Download as pdf or txt
Download as pdf or txt
You are on page 1of 51

การรถไฟแห่งประเทศไทย

โครงการก่อสร้างทางรถไฟ
สายบ้านไผ่- มหาสารคาม - ร้อยเอ็ด- มุกดาหาร - นครพนม สัญญาที1
่ ช่วงบ้านไผ่- หนองพอก

DETAILED ENGINEERING DRAWINGS

OVERPASS BRIDGE

CROSSING NO.38 KM. 150+800.000


DRAWING LIST DRAWING LIST
DRAWING NO. DRAWING TITLE SHEET NO. DRAWING NO. DRAWING TITLE SHEET NO.

GENERAL W-OP38-ST-0032 CONCRETE BARRIER AT BRIDGE TRANSITION, DETAILS S3E_02

W-OP38-GI-0001 LIST OF DRAWING S1_01 W-OP38-ST-0033 CONSTRUCTION OF ASSEMBLY MSE. WALL S3F_01

W-OP38-GI-0002 SYMBOL & ABBREVIATION S1_02 W-OP38-ST-0034 TRANSITION STRUCTURE ( SHEET 1 OF 3) S3F_02

W-OP38-GI-0003 STRUCTURE NOTES S1_03 W-OP38-ST-0035 TRANSITION STRUCTURE ( SHEET 2 OF 3) S3F_03

ALIGNMENT DETAILS W-OP38-ST-0036 TRANSITION STRUCTURE ( SHEET 3 OF 3) S3F_04

W-OP38-AL-0001 PLAN AND PROFILE OVERPASS (SHEET 1 OF 2) S2_01 W-OP38-ST-0037 CONCRETE APPROACH SLAB, DETAILS S3G_01

W-OP38-AL-0002 PLAN AND PROFILE OVERPASS (SHEET 2 OF 2) S2_02 W-OP38-ST-0038 CONCRETE PLINTH AND BEARING PAD, DETAILS (SHEET 1 OF 2) S3G_02

W-OP38-AL-0003 PLAN AND PROFILE U-TURN 1 S2_03 W-OP38-ST-0039 CONCRETE PLINTH AND BEARING PAD, DETAILS (SHEET 2 OF 2) S3G_03

W-OP38-AL-0004 PLAN AND PROFILE U-TURN 2 S2_04 W-OP38-ST-0040 EXPAASION JOINT, DETAILS S3G_04

W-OP38-AL-0005 PLAN AND ELEVATION KM.150+800.000 ( SHEET 1 OF 2 ) S2_05 Total Sheets:: 50

W-OP38-AL-0006 PLAN AND ELEVATION KM.150+800.000 ( SHEET 2 OF 2 ) S2_06

TRAFFIC SIGN PLAN

W-OP38-TF-0001 TRAFFIC SIGN PLAN CROSSING NO.38 KM.150+800.000 S2_07

RAILWAY CROSSING STRUCTURE

W-OP38-ST-0001 TYPICAL CROSSING SECTION A-A FOR ROADWAY WIDTH 20.00 M. S3A_01

W-OP38-ST-0002 TYPICAL CROSSING SECTION B-B FOR ROADWAY WIDTH 20.00 M. S3A_02

W-OP38-ST-0003 TYPICAL CROSSING SECTION C-C FOR ROADWAY WIDTH 20.00 M. S3A_03

W-OP38-ST-0004 TYPICAL CROSSING SECTION D-D FOR ROADWAY WIDTH 20.00 M. S3A_04

W-OP38-ST-0005 3D VIEW S3A_05

W-OP38-ST-0006 PIER SECTION 01 S3A_06

W-OP38-ST-0007 PIER SECTION 02 S3A_07

W-OP38-ST-0008 PIER SECTION 03 S3A_08

W-OP38-ST-0009 PILE DETAILS BORED PILE ø1.00 M. & ø1.20M. S3B_01

W-OP38-ST-0010 "A6" ABUTMENT DETAILS FOR 30.00 M. SPAN, DIMENSION S3B_02

W-OP38-ST-0011 "A6" ABUTMENT DETAILS FOR 30.00 M. SPAN, REINFORCEMENT (SHEET 1 OF 2) S3B_03

W-OP38-ST-0012 "A6" ABUTMENT DETAILS FOR 30.00 M. SPAN, REINFORCEMENT (SHEET 2 OF 2) S3B_04

W-OP38-ST-0013 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION (SHEET 1 OF 4) S3B_05

W-OP38-ST-0014 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION (SHEET 2 OF 4) S3B_06

W-OP38-ST-0015 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION (SHEET 3 OF 4) S3B_07

W-OP38-ST-0016 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION (SHEET 4 OF 4) S3B_08

W-OP38-ST-0017 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, REINFORCEMENT (SHEET 1 OF 5) S3B_09

W-OP38-ST-0018 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, REINFORCEMENT (SHEET 2 OF 5) S3B_10

W-OP38-ST-0019 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, REINFORCEMENT (SHEET 3 OF 5) S3B_11

W-OP38-ST-0020 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, REINFORCEMENT (SHEET 4 OF 5) S3B_12

W-OP38-ST-0021 "P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, REINFORCEMENT (SHEET 5 OF 5) S3B_13

W-OP38-ST-0022 I-GIDER FOR 30.00 M. SPAN, PRETENSION, DIMENSION S3C_01

W-OP38-ST-0023 I-GIDER FOR 30.00 M. SPAN, PRETENSION, DETAIL OF PRESTRESSING STRAND S3C_02

W-OP38-ST-0024 I-GIDER FOR 30.00 M. SPAN, PRETENSION, STEEL REINFORCEMENT S3C_03

W-OP38-ST-0025 SLAB SPAN 30.00 M. PLAN OF I-GIRDER AND DIAPHRAGM S3D_01

W-OP38-ST-0026 SLAB SPAN 30.00 M. DIAPHRAGM DETAILS S3D_02

W-OP38-ST-0027 SLAB SPAN 30.00 M.PLAN OF PLANK SLAB S3D_03

W-OP38-ST-0028 SLAB SPAN 30.00 M. PRECAST DETAILS S3D_04

W-OP38-ST-0029 SLAB SPAN 30.00 M. PLAN OF SLAB AND BARRIER S3D_05

W-OP38-ST-0030 SLAB SPAN 30.00 M. BARRIER DETAILS S3D_06

W-OP38-ST-0031 CONCRETE BRIDGE RAILING, DETAILS S3E_01

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
DRAWING LIST
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-GN-GI-0001
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-GI-0001 S1_01

JVBP-009 : Rev.1 : 05-04-23


ABBREVIATIONS SYMBOLS
A AREA H.W.L. HIGH WATER ELVEL P.V.T. POINT OF VERTICAL TANGENT CL
CONST.
CENTER LINE
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY HWY. HIGHWAY P.X. PIER TYPE X
SURVEY CL 350 INDEX CONTOUR
AND TRANSPORTATION OFFICIALS R. RADIUS TRANSIT LINE
I.D. INSIDE DIAMETER INTERMEDIATE CONTOUR
A.C. ASPHALTIC CONCRETE EXIST. R/W
IN. INCH RB. ROUND BAR EXISTING R/W
A.D. ALGEBRAIC DIFFERENCE WOODEN OR BARBED WIRE FENCE
R.C. REINFORCED CONCRETE PROPOSED R/W
ADT. AVERAGE DAILY TRAFFIC INV. INVERT PROPOSED R/W
JT. JOINT RC. REMOVED ADVERSE CROWN SL PROPERTY LINE BRIDGE , ROAD OVER STREAM
AGG. AGGREGATE
AH. AHEAD K CURVE COFFICIENT R.C.B. REINFORCED CONCRETE BOX CULVERT EDGE OF NEW PAVEMENT
RAIL ROAD SINGLE TRUCK
AISC. AMERICAN INSTITUTE CONSTRUCTION OF STEEL R.C.P. REINFORCED CONCRETE PIPE CULVERT EDGE OF EXISTING PAVEMENT
KG. KILOGRAM
ALT. ALTERNATIVE R.C.S. REINFORCED CONCRETE SLAB EXISTING SHOULDER LINE KHLONG OR RIVER
KM. KILOMETER
APPROX. APPROXIMATE RD. ROAD
KPH. KILOMETER PER HOUR NEW SHOULDER LINE DITCH , WATERWAY
ASTM. AMERICAN SOCIETY FOR TESTING AND MATERIALS
KSC. KILOGRAM PER SQUARE CENTIMETER R.E. RESIDENT ENGINEER
AVG. AVERAGE EXISTING CURB
REF. REFERENCE FLOW DIRECTION
L. LENGTH OF HORIZONTAL CURVE OR LENGTH
AX. ABUTMENT TYPE X NEW CURB
LEV. LEVEL REINF. REINFORCEMENT SWAMP AREA
BIT. BITUMINOUS , GROUND PROFILE
LG. LIGHT GAGE STEEL REQ D REQUIRED
BK. BACK EXISTING ROAD PROFILE BILLBOARD , SINGLE FACE
L.M. LINEAR METER R.I.D. ROYAL IRRGATION DEPARTMENT
BM. BENCH MARK
LPS. LOW PRESSURE SODIUM LAMP R.P. REFERENCE POINT BACKFILLING EXISTING CHANNELS
BOTT. BOTTOM BILLBOARD , DOUBLE FACE
Ls. SUPERELEVATION TRANSITION LENGTH RT. RIGTH
BRDG. BRIDGE EXISTING INLETS POWER POST OR TELEPHONE POLE
L.S. LUMP SUM R/W(OR R.O.W.) RIGTH-OF-WAY
BRG. BEARING
LT. LEFT S.B.S.T. SINGLE BITUMINOUS SURFACE TREATMENT EXISTING PIPE TRAFFIC SIGN
BT. BACK TANGENT
L.V.C. LENGTH OF VERTICAL CURVE S.C. SPIRAL - CIRCLE
C CANT EXISTING DITCH GUIDE POST
L.W.L. LOW WATER LEVEL SE. SUPERELEVATION
C.B.R. CALIFORNIA BEARING RATIO
M. METER SEC.(OR Sec.) SECANT PARALLEL DITCH HIGH WATER LEVEL
C/C(OR C TO C) CENTER TO CENTER
2 PIPES
M. SQUARE METER SECT. SECTION KILOMETER MARKER (EXISTING,PROPOSED)
CL. CLEARANCE
3
M. CUBIC METER SP. SPAN INLET
CM. CENTIMETER R/W MARKER (EXISTING, PROPOSED)
2 MAG. AZ. MAGNETIC AZIMUTH SPG. SPACING
CM. SQUARE CENTIMETER W WATER & WATER VALVE
MAX. MAXIMUM RAILWAY
S.R. SIDE ROAD
C.M.P. CORRUGATED METAL PIPE T TELEPHONE & MANHOLE
M.E.A. METROPOLITAN - ELECTRICITY AUTHORITY S.R.T. STATE RAILWAYS OF THAILAND SLOPE
COL. COLUMN
M.H. MANHOLE S.T. SPIRAL - TANGENT E ELECTRICITY
CONC. CONCRETE BENCH MARK
CONSTR. CONSTRUCTION MIN MINIMUM STA. STATION PT PT POWER TRANSMISSION LINE
WITH STEEL TOWER
C.P. CONCRETE PIPE MISC. MISCELLANEOUS STD. STANDARD HOR. & VER. CONTROL MONUMENT
WOODEN ELECTRIC POLE
C.S. CONTROL SURVEY MM. MILLIMETER STR. STRAIGHT
2 CONCRETE ELECTRIC POLE POINT OF HORIZONTAL INTERSECTION
C/W CARRIAGEWAY MM. SQUARE MILLIMETER SYMM. SYMMETRY OR SYMMETRICAL
CU.M. CUBIC METER TELEPHONE POLE
M.O. MIDDLE ORDINATE S/B SOUTH BOUND H TEPORARY SHELTER , HUT
D. DEGREE OF CURVE MONT. MONUMENT T. TANGENT LENGTH , TON INDIVIDUAL TREE
DB. DEFORMED BAR
M.S.L. MEAN SEA LEVEL THK. THICKNESS HEDGE 1-S-W BUILDING , ONE - STOREY WOODEN FRAME
D.B.S.T. DOUBLE BITUMINOUS SURFACE TREATMENT
N. NORTH TIS. THAI INDUSTRIAL STANDARD
DEG. DEGREE BUS STOP SHELTER
N/B NORTH BOUND T.S. TANGENT - SPIRAL 2-S-W BUILDING , TWO - STOREY WOODEN FRAME
DIA. DIAMETER
NC. NORMAL CROWN TYP. TYPICAL TELEPHONE JUNCTION
D.O.H. DEPARTMENT OF HIGHWAY
DS DESIGN SPEED NO. NUMBER VOL. VOLUME PUBLIC TELEPHONE BOX 1-S-C BUILDING , ONE - STOREY CONCRETE
O.D. OUTSIDE DIAMETER V.C. LENGTH OF VERTICAL CURVE
DWG. DRAWING MAIL BOX
P.B.M. PERMANENT BENCH MARK V. VELOCITY
E EXTERNAL DISTANCE OF SIMPLE CURVE OR EAST 2-S-C BUILDING , TWO - STOREY CONCRETE
P.C. POINT OF CURVE OR PRESTRESSED CONCRETE W. WIDENING TRAFFIC SIGNAL
EA. EACH
P.C.B.G. PRESTRESSED CONCRETE BOX GIRDER W/ WITH FIRE HYDRANT COMMERCIAL BUILDING , ONE - STOREY
EL.(OR ELEV.) ELEVATION 1-S-W(10)
P.C.C. POINT OF COMPOUND CURVE WOODEN FRAME , 10 UNITS
W/B WEST BOUND EXISTING PIPE CULVERT
ENGR. ENGINEER
P.C.I.G. PRESTRESSED CONCRETE I-GIRDER (WITH OR WITHOUT HEADWALL) COMMERCIAL BUILDING , TWO - STOREY
W/O WITHOUT 2-S-W(10)
E.O.P. EDGE OF PAVEMENT NEW PIPE CULVERT WOODEN FRAME , 10 UNITS
P.C.U.G. PRESTRESSED CONCRETE U-GIRDER WT. WEIGHT (WITH OR WITHOUT HEADWALL)
EQ.(OR=) EQUATION OR EQUAL
P.E.A. PROVINCIAL - ELECTRICITY AUTHORITY X SECT. CROSS SECTION EXISTING BOX CULVERT COMMERCIAL BUILDING , ONE - STOREY
EQUIV. EQUIVALENT 1-S-C(10)
CONCRETE STRUCTURE , 10 UNITS
P.G. PROFILE GRADE CL CENTERLINE NEW BOX CULVERT
ETA. EXPRESSWAY AND RAPID TRANSIT COMMERCIAL BUILDING , TWO - STOREY
P.G. LINE PROFILE GRADE LINE PL PROPERTY LINE 2-S-C(10)
AUTHORITY OF THAILAND EXISTING HIGHWAY GUARDRAIL CONCRETE STRUCTURE , 10 UNITS
P.I. POINT OF HORIZONTAL INTERSECTION SL SPUR LINE OR SURVEY LINE
EXIST. EXISTING
NEW HIGHWAY GUARDRAIL
PL. PLATE % PERCENT
EXP. EXPANSION
P.O.C. POINT ON CURVE & AND RAIL ROAD CROSSING SIGN
E/B EAST BOUND
P.O.S.T. POINT ON SUBTANGENT @ SPACING
FT. FORWARD TANGENT RAIL ROAD CROSSING SIGNAL LIGHT
P.O.T. POINT ON TANGENT " INCH
FTG. FOOTING
P.R.C. POINT OF REVERSE CURVE ∅ DIAMETER RAIL ROAD CROSSING GATE
GM. GRAM
PROJ. PROJECT DEFLECTION ANGLE
GL. GROUND LEVEL GASOLINE STATION
P.T. POINT OF TANGENT
H. & RN. HUB AND RED NAIL
P.V.C. POINT OF VERTICAL CURVE
HDWL. HEADWALL
P.V.I. POINT OF VERTICAL INTERSECTION
HOR. HORIZONTAL
P.V.R.C. POINT OF VERTICAL REVERSE CURVE
HPS. HIGH PRESSURE SODIUM LAMP

