Document No. SRV/MT/6.

11/34
Original Issue Date 10/01/2018 Site Requirement for CRP 300
Revision No. 01
Valid Up to. 31/12/2024 External use

Requirement for Installation of Batching Plant (to be arranged by Customer )


Model:- CRP 300

Sr. No. Items Specification Qty. Unit


1 Cable ( From Control Panel to DG )
Aluminum 95 Sq. mm or Copper 70
a CRP300 As per Location
Sq. mm
2 Earthing Details (As per IS - 3043 To be done by Elect. Contractor)
Earthing for Mixer tower, Bin
assembly, Control panel, Load 5 set
cells and DG Set
a Char Coal For Earthing 400 kg
b Raw Salt For Earthing 400 kg
c Copper Plate 300mm X 300mm X 5 mm 5 No.
d GI Pipe 1.5" 10 meter
e Copper Wire 5 Sq. mm As per Requirement
3 New DG Set
82.5 KVA Min ( only for plant run ) or
a CRP 300 100 KVA for best results (Ref :DG 1 No.
calculation chart)
4 Tools & Machinery For Erection
a Hydra 14 ton $$01 2 No.
b Welding Machine 3 Phase (If Require) 1 No.
c Gas Cutting Set If Require 1 No.
Hammering Drill
d 1 No.
Machine
Carbide 20 mm Dia and 10 Inch
e Drill Bit 1 No.
Length
f Hand hacksaw 1 No.
g Hammer 10kg 1 No.
5 Manpower
a Fitter Skilled 1 No.
b Electrician Skilled 1 No.
c Helper Skilled 4 No.
d Plumber Skilled 1 No.

Name Sign Date


Reviewed By: VKP 20-06-2023
Approved By: JMM 20-06-2023
Page No. : 1 of 2
Document No. SRV/MT/6.11/34
Original Issue Date 10/01/2018 Site Requirement for CRP 300
Revision No. 01
Valid Up to. 31/12/2024 External use

Plant Operator to
e Skilled 1 No.
Operate batching plant
Operator for Material
f Skilled 1 No.
Loader
6 Standard Weight For Calibration $$01
a Standard weight of 20 kg 60 Nos.
b Standard weight of 2 kg 2 Nos.
c Standard weight of 1 kg 2 Nos.
d Standard weight of 500 grams 2 Nos.
Activity to be Done with Plant Erection
Necessary safety requirements during plant Erection and Commissioning $$01
Slings and Lifting Belts should be in good condition.
Fire Extinguisher should be available at site
Suitable sign board should be available at site
Control Room
Control Cabin / Control Room Size 8 Feet X 6 Feet with glass window
Single phase 3 pin plug board (With Proper earthing provision)
Single phase 16 Amp point for A.C
Tube Light + A.C + Fan + PC + Printer + UPS (Ref: PC Specification Sheet)
Rubber mat for Control Panel. $$01
Civil Work
Foundation as Per layout Drawing.
RAMP for Aggregate. Bin
Cement Godown suitable as per your requirement
Water Tank
Underground / PVC water tank suitable capacity as per your requirement approx.20,000ltr
Water pipeline and connection till the plant

NOTE:- Kindly contact us if any Query.

Name Sign Date


Reviewed By: VKP 20-06-2023
Approved By: JMM 20-06-2023
Page No. : 2 of 2