.00

5052.46

5056.20
Ground Levels
Ground Levels
-12.00

0.00
-9.52

G.L. Offsets

0.00
G.L. Offsets

-5.89
11.62
12.00

-12.00

12.00
-0.03

-0.75

-0.84
0.61
0.36

0.17
0.58

0.00
0.25

0.17

0.00
1.38
Level Difference Level Difference

7.45
7.45
2.40

2.04
65°

2:1
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
2.26

65°
2:1

1.87
SMB SMB

8.58 4.66
Total Volume at 8.85 5.49 Total Volume at
Station 1+175.00 Station 1+200.00
Cut Area 3.95 Cut Area 2.90

Fill Area 8.36 Fill Area 7.83

5049.81

5053.71
5049.84

5050.46

5052.10

5052.17

5052.12

5052.62

5054.38

5051.68

5051.75

5051.68
Proposed Level Proposed Level
-2.81
-8.24

-6.98

-7.47

-3.13
6.01
0.00

2.19

4.25

0.00

3.13

5.76
Proposed Offsets Proposed Offsets

-12.00 5049.61
5055.91

5056.71

5050.00

5051.26

12.005056.37
5049.67

5050.00

5051.88

Ground Levels Ground Levels


G.L. Offsets G.L. Offsets

-2.95
12.00

0.00
-12.00

9.46
0.00
-4.42

-0.91
-0.70

-1.07

-0.07
0.00

0.00

0.50

0.00
0.58

0.29
1.42

1.68
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+125 TO 1+200
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 12 OF 102
CHEDKED BY :-
7.45

1.24
SMB
7.45
2:1 B
SM

65°
1.63
2:1

2.32

0.56
SMB 2:1
8.61 3.34 SMB
Total Volume at Total Volume at
Station 1+225.00 Station 1+250.00 13.19
Cut Area 1.86 Cut Area 0.00

Fill Area 7.44 Fill Area 15.97

5051.41

5051.21
5049.68

5050.08

5051.48

5051.43

5052.68

5048.90

5049.32

5051.26

5051.19

5050.64
Proposed Level Proposed Level

-2.01
-8.22
-7.06

-6.26

-2.76

-7.38
5.21
2.24

4.87
0.00

0.00

2.98
Proposed Offsets Proposed Offsets

5051.71
5049.56

5055.07
5050.75

5048.70

5050.00
5048.89

5049.67

5053.39
Ground Levels
Ground Levels

G.L. Offsets

12.00
3.22
-12.00
2.27
0.00

0.00
-12.00

12.00

-7.72
G.L. Offsets
-0.09

-0.27

-0.05

1.21

0.00
0.28

0.73

0.03

0.39
1.45

1.74

1.58
Level Difference Level Difference

0.89
7.45
7.45
2:1 SMB
2.39

1.84
2:1 2:1
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at SMB Total Volume at SMB


Station 1+275.00 Station 1+300.00 11.86
Cut Area 0.00
14.01
Cut Area 0.00

Fill Area 16.68 Fill Area 10.98


5048.58

5050.04

5050.97

5051.03

5050.97

5050.07

5050.81
5048.89

5050.74

5050.74

5050.37
Proposed Level Proposed Level
-8.42

-5.50

-2.56

-7.41
0.00

2.68

5.56

-3.13

0.00

3.12

4.45
Proposed Offsets Proposed Offsets
5048.21

5050.00

5052.59
5049.45

5053.02
5048.43

5050.00

5051.96
5049.65
Ground Levels

12.00
0.00

3.49

8.55
-12.00
Ground Levels
0.00

5.39

G.L. Offsets
12.00
-12.00

G.L. Offsets
0.00

0.00
1.16

1.79

1.59

1.25

1.41
0.00

0.77

0.00
1.17
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+225 TO 1+300
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 13 OF 102
CHEDKED BY :-
7.45
7.45
SMB
2:1
2:1

1.29
2:1

65°
0.15

0.25
SMB SMB
Total Volume at Total Volume at

0.96
10.33 8.89 0.77
Station 1+325.00 Station 1+350.00
Cut Area 0.02 Cut Area 0.22

Fill Area 6.92 Fill Area 4.26

5050.31

5050.31
5049.23

5050.14

5050.54

5050.59

5050.52

5050.36

5049.32

5049.87

5050.37

5050.47
Proposed Level Proposed Level

-6.25

-4.43

-2.23

-5.68

-4.57

-2.49

2.51

3.91
4.09
0.00

2.77

0.00
Proposed Offsets Proposed Offsets

5049.81
5048.80
5048.74

5050.00

5052.83

5050.00
5049.75
Ground Levels Ground Levels

12.00

2.27
0.00
-12.00
2.93
0.00
-12.00

G.L. Offsets G.L. Offsets

-0.01

-0.05
0.71
0.00

0.76

0.97

0.84

0.54

0.00

0.45

0.56

0.23
Level Difference Level Difference

7.45
7.45

65°
65°

2:1
1.32

0.62

2:1

1.15
SMB
SMB

0.84
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

8.36 2.41 5.69 4.60


Total Volume at Total Volume at
Station 1+375.00 Station 1+400.00
Cut Area 0.73 Cut Area 2.13

Fill Area 3.89 Fill Area 1.47

5049.01
5048.74

5050.07

5050.15

5050.07

5050.69

5049.85

5049.93

5049.85

5051.00
Proposed Level Proposed Level

-5.41
-6.39

-3.10

-3.13
4.34
0.00

3.13

0.00

3.13

4.88
Proposed Offsets Proposed Offsets
5047.83

5049.76

5052.56

5049.88

5052.74
5047.95
Ground Levels Ground Levels
-12.00

-12.00
12.00

12.00
0.00

0.00
G.L. Offsets G.L. Offsets
-0.32

-0.73
0.01

0.81

0.39

0.00

0.00

0.48

0.05

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+325 TO 1+400
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 14 OF 102
CHEDKED BY :-
7.45
7.45

0.84
65°

65°
2:1

1.34
SMB
2:1

0.16
0.78
SMB
5.84 4.05 9.34 0.99
Total Volume at Total Volume at
Station 1+425.00 Station 1+450.00
Cut Area 1.33 Cut Area 0.22
Fill Area 1.48 Fill Area 4.52