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
ABBREVIATION AND SYMBOL
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-GN-GI-0002
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-GI-0002 1 : 100 S1_02

JVBP-009 : Rev.1 : 05-04-23


SUFFIX
DESIGN STANDARD AP ALTERNATELY PLACED (BARS OF ONE MARK ALTERNATING WITH BARS OF
e) TYPICAL BENDS
ANOTHER MARK)
- STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, AASHTO 2007.
AR ALTERNATELY REVERSED (ALTERNATE BARS TURNED END FOR END AND
- BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, ACI 318-11.
POSSIBLY MOVED ALONG THEIR LENGTH, AS INDICATED BY TYPICAL BARS) 1. 2. 3.
CONCRETE AS ALTERNATELY STAGGERED (BARS OF ONE MARK WITH ALTERNATE BARS MOVED A h h A h
ALONG THEIR LENGTH SO THAT TWO SETS OF PLAN POSITIONS ARE A
1. EXCEPT WHERE NOTED ON THE DRAWINGS, SPECIFIED CYLINDER COMPRESSIVE L=A L=A+h L=A+2h
OCCUPIED, AS INDICATED BY TYPICAL BARS)
STRENGTH OF CONCRETE AT 28 DAYS SHALL BE AS FOLLOWS :
2 T TOP 4. A 5. C 6. A
a) PRESTRESSED CONCRETE STRUCTURES 450 KG./CM.
B BOTTOM
n

D
2
A

B
b) COLUMN 350 KG./CM.
EF EACH FACE C E

B
2
c) PILE CAP 350 KG./CM. L=A+0.57B+C-1.57d L=A+C+E+0.57(B+D)- D } L=A+n-r/2-d
2 FF FAR FACE
d) BORED PILE 300 KG./CM.
2 NF NEAR FACE 7. A 8. B 9. B
e) PRESTRESSED PILE 350 KG./CM.
2 IF INSIDE FACE
f) LEAN CONCRETE 200 KG./CM. n n A A C
OF OUTSIDE FACE
2. UNLESS SHOWN OTHERWISE ON THE DRAWINGS, ALL EXPOSED CORNERS SHALL HAVE L=A+2n-r-2d L=A+B-r/2-d L=A+B+C-r-2d
EW EACH WAY
25 MM CHAMFERS
RL RANDOM LENGTH 10 11. C 12. C
B
3. UNLESS NOTED ON THE DRAWINGS, THE FOLLOWING CONCRETE CLEAR COVERS SHALL V VARIES (BAR OF VARYING DIMENSIONS) B B
A A A

D
BE MAINTAINED : D
4. SPILICES OF REINFORCEMENT SHALL CONFORM TO THE FOLLOWING REQUIREMENTS :

C
L=A+B+0.57C+D-r/2-2.57d L=A+B+C for angle 45° L=A+B+C for angle 45°
a) 25 MM FOR REINFORCEMENT NEAR INTERNAL FACES
a) DEVELOPMENT AND LAP LENGTHS OF REINFORCEMENT
b) 40 MM FOR REINFORCEMENT IN THE TOP OF BRIDGE SLAB AND EXTERNAL 13. 14. A D 15. A
C

E
DEVELOP LENGTHS (MM.) LAP LENGTHS (MM.) E
FACES EXPOSED TO THE WEATHER B D B B B
A C D

E
c) 50 MM FOR REINFORCEMENT IN SECTIONS IN CONTACT WITH THE GROUND BAR TOP OTHER TOP BARS OTHER BARS C
L=A+B+C+D-r/2-d L=A+2B+C+D for angle 45° L=A+B+C+D+E-2r-4d
d) 75 MM FOR REINFORCEMENT NEAR UNDER SIDE FACES OF FOOTINGS, UNLESS DIA BARS BARS TENS COMP TENS COMP
SPECIFIED OTHERWISE A A
6 500 500 500 500 500 500 16. 17. 18.
E B
e) 50 MM WHERE BUNDLE BARS ARE USED OR THE EQUIVALENT BUNDLE-BARS B B INTERNAL
D C A
9 600 600 600 600 600 600 C D DIMENSIONS
DIAMETER, WHICHEVER IS THE GREATER
L=A+B+C+D+E-2r-4d L=A+2B+C+D-2r-4d L=2(A+B)+Lx B
f) 50 MM FOR BAR END COVERINGS 10 350 300 450 400 300 300
g) FULL COVER HAVE TO BE MAINTAINED AT GROOVES AND ANY ARCHITECTURAL 19. 20. C 21. E
12 400 300 550 500 400 350
FINISHES INTERNAL INTERNAL A D
INTERNAL A A
16 550 400 700 650 500 450 DIMENSIONS DIMENSIONS DIMENSIONS B C
L=2A+3B+Lx B B
REINFORCING STEEL L=2A+B+C+Lx/2 L=A+B+C+2D+E+Lx/2
20 650 500 850 800 600 600

1. MILD STEEL ROUND BARS WHICH DIAMETERS ARE 9 MM OR SMALLER SHALL 25 950 700 1250 1000 900 700 22. 23. 24. A
R

B
INTERNAL A
CONFORM TO THE REQUIREMENTS OF TIS20, GRADE SR24 A B
28 1200 850 1550 1100 1100 800 DIMENSIONS INTERNAL
2. HIGH YIELD DEFORMED BARS WHICH DIAMETERS ARE 10 MM OR GREATER SHALL L=2A+B+25d B L=2A+3B+22d DIMENSIONS L=A+B-R/2-d
32 1500 1200 2100 1600 1600 950
CONFORM TO THE REQUIREMENTS OF TIS 24, GRADE SD40 EXCEPT DIAMETER 32 MM B
25. R 26.
3. HIGH YIELD DEFORMED BAR WHICH DIAMETER IS 32 MM SHALL CONFORM TO b) THE DEVELOPMENT LENGTH AS WELL AS THE LAP LENGTH OF INDIVIDUAL BARS A
THE REQUIREMENTS OF TIS 24, GRADE SD50. WITHIN A BUNDLE SHALL BE INCREASED BY 20 PERCENT FOR A THREE - BAR C C
A
BUNDLE AND 33 PERCENT FOR A FOUR - BAR BUNDLE L=A }
L=B/C (A+d)+8dwhenC A/5
4. PLAIN ROUND SPACER BAR OF DIAMETER NOT LESS THAN 25 MM ARE TO BE
c) SPLICES IN ADJACENT BAR HAVE TO BE STAGGERED
PROVIDED BETWEEN ADJACENT LAYERS OF PARALLEL REINFORCEMENT AND SPACED
AT NOT MORE THAN 60 TIMES THE SIZE OF SMALLER BAR 5. STANDARD BAR BENDS AND HOOKS : 6. PRESTRESSING STEEL
a) STANDARD 180° HOOK b) STANDARD 90° BEND
5. BARS IN RANDOM LENGTHS ARE SPLICED AS SPECIFIED AND NOT MORE THAN 1. ALL UNLESS OTHERWISED NOTE, PRESTRESSING STRANDS SHALL BE SEVEN-WIRE, UNCOATED, LOW-RELAXATION
h DETAILING DIMENSION (OUT-TO-OUT) DETAILING DIMENSION (OUT-TO-OUT)
ONE BAR PER LINE IS SHORTER THAN : STRANDS CONFORMING TO THE REQUIREMENTS OF AASHTO M 203-90 (SUPPLEMENT)
a) 4.00 M FOR 16 MM DIAMETER OR SMALLER OR ASTM A 416-86, GRADE 270 AND HAVING THE FOLLOWING CHARACTERISTICS :

d
b) 6.00 M FOR 20 MM DIAMETER OR LARGER a) NOMINAL DIAMETER 1/2 IN OR 12.7 MM
b) YIELD STRENGTH AT 1% EXTENSION 16.8 TONNE
6. SYSTEM OF BAR MARKINGS : r r
c) BREAKING STRENGTH (f's) 18.7 TONNE
50 - 2XDB - 25 @ 0.20 X 5.00 (T)

n
2. STRAND STRESS AT ANCHORAGES AFTER SEATING :

12d
H
a) PRETENSIONED MEMBERS 75% (f's)
SUFFIX H = 4d FOR d > 20 MM b) POSTENSIONED MEMBERS 70% (f's)
LENGTH OF BAR IN METERS H = 65 MM FOR d < 16 MM r = 3d FOR d < 25 MM
3. DEBONDING OF STRANDS AS SPECIFIED SHALL BE APPROVED BY THE ENGINEER
r = 4d FOR d = 28, 32 MM
BAR SPACING IN METER c) STANDARD LINK (STIRRUP)
STRUCTURAL STEEL
L
BAR DIAMETER IN MILLIMETERS L = 65 MM FOR d < 10 MM
L = 6d FOR 12 MM < d < 16 MM 1. ALL STEEL SECTIONS, UNLESS SPECIFIED ON THE DRAWINGS SHALL BE
DB = DEFORMED BAR, RB = ROUND BAR
L = 12d FOR d > 20 MM STRUCTURAL GRADE CONFORMING TO THE REQUIREMENTS OF TIS 107 AND TIS 116
NO. OF BARS IN BUNDLE (LEAVE BLANK WHERE r WITH A MINIMUM YIELD STRENGTH OF 2,400 KG/CM
2

NO. BUNDLE) OR NO. OF STIRRUPS


L
INTERNAL 2. ALL GALVANIZED STEEL SHALL HAVE THE WEIGHT OF ZINC COATING NOT LESS
d DIMENSIONS 2
NO. OF BUNDLES OR BARS THAN 1,100 GRAMS/M
A

B
3. ALL ANCHOR BOLTS SHALL BE GALVANIZED ONLY AT THE EXPOSED PORTIONS
r r = 2d FOR d < 16 MM
r = 3d FOR d > 20 MM 4. ALL WELDING CONNECTIONS SHALL BE IN ACCORDANCE WITH THE AMERICAN
WELDING SOCIETY (AWS)

d) HOOK, BEND AND LINK ALLOWANCES IN MM GENERAL NOTES

BAR DIA 6 10 12 16 20 25 28 32 1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE NOTED

h 101 140 155 180 220 280 370 410 2. ALL UNITS ARE IN METRIC SYSTEM UNLESS OTHERWISE SHOWN.

n 96 160 192 256 320 400 480 550

Lx 154 170 192 256 550 690 770 870

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
STRCTURE NOTES
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-GI-0003 1 : 925 S1_03

JVBP-009 : Rev.1 : 05-04-23


STA. 0+700.000
BEGINNING OF ALIGNMENT -150+800.000

N
STA.=0+000.000

1:12
0+100 0+200 0+300
0+000

150+800
0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700

0+512.1
410+500
0+400 0+300 0+200 0+100

1:12

MATCH LINE
1:12

1:12

150+900
SETTING OUT DATA
COORDINATES SPIRAL SPIRAL
NAME POINT STATION DEFLECTION ANGLE RADIUS
NORTHING EASTING IN OUT
STA. 150+800 RP. 0+000.000 1,803,359.240 391,098.931 - - - -
RP. 0+950.000 1,804,288.558 391,296.077 - - - -

1:12
174.00 174.00

172.00 172.00

170.00 170.00

168.00 168.00

ELEV.=158.650
PVT STA.=0 574.998
PVI STA.=0+499.998

ELEV.=157.900
PVC STA.=0+424.998

ELEV.=157.579
PVCSTA.=0+610.712
166.00 ELEV.=160.900 166.00
VCL=150.000
164.00 MO =-1.312 164.00
PVI STA.=0+685.712

ELEV.=153.500
PVT STA.=0+315.000
162.00 162.00
LEVEL (M.)

