Four Lanning of Rohtak-Jind Section from Km. 307.000 to Km. 347.
800 of NH-71 and connecting line from
Km. 347.800 of NH-71 to Km. 9.400 of NH-71A (Balance Work) on EPC mode under Bharatmala (left out in NHDP) in the State of Haryana. VRC Construction (I) Pvt.Ltd. Daily Progress Report Da Wednesday, July 10, 2024 Sr. No. Activity Chainage Side te Carriage- way Length Qty. Remarks (Km) (Cum) From To A Highway 1 RE Wall Embankment 10th layer 354.730 354.900 LHS MCW 0.170 680 2 RE Wall Eraction RHS 354.800 354.900 RHS MCW 0.100 3 Median Soil Filling 353.400 354.800 N/A MCW 1.400 780 4 Median Cleaning For Plantation 330.400 330.900 N/A MCW 0.500 5 Crash Barrier joint filling for Painting 324.700 325.130 LHS MCW 0.430 6 Laying of kerb wall 336.140 336.480 RHS SR 0.340 10.24 7 laying of Granular Shoulder 320.300 320.900 LHS MCW 0.600 420 B Structure 1 R.E.Panel Caasting VRC Camp VRC Camp N/A N/A 69 Nos. 30 2 Drain PCC Laying RHS 354.740 354.790 RHS SR 0.050 C Road Safety and Signage i Fixing of Sign Board ii Road Marking iii Kerb Painting 333.600 334.660 RHS MCW 1.400 iv Crash Barrier Painting D Toll Plaza 341.375 i Toll Plaza Building ii TMS/ATMS