5049.71
5048.85
5049.13

5049.65

5049.63

5050.52

5048.06

5048.85

5049.42

5049.48

5049.42

5049.55
Proposed Level Proposed Level

-5.28
-4.72

-2.19

2.81

4.61
0.00

-6.41

-4.84

-2.50

0.00

2.50

3.92
Proposed Offsets Proposed Offsets

5048.99
5049.61

5050.00

5052.34
5047.88

5047.26

5050.00

5051.25
Ground Levels Ground Levels

2.70
0.00

12.00
0.00
-12.00

7.02
G.L. Offsets G.L. Offsets

12.00
-12.00

-0.39
0.00
0.20

0.36

0.09

0.03

0.00

0.56

0.79

0.50

0.07

0.00
Level Difference Level Difference

7.45
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
2:1 SMB Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

7.45
1.90

2:1
0.22

0.28
SMB
Total Volume at
11.70 Total Volume at SMB 2:
1
Station 1+475.00
4.57 3.56

65°
Station 1+500.00

0.20
Cut Area 0.03
Cut Area 0.74
Fill Area 8.68
Fill Area 0.36
5047.41

5049.21
5049.19

5049.26

5048.96

Proposed Level

5048.76

5048.96

5049.04

5048.96

5049.24
Proposed Level
-2.81
-7.27

0.00

2.19

4.16

Proposed Offsets

-4.13

-3.13

4.00
0.00

3.12
Proposed Offsets
5046.64

5048.36

5050.00
5050.17

5048.27

0.00 5049.00

5049.54
5048.39

7.52 5049.45

5049.67
Ground Levels Ground Levels
0.00
-12.00

11.34
12.00

10.06
-10.31
G.L. Offsets

-12.00

12.00
G.L. Offsets

-0.23
0.09

0.90

0.53

0.00

0.00

0.14

0.04

0.00
1.23

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+425 TO 1+500
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 15 OF 102
CHEDKED BY :-
0.97
7.45 7.45
2:1 SMB
2:1 2:1
2:1 SMB

1.55
0.31
SMB

0.75
Total Volume at Total Volume at SMB
10.00
Station 1+525.00 Station 1+550.00 12.06
Cut Area 0.01 Cut Area 0.00

Fill Area 5.28 Fill Area 10.86

5048.01
5047.77

5048.77

5048.82

5048.75

5048.43

5046.97

5047.42

5048.54

5048.60

5048.53

5047.76
Proposed Level Proposed Level

-2.11
-5.66
-5.18

-6.85

-5.95

-2.22

5.21
4.34
0.00

2.89

0.00

2.78
Proposed Offsets Proposed Offsets

5048.21
5046.62

5047.42
5048.94
5047.35

5048.15
Ground Levels
Ground Levels

0.00
-12.00

0.00

12.00

12.00
G.L. Offsets

-12.00
G.L. Offsets
0.21

0.41
0.00

0.76

0.67

0.00

0.00

0.39

0.92

0.00
1.27

1.18
Level Difference Level Difference

7.45 7.45
2:1 2:1
2.06

SMB SMB

2.13
2:1 2:1
1.09

1.02
SMBEngaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

SMB

13.74 13.74
Total Volume at Total Volume at
Station 1+575.00 Station 1+600.00
Cut Area 0.00 Cut Area 0.00

Fill Area 16.12 Fill Area 15.98

5045.95
5048.31

5048.31

5047.21
5046.24

5047.09

5048.37

5047.67

5048.07

5048.15

5048.07

5047.05
Proposed Level Proposed Level

-7.98
-7.88

-6.17

-2.42

-3.13
4.93
0.00

2.58

5.86

0.00

3.13

5.77
Proposed Offsets Proposed Offsets
5045.94

5046.79

5047.65

5047.56
5045.63

0.00 5046.59
Ground Levels Ground Levels
0.00

12.00

12.00
G.L. Offsets G.L. Offsets
-12.00

-12.00
0.00

0.73

0.53

0.00
1.69

1.58

1.33

0.00

0.00
1.74

1.56

1.23
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+525 TO 1+600
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 16 OF 102
CHEDKED BY :-
7.45
2:1
2:1 SMB

1.55

0.58
SMB 7.45
2:1
11.70 2:1 SMB
Total Volume at Total Volume at SMB

0.79
Station 1+625.00 Station 1+650.00 9.29
Cut Area 0.00 Cut Area 0.12

Fill Area 9.63 Fill Area 3.59

5047.71
5046.92
5046.30
5046.48

5047.88

5047.93

5047.86

5047.28

5046.86

5047.70

5047.78

5047.63
Proposed Level Proposed Level

-2.01
-6.83
-6.46

-5.42
-5.30

-3.13
0.00

2.99

4.88

0.00

3.05

3.87
Proposed Offsets Proposed Offsets

5046.31

0.00 5047.31

5048.31
5045.87

0.00 5046.87

5047.87
Ground Levels Ground Levels

G.L. Offsets G.L. Offsets

12.00

12.00
-12.00

-12.00
0.00
0.15

0.74

0.00

0.00
0.05

0.66

0.47

0.14

0.00
1.18

1.06
Level Difference Level Difference

7.45
0.31

7.45
2:1
2:1 SMB
65°

SMB

2.62

0.64
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

7.39 2.21 2:1


SMB
Total Volume at Total Volume at 13.98
Station 1+675.00 Station 1+700.00
Cut Area 0.47 Cut Area 0.00

Fill Area 2.45 Fill Area 15.77

-8.96 5045.17
5046.81

5047.72

5047.80

5047.72

5047.99

5047.79

5047.86

5047.79

5047.14
Proposed Level Proposed Level
-5.56

-3.03

-3.13

5.01
0.00

3.13

4.00

0.00

3.13
Proposed Offsets Proposed Offsets
5047.52
5045.99

5048.16

5048.74

5044.76

5046.40

5048.18
Ground Levels Ground Levels

0.00
0.00

5.02

12.00

12.00
G.L. Offsets
-12.00

-12.00
G.L. Offsets
-0.01

-0.20

-0.04

0.00

0.92

0.00
0.59

0.28

1.83

1.46
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+625 TO 1+700
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 17 OF 102
CHEDKED BY :-
7.45 7.45
2:1 SMB 2:1 SMB

2.71

2.60

0.55
0.62
2:1 2:1
SMB SMB
Total Volume at Total Volume at 13.76
Station 1+725.00 14.11
Station 1+750.00
Cut Area 0.00 Cut Area 0.00