LEVEL (M.)
ELEV.=155.329
PROPOSED PROFILE LEVEL VCL=150.000
ELEV. = 149.816 (NO CURVE)

160.00 P.6 P.7 160.00


PVI STA.=0+250.000 MO =1.088
ELEV.=150.618
PVC STA.=0+185.000

P.5 P.8
ELEV.=150.900 P.9 g = -3.000
158.00 P.4 %P.10 158.00
PVI.STA. = 0+000.000

VCL=130.000
MO =0.580 P.3 P.11
156.00 P.2 0 % 156.00
00
g = +4.
154.00 A.1 154.00

152.00 152.00

150.00 g = +0.434 % 150.00


EXISTING GROUND PROFILE
148.00 148.00

146.00 146.00

144.00 144.00
EG. LEVEL EG. LEVEL
150.245

150.001

149.760

149.567

149.410

149.285

149.248

149.038

148.996

149.053

149.162

149.333

149.514

149.720

149.990

150.288

150.614

151.043

151.363

151.653

151.964

152.278

152.648

153.100

153.487

153.952

154.440

155.012

155.564
149.816

149.924

150.033

150.141

150.250

150.358

150.466

150.575

150.714

151.011

151.480

152.119

152.931

153.900

154.900

155.900

156.900

157.900

158.754

159.317

159.588

159.567

159.254

158.650

157.900

157.190

156.699

156.450

156.443
PG. LEVEL PG. LEVEL

HORIZONTAL STRAIGHT HORIZONTAL


ALIGNMENT ALIGNMENT

CONTROL LINE
CROSS FALL CROSS FALL
-2.00% LEFT&RIGHT EDGE -2.00%
CROSS FALL CROSS FALL
STATION STATION

STATION STATION
0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PLAN AND PROFILE OVERPASS
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 1 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-RL-CR-2061
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : H : 1000 Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-AL-0001 V : 200
. 1 : 1000 S2_01

JVBP-009 : Rev.1 : 05-04-23


STA. 0+700.000

N
END OF ALIGNMENT -150+800.000
STA.=0+950.000

0+400
0+472.0
99
0+700 0+800 0+900 0+950.000

0+000
MATCH LINE

SETTING OUT DATA


COORDINATES SPIRAL SPIRAL
NAME POINT STATION DEFLECTION ANGLE RADIUS
NORTHING EASTING IN OUT
STA. 150+800 RP. 0+000.000 1,803,359.240 391,098.931 - - - -
RP. 0+950.000 1,804,288.558 391,296.077 - - - -

174.00 174.00

ELEV. = 162.739 (NO CURVE)


172.00 172.00

PVI.STA. = 0+950.000
170.00 170.00

168.00 168.00
ELEV.=157.432
PVTSTA.=0+760.712

166.00 166.00

164.00 164.00

162.00 162.00
LEVEL (M.)

LEVEL (M.)
PROPOSED PROFILE LEVEL
%
160.00 g = +2.804 160.00

158.00 158.00

156.00 156.00
EXISTING GROUND PROFILE
154.00 154.00

152.00 152.00

150.00 150.00

148.00 148.00

146.00 146.00

144.00 144.00
EG. LEVEL EG. LEVEL
155.564
156.443

156.677

157.154

157.832

158.533

159.234

159.935

160.636

161.337

162.038

162.739
156.226

156.842

157.525

158.257

158.985

159.773

160.590

161.384

162.172

162.739

PG. LEVEL PG. LEVEL

HORIZONTAL STRAIGHT END OF ALIGNMENT STA. 150+800 HORIZONTAL


ALIGNMENT ALIGNMENT

CONTROL LINE
CROSS FALL CROSS FALL
-2.00% LEFT&RIGHT EDGE -2.00%
CROSS FALL CROSS FALL
STATION STATION

STATION STATION
0+700 0+800 0+900 0+950

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PLAN AND PROFILE OVERPASS
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 2 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-RL-CR-2062
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : H : 1000 Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-AL-0002 V : 200
. 1 : 1000 S2_02

JVBP-009 : Rev.1 : 05-04-23


PC.STA.=0+025.356 PT.STA.=0+446.787

N
PC.STA.=0+443.419
PT.STA.=0+028.719 PC.STA.=0+237.240 PT.STA.=0+254.902

BEGINNING OF ALIGNMENT -150+800.000 UT1

1:12
STA.=0+000.000
0+100 0+200 0+300 0+400
0+000

150+800
0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700

0+512.1
410+500
0+400 0+300 0+200 0+100

1:12
END OF ALIGNMENT UT1
STA.=0+512.141 PC.STA.=0+483.457 PT.STA.=0+274.939 PC.STA.=0+217.203
PT.STA.=0+028.684
PT.STA.=0+486.824
PC.STA.=0+025.317
SETTING OUT DATA

1:12
COORDINATES SPIRAL SPIRAL
NAME POINT STATION DEFLECTION ANGLE RADIUS

1:12
NORTHING EASTING IN OUT
STA. 135+533 U1 RP. 0+000.000 1,803,555.1074 391,132.8424 - - - -
PC. 0+025.356 1,803,580.4423 391,133.8787 - - - -

150+900
PI. 0+027.042 1,803,582.1265 391,133.9476 9° 38' 05.32" RT - 20.00 -
PT. 0+028.719 1,803,583.7753 391,134.2974 - - - -
PC. 0+237.240 1,803,787.7565 391,177.5700 - - - -
PI. 0+249.239 1,803,799.4949 391,180.0602 89° 59' 53.68" RT - 12.00 -
PCC. 0+256.089 1,803,797.0050 391,191.7987 - - - -
PI. 0+268.089 1,803,794.5150 391,203.5379 90° 00' 06.32" RT - 12.00 -
PT. 0+274.939 1,803,782.7759 391,201.0476 - - - -

1:12
PC. 0+483.457 1,803,578.7972 391,157.7754 - - - -
PI. 0+485.145 1,803,577.1463 391,157.4252 9° 38' 47.35" RT - 20.00 -
PT. 0+486.824 1,803,575.5774 391,156.8033 - - - -
RP. 0+512.141 1,803,552.0420 391,147.4737 - - - -

168.00
168.00
166.00
166.00
164.00
164.00
162.00
162.00
160.00
ELEV.=151.000

ELEV.=151.000
PVCSTA.=0+275.000
PVTSTA.=0+225.000

ELEV.=150.948
ELEV.=150.945

PVTSTA.=0+325.000
PVC STA.=0+175.000

160.00
PVI.STA. = 0+000.000

PVI.STA. = 0+512.141
158.00
158.00
ELEV. = 150.558

ELEV. = 150.558
156.00
156.00 PVI STA.=0+200.000 PVI STA.=0+300.000
LEVEL (M.)

LEVEL (M.)
ELEV.=151.000 ELEV.=151.000 154.00
154.00 VCL=50.000 VCL=50.000
MO =-0.014 MO =-0.013 PROPOSED PROFILE LEVEL 152.00
152.00 0.000 %
g = +0.221 % g = -0.208 %
150.00
150.00
148.00
148.00 EXISTING GROUND PROFILE
146.00
146.00
144.00
144.00
142.00
142.00
140.00
140.00
138.00
138.00
EG. LEVEL EG. LEVEL
150.669

150.724

150.779

150.834

150.890

150.945

150.986
150.558

150.613

151.000

151.000

151.000

150.558
150.987

150.948

150.896

150.844

150.792

150.740

150.687

150.635

150.583
148.841

148.856

149.040

149.131

149.217

149.468

149.776

150.031

150.268

150.540

150.844

150.689

150.388

150.129

149.875

149.588

149.317

149.128

148.975

148.918

148.918

148.887
PG. LEVEL PG. LEVEL
R=20.00 PC R=12.00 PT R=20.00
HORIZONTAL STRAIGHT STRAIGHT STRAIGHT STRAIGHT R=0.00 HORIZONTAL
ALIGNMENT PC PT Lc=37.699 PC PT PC PT ALIGNMENT
LEFT EDGE
CONTROL LINE +2.00% +2.00% CONTROL LINE
CROSS FALL CROSS FALL
-2.00% LEFT&RIGHT EDGE -2.00% RIGTH EDGE -2.00% LEFT&RIGHT EDGE -2.00%
0+025.356

0+028.719

0+483.457

0+486.824
0+187.240

0+212.240

0+237.240

0+274.939

0+299.939

0+324.939

CROSS FALL CROSS FALL


HC.

NC.
NC.

HC.

FC.

FC.
PC.

PT.

PC.

PT.
STATION STATION

STATION STATION
0+000 0+100 0+200 0+300 0+400 0+500 0+512.141

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PLAN AND PROFILE U - TURN 1
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-RL-CR-2063
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : H : 1000 Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-AL-0003 V : 200
. 1 : 1000 S2_03

JVBP-009 : Rev.1 : 05-04-23


PC.STA.=0+025.356 PT.STA.=0+446.787

N
END OF ALIGNMENT UT2
PC.STA.=0+443.419 STA.=0+472.099
PT.STA.=0+028.719 PC.STA.=0+237.240 PT.STA.=0+254.902

1:12
0+100 0+200 0+300 0+400
0+472.0
9 9

150+800
0+300 0+400 0+500 0+600 0+700 0+800 0+900 0+950.000

0+000
0+400 0+300 0+200 0+100

1:12
PC.STA.=0+483.457 PT.STA.=0+274.939 PC.STA.=0+217.203
PT.STA.=0+028.684
BEGINNING OF ALIGNMENT -150+800.000 UT2
PT.STA.=0+486.824 STA.=0+000.000
PC.STA.=0+025.317
SETTING OUT DATA

1:12
COORDINATES SPIRAL SPIRAL

1:12
NAME POINT STATION DEFLECTION ANGLE RADIUS
NORTHING EASTING IN OUT
STA. 135+533 U2 RP. 0+000.000 1,804,122.0151 391,268.3881 - - - -
PC. 0+025.317 1,804,096.7189 391,267.3585 - - - -

150+900
PI. 0+027.005 1,804,095.0327 391,267.2899 9° 38' 47.35" RT - 20.00 -
PT. 0+028.684 1,804,093.3818 391,266.9397 - - - -
PC. 0+217.203 1,803,908.9676 391,227.8179 - - - -
PI. 0+229.203 1,803,897.2285 391,225.3276 90° 00' 06.39" RT - 12.00 -
PCC. 0+236.052 1,803,899.7192 391,213.5885 - - - -
PI. 0+248.052 1,803,902.2098 391,201.8502 89° 59' 53.61" RT - 12.00 -
PT. 0+254.902 1,803,913.9482 391,204.3404 - - - -

1:12
PC. 0+443.419 1,804,098.3620 391,243.4621 - - - -
PI. 0+445.107 1,804,100.0132 391,243.8123 9° 38' 52.96" RT - 20.00 -
PT. 0+446.787 1,804,101.5822 391,244.4344 - - - -
RP. 0+472.099 1,804,125.1126 391,253.7627 - - - -

168.00
168.00
166.00
PVI.STA. = 0+000.000

PVI.STA. = 0+472.099
166.00
ELEV. = 157.861

ELEV. = 157.861
164.00
164.00
162.00
162.00
ELEV.=151.980
PVCSTA.=0+150.000

PVTSTA.=0+300.000
ELEV.=151.870
160.00
ELEV.=151.000

ELEV.=151.000
PVTSTA.=0+200.000

PVCSTA.=0+250.000
160.00
158.00
158.00 PVI STA.=0+175.000
ELEV.=151.000 PVI STA.=0+275.000
EXISTING GROUND PROFILE ELEV.=151.000 156.00
156.00 g = -3.9 MO =0.245
81 %
LEVEL (M.)

