<<<< TOWARDS AHMEDABAD TOWARDS DHOLERA >>>>

CARRIAGEWAY
COMPRESSIBLE FILLER MATERIAL

-2.5%

START OF RE WALL-2nd TIER


COPING BEAM-II

START OF RE WALL-1st TIER


START OF TAPER -1st TIER
2nd TIER RE WALL FACIA

END OF TAPER -1st TIER

END OF TAPER -1st TIER

CH : 5638.976

CH : 5640.976*
CH : 5039.115
END OF MNB

START OF MNB
CH : 5057.368
2.500

CH : 4940*
CH : 4881.484
0.600 WALL-1(LHS SIDE)(1st TIER)

CH : 4870
AREA- 8133.00 SQM

2.500
CORNER PANEL
1.5
COPING BEAM-I
1

CROSS WALL A1(LHS) 2nd TIER

CROSS WALL A1(LHS) 1st TIER


WALL-2st TIER
CH : 4881.484
0.500

END OF RE
WALL-1(LHS SIDE)(2nd TIER)

CH : 4881.484

AREA- 130.725 SQM

AREA- 214.022 SQM


AREA- 4740 SQM

GEOCOMPOSITE DRAIN

13.750
BACKFILL

RE FACIA (1st TIER) MNB LHS MEDIAN WALL-1(2nd TIER)


SIDE WALL AREA- 387.00 SQM
MEDIAN
2.000

2.500
AREA-127 SQM

ION
A MEDIAN WALL-1A(1st TIER)

PORT
AREA- 387.064 SQM

END
CORNER PANEL

MNB REA-558.0
MNB
AREA

MEDIA
A
M
27.500

E
-607.0 OSS WALL
DIAN

N CR SQM
MEDIAN DRAIN

CR
00 SQ
0.350

OSS W
0
GEOSTRIP AS PER DESIGN

CROSS WALL A1(RHS) 1st TIER


0.150

AREA- 460.148 SQM


ALL-2
ION
-1

PORT
TYPICAL SECTION OF

END
DOUBLE TIER RE WALL

RE WALL-7 2nd TIER AREA-126 SQM

RE WALL-7 1st TIER MNB RHS

CROSS WALL A1(RHS) 2nd TIER


0.020 SLIP JOINT SIDE WALL
MEDIAN

AREA- 362.354 SQM


3.000 1.980
13.750

CH : 4896.844
END OF RE
WALL-2st TIER
2.000
0.500

WALL-2(RHS SIDE)(2nd TIER)


AREA- 4827.000 SQM
0.020 SLIP JOINT

2.500
END OF TAPER -1st TIER

CORNER DETAIL
END OF TAPER -1st TIER

CORNER PANEL

START OF MNB
CH : 4968.115

CH : 4986.912

START OF RE WALL-2nd TIER


START OF TAPER -1st TIER

END OF MNB
WALL-2(RHS SIDE)(1st TIER)

START OF RE WALL-1st TIER


AREA- 7677.679 SQM
CH : 4896.844
CH : 4860

CH : 4960.000*

CH : 5604.587

CH : 5606.587
CONCRETE BLOCK 150X150X150 MM
GEOTEXTILE FABRIC 450 MM WIDE
CROSS WALL A1 RHS 2nd TIER
CROSS WALL A1 RHS 1st TIER

DETAIL - A PLAN OF ROB CH. 5+695.165(LHS)&5+681.745(RHS)A1 SIDE

CLIENT : SAFETY CONSULTANT DESIGN CONSULTANT : EPC CONTRACTOR: PROJECT :