Fill Area 15.70 Fill Area 14.50

5045.35

5046.75
5045.14
5045.28

5047.85

5047.93

5047.85

5047.23

5047.87

5047.94

5047.87

5047.30
Proposed Level Proposed Level

-8.74

-5.95
-9.14
-8.86

-3.06

4.97

-2.47
0.00

3.13

2.53

4.83
0.00
Proposed Offsets Proposed Offsets

5044.81
5044.72

5046.49

5048.27

5046.59

5048.36
Ground Levels Ground Levels

12.00

12.00
0.00
-12.00

0.00
-12.00
G.L. Offsets G.L. Offsets

1.81
0.00
0.10

0.00
0.89
1.43

0.91

0.00
0.05

1.04

1.65

1.35
Level Difference Level Difference

7.45
2:1 SMB 7.45
2:1
1.69

0.22
0.28

65°
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

SMB Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

11.40
2:1
Total Volume at Total Volume at SMB 7.50 1.77

0.80
Station 1+775.00 Station 1+800.00
Cut Area 0.00 Cut Area 0.34

Fill Area 8.32 Fill Area 2.35


5046.41

5047.81
5046.99

5047.78

5047.85

5047.79

5047.62

5046.79

5047.59

5047.67

5047.59
Proposed Level Proposed Level
-2.81
-6.45

-5.28

-5.33

-3.13
0.00

2.19

4.03

0.00

3.13

3.94
Proposed Offsets Proposed Offsets

5046.05

5047.37

5048.69
5046.32
5045.57

0.00 5046.94

5048.48

Ground Levels
Ground Levels
-4.88

12.00

12.00
-12.00

-12.00

0.00
G.L. Offsets G.L. Offsets

-0.13
0.91
0.72

0.57

0.16

0.00

0.56

0.29

0.00
0.25

1.20

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+725 TO 1+800
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 18 OF 102
CHEDKED BY :-
7.45
7.45

65°
2:1 2:1
SMB

0.24
SMB

65°
0.78

0.28
7.37 1.88 3.78 5.00
Total Volume at Total Volume at
Station 1+825.00 Station 1+850.00
Cut Area 0.37 Cut Area 1.44

Fill Area 2.21 Fill Area 0.28

5046.51
5046.54

5047.32

5047.37

5047.30

5047.53

5046.92

5046.98

5046.92

5047.45
Proposed Level Proposed Level

-4.51
-5.24

-2.25

-2.62
0.00

2.75

3.96

0.00

2.38

4.27
Proposed Offsets Proposed Offsets

Ground Levels Ground Levels

12.00 5048.42
-12.00 5045.78

5047.10

-12.00 5045.90

5047.04

12.00 5048.17
0.00

0.00
G.L. Offsets G.L. Offsets

-0.10

-0.10

-0.06

-0.34
0.02

0.47

0.28

0.00

0.13

0.00
Level Difference Level Difference

7.45
2:1 SMB
7.45

2.19

0.41
2:1
2:1
SMB
SMB
12.64
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at
1.17

9.91 Total Volume at


Station 1+875.00 Station 1+900.00
Cut Area 0.12 Cut Area 0.00
Fill Area 4.82 Fill Area 11.54
5045.24

5046.42

5046.49

5046.44

5046.40

5043.65

5045.85

5045.92

5045.85

5045.44
Proposed Level Proposed Level
-6.13

-2.85

2.15

4.08
0.00

-8.11

-3.13

4.54
0.00

3.13
Proposed Offsets Proposed Offsets
5045.92

5046.51
5044.59

5046.97

5047.28

5043.20

5043.78

5044.79
Ground Levels Ground Levels
-12.00

12.00
0.00
-12.00

-7.04
12.00

G.L. Offsets
0.00

9.40

G.L. Offsets
0.81
0.00

0.56

0.27

0.02

0.61
1.51
0.00

0.00
1.13
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+825 TO 1+900
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 19 OF 102
CHEDKED BY :-
7.45
7.45
2:1
SMB
2:1 2:1

2.71

0.71
SMB

1.02
Total Volume at SMB Total Volume at
Station 1+925.00 Station 1+950.00 9.30
14.29
Cut Area 0.00 Cut Area 0.57

Fill Area 16.66 Fill Area 3.35

5042.84

5044.68

5045.29

5045.34

5045.27

5044.70

5043.05

5043.97

5044.70

5044.76

5044.70

5044.34
Proposed Level Proposed Level

-8.70

-5.02

-2.36

-7.12

-2.62
-5.28
2.64

4.73

2.38

4.30
0.00

0.00
Proposed Offsets Proposed Offsets

5045.51
5042.16

5043.83

5042.84

5044.39

5045.37
Ground Levels Ground Levels

0.00
0.00

12.00

12.00
-12.00

-12.00
G.L. Offsets G.L. Offsets

-0.44

-0.40
0.21

0.61
1.51
0.22

0.23

0.38

0.12
1.54

1.78

1.07
Level Difference Level Difference

7.45
7.45
2:1
SMB
1.67

2:1 2:1
0.56

SMB

2.05
2:1

0.82
11.91
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at Total Volume at


13.19
Station 1+975.00 Station 2+000.00
Cut Area 0.00 Cut Area 0.00

Fill Area 10.09 Fill Area 13.98

5043.61

5042.71
5042.44

5043.48

5044.12

5044.19

5044.13

5043.55

5041.48

5043.53

5043.53
Proposed Level Proposed Level
-7.06

-4.97

-2.62

-7.82

-3.12
0.00

2.38

4.85

0.00

3.12

5.37
Proposed Offsets Proposed Offsets
5044.21

5042.21
5041.98

5043.10

5043.32
5041.09
Ground Levels Ground Levels

0.00
0.00

12.00

12.00
-12.00

-12.00
G.L. Offsets G.L. Offsets
0.81

1.61
0.00

0.00

0.00

0.00
0.85

1.27

1.09

1.40

1.03
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-1+925 TO 2+000
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 20 OF 102
CHEDKED BY :-
1.08
7.45
2:1
7.45