LEVEL (M.)
20 % VCL=50.000 VCL=50.000 g = +3.4
MO =0.218 154.00
154.00
152.00
152.00 g = 0.000 %
PROPOSED PROFILE LEVEL 150.00
150.00
148.00
148.00
146.00
146.00
144.00
144.00
142.00
142.00
140.00
140.00
138.00
138.00
EG. LEVEL EG. LEVEL
157.302

156.552

155.913

155.251

154.674

154.118

153.573

153.071

152.647

152.334

152.450

152.765

153.204

153.682

154.173

154.728

155.380

155.986

156.625

157.305
157.861

156.881

155.901

154.921

153.940

152.960

151.980

151.245

151.000

151.000

151.000

151.218

151.870

152.740

153.611

154.481

155.351

156.221

157.092

157.861
PG. LEVEL PG. LEVEL
R=20.00 PC R=12.00 PT R=20.00
HORIZONTAL STRAIGHT STRAIGHT STRAIGHT HORIZONTAL
ALIGNMENT PC PT Lc=37.699 PC PT PC PT ALIGNMENT
LEFT EDGE
+2.00% +2.00% CONTROL LINE
CROSS FALL CROSS FALL
-2.00% -2.00%
-2.00% RIGTH EDGE -2.00% LEFT&RIGHT EDGE
0+025.317

0+028.684

0+443.419

0+446.787
0+167.203

0+192.203

0+217.203

0+254.902

0+279.902

0+304.902

CROSS FALL CROSS FALL


HC.

NC.
NC.

HC.

FC.

FC.
PC.

PT.

PC.

PT.
STATION STATION

STATION STATION
0+000 0+100 0+200 0+300 0+400 0+472.099

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PLAN AND PROFILE U - TURN 2
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-RL-CR-2064
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : H : 1000 Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-AL-0004 V : 200
. 1 : 1000 S2_04

JVBP-009 : Rev.1 : 05-04-23


A1 P2 P3 P4 P5 P6 P7

ELEV. = 158.8700
STA. = 0+335.000

STA. = 0+365.000

STA. = 0+395.000

STA. = 0+425.000

STA. = 0+455.000

STA. = 0+485.000

STA. = 0+515.000
ELEV. = 154.300

ELEV. = 155.500

ELEV. = 156.700

ELEV. = 157.900

ELEV. = 159.447

ELEV. = 159.597
N

PROPOSED R.O.W.
58.50 300.00

MSE WALL STRUCTURE 5.00 30.00 30.00 30.00 30.00 30.00 30.00

APPROACH SLAB
PROPOSED R.O.W.

0+100 0+200
A6 P6C P6C P6C P6C P6C
0+000

150+800
0+200 0+300 0+400 0+500

20.00
0+512.1
41
0+500
0+400 0+300 CL OF BRIDGE

PROPOSED R.O.W.
PROPOSED R.O.W. KM.150+802.323

40.00 40.00
80.00
Plan
1 A1 = 1 : 500 (A3=2x)

A1 P2 P3 P4 P5 P6 P7

ELEV. = 158.8700
STA. = 0+335.000

STA. = 0+365.000

STA. = 0+395.000

STA. = 0+425.000

STA. = 0+455.000

STA. = 0+485.000

STA. = 0+515.000
ELEV. = 154.300

ELEV. = 155.500

ELEV. = 156.700

ELEV. = 157.900

ELEV. = 159.447

ELEV. = 159.597
58.50 300.00

PROPOSED R.O.W.
PVC STA.=0+424.998
MSE WALL STRUCTURE
PVC STA.=0+185.000

5.00 30.00 30.00 30.00 30.00 30.00 30.00

ELEV.=157.900
ELEV.=150.618

PVI STA.=0+499.998

PVT STA.=0+315.000
APPROACH SLAB ELEV.=160.900
PVI STA.=0+250.000
ELEV.=150.900 MO = -1.312

ELEV.=153.500
VCL =130.000 VCL =150.000
MO =0.580
PROPOSED PROFILE LEVEL
LS LS LS
LS
4.000 % LS
EJ.B
EJ.A

6.587
5.668
1.5 1.5 1.5 1.5
1 1
2 1 1 2
1 1

EXISTING GROUND

CL PROPOSED TRACK
Existing Ground Elev. 149.822 150.167 150.548 151.043 151.427 151.771 152.149
40.00 40.00

80.00

Elevation
2 A1 = 1 : 500 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PLAN PROFILE AND ELEVATION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 1 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-ST-OP-1060
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-AL-0005 1 : 500 S2_05

JVBP-009 : Rev.1 : 05-04-23


P5 P6 P7 P8 P9 P10 A2

ELEV. = 158.8700
STA. = 0+455.000

STA. = 0+485.000

STA. = 0+515.000

STA. = 0+545.000

STA. = 0+575.000

STA. = 0+605.000

STA. = 0+635.000
ELEV. = 159.447

ELEV. = 159.597

ELEV. = 159.320

ELEV. = 158.650

ELEV. = 157.750

ELEV. = 156.979

N
PROPOSED R.O.W.
300.00 58.50

30.00 30.00 30.00 30.00 30.00 30.00 5.00 MSE WALL STRUCTURE

APPROACH SLAB
PROPOSED R.O.W.

0+300 0+400
P6C A6
P6C P6C P6C P6C P6C 0+472.0
9 9
150+800

0+500 0+600 0+700 0+800


20.00

0+000
CL OF BRIDGE 0+200 0+100
PROPOSED R.O.W.

PROPOSED R.O.W.
KM.150+802.323 PROPOSED R.O.W.

40.00 40.00

80.00

Plan
1 A1 = 1 : 500 (A3=2x)

P5 P6 P7 P8 P9 P10 A2
ELEV. = 158.8700
STA. = 0+455.000

STA. = 0+485.000

STA. = 0+515.000

STA. = 0+545.000

STA. = 0+575.000

STA. = 0+605.000

STA. = 0+635.000
ELEV. = 159.447

ELEV. = 159.597

ELEV. = 159.320

ELEV. = 158.650

ELEV. = 157.750

ELEV. = 156.979

PVT STA.=0+760.712
300.00 58.50

PVC STA.=0+610.712
PROPOSED R.O.W.

PROPOSED R.O.W.

ELEV.=157.432
PVT STA.=0+574.998

30.00 30.00 30.00 30.00 30.00 30.00 5.00 MSE WALL STRUCTURE

ELEV.=157.579
ELEV.=158.650

PVI STA.=0+499.998 PVI STA.=0+685.712


ELEV.=160.900 ELEV.=155.329
MO = -1.312 MO =1.088
VCL =150.000 VCL =150.000

LS LS LS LS LS PROPOSED PROFILE LEVEL


3.000 % EJ.B EJ.A
6.587

6.191

1.5 1.5 1.5 1.5


1 1
2 1 1 2
1 1

EXISTING GROUND
CL PROPOSED TRACK

151.427 151.771 152.149 152.564 153.100 153.581 154.129 Existing Ground Elev.

40.00 40.00

80.00

Elevation
2 A1 = 1 : 500 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PLAN PROFILE AND ELEVATION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 2 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-ST-OP-1061
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-AL-0006 1 : 500 S2_06

JVBP-009 : Rev.1 : 05-04-23


150+700
W.32-60

W.46-60
WHITE CHEVRON HATCHINGWITH
UNI-DIRECTIONAL ROADSTUD

ที่กลับรถใต้สะพาน
U-TURN UNDER BRIDGE

G.2-60

5.5 ม.

จุดกลับรถ
STA. 0+435.000 (LT.)

G.11-45
STA. 0+188.500 (LT.)

STA. 0+225.000 (LT.)

STA. 0+350.000 (LT.)

STA. 0+675.000 (LT.)


W.71-45

W.62-60
STA. 0+075.000 (LT.)
0.15 M. YELLOW SOLIDLINE

W.50-60
0.15 M. WHITE SOLIDLINE
0.15 M. WHITE BROKEN SOLIDLINE
BEGINNING OF ALIGNMENT -150+800
STA.=0+000.000 2.00 M. LONG WITH 4.00 M.GAP
STA. 0+447.000 (LT.) R.35-60

5.5 ม.

150+800
0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700

R.35-60

STA. 0+560.000 (RT.)


5.5 ม.

STA. 0+188.500 (RT.)

STA. 0+675.000 (RT.)


STA. 0+553.000 (RT.)

STA. 0+758.000 (RT.)


R.2-90

W.62-60
END OF ALIGNMENT - 150+800 U1

W.71-45
จุดกลับรถ
STA.=0+494.328

W.50-60
150+900
W.46-60

ROAD STATION SIGN CODE DIMENSION M.xM. MOUNTING TYPE

ALIGNMENT - 150+800
END OF ALIGNMENT - 150+800U2 OVERPASS BRIDGE
STA. 0+675.000 (LT.)

STA.=0+454.328 STA.0+075.000 LT. G.2-60 2.10x0.60 M-5


STA. 0+790.000 (LT.)

STA. 150+800
R.2-90

WHITE CHEVRON HATCHINGWITH


STA.0+188.500 LT. W.32-60 0.60x0.60 M-1
UNI-DIRECTIONAL ROADSTUD
END OF ALIGNMENT -150+800
(ถนนทางหลวงหมายเลข 2046)
STA.0+225.000 LT. W.62-60 0.60x0.60 M-3
STA.=0+950.000
W.71-45 0.45x0.75

STA.0+350.000 LT. W.50-60 0.60x0.60 M-1

STA.0+435.000 LT. G.11-45 0.45x0.75 M-1

STA.0+447.000 LT. R.35-60 0.60 M-4


0+600 0+700 0+800 0+900 0+950
STA.0+675.000 LT. W.46-60 0.60x0.60 M-2

STA.0+790.000 LT. R.2-90 0.90x0.90 M-1

STA.0+188.500 RT. R.2-90 0.90x0.90 M-1


STA. 0+900.000 (RT.)

STA.0+325.000 RT. W.46-60 0.60x0.60 M-2


STA. 0+675.000 (RT.)

STA.0+553.000 LT. R.35-60 0.60 M-4


STA. 0+790.000 (RT.)
STA. 0+758.000 (RT.)

STA.0+560.000 RT. G.11-45 0.45x0.75 M-1

STA.0+675.000 RT. W.50-60 0.60x0.60 M-1


W.62-60

W.71-45

STA.0+758.000 RT. W.62-60 0.60x0.60 M-3


U-TURN UNDER BRIDGE
ที่กลับรถใต้สะพาน
W.50-60

W.71-45 0.45x0.75
5.5 ม.
W.32-60

G.2-60

STA.0+790.000 RT. W.32-60 0.60x0.60 M-1

STA.0+900.000 RT. G.2-60 2.10x0.60 M-5


BEGINNING OF ALIGNMENT - 150+800 U2

0.20 M. WHITE BROKEN SOLIDLINE


2.00 M. LONG WITH 4.00 M.GAP

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TRAFFIC SIGN PLAN
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-TF-0001 As indicated S2_07

JVBP-009 : Rev.1 : 05-04-23


C
L OF EXISTING ROAD

40.00

20.00 20.00

EXISTING R.O.W.

EXISTING R.O.W.
EXISTING ELECTRIC POLE EXISTING ELECTRIC POLE

2.70 3.50 3.50 0.70 2.00 0.70 3.50 3.50 2.70

2.00% 2.00% 2:1


S
ARIE OR
V VA
OR RIE
2:1 S

SECTION A - A
SCALE 1 : 75

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TYPICAL CROSS SECTION A-A
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
FOR ROADWAY WIDTH 20.00 M.
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0001 1 : 75 S3A_01

JVBP-009 : Rev.1 : 05-04-23


C
L OF EXISTING ROAD

40.00

20.00 20.00

EXISTING R.O.W.

EXISTING R.O.W.
EXISTING ELECTRIC POLE EXISTING ELECTRIC POLE

0.60

VARIES AT GRAD TO OVERPASS VARIES AT GRAD TO OVERPASS

2.00% 2.00% 2:1


IES
VAR OR
VA
OR RIE
2:1 S

SECTION B - B
SCALE 1 : 75

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TYPICAL CROSS SECTION B-B
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
FOR ROADWAY WIDTH 20.00 M.
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0002 1 : 75 S3A_02

JVBP-009 : Rev.1 : 05-04-23


C
L OF BRIDGE

40.00

20.00
PROPOSED R.O.W.

PROPOSED R.O.W.
0.50
0.50 9.20 0.60 9.20 0.50
0.50

1.50 3.50 3.50 0.70 0.70 3.50 3.50 1.50


SHOULDER CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY SHOULDER

2.00% 2.00%

2.0% 2.0%

SECTION C - C
SCALE 1 : 75

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TYPICAL CROSS SECTION C-C
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
FOR ROADWAY WIDTH 20.00 M.
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0003 1 : 75 S3A_03

JVBP-009 : Rev.1 : 05-04-23


40.00

C
L OF BRIDGE
20.00

VARIES 6.00 0.50


0.50 9.20 0.60 9.20 0.50
0.50 6.00 VARIES
SIDEWALK U-TURN WIDTH U-TURN WIDTH SIDEWALK
1.50 3.50 3.50 0.70 0.70 3.50 3.50 1.50
SHOULDER CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY SHOULDER
PROPOSED R.O.W.

PROPOSED R.O.W.
2.00% 2.00%

5.50 (Min.)

