Professional Documents
Culture Documents
CANAL DWG FINAL
CANAL DWG FINAL
300
AGGREGATE OVER HESSIAN CLOTH P.C.C M-15 DOWEL
SPOIL BANK (R/S)
600 600
FB - 1220MM
6000 5000
LONGITUDINAL
SLEEPER BEAM 450 450 LONGITUDINAL BOTTOM OF LINNING
SLEEPER BEAM
TOP OF LINNING
SL
1:
1 OP MM
14
1:
E
1
LE FSL 5
NG -5
1.5 H
:1 TH
NGT 1.5
:1
-5 LE
3430
51 E
160MM O.D.P.V.C. HOUSING PIPE
75 GRADED GRAVEL/METAL 20 TO
4M
OP
(PERFORETED)
R-
M SL 45 MM
10
75
22
75 GRADED GRAVEL/STONE CHIPS 5
22
PRV 90MM OUTER DIA
75
FSD -
10
2210
2210
2210
TO 20 MM
75
75 COARSE SAND OF F.M. 1.5 OR
150MM THICK
SAND FILTER OF PRESSURE ABOVE
100 RELEASE VALVE
1304
1304
75
GRAVEL/METAL D15 @ 7.5MM
0
430
500 GRAVEL/STONE CHIPS
CONSTRUCTION JOINT 5650 5650 5650
TOP SURFACE TO BE CEMENT WASHED SEALING COMPOUND 10MM THICK 16950
WITH INTERRATED WATER REPELLER PERFORATED PVC PIPE 90 0
CASING FOR P.R.V 16 0
75
18290
31
75
COARSE SAND D15 @ 0.4MM 0
46
150
75
TYPICAL LINED CROSS SECTION OF AJAY MAIN CANAL
150
0
BOTTOM PLUG 61
150
150
150
500
PCC -M15
150MM THICK SLEEPER BEAM
SAND FILTER
150 150 150 150 150 150 150
GRADE M-15 OF SIZE 200MM X 150MM PROVIDED AT ALL PANEL JOINTS IN LONGITUDINAL
PRV. 10M C/C AND TRANSVERSE DIRECTION. THE JOINT SHALL BE FILLED WITH APPROVED SEALING
TRANSVERSE
SPACING BETWEEN
3.20M
PRV. 10M C/C PRV. 10M C/C 4. HESSIAN CLOTH SHALL BE LAID UNDERNEATH THE CONCRETE LINING IN
THE BED AND SIDE SLOPE AS SHOWN IN THE DRAWING.
DRAIN
5. CONSTRUCTION JOINTS SHALL BE PROVIDED IN THE LONGITUDINAL SLEEPER BEAM
LONG DRAIN @15M INTERVAL FILLED WITH SEALING COMPOUND.
6. EXPANSION JOINTS SHALL BE PROVIDED IN THE BED AND SIDE LINING NEAR THE STRUCTURE.
7. R.C.C LADDER SHALL BE PROVIDED AT 300M INTERVAL ALTERNATELY AS PER IS CODSE: 3872:1966
8. DETAIL OF PRESSURE RELEASE ARRANGEMENT SHOWNIN THE DRAWING SHALL BE
APPLICABLE IN CUTTING REACES OF THE CANAL WITH SUB GRADE HAVING PREMEABILITY
3.20M
PRV. 10M C/C LASS THAN 10 CM/SEC (LESS THAN100FT PER YEAR). PERFORATED P.V.C. PIPE SHALL BE
EACH SLOPE PANEL
9. FOR SUBGRADE COMPRISING OF EXPANSIVE SOIL (BLACK COTTON SOIL) THE SAME
TRANSVERSE DRAIN
10.00M
BETWEEN
PERMEABILITY LESS THAN 10CM/SEC . THE SUBGRADE TO BE REMOVED TO A DEPTH OF 600MM
AND REPLACED WITH SAND, MORUM OR OTHER SUITABLE PERVIOUS MATERAL.
3.20M
11. LINING CONCRETE SHALL BE COMPACTED BY MEAND OF MECHAINCAL OR SCREED/PLATE
VIBRATOR. IN NO CASE THE CONCRETE SHOULD BE COMPACTED BY TAMPING.
12. WHILE LAYING LINING CONCRETE PROCEDURE & PRECAUTIONS SUGGESTED
IN IS: 3873-2002 TO BE FOLLOWED
13. FULL SUPPLY DEPTH IN CANAL WILL DECREASE DUE TO LINING OF EXISTING CANAL
APPRPRIATE MEASURE TO BE TAKEN TO ENSURE REQUIRED HEAD AT OUTLET
SO THAT COMMAND AREA IS NOT AFFECTED.
TRANSVERSE
14. WITH LINING, OUTER SLOPE OF EXISTING UNLINED CANAL EMBANKMENT MAY NOT
PRV. 10M C/C BE FLATTER THAN 2H:1V.
PRV. 10M C/C PRV. 10M C/C 15. DRAWING IS AS PER IS CODE.
DRAIN
16. PERMEABILITY TEST OF SUBSOIL MUST BE CARRIED OUT BEFORE USING THE DRAWING OF
LINING.
17. THICKNESS OF FILTER MUST BE ACHERED AS PER DESIGN AND DRAWING.
18. BEFORE LAYING CONCRETE FOR LINING, SAND PROVIDED AS FILTER MUST BE WELL
WATERED.
LONGITUDINAL
19. EARTH MUST BE COMPACTED AT 90% OMC.
DRAIN EACH BED PANEL RISER 200MM
BOTTOM OF LINNING
SOFFIT 50MM
PERFORATED A.C/P.V.C PIPE
GOVT. OF JHARKHAND
PLAN
LINNING
REACH 1ST REACH WATER RESOURCES DEPARTMENT
150 75
150
150
45 MM
GRADED GRAVEL/STONE CHIPS 5 NOT TO SCALE TYPICAL SECTION DETAILS OF LINING OF OF AJAY MAIN CANAL
TO 20 MM BED WIDTH(A) A=16950
COARSE SAND OF F.M. 1.5 OR ELEVATION
75 150
GUIDE WALL
500 SAND FILTER F.S.D. 2210
DETAIL SECTION OF
LONGITUDINAL/TRANSVERSE DRAIN PCC LINNING 1220
FREE BOARD
1500
CANAL BED
SHEET :