2.10
2:1 SMB
2:1

1.91
SMB
Total Volume at 2:1
Total Volume at

1.06
Station 2+025.00 13.82 SMB
Station 2+050.00 13.39
Cut Area 0.00
Cut Area 0.00
Fill Area 16.41
Fill Area 15.73

5041.91
5040.85

5042.43

5042.97

5043.03

5042.96

5042.17

5041.31
5040.46

5042.37

5042.37
5042.45

5041.35
-7.93

-4.76

-2.19

2.81

5.81
0.00

5.27

-7.55

-3.12

0.00

3.08

5.76
5.84
0.00 5041.42

5.46 5041.82
5040.55

5042.43

5040.44

5040.47

0.00 5040.89

5041.76
12.00

-5.74
-12.00

12.00
-12.00
1.71
0.00

0.36
0.05
1.35

1.60

1.33

1.71
0.00

0.05
0.00
1.56

1.26
1.14

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
7.45 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

7.45

2:1 2:1
1.37

2:1 2:1
Total Volume at SMB Total Volume at SMB
SMB

0.63
Station 2+075.00 Station 2+100.00

1.03
10.77
Cut Area 0.00 12.45 Cut Area 0.00

Fill Area 13.28 Fill Area 8.07


5042.01
5040.57

5040.99

5041.94

5041.95

5041.66

5040.79

5041.07

5041.70

5041.78

5041.70

5040.67
Proposed Level Proposed Level
-5.61

-2.81
-6.44

-4.99

-3.12
6.01
2.19

5040.61 4.25

3.12
0.00

0.00

5.78
Proposed Offsets Proposed Offsets
-12.00 5040.54

5040.80
5040.55

5040.59

12.00 5041.23

5041.46

5040.68

12.00 5040.63
Ground Levels Ground Levels
0.00

0.00

5.28
-7.67

-12.00
3.50

G.L. Offsets G.L. Offsets

1.01
0.02

0.43

0.00

0.00

0.73

0.98

0.00
1.36

1.42

1.35

1.00

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+025 TO 2+100
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 21 OF 102
CHEDKED BY :-
7.45

0.97
0.47
7.45

1.46

65°
°
65 9.63
Total Volume at Total Volume at
Station 2+125.00 8.35 Station 2+150.00
Cut Area 2.01 Cut Area 10.03

Fill Area 0.00 Fill Area 0.00

5042.22

5041.77

5041.83

5041.76

5041.76

5043.21

5042.04

5042.10

5042.04

5042.74
Proposed Level Proposed Level

-4.20

-2.19

-4.91
2.81

4.16

-2.50
0.00

4.49
0.00

2.50
Proposed Offsets Proposed Offsets

5043.81

5043.71
5042.65

5041.99

5041.33

5042.52
5043.18
Ground Levels Ground Levels

-12.00
12.00

12.00
G.L. Offsets G.L. Offsets

-9.66
0.00

0.00
-12.00

-0.24

-1.27

-1.07

-1.00

-0.19
-0.34

-0.16

-0.08
0.00

0.00
Level Difference Level Difference

7.45
0.37
65°

° 7.45
65
0.74

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

8.57
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

65°
Total Volume at Total Volume at
Station 2+175.00 Station 2+200.00

0.40
8.34
Cut Area 4.52 Cut Area 0.15

Fill Area 0.00 Fill Area 1.83


5042.51
5043.22

5042.50

5042.57

5042.85

5042.93

5042.99

5043.07

5042.99

5042.59
Proposed Level Proposed Level
-4.46

-2.79

2.21

4.10
0.00

-3.85

-3.12
Proposed Offsets Proposed Offsets

4.52
0.00

3.13

5042.41
5043.26

5042.78

5042.33
5042.52
5043.56

5043.04

Ground Levels Ground Levels

8.99
0.00

12.00
G.L. Offsets G.L. Offsets

-12.00

0.00
12.00
-12.00

-0.01

-0.01
-0.66

-0.47

-0.43

0.00

0.09

0.29

0.34

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+125 TO 2+200
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 22 OF 102
CHEDKED BY :-
7.45
7.45
SMB 2:1 2:1
2:1 SMB
SMB
Total Volume at Total Volume at

0.75
9.88

0.46
Station 2+225.00 8.73 Station 2+250.00
Cut Area 0.08 Cut Area 0.00

Fill Area 2.50 Fill Area 5.16

5043.51

5043.01
5043.26

5043.52

5043.58

5044.02

5044.02
5043.57

5044.08

5043.30
Proposed Level Proposed Level

-4.60

-2.50

0.00

2.50

5.14
-4.19

-2.19

2.81
0.00

4.69
Proposed Offsets Proposed Offsets

5043.21
5043.53

5043.26

5042.80
5043.19

5043.76

5043.64

5043.40

5043.09
Ground Levels Ground Levels

12.00
-2.15

0.00
G.L. Offsets G.L. Offsets

12.00
-12.00

0.00
-12.00

6.81
-8.42

0.03

0.55

0.68

0.69

0.04
-0.05

-0.03
0.26

0.38

0.40
Level Difference Level Difference

7.45
2:1 2:1

0.41
SMB
SMB
7.45
0.71
0.50

Total Volume at 9.88 Total Volume at SMB 2:1 2:1


SMB
Station 2+275.00 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 2+300.00 Engaging


Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Cut Area 0.00 Cut Area 0.00 9.46


Fill Area 5.18 Fill Area 4.16
5044.01

5044.53

5044.59

5044.52

5043.80

5044.60

5045.02

5045.09

5045.02

5044.42
Proposed Level Proposed Level
-4.72

-2.48

0.00

2.52

5.15

-3.12
-4.55
Proposed Offsets Proposed Offsets

4.91
0.00

3.12
5043.91

5043.81

5043.66
5044.18

5044.52
5044.75

5044.33

5044.27
Ground Levels Ground Levels
4.30
0.00

12.00
G.L. Offsets G.L. Offsets

9.57
-12.00
-12.00

0.00
12.00

0.00

0.44

0.58

0.56

0.00
0.01
0.00

0.56

0.68

0.68

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+225 TO 2+300
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 23 OF 102
CHEDKED BY :-
7.45
7.45