5.50 (Min.)
EXISTING GROUND

2.0% 2.0%

SECTION D - D
SCALE 1:75

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TYPICAL CROSS SECTION D-D
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
FOR ROADWAY WIDTH 20.00 M.
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0004 1 : 75 S3A_04

JVBP-009 : Rev.1 : 05-04-23


OVERALL 3D : CROSSING BRIDGE NO.38 KM.150+800
1 A1 = (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
OVERALL 3D CROSSING BRIDGE
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0005 S3A_05

JVBP-009 : Rev.1 : 05-04-23


CL

CL 20.00
P2
0.50 9.50 9.50 0.50
20.00 A1

0.50 9.50 9.50 0.50 2.40


2.00% 2.00%

2.00% 1.20 0.500.60


2.00%

1.60

1.60
1.60
1.60

0.50

0.50
1.20
1.00

+149.822 +150.167

2.94

2.94
EXISTING EXISTING EXISTING EXISTING
2.08

2.08
GROUND GROUND GROUND +149.167 GROUND
+148.822
1.40

1.40

1.65

1.65
CROSS SECTION (AT ABUTMENT A1) SHORT SECTION - A1 CROSS SECTION- P2 SHORT SECTION - P2
1 A1 =1 : 75 (A3=2x)
2 A1 =1 : 75 (A3=2x)
3 A1 =1 : 75 (A3=2x)
4 A1 =1 : 75 (A3=2x)

CL
P3 CL
20.00
P4
20.00
0.50 9.50 9.50 0.50
0.50 9.50 9.50 0.50
2.40 2.40
2.00% 2.00% 2.00% 2.00%
1.60

1.60

1.60

1.60
0.50

0.50

0.50

0.50
3.76

3.76
+150.548

4.46

4.46
EXISTING EXISTING
GROUND GROUND
+149.548
EXISTING EXISTING
GROUND GROUND
1.65

1.65

1.65

1.65
CROSS SECTION (AT PIER 3) SHORT SECTION - P3 CROSS SECTION (AT PIER 4) SHORT SECTION - P4
5 A1 =1 : 75 (A3=2x)
6 A1 =1 : 75 (A3=2x)
7 A1 =1 : 75 (A3=2x)
8 A1 =1 : 75 (A3=2x)

A1 P2 P3 P4 P5 P6 P7 P8 P9 P10 A2

1 3 5 7

S3A_06 S3A_06 S3A_06 S3A_06

CL

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PIER SECTION 01
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0006 As indicated S3A_06

JVBP-009 : Rev.1 : 05-04-23


CL CL

20.00 20.00
P5 P6
0.50 9.20 0.61 9.20 0.50
0.50 9.20 0.61 9.20 0.50
2.40 2.40
2.00% 2.00%
2.00% 2.00%

1.60

1.60
1.60

1.60

0.50

0.50
0.50

0.50

5.28

5.28
5.05

5.05
+151.771
+151.427
EXISTING EXISTING EXISTING EXISTING
GROUND GROUND GROUND +150.771 GROUND
+150.427

1.65

1.65
1.65

1.65
CROSS SECTION (AT PIER 5) SHORT SECTION - P5 SHORT SECTION - P6
1 2 CROSS SECTION (AT PIER 6)
A1 =1 : 75 (A3=2x) A1 =1 : 75 (A3=2x) 3 4 A1 =1 : 75 (A3=2x)
A1 =1 : 75 (A3=2x)
CL CL

20.00 20.00
P7 P8
0.50 9.20 0.61 9.20 0.50
0.50 9.20 0.61 9.20 0.50
2.40
2.00% 2.00% 2.40
2.00% 2.00%
1.60

1.60

1.60

1.60
0.50

0.50

0.50

0.50
4.36

4.36
5.05

5.05

+152.564
+152.149 EXISTING EXISTING
EXISTING EXISTING GROUND +151.564 GROUND
GROUND +151.149 GROUND

1.65

1.65
1.65

1.65

CROSS SECTION (AT PIER 7) SHORT SECTION - P7 CROSS SECTION (AT PIER 8) SHORT SECTION - P8
5 6 7 8 A1 =1 : 75 (A3=2x)
A1 =1 : 75 (A3=2x) A1 =1 : 75 (A3=2x) A1 =1 : 75 (A3=2x)

A1 P2 P3 P4 P5 P6 P7 P8 P9 P10 A2

1 3 5 7
S3A_07 S3A_07 S3A_07 S3A_07

CL

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PIER SECTION 02
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0007 As indicated S3A_07

JVBP-009 : Rev.1 : 05-04-23


CL

20.00 CL

0.50 9.20 0.61 9.20 0.50 P9


20.00
2.40 0.50 9.20 0.61 9.20 0.50 P10
2.00% 2.00%

2.40
2.00% 2.00%
1.60

1.60

1.60

1.60
0.50

0.50

0.50

0.50
+153.581
+153.100 EXISTING
3.15

3.15
EXISTING

1.77

1.77
EXISTING GROUND GROUND
EXISTING +152.581
GROUND +152.100 GROUND

1.65

1.65
1.65

1.65
CROSS SECTION (AT PIER 10) SHORT SECTION - P10
CROSS SECTION (AT PIER 9) SHORT SECTION - P9 3 A1 =1 : 75 (A3=2x) 4
1 2 A1 =1 : 75 (A3=2x)
A1 =1 : 75 (A3=2x)
A1 =1 : 75 (A3=2x)

CL

20.00
0.50 9.20 0.61 9.20 0.50 A2

0.60 0.50 1.20

1.60
1.60

+154.129
EXISTING EXISTING

1.40 0.45 1.20


GROUND
1.45

GROUND
+153.129
1.40

CROSS SECTION (AT ABUTMENT A2) SHORT SECTION - A2


5 A1 =1 : 75 (A3=2x)
6 A1 =1 : 75 (A3=2x)

A1 P2 P3 P4 P5 P6 P7 P8 P9 P10 A2

1 3 5
S3A_08 S3A_08 S3A_08

CL

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM. 150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
PIER SECTION 03
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP38-ST-0008 As indicated S3A_08

JVBP-009 : Rev.1 : 05-04-23


PILE DIA. 1.20 m
PILE DIA. 1.00 m THIS PART TO BE BROKEN OFF THIS PART TO BE BROKEN OFF

(MIN.)

(MIN.)
0.80

0.80
ø 1.20

ø 1.00
0.075 0.075
0.075 0.075
STIFFENER RING STIFFENER RING
DB20@250 DB20@250

A
S3B_01

C
S3B_01
12.00

12.00
SECTION A SECTION C
A A1 = 1 : 20 (A3=2x)
C A1 = 1 : 20 (A3=2x)
15.00

15.00
ø 1.20
ø 1.00
0.075 0.075
0.075 0.075
STIFFENER RING
STIFFENER RING
DB20@250
DB20@250
F.L.T. = 1.00 m

F.L.T = 1.00 m
SECTION B SECTION D
B A1 = 1 : 20 (A3=2x)
D A1 = 1 : 20 (A3=2x)

B
S3B_01

D
S3B_01 PILE DESIGNATIOIN

MAIN. REINF. STIRRUP (SPIRAL)


PILE DIA. (m) PROCESS
SECTION A-A SECTION B-B SECTION A-A SECTION B-B

1.00 14-DB25 14-DB20 DB12 @200 DB12 @200 DRY/WET

1.20 18-DB25 18-DB20 DB12 @200 DB12 @200 DRY/WET

PILE TIP OFF PILE TIP OFF


FULL TENSION LAP SPLICE F.T.L. = 40*DIA. OF REINF. REBAR
DOWEL BAR LENGTH = 40*DIA. OF REINF. REBAR

REINFORCEMENT
ROUND BAR (RB) SHALL CONFORM TIS20 CLASS SR24
BORED PILE ø1.00M. BORED PILE ø1.20M. DEFORMED BAR (DB) SHALL CONFORM TIS24 CLASS SD40
1 A1 = 1 : 40 (A3=2x)
2 A1 = 1 : 40 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW

Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY


....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0009 As indicated S3B_01

JVBP-009 : Rev.1 : 05-04-23


C
L OF BRIDGE
A
S3B_04
20.00

0.50 9.20 0.60 9.20 0.50


1.50 3.50 3.50 0.70 0.70 3.50 3.50 1.50
SHOULDER CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY SHOULDER
C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER
1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00

B
S3B_04

EXISITING GROUND

LEAN CONCRETE 0.10 M. THK.


COMPACTED SAND 0.10 M. THK.

9-BORED PILES ø1.00 M.


SAFE LOAD 250 TON / PILE C
L OF BRIDGE
(F.S. = 2.5)

1.20 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.20
FRONT ELEVATION
1 A1 = 1 : 50 (A3=2x)

1.00
1.90
C
L OF ABUTMENT

3.40

1.40
1.50

1.00
A
C
L OF BRIDGE
S3B_04

PLAN OF FOOTING
20.40
2 A1 = 1 : 50 (A3=2x)
0.20 20.00 0.20

1.20
C
1.70

S3B_04

C
L OF ABUTMENT
3.40

1.10
0.60
1.10

1.10
2.90 14.60 2.90

PLAN OF ABUTMENT
3 A1 = 1 : 50 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"A6" ABUTMENT DETAILS FOR 30 M. SPAN, DIMENSION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0010 1 : 50 S3B_02

JVBP-009 : Rev.1 : 05-04-23


B
C
L OF ABUTMENT
S3B_03 C
L OF BRIDGE
(1) DB32@300

(3) DB20@200
(3) DB20@200
A (4) DB20@200
S3B_03

(TYP.)
1.00
DB16@200

(TYP.)
1.00
ALL AROUND

ALL AROUND LEAN CONCRETE 0.10m THK.


DB16@200
COMPACTED SAND 0.10m THK.

(2) DB32@300
(2) DB32@300
(1) DB32@300 9-BORED PILE Ø1.00m.
(4) DB20@200 SAFE LOAD 250 TON/PILE
(F.S. = 2.5)

PLAN OF FOOTING SECTION B


1 A1 = 1 : 50 (A3=2x)
B A1 = 1 : 30 (A3=2x)

C
L OF ROADWAY

(4) DB20@200
(3) DB20@200

DB16@200
ALL AROUND

LEAN CONCRETE 0.10m THK.


COMPACTED SAND 0.10m THK.

9-BORED PILE Ø1.00m.


SAFE LOAD 250 TON/PILE
(F.S. = 2.5)
(1) DB32@300
(2) DB32@300

SECTION A
A A1 = 1 : 30 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"A6" ABUTMENT DETAILS FOR 30 M. SPAN, REINFORCMENT
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 1 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0011 As indicated S3B_03

JVBP-009 : Rev.1 : 05-04-23


20.40
0.20 20.00 0.20

(12) RB9@150

(13) DB12@150
C
L OF ABUTMENT

VARIES
1.10 1.10 1.20

0.50 1
S3B_04

0.25 0.30
0.50 0.50
0.15
1.60

1.40
WING WALL
(6) 4-DB25

9-BORED PILE Ø1.00m.


SAFE LOAD 250 TON/PILE
(8) DB16@300 (F.S. = 2.5)
1.00

SECTION C
(7) 4-DB25 C A1 = 1 : 50 (A3=2x)

0.40 0.15
C
L OF ROADWAY
0.40

(9) DB28@125 (12) RB9@150


(12) RB9@150

1.50
(13) DB12@150

1.90
(10) DB28@125 (13) DB12@150
(3.00 MAX.)
VARIES

0.40
(11) DB16@150
2
S3B_04

(9) DB28@125
(10) DB28@125
(11) DB16@150
SECTION B
B A1 = 1 : 50 (A3=2x)
0.60 0.35 0.15

(3) DB16@150

0.20
1.40

(2) DB16@150

(12) RB9@150

1.60
(1) DB16@150
(13) DB12@150

9-BORED PILE Ø1.00m.


SAFE LOAD 250 TON/PILE
(F.S. = 2.5)
0.50

SECTION A
A

0.40
A1 = 1 : 25 (A3=2x)

DETAIL "1" DETAIL "2"


1 A1 = 1 : 20 (A3=2x)
2 A1 = 1 : 20 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"A6" ABUTMENT DETAILS FOR 30 M. SPAN, REINFORCMENT
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 2 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0012 As indicated S3B_04

JVBP-009 : Rev.1 : 05-04-23


C
L OF CONSTRUCTION

20.00

0.50 9.20 0.60 9.20 0.50

1.50 3.50 3.50 0.70 0.70 3.50 3.50 1.50


SHOULDER CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY SHOULDER
C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER
1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00

2.00% 2.00%

1.10
2.10

0.30 0.70

3.50 3.50

6.50 7.00 6.50

20.00
1.05
1.05
0 R8.0
R8.0 0
5.50
H = COLUMN HEIGHT
(SEE TABLE P6C)

C
L OF COLUMN

5.40

COLUMN 1.20 1.50 1.50 1.20

COLUMN
VARIES

1.20
2.50

1.05 0.40 1.05


2.50

1.50
EXISITING GROUND

CW1
5.40
(MIN.)
1.00

1.50
LEVEL TOP FOOTING

FOOTING
1.65

1.20
FOOTING

LEAN CONCRETE 0.10 M. THK.


COMPACTED SAND 0.10 M. THK.
FOOTING PLAN PIER TYPE "P6C"
4-BORED PILES ø1.20 M.
SAFE LOAD 485 TON / PILE
2 A1 = 1 : 50 (A3=2x)
(F.S. = 2.5)
1.20 3.00 1.20

5.40 TABLE OF PIER "P6C"


COLUMN HEIGHT COLUMN FOOTING PILE SAFE LOAD
(H) TYPE CW1 TYPE DEPTH ∅1.20 M. (tons/pile)

CROSS SECTION PIER TYPE "P6C" 10.00 (MAX.) C-P6C-A 1.00 F-P6C 1.65 TYPE 1 485
1 A1 = 1 : 50 (A3=2x)
10.01-15.00 C-P6C-B 1.00 F-P6C 1.65 TYPE 1 485

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 1 OF 4)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0013 As indicated S3B_05

JVBP-009 : Rev.1 : 05-04-23


C
L OF PIER C
L OF SPAN C
L OF PIER

TYPICAL SPAN = 30.00 M. TYPICAL SPAN = 30.00 M. TYPICAL SPAN = 30.00 M.