APPROVED BY V.S.
NATIONAL HIGHWAYS AUTHORITY CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM SARDAR
OF INDIA G-ENG ADVISORY SERVICES CHECKED BY R.M. PATEL RING ROAD TO SINDHREJ VILLAGE OF AHMEDABAD
PVT. LTD. ECSTATIC ENGINEERING M/s SADBHAV ENGINEERING. LTD. DISTRICT (CH.- 0 TO 22+000) SECTION OF AHMEDABAD-DHOLERA
V.S. GREENFIELD ALIGNMENT (NH-751) ON EPC MODE UNDER
CONSULTANTS PVT. LTD. DESIGNED BY
AUTHORITY ENGINEER : REGD. OFFICE.: SADBHAV HOUSE, OPP. LAW BHARATMALA PARIYOJANA IN THE STATE OF GUJARAT
PROOF CONSULTANT M/S TTL ENGINEERING PVT. LTD. GARDEN POLICE CHOWK, DRAWN BY M.M. DRAWING TITLE : SHEET NO.
LION ENGINEERING CONSULTANTS PVT. LTD. CORP. OFF. :SCO. - 103 , SECOND FLOOR HUDA
PLAN OF ROB A1 SIDE CH.@
05.01.2024 R1 R.M. AS PER SITE CONDITION SHOPPING CENTER, SECTOR - 55, GURUGRAM , ELLIBRIDGE, AHMEDABAD- 380006, GUJARAT
IN JV WITH Office Address: SCO-75, 2nd Floor,HUDA Market, HARYANA - 122002. T:+917926463384, F:-+917926400210 DATE 05.01.2024 5+695.165(LHS)&(5+681.745) 01
27.03.2023 R0 R.M. SUBMISSION FOR APPROVAL ARKITECHNO CONSULTANTS (INDIA) PVT. LTD. Sector 10A, Near Hero Honda Chowk, DRAWING NO.-
DATE REV CHECKED DESCRIPTION OF REVISIONS Gurgaon, Haryana SCALE NHAI/SEL/NH-751/EEC/ELE/04
<<<< TOWARDS AHMEDABAD TOWARDS DHOLERA >>>>

START OF RE WALL-2nd TIER

START OF RE WALL-2nd TIER

START OF RE WALL-2nd TIER


START OF RE WALL-1st TIER

START OF RE WALL-1st TIER

START OF RE WALL-1st TIER

START OF TAPER -1st TIER

END OF TAPER -1st TIER

END OF TAPER -1st TIER


CH : 5749.976*
CH : 5747.976*

CH : 6241.246*

CH : 6390.000*
CH : 6240.140*
CH : 6201.484

CH : 6204.728
MNB TOP SLAN

CH : 6461.517
CORNER PANEL WALL-4(LHS SIDE)(1st TIER) CORNER PANEL WALL-6(LHS SIDE)(1st TIER)

CH : 6650
AREA- 5128.00 SQM AREA- 4626.000 SQM

2.500

2.500

2.500

2.500
RE WALL 1.0 M
OVERLAPPING
MNB RCC
WALL BLOCK WITH

WALL-2st TIER
CH : 6461.517
GEOTEXTILE

CROSS WALL A2(LHS) 2nd TIER


CROSS WALL A2(LHS) 1st TIER
2.0

END OF RE
(150X150X150 mm) WALL-4(LHS SIDE)(2nd TIER) WALL-6(LHS SIDE)(2nd TIER)
00
AREA- 3813.00 SQM AREA- 636.000 SQM
0.999

AREA- 207.883 SQM

AREA- 130.725 SQM


2.0
00

25 mm SLIP
JOINT RE WALL MEDIAN SIDDE RE WALL
AT MNB TOP SLAB
OUTER FACE OF INNER FACE OF 0.300 X1.000 MM BEAM MEDIAN WALL-2(2nd TIER)
LEVELLING PAD LEVELLING PAD
AREA- 129.564 SQM

EARTH FACE

DETAIL - C
CORNER PANEL
B

MEDIAN WALL-2A(1st TIER)