0.32
SMB 2:1 2:1
SMB
2:1
SMB 2:1 SMB

0.29

0.51
Total Volume at Total Volume at

0.55
Station 2+325.00 9.20 Station 2+350.00 9.03
Cut Area 0.02 Cut Area 0.04

Fill Area 3.55 Fill Area 3.16

5045.20

5045.54

5045.60

5045.54

5044.97

5045.74

5046.06

5046.10

5046.04

5045.52
5045.89
Proposed Level Proposed Level

-4.46
-4.15

-2.04

0.00

2.33

4.57
-4.40

-2.52

4.79
0.00

2.48
Proposed Offsets Proposed Offsets
5045.37

5045.29

5045.09

5044.79

5045.92

5045.64

5045.44

5045.34
Ground Levels Ground Levels

-12.00
G.L. Offsets G.L. Offsets

0.00

8.40
-12.00

12.00
-8.15

0.00

12.00

-0.01
0.51

0.51
0.00

0.38

0.00

0.00
0.16

0.37

0.46

0.46
Level Difference Level Difference

7.38
SMB 2:1 2:1 7.45

0.10

0.51
SMB
0.23

0.46

Total Volume at
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

8.83 Total Volume at SMB 2:1


Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

2:1
SMB
Station 2+375.00 Station 2+400.00
Cut Area 0.06 Cut Area 0.11 8.67
Fill Area 2.73 Fill Area 2.42
5046.54

5046.60
5046.29

5046.53

5046.07

5046.84

5046.95

5047.02

5046.95

5046.44
Proposed Level Proposed Level

-3.93

-3.13
-4.25

-2.42

4.74
0.00

3.12
0.00

2.58

4.56

Proposed Offsets Proposed Offsets


5046.49
5046.47

5046.19

5045.88

5047.04

5046.86

5046.66

5046.10
Ground Levels Ground Levels

-4.22
G.L. Offsets G.L. Offsets
-12.00
-11.41

-12.00

12.00
0.00

0.00
12.00
0.41

0.41
0.00

0.29

0.00

0.00

0.14

0.36

0.43

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+325 TO 2+400
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 24 OF 102
CHEDKED BY :-
7.45
2:1
SMB 2:1

1.43
7.45

0.69
SMB

SMB 2:1 2:1


11.71
Total Volume at SMB Total Volume at

0.31
Station 2+425.00 Station 2+450.00

0.76
Cut Area 0.03 9.57 Cut Area 0.00

Fill Area 4.34 Fill Area 9.84

5046.80

5047.52

5047.57

5047.50

5046.06
5046.95

5047.27

5047.34

5047.27

5046.44
Proposed Level Proposed Level

-4.39

-2.64

-5.12

-2.05
0.00

2.53

5.32

0.00

2.95

6.58
Proposed Offsets Proposed Offsets

5045.72
5047.31

5047.24

5046.48
5046.50
5046.75

5046.08
Ground Levels Ground Levels

-12.00
-12.00

G.L. Offsets G.L. Offsets

5.31

12.00
0.00

0.00
12.00

1.21
-0.06

0.00

0.92

0.00
1.10
0.00

0.40

0.59

0.64
Level Difference Level Difference

7.45
0.64

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

7.45 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

SMB 2:1 2:1


2:1
1.23

SMB 2:1 SMB

0.14
Total Volume at SMB Total Volume at

0.75
Station 2+475.00 Station 2+500.00 9.22
11.20
Cut Area 0.01 Cut Area 0.09

Fill Area 8.31 Fill Area 3.52


5047.01

5047.74

5047.80

5047.74

5046.42

5047.82

5047.96

5048.03

5047.96

5047.20
Proposed Level Proposed Level

-4.00

-3.12

0.00

3.12

5.23
-5.16

-2.39

2.61
0.00

6.34

Proposed Offsets Proposed Offsets


5047.41

5046.85

5046.16

5048.36

5047.55

5046.75
Ground Levels Ground Levels

0.00
G.L. Offsets G.L. Offsets
0.00

12.00
-12.00

-12.00
12.00
-0.08

-0.07

0.61
0.79

0.96

1.03

0.00

0.19

0.48

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+425 TO 2+500
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 25 OF 102
CHEDKED BY :-
7.45

0.12
7.45
2:1
SMB 2:1 2:1
SMB
SMB
Total Volume at 9.16 Total Volume at 9.28
Station 2+525.00 Station 2+550.00
Cut Area 0.10 Cut Area 0.08

Fill Area 3.39 Fill Area 3.68

5048.31

5048.54
5048.48

5048.48

5047.69
5048.06

5048.20

5048.26

5048.20

5047.45
Proposed Level Proposed Level

-4.03

-2.50

0.00

2.50

5.27
-3.97

-2.49

2.51
Proposed Offsets Proposed Offsets

0.00

5.19

5048.84

5048.04

5047.24
5048.60

5047.80

5047.00
Ground Levels Ground Levels

G.L. Offsets G.L. Offsets

12.00
12.00
0.00

0.00
-12.00
-12.00

0.00

0.27

0.50

0.60

0.00
0.00

0.24

0.47

0.57

0.00
Level Difference Level Difference

7.45

SMB 2:1 2:1 7.45

0.14
SMB
0.27

0.63

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

SMB 2:1 2:1


Total Volume at 9.23 Total Volume at SMB
Station 2+575.00 Station 2+600.00
Cut Area 0.04 Cut Area 0.09 8.96

Fill Area 3.50 Fill Area 3.00

5049.12

5049.26

5049.34

5049.26

5048.65
5048.65

5048.85

5048.92

5048.85

5048.16

Proposed Level Proposed Level

-4.01
-4.11

-3.12
-2.49

2.51

3.12

4.95
0.00
0.00

5.08

Proposed Offsets Proposed Offsets

5048.91
5048.31

5049.54

5048.28
5048.57

5048.42

5047.84
5049.09

Ground Levels Ground Levels


12.00
-4.18
-12.00

0.00
3.13

G.L. Offsets G.L. Offsets


0.00

-12.00

12.00
-0.05
0.08

0.35

0.50

0.52

0.00

0.19

0.43

0.52

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+525 TO 2+600
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 26 OF 102
CHEDKED BY :-
7.45

0.13
7.45
SMB 2:1 2:1
SMB 2:1 2:1 SMB
SMB

0.59
Total Volume at Total Volume at

0.60
Station 2+625.00 8.92 Station 2+650.00 8.88
Cut Area 0.10 Cut Area 0.10

Fill Area 2.91 Fill Area 2.82

5049.97

5050.13

5050.19

5050.13

5049.52
5049.71
5049.56

5049.76

5049.69

5049.08
Proposed Level Proposed Level

-3.99

-2.19

-4.01
2.81

-2.53
4.93
0.00

4.91
0.00

2.47
Proposed Offsets Proposed Offsets

5050.31
5048.71

5050.00

5049.78

5049.15
5049.98

5049.34
Ground Levels Ground Levels

G.L. Offsets G.L. Offsets


-12.00

-12.00
12.00
0.00

-4.18

0.00

12.00
-0.02

0.21

0.41

0.48

0.00
0.00

0.25

0.42

0.50

0.00
Level Difference Level Difference

7.45
SMB 2:1 2:1
SMB 7.45
0.56

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at Total Volume at SMB 2:1 2:1