2.10

2.10
0.300.90

0.300.90
LEVEL TOP COLUMN LEVEL TOP COLUMN

CW1 CW1

2.40 2.40
5.50

5.50
H = COLUMN HEIGHT

H = COLUMN HEIGHT
(SEE TABLE P6C)

(SEE TABLE P6C)


COLUMN COLUMN
VARIES

VARIES
EXISITING GROUND
(MIN.)

(MIN.)
1.00

1.00
LEVEL TOP FOOTING LEVEL TOP FOOTING

FOOTING FOOTING
1.65

1.65
LEAN CONCRETE 0.10 M. THK. LEAN CONCRETE 0.10 M. THK.
COMPACTED SAND 0.10 M. THK. COMPACTED SAND 0.10 M. THK.

4-BORED PILES ø1.20 M. 4-BORED PILES ø1.20 M.


SAFE LOAD 485 TON / PILE SAFE LOAD 485 TON / PILE
(F.S. = 2.5) (F.S. = 2.5)

1.20 1.50 1.50 1.20 1.20 1.50 1.50 1.20

5.40 5.40

LONGITUDINAL SECTION PIER TYPE "P6C"


1 A1 = 1 : 75 (A3=2x)
TABLE OF PIER "P6C"
COLUMN HEIGHT COLUMN FOOTING PILE SAFE LOAD
(H) TYPE CW1 TYPE DEPTH ∅1.20 M. (tons/pile)

10.00 (MAX.) C-P6C-A 1.00 F-P6C 1.65 TYPE 1 485


10.01-15.00 C-P6C-B 1.00 F-P6C 1.65 TYPE 1 485

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 2 OF 4)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0014 1 : 75 S3B_06

JVBP-009 : Rev.1 : 05-04-23


A
S3B_08
C
L OF PIER
C
L OF BEARING
C
L OF PIER C
L OF BEARING
0.80 0.80
20.00
2.40
10.00 10.00
0.80 0.80 0.80

B
S3B_08

0.20 0.20
1.10

1.10
2.00% 2.00%
2.10

2.10
0.30 0.70

1.00
C
S3B_08
5 1.0
1.0 5

6.50 3.50 3.50 6.50


CW1
7.00
5.50

5.50
0 R8.0
R8.0 0
D
S3B_08
H = COLUMN HEIGHT

H = COLUMN HEIGHT
(SEE TABLE P6C)

(SEE TABLE P6C)


E
S3B_08
VARIES

VARIES
2.50 COLUMN

1.05 0.40 1.05

EXISITING GROUND EXISITING GROUND


(MIN.)

(MIN.)
1.00

1.00
LEVEL TOP FOOTING LEVEL TOP FOOTING
1.65

1.65
FOOTING
FOOTING

TABLE OF PIER "P6C"


COLUMN HEIGHT COLUMN FOOTING PILE SAFE LOAD
(H) TYPE CW1 TYPE DEPTH ∅1.20 M. (tons/pile)

10.00 (MAX.) C-P6C-A 1.00 F-P6C 1.65 TYPE 1 485


10.01-15.00 C-P6C-B 1.00 F-P6C 1.65 TYPE 1 485

FRONT ELEVATION OF PIER TYPE "P6C" SIDE ELEVATION OF PIER TYPE "P6C"
1 A1 = 1 : 50 (A3=2x) NOTE :
2 A1 = 1 : 50 (A3=2x)
1. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED.

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 3 OF 4)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0015 As indicated S3B_07

JVBP-009 : Rev.1 : 05-04-23


C
L OF PIER
C
L OF PIER
20.00
C
L OF BEARING
C 10.00 10.00
L OF BEARING
2.40

0.80 0.80

0.80
C
L OF BEARING

0.80
0.80 0.80 0.80

2.40

0.80
C
L OF COLUMN

0.80
0.80
C
L OF BEARING
1.10
2.10

0.20
0.30 0.70

SECTION B

0.10
B A1 = 1 : 50 (A3=2x)

C
L OF PIER C
L OF PIER C
L OF PIER
6.85
7.00 VARIES 2.50
1.32 4.22 1.32 1.05 VARIES 1.05 0.95 0.60 0.95
5.50

0.15
EQ EQ

EQ EQ

EQ EQ
CW1

CW1
C C

CW1
L OF COLUMN L OF COLUMN C
L OF COLUMN

0.15
0.10 0.10
1
S3B_08
10.80

SECTION C SECTION D SECTION E


C A1 = 1 : 50 (A3=2x)
D A1 = 1 : 50 (A3=2x)
E A1 = 1 : 50 (A3=2x)

A
S3B_08
VARIES

B
S3B_08

C
S3B_08

EXISITING GROUND

0.15
1.00

D
LEVEL TOP FOOTING 0.10 0.40 0.10 S3B_08

0.15 0.15

CW1
1.65

FOOTING
DETAIL "1"
1 A1 = 1 : 10 (A3=2x) E
S3B_08

SECTION A TABLE OF PIER "P6C"


A A1 = 1 : 50 (A3=2x) COLUMN FOOTING PILE SAFE LOAD
COLUMN HEIGHT
(H) TYPE CW1 TYPE DEPTH ∅1.20 M. (tons/pile)

10.00 (MAX.) C-P6C-A 1.00 F-P6C 1.65 TYPE 1 485


10.01-15.00 C-P6C-B 1.00 F-P6C 1.65 TYPE 1 485
KEY SECTION
2 A1 = 1 : 100 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN, DIMENSION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
(SHEET 4 OF 4)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0016 As indicated S3B_08

JVBP-009 : Rev.1 : 05-04-23


C
L OF ROADWAY

B
S3B_09
C (4) DB16@200
L OF ROADWAY
(3) DB16@200
5.40
1.20 3.00 1.20

0.50
3-DB16
1.20

ALL AROUND

1.00
(1) DB25@125

(3) DB16@200

0.10
LEAN CONCRETE 0.10m THK.
COMPACTED SAND 0.10m THK.

(1) DB25@125
(2) DB32@125
4-BORED PILE Ø1.20m.
SAFE LOAD 485 TON/PILE
(F.S. = 2.5)
5.40
3.00

C
L OF PIER SECTION A
A A1 = 1 : 25 (A3=2x)

A
S3B_09

C
L OF PIER
3-DB16
ALL AROUND
1.20

(3) DB16@200

(4) DB16@200

(4) DB16@200

(2) DB32@125

0.50
3-DB16
ALL AROUND
PLAN OF FOOTING

1.00
1 A1 = 1 : 25 (A3=2x)

0.10
LEAN CONCRETE 0.10m THK.
COMPACTED SAND 0.10m THK.

(2) DB32@125
(1) DB25@125
4-BORED PILE Ø1.20m.
SAFE LOAD 485 TON/PILE
(F.S. = 2.5)

SECTION B
B A1 = 1 : 25 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN,
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
REINFORCEMENT (SHEET 1 OF 5)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0017 1 : 25 S3B_09

JVBP-009 : Rev.1 : 05-04-23


C
L OF ROADWAY

1.10
2.10

(4) (2)
(1) DB12@300
(3) (4) (5) - DB12 @300
0.70
0.30

B
S3B_11

(8) - ADDITIONAL DB32


(8)-ADDITIONAL: 2x14-DB32 FOR COLUMN TYPE "C-P6C-A"
(8) - ADDITIONAL 2x14-DB32 FOR COLUMN TYPE "C-P6C-B"
5.50

6.50
(1)
(4) (2) (3) (4) (5) - DB12 @300
DB12@300
H = COLUMN HEIGHT
VARIES

<varies>
(6) - MAINDB32
: 2x20-DB32 FOR COLUMN TYPE "C-P6C-A"
(6) - MAIN : 2x22-DB32 FOR COLUMN TYPE "C-P6C-B"
VARIES

(7) - MAIN DB32


(7)-MAIN: : 6-DB32 FOR ALL COLUMN TYPE

A (4)(2)
(1) DB12@100
(3) (4) (5) - DB12 @100
S3B_11

EXISITING GROUND
2.50
(MIN)
1.00
1.65

TABLE OF PIER "P6C"


COLUMN HEIGHT COLUMN FOOTING PILE SAFE LOAD
(H) TYPE CW1 TYPE DEPTH ∅1.20 M. (tons/pile)

10.00 (MAX.) C-P6C-A 1.00 F-P6C 1.65 TYPE 1 485


10.01-15.00 C-P6C-B 1.00 F-P6C 1.65 TYPE 1 485

TYPICAL REINFORCEMENT DETAIL OF PIER TYPE "P6C"


1 A1 = 1 : 40 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN,
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
REINFORCEMENT (SHEET 2 OF 5)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0018 As indicated S3B_10

JVBP-009 : Rev.1 : 05-04-23


VARIES
6.40
2.50 (1) 2 -DB12@300
(1) 2-DB12 mm
(7)-MAIN: 6-DB32 (7)-MAIN: 6-DB32
(1) 2 -DB12@100
(1) 2-DB12 mm (8)-ADDITIONAL: 14-DB32 (8)-ADDITIONAL: 14-DB32

(2) 2 -DB12@100
(2) 2-DB12 mm (2) 2 -DB12@300
(2) 2-DB12 mm

1.00

1.00
(6)-MAIN : 20-DB32 (6)-MAIN : 20-DB32
(3) 2 -DB12@100
(3) 2-DB12 mm (3) 2 -DB12@300
(3) 2-DB12 mm

(4) 2 -DB12@100
(4) 2-DB12 mm
(6)-MAIN: 20-DB32 (6)-MAIN: 20-DB32 (4) 2 -DB12@300
(4) 2-DB12 mm
(5) 5 -DB12@300
(5) 5-DB12 mm
(5) DB12@100

COLUMN TYPE "C-P6C-A" : SECTION A COLUMN TYPE "C-P6C-A" : SECTION B


A A1 = 1 : 25 (A3=2x)
B A1 = 1 : 25 (A3=2x)

VARIES
6.40
2.50
(1) 2 -DB12@300
(1) 2-DB12 mm
(7)-MAIN: 6-DB32 (7)-MAIN: 6-DB32
(1) 2 -DB12@100
(1) 2-DB12 mm
(8)-ADDITIONAL: 14-DB32 (8)-ADDITIONAL: 14-DB32

(2) 2 -DB12@100
(2) 2-DB12 mm (2) 2 -DB12@300
(2) 2-DB12 mm
1.00

1.00
(6)-MAIN: 22-DB32 (6)-MAIN: 22-DB32
(3) 2 -DB12@100
(3) 2-DB12 mm (3) 2 -DB12@300
(3) 2-DB12 mm

(6)-MAIN: 22-DB32 (4) 2 -DB12@100


(4) 2-DB12 mm (6)-MAIN: 22-DB32 (4) 2 -DB12@300
(4) 2-DB12 mm
(5) 5 -DB12@300
(5) 5-DB12 mm
(5) -DB12@100
(5)-DB12 mm

COLUMN TYPE "C-P6C-B" : SECTION A COLUMN TYPE "C-P6C-B" : SECTION B


A
3 A1 = 1 : 25 (A3=2x)
B
4 A1 = 1 : 25 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN,
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
REINFORCEMENT (SHEET 3 OF 5)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0019 1 : 25 S3B_11

JVBP-009 : Rev.1 : 05-04-23


A B C D
S3B_12 S3B_12 S3B_12 S3B_12

(6) DB16@150 C
(6) DB16@150 L OF ROADWAY (6) DB16@150 (6) DB16@150
(5) DB25@150
(9) 2 -DB16@150
(9) 2-DB16 mm (5) DB25@150 (5) DB25@150 (9) 2 -DB16@150
(9) 2-DB16 mm (9) 2 -DB16@300
(9) 2-DB16 mm (5) DB25@150
(9) 2 -DB16@300
(9) 2-DB16 mm
4.00 6.00 6.00 4.00

(8) 6-DB16 EF (10) 6-DB25 (11) 6-DB25


1.10

(1) 4-DB25 EF
2.10

0.70
0.30

(12) 7-DB12
(13) 2-DB25 (7) DB16@300 (2) 3-DB16 EF

LONGITUDINAL SECTION OF CROSS BEAM


1 A1 = 1 : 30 (A3=2x)
2.40 2.40 2.40 2.40

(10) 6-DB25 (10) 6-DB25 (11) 6-DB25 (10) 6-DB25 (11) 6-DB25
6-DB12 6-DB12

(9) 2 -DB16@300
(9) 2-DB16 mm (9) 2 -DB16@150
(9) 2-DB16 mm (9) 2 -DB16@150
(9) 2-DB16 mm
1.10

1.10

1.10
(8) 6-DB16 EF (8) 6-DB16 EF (8) 6-DB16 EF
(5) DB25@150 (5) DB25@150
(5) DB25@150
(1) 4-DB25 EF (1) 4-DB25 EF (1) 4-DB25 EF
1.80