AREA- 142.176 SQM

IER
M TIER
IER

SQ nd T
SQ nd T

21 S) 1sT

M IER

2
2

M
M

ION

1.3 HS)
2.6 HS)

SQ

T
- 93 A1(LH

809 ) 2nd
RT

- 43 A2(L
- 45 A1(L

04
41

SQ
3.6

PO

S
- 10 A2(LH
AR WALL

AR WALL
AR WALL
MEDIAN DRAIN MEDIAN DRAIN

ER

01.
EA

EA
EA

OV
RE WALL-8 2nd TIER

S
S

AR ALL
FLY
OS

OS
OS
RE WALL-8 1st TIER
0.020 SLIP JOINT

SW
EA
CR

CR
CR

OS
1.980 3.000

CR
0.020 SLIP JOINT

2.0
00
CROSS WALL A2(RHS) 2nd TIER
CROSS WALL A2(RHS) 1st TIER

CONCRETE BLOCK
150X150X150 MM
AREA- 430.952 SQM

AREA- 362.254 SQM

GEOTEXTILE FABRIC
450 MM WIDE
CROSS WALL A3
RHS 2nd TIER

CH : 6461.517
CROSS WALL

END OF RE
WALL-2st TIER
A2 RHS 1st TIER

DETAIL - B WALL-3(RHS SIDE)(2nd TIER) WALL-5(RHS SIDE)(2nd TIER)


AREA- 3350.00SQM AREA- 972.000 SQM
2.500

2.500

2.500

END OF TAPER -1st TIER


END OF TAPER -1st TIER
START OF RE WALL-2nd TIER

START OF RE WALL-2nd TIER


START OF RE WALL-1st TIER

START OF RE WALL-1st TIER


START OF RE WALL-1st TIER

CH : 6461.517
CORNER PANEL

START OF TAPER -1st TIER


WALL-3(RHS SIDE)(1st TIER) WALL-5(RHS SIDE)(1st TIER)
CH : 5758.958
START OF RE WALL-2nd TIER
CH : 5756.958

AREA-4339.00 SQM AREA- 5207.00 SQM


CORNER PANEL

CH : 6650
180

CH : 6390.000*
CH : 6142.743*

CH : 6183.060*

FACING PANELS
CH : 6143.849

CH : 6179.820

CONNECTION
NONWOVEN
PARAWEB
GEOTEXTILE OR
90
°

SIMILAR APPROVED
180
44
0

FACING PANELS PLAN OF ROB CH. 5+695.165(LHS)&5+681.745(RHS)A2 SIDE


CORNER PANEL DETAIL PLAN OF FLYOVER AT CH.6+209.625(LHS)&6+168.375(RHS)
CLIENT : SAFETY CONSULTANT DESIGN CONSULTANT : EPC CONTRACTOR: PROJECT :
APPROVED BY V.S.
NATIONAL HIGHWAYS AUTHORITY CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM SARDAR
OF INDIA G-ENG ADVISORY SERVICES CHECKED BY R.M. PATEL RING ROAD TO SINDHREJ VILLAGE OF AHMEDABAD
PVT. LTD. ECSTATIC ENGINEERING M/s SADBHAV ENGINEERING. LTD. DISTRICT (CH.- 0 TO 22+000) SECTION OF AHMEDABAD-DHOLERA
V.S. GREENFIELD ALIGNMENT (NH-751) ON EPC MODE UNDER
CONSULTANTS PVT. LTD. DESIGNED BY
AUTHORITY ENGINEER : REGD. OFFICE.: SADBHAV HOUSE, OPP. LAW BHARATMALA PARIYOJANA IN THE STATE OF GUJARAT
PROOF CONSULTANT M/S TTL ENGINEERING PVT. LTD. GARDEN POLICE CHOWK, DRAWN BY M.M. DRAWING TITLE : SHEET NO.
LION ENGINEERING CONSULTANTS PVT. LTD. CORP. OFF. :SCO. - 103 , SECOND FLOOR HUDA
PLAN OF ROB A2 SIDE CH.@ 5+695.165
05.01.2024 R1 R.M. AS PER SITE CONDITION SHOPPING CENTER, SECTOR - 55, GURUGRAM , ELLIBRIDGE, AHMEDABAD- 380006, GUJARAT
IN JV WITH Office Address: SCO-75, 2nd Floor,HUDA Market, HARYANA - 122002. T:+917926463384, F:-+917926400210 DATE 05.01.2024 (LHS)&(5+681.745) & FLY CH.@ 6+189 02
27.03.2023 R0 R.M. SUBMISSION FOR APPROVAL ARKITECHNO CONSULTANTS (INDIA) PVT. LTD. Sector 10A, Near Hero Honda Chowk, DRAWING NO.-
DATE REV CHECKED DESCRIPTION OF REVISIONS Gurgaon, Haryana SCALE NHAI/SEL/NH-751/EEC/ELE/04