Station 2+675.00
8.95 SMB
Station 2+700.00

0.09
Cut Area 8.62

0.50
Cut Area 0.07 0.12

Fill Area 2.92 Fill Area 2.29

5050.75

5050.83

5050.90

5050.83

5050.32
5050.32

5050.52

5050.59

5050.53

5050.10
5049.95

Proposed Level Proposed Level

-3.12
-3.88
-2.81

4.73
0.00

3.12
-4.10

2.19

4.55
4.84
0.00

Proposed Offsets Proposed Offsets


5049.71

5051.15

5050.56

5050.19

5050.19
5050.63

5050.16

5050.00

5049.87

5049.80

Ground Levels Ground Levels


12.00
6.51
0.00

G.L. Offsets G.L. Offsets

12.00
4.06

0.00
-12.00

7.34
-12.00

9.64
-0.01

0.00

0.12

0.35

0.42

0.00
0.00

0.25

0.43

0.46

0.12

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+625 TO 2+700
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 27 OF 102
CHEDKED BY :-
7.45
7.45

2:1 SMB
2:1 °
Total Volume at SMB Total Volume at 65

0.30

0.09
Station 2+725.00 Station 2+750.00
0.98 7.22 5.12 2.81
Cut Area 0.24 Cut Area 0.96

Fill Area 1.19 Fill Area 0.07

5051.44

5051.17

5051.23

5051.17

5051.02
5051.11
5051.09

5051.04

5050.69
5051.05
Proposed Level Proposed Level

-4.02

-2.47

0.00

2.53

3.99
-3.79

-2.19

2.81

4.41
0.00
Proposed Offsets Proposed Offsets

5051.85

5051.26

5050.66
5050.91

5050.41

5050.41
5051.50

Ground Levels Ground Levels

G.L. Offsets G.L. Offsets

12.00
0.00

0.00
10.08

12.00

-12.00
-12.00

-0.01

-0.21

-0.03

-0.04
0.04
0.00

0.04

0.20

0.27

0.00
Level Difference Level Difference

0.13
7.45 7.45

2:1 2:1

65°
SMB SMB
Total Volume at Total Volume at

0.29

0.18

0.35
Station 2+775.00 6 Station 2+800.00
3.80 4.29 1.81 6.46
Cut Area 0.81 Cut Area 0.32
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Fill Area 0.27 Fill Area 1.03


5051.54

5051.25

5051.32

5051.27

5051.07

5051.47

5051.34

5051.42

5051.34

5050.99
Proposed Level Proposed Level
-2.81
-4.02

0.00

2.19

4.08

Proposed Offsets Proposed Offsets

-3.86

-3.12

0.00

3.12

4.42
5051.31

5050.61

5051.94

5050.56
5051.25
5052.00

Ground Levels Ground Levels

G.L. Offsets G.L. Offsets

-12.00
0.00

12.00

0.00
-12.00

12.00
-0.09
-0.21

0.00

0.17

0.27

0.00
0.00

0.02

0.09

0.00

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+725 TO 2+800
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 28 OF 102
CHEDKED BY :-
7.45 7.45

2:1 SMB 2:1 2:1


SMB SMB
Total Volume at Total Volume at

0.15
0.14 8.20

0.44

0.77
Station 2+825.00 Station 2+850.00 9.29
Cut Area 0.17 Cut Area 0.08

Fill Area 1.70 Fill Area 3.80

5051.51

5051.62

5051.62

5050.82
5051.44

5051.68
5051.49

5051.45

5051.45

5050.97
Proposed Level Proposed Level

-3.78

-2.48

4.65
0.00

2.52

-4.05

-2.50
Proposed Offsets Proposed Offsets

0.00

2.50

5.29
5051.97

5051.17

5050.37
5051.89

5051.24

5051.00

5050.60
5050.56
Ground Levels Ground Levels

4.61
-12.00

11.37
12.00
0.00

-12.00
G.L. Offsets G.L. Offsets

0.00

12.00
0.51
-0.02

0.00

0.28

0.62

0.00
0.05

0.08

0.27

0.34
Level Difference Level Difference

7.45
7.45
2:1
2:1 SMB 2:1

1.46
SMB 2:1
1.23

Total Volume at Total Volume at SMB


0.51

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
SMB Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Station 2+875.00 Station 2+900.00


10.93
Cut Area 0.00 Cut Area 0.00 11.72
Fill Area 7.64 Fill Area 9.86
5051.41

5051.31

5052.31

5052.31
5051.94

5052.00

5051.93

5050.69

5051.63

5052.39

5050.85
Proposed Level Proposed Level
-4.74

-2.48

0.00

2.52

4.95

6.19

Proposed Offsets Proposed Offsets

-5.08

-3.12

0.00

3.12

6.64
5051.30

5050.50
5052.09
5051.90

5051.10

5050.30

Ground Levels Ground Levels

-12.00
G.L. Offsets G.L. Offsets
0.00

12.00
-12.00

0.00
12.00

0.81
0.00

0.00
1.22
1.09
0.00

0.67

0.90

0.54

0.00
1.00

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+825 TO 2+900
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 29 OF 102
CHEDKED BY :-
7.45 7.45
SMB 2:1 2:1