E
(7) DB16@300 (7) DB16@300
2.10

2.10

2.10
S3B_12
(7) DB16@300
VARIES

VARIES

1.00
8-DB12 (2) 3-DB16 (2) 3-DB16 (2) 3-DB16
(13) 2-DB25

(12) 7-DB12
(6) DB16@150 (4) DB25@150
(6) DB16@150 (4) DB25@150 (6) DB16@150 (4) DB25@150
SECTION A
A A1 = 1 : 20 (A3=2x) SECTION B SECTION C SECTION D
B A1 = 1 : 20 (A3=2x)
C A1 = 1 : 20 (A3=2x)
D A1 = 1 : 20 (A3=2x)
2.40

0.80 0.80 0.80

(13) 2-DB25
0.20

4-DB12 (12) 2-DB12


7 4-DB12
6-DB12 6-DB12

SECTION E
E A1 = 1 : 20 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN,
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
REINFORCEMENT (SHEET 4 OF 5)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0020 As indicated S3B_12

JVBP-009 : Rev.1 : 05-04-23


A B C D
S3B_13 S3B_13 S3B_13 S3B_13

C
L OF PIER
1.50 1.50
20.50
10.25 10.25 7-DB12 0.15 4-DB12 4-DB12 0.15 7-DB12
@70 @200 @200 @70
T5,T6 T5,T6

T3,T4 T3,T4 1-DB12EF 1-DB12EF


6-DB12 6-DB12
T1,T2 T1,T2
1.75

1.75
1-DB12EF 1-DB12EF

1.70
1.30

1.30
1-DB12EF 1-DB12EF

1.90
1.50
0.85

0.85
6-DB12 6-DB12
Y Y
6-DB12 6-DB12

1-DB12EF 1-DB12EF
DISTANCE (M.) 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 10.50 11.50 12.50 13.50 14.50 15.50 16.50 17.50 18.50 19.50 20.50 6-DB12 6-DB12
TENDONT1,T2 1.014 1.154 1.270 1.362 1.431 1.477 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.477 1.431 1.362 1.270 1.154 1.014 6-DB12 6-DB12
TENDONT3,T4 1.399 1.484 1.555 1.612 1.655 1.685 1.700 1.700 1.700 1.700 1.700 1.700 1.700 1.700 1.700 1.685 1.655 1.612 1.555 1.484 1.399
1-DB12EF 1-DB12EF
TENDONT5,T6 1.784 1.814 1.840 1.862 1.879 1.891 1.900 1.900 1.900 1.900 1.900 1.900 1.900 1.900 1.900 1.891 1.879 1.862 1.840 1.814 1.784
6-DB12 6-DB12
1-DB12EF 1-DB12EF
VERTICAL PROFILE OFLONGITUDINAL WEB TENDONS STRESSING END DEAD END
1 A1 = 1 : 50 (A3=2x)

C
L OF PIER TYPICAL DETAIL OF END BLOCK
20.50 3 A1 = 1 : 20 (A3=2x)
10.25 10.25

MIN. CONCRETE CYLINDER


1.00

STRESSING JACKING FORCE

1.20
TENDON NO. TENDON SIZE SEQUENCE STRESSING END STRENGTH AT TRANSFER
STAGE (KN)
+Z T1,T3,T5 (MPa)
2.40

0.40

2.40
T1 17-15.2mm. 3362 - LEFT END 36
-Z T2,T4,T6
T2 17-15.2mm. 3362 - LEFT END 36

1.20
1
1.00

T3 17-15.2mm. 3362 - LEFT END 36


T4 17-15.2mm. 3362 - LEFT END 36
T5 17-15.2mm. 3362 - LEFT END 45
DISTANCE (M.) 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 10.50 11.50 12.50 13.50 14.50 15.50 16.50 17.50 18.50 19.50 20.50 2
T6 17-15.2mm. 3362 - LEFT END 45
TENDON T1,T3,T5 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20 +0.20
TENDONT2,T4,T6 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 -0.20 STRESSING STAGE 1 : BEFORE INSTALL I-GIRDER
STRESSING STAGE 2 : AFTER INSTALL I-GIRDER OF 1st AND 2nd SPAN AND BEFORE INSTALL DECK SLAB OF 1st AND 2nd SPAN
REMARK : STRESSING STAGE 2 SEQUCENCE CAN BE CHANGED DEPENDING ON METHOD OF CONSTRUCTION
- FOR VERTICAL PROFILE, Y DISTANCE ARE MEASURED FROM BOTTOM SURFACE TO CENTER OF DUCT. NOTES :
- FOR HORIZONTAL PROFILE, Z DISTANCE ARE MEASURED FROM CENTER OF CROSS BEAM TO CENTER OF DUCT.
1. IN CASE THERE IS ANY CONSTRAIN AT THE LEFT END SUCH AS DIFFICULTY TO ACCESS,
TENSIONING CAN BE PERFORMED BY JACKING FROM RIGHT END AT THE OPTION OF THE CONTRACTOR.
HORIZONTAL PROFILE OF LONGITUDINAL WEB TENDONS 2. THE VOID SPACE BETWEEN THE DUCT AND THE TENDON SHALL BE FILLED WITH GROUT.
2 A1 = 1 : 50 (A3=2x) 3. THE SCAFFOLDING SUPPORTED CROSSBEAM CAN BE REMOVED BEFORE STRESSING STAGE 1 ONLY WHEN CONCRETE STRENGTH
OF CROSSBEAM HAS REACHED OR EXCEEDED 36 MPa (CYLINDER)

CL CROSS BEAM C
L CROSS BEAM C
L CROSS BEAM C
L CROSS BEAM
2.40
2.40 2.40 2.40
0.80 0.80 0.80
0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.200.200.20
0.22 0.22 0.22
T5 T6
0.33 0.29

T5 T6
0.35

T5 T6
T5 T6 T3 T4
T3 T4
T3 T4 T1 T2
1.10

0.45

T1 T2
T3 T4
0.33

T1 T2
VARIES
VARIES
0.45
2.10

2.10

2.10

2.10
T1 T2

1.50
1.43
0.70

1.15
0.85
0.30

1.00 0.40 1.00 1.00 0.40 1.00 1.00 0.40 1.00

SECTION A SECTION B SECTION C SECTION D


A A1 = 1 : 25 (A3=2x)
B A1 = 1 : 25 (A3=2x)
C A1 = 1 : 25 (A3=2x)
D A1 = 1 : 25 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
"P6C" PIER DETAILS FOR 30.00+30.00 M. SPAN
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
ROADWAY WIDTH 4 LANES, DIMENSION (SHEET 5 OF 5)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP32-ST-0021 As indicated S3B_13

JVBP-009 : Rev.1 : 05-04-23


14990 14990

A B
S3C_01 S3C_01 CL SYM.

200
150

1100
920

1700
1700

300 200

0.23

MID SPAN
1700 200

ELEVATION OF I-GIRDER SPAN LENGTH 30.00 M.


1 A1 = 1 : 100 (A3=2x)
EXTERIOR CL SYM.
CL

200
200 600
600

200

200

INTERIOR

200
200 600
600

200

200
CROSS BEAM
PLAN OF I-GIRDER SPAN LENGTH 30.00 M. MID SPAN
2 A1 = 1 : 100 (A3=2x)

600 600

INTENTIONALLY ROUGH SURFACE 6 MM. DEEP

200
1700+600 tan O

150
CL

O
600

920
1700
1700

200

CROSS BEAM

200
230
NOTES :
1700 200 200 200 200
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE INDICATED.
2. ALL EXPOSED CONCRETE CORNERS SHALL BE 20 MM. CHAMFER UNLESS NOTED OTHERWISE.
PLAN OF I-GIRDER (SKEW) SECTION A SECTION B
3 A1 = 1 : 100 (A3=2x)
A A1 = 1 : 100 (A3=2x)
B A1 = 1 : 100 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
I-GIRDER FOR 30.00 M. SPAN
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PRETENSION, DIMENSIONS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0022 1 : 100 S3C_01

JVBP-009 : Rev.1 : 05-04-23


14990 14990
A
S3C_02 CL SYM.

1700

LAYER NO. 1

5 LAYERS @ 55 200

LAYER NO. 5

75
0 1600 3200 4800 MID SPAN

ELEVATION - PRESTRESSING STRAND ARRAGEMENT FOR SPAN 30 M.


1 A1 = 1 : 100 (A3=2x)
CL SYM.

CL 4 LAYERS @ 60
600

LAYER NO.1 - 4 STRAND 55


LAYER NO.2 - 8 STRAND 55
LAYER 1 NUMBER OF STRAND 4 NO. 220
0 MID SPAN LAYER NO.3 - 8 STRAND 55
LAYER NO.4 - 8 STRAND 55
PRESTRESSING STRAND LAYER NO. 1 LAYER NO.4 - 8 STRAND 75 75
2 A1 = 1 : 100 (A3=2x) CL SYM.
420
90
600
CL 8 LAYERS @ 60
600

90
SECTION A
0
LAYER 2 NUMBER OF STRAND 8 NO.
MID SPAN
A A1 = 1 : 100 (A3=2x)

PRESTRESSING STRAND LAYER NO. 2


3 A1 = 1 : 100 (A3=2x) 200
CL SYM.
90
150
CL 8 LAYERS @ 60
600

90
LAYER 3 NUMBER OF STRAND 8 NO.
0 1600 MID SPAN
200
PRESTRESSING STRAND LAYER NO. 3
4 A1 = 1 : 100 (A3=2x)
CL SYM.
920
90 1700

CL 8 LAYERS @ 60
600

90
LAYER 4 NUMBER OF STRAND 8 NO.
0 3200 MID SPAN

PRESTRESSING STRAND LAYER NO. 4


5 A1 = 1 : 100 (A3=2x) 200
CL SYM.
90

CL 8 LAYERS @ 60
600

230

90
LAYER 5 NUMBER OF STRAND 8 NO.
0 4800 MID SPAN 600

PRESTRESSING STRAND LAYER NO. 5 DIMENSION OF GIRDER


6 A1 = 1 : 100 (A3=2x)
7 A1 = 1 : 100 (A3=2x)
NOTES LEGEND AND DISTANCE TO DEBOND

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. 4. FORCE IN EACH STRAND SHALL BE 14050 kg. 6. CONCRETE COMPRESSIVE STRENGTH AT TRANSFER STAGE PLAIN STRAND 24- STRAND

5. LOCATIONS OF BOND AND DEBOND OF TENDONS SHALL BE AS SHOWN ON THIS DRAWING SHALL NOT BE LESS THAN 85% OF fc'. DEBONDED STRANDS 1.60 M FROM ENDS OF GIRDER 4 - STRAND
2. CONCRETE FOR GIRDER : fc' (cube) = 50 MPa.
DEBONDED STRANDS 3.20 M FROM ENDS OF GIRDER 4 - STRAND
3. ALL PRESTRESSING STRANDS SHALL BE ∅12.7 mm. SEVEN WIRE, 5.1 DEBONDING SHALL BE DONE BY USING SUITABLE PLASTIC TUBES WRAPPED
DEBONDED STRANDS 4.80 M FROM ENDS OF GIRDER 4 - STRAND
UNCOATED, LOW RELAXATION STRANDS CONFORMING TO THE REQUIREMENT 5.2 LEGEND
36- STRAND
OF TIS 420 GRADE 1860. DENOTE BOND
DENOTE DEBOND

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
I-GIRDER FOR 30.00 M. SPAN
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PRETENSION, DETAIL OF PRESTRESSING STRAND
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER.
BN-OP-1056,BN-ST-OP-1057
Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0023 1 : 100 S3C_02

JVBP-009 : Rev.1 : 05-04-23


A B C D E
S3C_03 S3C_03 S3C_03 S3C_03 S3C_03

CL SYM.
14990 14990

50 0.45 100 1100 100 1000 125 1375 200 4.00 200 6.29
6-G1,G3, 12- G2,G4,E2 @ 100 11- G5,G9,G13 12- G6,G10,G14 @ 125 21- G7,G11,G15 @ 200 22- G8,G12,G16 @ 300
E1@90 @ 100
L4- 2 DB16 (L=2900 FROM END OF GIRDER)
E5- 6 DB12 550 L3- 2 DB16 (L=3200 FROM END OF GIRDER) L1- 4 DB16 L1- 2 DB16 L1- 2 DB16
600
180

1700

E3 DB16 500 E6- 8 DB16 L1- 3 DB16 L1- 2 DB16 L2- 8 DB16 L5- 2 DB16 (L=11500 AT MID SPAN) L6- 2 DB16 (L=9000 AT MID SPAN) MID SPAN
900
+ E4 DB16 250 (L=2200 FROM END OF GIRDER)
900 4500
5750

ELEVATION - DETAIL OF STEEL REINFORCEMENT (PRETENSIONED GIRDER 30 M.)