1.27
2:1 SMB

0.25
SMB

0.49
Total Volume at Total Volume at 9.91
Station 2+925.00
10.97 Station 2+950.00
Cut Area 0.01 Cut Area 0.03

Fill Area 7.68 Fill Area 5.07

5052.71
5052.12

5052.73

5052.78

5051.43

5053.11

5053.11

5052.11
5052.84

5053.17

5052.68
Proposed Level Proposed Level

-4.89

-2.19

2.81
0.00

6.26

-4.16

-2.46

4.64
0.00

2.55

5.78
Proposed Offsets Proposed Offsets

5053.41
5051.02
5052.58

5052.28

5051.89

5052.53

5051.66
Ground Levels Ground Levels

-12.00
-12.00

12.00
G.L. Offsets G.L. Offsets

0.00

0.00
12.00
-5.73
-0.10

0.69

0.89

0.00
1.03

0.00

0.40

0.64

0.77

0.49

0.00
Level Difference Level Difference

7.45

0.75
7.45
SMB 2:1 2:1
SMB 2:1 2:1 SMB

0.09
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at SMB Total Volume at


0.10

Station 2+975.00 9.25 Station 3+000.00 9.13


0.80

Cut Area 0.10 Cut Area 0.11

Fill Area 3.59 Fill Area 3.28

5053.76

5053.85

5053.93

5053.85

5053.10
5053.38

5053.49

5053.56

5053.49

5052.90
5052.68

Proposed Level Proposed Level


-3.84

-2.70

-3.91
2.92
0.00

5.00
5.43

-3.12

0.00

3.13

5.22
Proposed Offsets Proposed Offsets
5053.99

5053.09

5052.19

5053.20
5054.33

5053.48

5052.58
Ground Levels Ground Levels
-12.00

-12.00
0.00

G.L. Offsets G.L. Offsets

0.00

3.86

12.00
12.00
0.62
0.00

0.20

0.47

0.19
0.00

0.00

0.15

0.45

0.59

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-2+925 TO 3+000
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 30 OF 102
CHEDKED BY :-
7.45 7.45

SMB 2:1 2:1


SMB 2:1 2:1

1.27

0.54
SMB

0.54
Total Volume at SMB Total Volume at

1.17
Station 3+025.00 Station 3+050.00
11.07 10.88
Cut Area 0.00 Cut Area 0.00

Fill Area 8.13 Fill Area 7.69

5053.81

5053.21
5053.88

5054.38

5054.44

5054.40
5053.64

5054.13

5054.20

5054.14

5053.20
5052.89
Proposed Level Proposed Level

-4.54

-2.32

0.00

2.03

4.98

6.18
Proposed Offsets Proposed Offsets

-4.55

-2.69

2.31

6.31
0.00

5.68

5054.30

5053.80

5053.54

5052.85
5053.26
5054.07

5053.83

5052.48
Ground Levels Ground Levels

12.00
-4.52
G.L. Offsets G.L. Offsets

0.00
-12.00
12.00
-12.00

0.00
-8.63

0.71
0.31

0.07

0.90

0.97

0.56

0.02
0.08

0.69

0.93

0.04
1.03
Level Difference Level Difference

7.45
SMB 2:1 2:1

0.12
SMB
7.45
0.32

9.85
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
0.88

Total Volume at Total Volume at 2:1


SMB
°
Station 3+075.00 Station 3+100.00 65

0.37
Cut Area 0.01 Cut Area 0.29
1.63 6.68
Fill Area 5.05 Fill Area 1.14
5054.33

5054.64

5054.69

5054.63

5054.03
5053.77

5054.97

5054.86

5054.93

5054.86

5054.49
Proposed Level Proposed Level

-3.12
-4.16

-2.06

-3.84
2.31

4.47
0.00

5.00
5.53

0.00

3.12
Proposed Offsets Proposed Offsets

5054.04
5055.45

5054.75
5054.74

5054.26

5054.04

5053.36

Ground Levels Ground Levels

-12.00
G.L. Offsets G.L. Offsets
-12.00

12.00

12.00
-3.91

0.00
0.00

-0.08
0.00

0.19

0.29

0.00
0.72
0.05

0.48

0.65

0.28
0.04

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-3+025 TO 3+100
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 31 OF 102
CHEDKED BY :-
7.45

0.52
7.45
2:1
2:1
Total Volume at ° SMB Total Volume at SMB

0.05
65

0.16
Station 3+125.00 Station 3+150.00

0.34
2.24 6.05
Cut Area 0.38 Cut Area 0.13 8.59
Fill Area 0.94 Fill Area 2.31

5055.36

5055.37

5055.42

5055.36

5054.87
5055.11
5055.27

5055.18

5055.13

5054.76
Proposed Level Proposed Level

-3.65

-2.28

0.00

2.72

4.80
-3.76

-2.69

2.31

4.54
0.00
Proposed Offsets Proposed Offsets

5055.04
5055.78

5054.30

5055.80

5055.24

5054.44
5055.08
Ground Levels Ground Levels

0.00

12.00
-12.00

G.L. Offsets G.L. Offsets

-2.97
0.00

12.00

-12.00
-0.09
0.00

0.14

0.23

0.00

0.07

0.16

0.34

0.42

0.05
Level Difference Level Difference

7.45
0.04

7.45
2:1
SMB
°

0.43

0.09
Total Volume at 65 Total Volume at 7.97
Station 3+175.00 0.72 7.60 Station 3+200.00
Cut Area 0.19 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Cut Area 2.04 Engaging


Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Fill Area 1.50 Fill Area 0.00


5055.61
5055.63

5055.67

5055.60

5055.18

5056.22

5055.79

5055.87

5055.79
5055.87
Proposed Level Proposed Level
-3.77

-2.26

-4.16

-3.13
2.74

4.55
0.00

3.81
0.00

3.13
Proposed Offsets Proposed Offsets
5056.08

5055.43

5055.06

5054.83

5056.56

5056.04

5055.52
Ground Levels Ground Levels
-12.00

-12.00
G.L. Offsets G.L. Offsets

12.00
0.00
6.70
0.00

12.00
0.00

0.06

0.24

0.32

0.00

Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-3+125 TO 3+200
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 32 OF 102
CHEDKED BY :-
7.45 7.45

0.68
0.41

0.27
65°

65°
°
65 65
°

0.85
Total Volume at Total Volume at
Station 3+225.00 8.68 Station 3+250.00
8.42
Cut Area 5.13 Cut Area 3.95

Fill Area 0.00 Fill Area 0.00

5055.91

5055.91

5055.91
5055.96

5056.27
5056.68

5055.89

5056.58

5055.98

5056.17
Proposed Level Proposed Level

-2.81
-4.52

0.00

2.19

4.13
Proposed Offsets Proposed Offsets

-4.41

-2.53

4.01
0.00

2.47

5055.80
5056.96

5056.38
5056.51

5055.91
5057.10

Ground Levels Ground Levels

12.00
0.00
0.00

-12.00
G.L. Offsets G.L. Offsets

12.00
-12.00

-0.01

-0.41
-0.59

-0.35

-0.02
-0.05

-0.75

-0.54

-0.49

-0.03
Level Difference Level Difference

7.45
7.45

0.34
0.11
65°

Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

° 2:1
65 SMB

0.05
Total Volume at Total Volume at
Station 3+275.00 8.06 Station 3+300.00 6.68 1.20
Cut Area 2.41 Cut Area 1.18

Fill Area 0.00 Fill Area 0.01


5056.32

5055.84

5055.90

5055.83

5055.93

5056.01

5055.67

5055.75

5055.67
5055.63
Proposed Level Proposed Level

-4.06

-3.13

0.00

3.82
3.13
-4.23

-2.19

2.81
0.00

3.84

Proposed Offsets Proposed Offsets

5055.81
5056.40

5055.23
5056.70

5056.12

5055.53

Ground Levels Ground Levels

G.L. Offsets G.L. Offsets


-12.00

0.00
-12.00

12.00
0.00

12.00
-0.22
-0.38

-0.15
0.00

0.00

-0.29

-0.06

0.01
0.00

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-3+225 TO 3+300
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 33 OF 102
CHEDKED BY :-
7.45
7.45

0.38
65°
65° 2:1 °
SMB
65

0.90
Total Volume at Total Volume at
Station 3+325.00 4.82 3.22 Station 3+350.00 8.74
Cut Area 1.01 Cut Area 5.29

Fill Area 0.15 Fill Area 0.00

5055.86

5055.53

5055.60

5055.54

5055.42

5056.26

5055.38

5055.44

5055.38

5055.75
Proposed Level Proposed Level

-2.81
-4.06

4.07

-4.62

-2.50
0.00

2.19

2.50
0.00
Proposed Offsets Proposed Offsets

4.13

5055.31
5056.69

5056.00
5056.32

5055.62

5054.93
Ground Levels Ground Levels

0.00
-12.00
G.L. Offsets G.L. Offsets

12.00
0.00
-12.00

12.00
-0.26

-0.02

-0.01

-0.01
-0.77

-0.56

-0.48
0.00

0.05

0.04
Level Difference Level Difference

7.45 7.45
0.60

0.57
65°

65°
65°

1.27

65°
Total Volume at Total Volume at
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116
1.18

Station 3+375.00 Station 3+400.00


9.27 9.13
Cut Area 7.55 Cut Area 6.96

Fill Area 0.00 Fill Area 0.00

5056.17

5055.06

5055.13

5055.06

5055.62
5055.81
5055.22
5056.36

5055.23

5055.29

Proposed Level Proposed Level


-4.88

-2.19

-4.84

-3.13
2.81

4.37
0.00

4.33
0.00

3.13
Proposed Offsets Proposed Offsets
5056.81

5056.10

5055.38

5055.16
5056.59

5056.18

5055.88
Ground Levels Ground Levels
-12.00

12.00
0.00

G.L. Offsets G.L. Offsets

-12.00

-5.07

0.00

12.00
-0.81

-0.71

-1.01
-0.03

-1.00

-0.02

-0.74

-0.64
0.00

0.00
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-3+325 TO 3+400
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 34 OF 102
CHEDKED BY :-
7.45

0.15

0.33
7.45

0.99
2:1

0.46
SMB
°

65°
65

65°
Total Volume at Total Volume at
2.04 6.27
Station 3+425.00 Station 3+450.00
Cut Area 5.94 Cut Area 0.41
8.90
Fill Area 0.00 Fill Area 0.94

5054.91
5054.91

5054.76

5054.82

5054.76

5054.42
5055.78

5054.98

5054.92

5055.27
Proposed Level Proposed Level

-4.13

-2.50

0.00

2.50

4.43
-4.61

-2.81
Proposed Offsets Proposed Offsets

0.00

2.19

4.12
5055.61
5056.32

5054.90

5055.37

5054.67

5053.98
Ground Levels Ground Levels

0.00

12.00
0.00
G.L. Offsets G.L. Offsets
-12.00

-12.00
12.00

-0.05
0.00

0.23

0.00
0.15
-0.10

-0.87

-0.63

-0.56

-0.10
Level Difference Level Difference

7.45
7.45
SMB 2:1 1.24 2:1
2:1 SMB

1.62
2:1
0.54

SMB

0.69
Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116 Engaging
Project
UDAYAK
22.875
Rcc Under
(length
Report
in
Technical
48
theBRTF
(DPR)
6.375
stateConsultant
(RECALL)
kms)
of
onArunachal
EPC
Green
Modef
For
Field
Pradesh
Preparation
orAlignment
Construction
Changlohagam-Kepapu
ofTo
Feasibility
of
NHSL
following
Specification
Study
Road
(FS)
from
sunder
andDetailed
In
km-16.50
TheProject
Aorto116

Total Volume at Total Volume at SMB


Station 3+475.00 Station 3+500.00 12.07
11.00
Cut Area 0.00 Cut Area 0.00

Fill Area 7.98 Fill Area 10.77


5054.08

5054.62

5054.67

5054.60

5053.38

5054.52

5052.82
5053.75

5054.44

5054.44
Proposed Level Proposed Level
-4.76

-2.19

-5.11
2.81

-3.13
0.00

Proposed Offsets Proposed Offsets

0.00

3.13

6.96
6.15

5052.44
5054.27

5053.36
5054.52

5053.02
5053.74

5053.56

Ground Levels Ground Levels

-12.00
G.L. Offsets G.L. Offsets

0.00
-12.00

0.00

2.65

12.00

12.00
0.02
0.03

0.74

0.93

1.05

0.00

0.00
0.85

1.16

1.32
Level Difference Level Difference

SVD BY :- CROSS SECTION FOR CONSTRUCTION OF ROAD DBO TO BPM HUT AT NATIONAL HIGHWAY SINGLE LANE SPECIFOCATION FROM KM 0.000 OFFICIATING OFFICER COMMANDING CHAINAGE - CH:-3+425 TO 3+500
DRAWN BY :- TO 10+260 (TOTAL LENGTH - 10.260 KM) THROUGH DEPARTMENT WORK (7.45 mtr. FORMATION WIDTH ) UNDER 78 RCC (GREF)
78RCC/50BRTF/PROJECT HIMANK IN UNION TERRITORY OF LADAKH. SHEET NO- 35 OF 102