1 A1 = 1 : 100 (A3=2x)

150 150 150 150 150 150 150 150 150 150 150 150
150 150 150

G5- 11 DB12 @ 100


G3- DB16 @ 90 180 G4- DB12 @ 100 180 (DIST.=1800-2800) 180 180
G7- DB12 @ 200 180 G8- DB12 @ 300
G6- 12 DB12 @ 125
L1- 4 DB16 L1- 4 DB16 (DIST.=2925-4300) L1- 4 DB16
L1- 4 DB16 L1- 4 DB16
L4- 2 DB16 (L=2200 FROM END OF GIRDER) G11- DB12 @ 200 G12- DB12 @ 300
L1- 2 DB16 L1- 2 DB16 L1- 2 DB16 L1- 2 DB16
L1- 2 DB16
L3- 2 DB16
L1- 2 DB16 (L=3200 FROM END OF GIRDER) L1- 2 DB16 L1- 2 DB16 L1- 2 DB16
L1- 2 DB16

E6- 8 DB16 G9- 11 DB12 @ 100


(DIST.=1800-2800)
L2- 2 DB16 (L=2200 FROM END OF GIRDER) L2- 2 DB16 L2- 2 DB16 L2- 2 DB16
G10- 12 DB12 @ 125 L2- 2 DB16
E5- 6 DB12 (DIST.=2925-4300)
550
600 L2- 2 DB16 L2- 2 DB16 L2- 2 DB16 L2- 2 DB16
G2- DB12 @ 100 L2- 2 DB16
G1- DB16 @ 90
L2- 2 DB16 L2- 2 DB16 L2- 2 DB16 L2- 2 DB16
L2- 2 DB16

L2- 2 DB16 L2- 2 DB16 L2- 2 DB16 L2- 2 DB16


L2- 2 DB16

E1- DB16 @ 90 E2- DB12 @ 100 G16- DB12 @ 300

200 200 L1- 2 DB16 L1- 2 DB16 L1- 2 DB16


L1- 2 DB16 L1- 2 DB16
G13- 11 DB12 @ 100
G15- DB12 @ 200 L5- 2 DB16
L1- 3 DB16 L1- 3 DB16 (DIST.=1800-2800)
L1- 3 DB16 L1- 3 DB16
L1- 3 DB16 (L=11500 AT MID SPAN)
E3 DB16 500 G14- 12 DB12 @ 125 L6- 2 DB16
900 (DIST.=2925-4300)
+ E4 DB16 250 (L=9000 AT MID SPAN)
900

SECTION A SECTION B SECTION C SECTION D SECTION E


A B C A1 = 1 : 100 (A3=2x)
D A1 = 1 : 100 (A3=2x)
E A1 = 1 : 100 (A3=2x)
A1 = 1 : 100 (A3=2x) A1 = 1 : 100 (A3=2x)

NOTES

1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE INDICATED.

2. FOR CLARITY, PRESTRESSING STRAND ARE NOT SHOWN IN EACH SECTION.

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
I-GIRDER FOR 30.00 M. SPAN
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PRETENSION, STEEL REINFORCEMENT
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0024 1 : 100 S3C_03

JVBP-009 : Rev.1 : 05-04-23


C
L OF ABUTMENT C
L OF PIER

30.00

LINK SLAB OR EXPANSION JOINT LINK SLAB OR EXPANSION JOINT

C
L OF EXTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
END DIAPHRAGM END DIAPHRAGM
L OF BRIDGE

C
L OF INTERIOR
20.40

2.00
C

C
L OF INTERIOR

2.00
INTERMEDIATE DIAPHRAGM

C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF EXTERIOR

PLAN OF I-GIRDER AND DIAPHRAGM AT ABUTMENT AND PIER


1 A1 = 1 : 75 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PLAN OF I-GIRDER AND DIAPHRAGM (SHEET 1 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0025 1 : 75 S3D_01

JVBP-009 : Rev.1 : 05-04-23


C
L OF BRIDGE
20.00

0.50 9.20 0.60 9.20 0.50

5-DB25
DB12@150 DB12@150 DB12@150
DB12@150 3-DB25 DB12@150
DB12@150 DB12@150 DB12@150
DB12@150 DB12@150

~ END DIAPHRAMG ~ ~ END DIAPHRAMG ~


~ END DIAPHRAMG ~ ~ END DIAPHRAMG ~

6-DB16 2-DB25 6-DB16 2-DB25 6-DB16 2-DB25 6-DB16 2-DB25 6-DB16 2-DB25
2-DB25 2-DB25 2-DB25
2-DB25
2-DB25

SECTION A : STEEL REINFORCEMENT IN END DIAPHRAGM


A A1 = 1 : 30 (A3=2x)
C
L OF BRIDGE

2-DB25
DB12@150 DB12@150 DB12@150 DB12@150 DB12@150

~ INTERMEDIATE DIAPHRAMG ~ ~ INTERMEDIATE DIAPHRAMG ~


~ INTERMEDIATE DIAPHRAMG ~ ~ INTERMEDIATE DIAPHRAMG ~

6-DB16 6-DB16
6-DB16
6-DB16
2-DB25 2-DB25 2-DB25 6-DB16
2-DB25 2-DB25 2-DB25 2-DB25 2-DB25 2-DB25 2-DB25

SECTION B : STEEL REINFORCEMENT IN INTERMEDIATE DIAPHRAGM


B A1 = 1 : 30 (A3=2x)
C
L OF ABUTMENT C
L OF PIER
B A-
S3D_02 S3D_02
---

6-DB16

DB12@150
2-DB25 C
L OF BRIDGE

C
S3D_02

SECTION C : INTERMEDIATE DIAPHRAGM


C A1 = 1 : 25 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
DIAPHRAGM DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0026 As indicated S3D_02

JVBP-009 : Rev.1 : 05-04-23


C
L OF ABUTMENT C
L OF PIER

30.00

LINK SLAB OR EXPANSION JOINT LINK SLAB OR EXPANSION JOINT


PLANK FOOTPATH
500X1550X50 MM.

C
L OF EXTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
L OF BRIDGE

C
L OF INTERIOR
20.40

2.00
C

C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF INTERIOR

2.00
C
L OF EXTERIOR

0.27 29.18 0.01

PLAN OF PLANK AT ABUTMENT AND PIER


1 A1 = 1 : 75 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PLAN OF PLANK SLAB
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0027 1 : 75 S3D_03

JVBP-009 : Rev.1 : 05-04-23


2.00 MAX.

0.15 0.05 0.05

0.05

0.50
0.05
RB6 @0.25 6-WIRE ∅7 mm. @0.08

PRESTRESSING STRAND
EXTRUDE FROM CONC. 15 CM.
6-WIRE ∅7 mm. @80 IN THE MIDDLE

INTENTIONALLY ROUGH SURFACE 6 MM. DEEP RB6 @0.25

RB6 @250

PRESTRESSING STRAND
6-WIRE ∅7 mm. @0.08 IN THE MIDDLE OF CONC. THK.
EXTRUDE FROM CONC. 15 CM.

0.05
PRECAST CONCRETE PANEL
1 A1 = 1 : 5 (A3=2x)

NOTES
1. ALL DIMENSIONS ARE IN METER, UNLESS OTHERWISE NOTED.
0.08 0.08
2. CONCRETE FOR DECK SLAB AND DIAPHRAGM:fc'(cube) = 35 MPa.
0.20

0.25

3. CONCRETE COVERING
3.1 TOP SURFACE 3.5 CM.
3.2 BOTTOM SURFACE 2.5 CM.
0.05

3.3 END DIAPHRAGM 2.5 CM.


4. PRECAST CONCRETE PANEL

9 MM.
4.1 CONCRETE FOR PRECAST PANEL : fc' (cube) = 50 MPa.
4.2 ALL PRESTRESSING WIRE SHALL BE ∅ 7 mm. GRADE 1670
250 MM.
AND SHALL BE CONFORMED TO TIS 95.
4.3 FORCE IN EACH PC. WIRE SHALL BE 4,585 kg.
55 MM. 140 MM. 55 MM.
4.4 CONCRETE COMPRESSIVE STRENGTH AT TRANSFER STAGE

25 MM.
SHALL NOT BE LESS THAN 85% OF fc'.
4.5 BEFORE CASTING CONCRETE TOPPING, NO CRACK SHALL BE OCCUR
ON THE PRECAST CONC. PANEL.
4.6 PRECAST CONC. PANEL SHALL BE LIFTED AT BOTH END ONLY.
4.7 OTHER TYPE OF PANEL CAN BE PROPOSED BY THE CONTRACTOR.

9 MM.
THE PANEL SHALL BE DESIGNED AND CONSTRUCTED TO SUSTAINED
LIVE LOAD NOT LESS THAN 700 KG./SQ.M. THE DESIGN
CALCULATION SHEET AND SHOP DRAWING SHALL BE SUBMITTED
DETAIL OF PRECAST CONC. PANEL PLACING DETAIL OF DB25 WELDING
2 A1 = 1 : 5 (A3=2x)
3 A1 = 1 : 3 (A3=2x)
TO THE ENGINEER FOR APPROVAL BEFORE ANY IMPLEMENT.

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PRECAST DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0028 As indicated S3D_04

JVBP-009 : Rev.1 : 05-04-23


C
L OF ABUTMENT C
L OF PIER

30.00

LINK SLAB OR EXPANSION JOINT SLAB THK. = 200 MM. BARRIER LINK SLAB OR EXPANSION JOINT

0.50
0.60
10.00
DECK SLAB THK. = 250 MM.

9.40
L OF BRIDGE

BARRIER
20.00

19.00
CL
C

9.40
10.00

ASPHALT THK. = 50 MM.

0.60

0.50
BARRIER

PLAN OF SLAB AT ABUTMENT AND PIER


1 A1 = 1 : 75 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
PLAN OF SLAB AND BARRIER
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0029 1 : 75 S3D_05

JVBP-009 : Rev.1 : 05-04-23


C
L OF BRIDGE
20.00

0.50 0.10 9.10 0.60 9.10 0.10 0.50

2.00% 2.00%

SECTION A : SLAB CROSS SECTION DIMENSION


A A1 = 1 : 30 (A3=2x)

C
L OF BRIDGE

BOTTOM DB16@150
TOP DB16@150
BOTTOM DB12@150
TOP DB12@150

SECTION B : SLAB CROSS SECTION REINFORCMENT


B A1 = 1 : 30 (A3=2x) C
L OF ABUTMENT C
L OF PIER
A
S3D_06

B
S3D_06

C
L OF BRIDGE

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
SLAB DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0030 As indicated S3D_06

JVBP-009 : Rev.1 : 05-04-23


0.50

0.10 0.20 0.20 0.60

0.17 0.05 0.15 0.05 0.17

0.02 0.11 0.02

0.02
RB9
AT CORNERS (TYP.)
0.65

(1)12-DB12

0.46
DB12@150
1.00

0.82
DB16@150 DB12@150 DB12@150

0.25
DB12@150
0.22

0.10

0.09
0.20
0.13
(0.10 MIN.)
0.25

0.10 0.10 0.10 0.10

BARRIER DIMENSION BARRIER REINFORCMENT MID BARRIER DIMENSION MID BARRIER REINFORCMENT
1 A1 = 1 : 10 (A3=2x)
2 A1 = 1 : 10 (A3=2x)
3 A1 = 1 : 10 (A3=2x)
4 A1 = 1 : 10 (A3=2x)

C
L OF PIER C
L OF PIER & JOINT

30000
10 20
1000

ROADWAY LEVEL
200

PVC PIPES ∅1" 1250 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1250 1250

NOTES
BRIDGE RAILING FOR 30.00 M. SPAN
5 A1 = 1 : 50 (A3=2x)
1. ALL DIMENSIONS ARE IN MILLIMETER, UNLESS OTHERWISE NOTED.
2. CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF
210 KSC. FOR 150X150X150 MM. CUBE AT 28 DAYS. AN APPROXIMATE MIX DESIGN
PER CUBE METER IS SUGGESTED AS FOLLOWS :
40 60 NON-EXTRUDING JOINT FILLER PORTLAND CEMENT TYPE 1 350 KG. (MIN.)
DOWEL RB 25 MM. 600 MM. LONG SAND 0.43 M.3
DOWEL DB 20 MM. 600 MM. LONG 20
TOP OF CONCRETE BARRIER CRUSHED ROCK OR GRAVEL 0.86 M.3
SHEAR KEY (SEE DETAIL)
20

CONCRETE SLUMP 10 CM. (MAX.)


30
3. CLEAR CONCRETE COVER SHALL BE 50 MM.
213

RUST-OLEUM PAINTED & GREASE 4. REINFORCEMENT STEEL SHALL CONFORM TO TIS.20 GRADE SR24 FOR ROUND BARS
300 300
120
80

STEEL OR P.V.C. CAP AND TIS.24 GRADE SD30 FOR DEFORMED BARS.
813

400

5. REINFORCEMENT AND OTHER DETAILS OF APPROACH CONCRETE BARRIER


ROADWAY SURFACE LEVEL
100 SHALL BE THE SAME AS CONCRETE BARRIER.
40
200

DRAIN HOLE
20

6. CONSTRUCTION JOINT SHALL BE PROVIDED AT 10.00 M. INTERVAL.


250

60 600 7. EXPANSION JOINT WITH NON-EXTRUDING JOINT FILLER SHALL BE PROVIDED


AT 60.00 M. INTERVAL.
SHEAR KEY DETAIL CONSTRUCTION JOINT DETAIL EXPANSION JOINT DETAIL 8. APPROACH CONCRETE BARRIER SHALL BE PAINTED IN BLACK AND WHITE
6 A1 = 1 : 2 (A3=2x)
7 A1 = 1 : 20 (A3=2x)
8 A1 = 1 : 20 (A3=2x) STRIPE 0.50 M. WIDE, IN TWO COATS. THE PAINT SHALL CONFORM TO TIS.327.

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
SLAB SPAN 30.00 M.
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
BARRIER DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0031 As indicated S3E_01

JVBP-009 : Rev.1 : 05-04-23


C
L OF ABUTMENT C
L OF ABUTMENT
L = BRIDGE TRANSITION STRUCTURE LENGTH BRIDGE L = BRIDGE TRANSITION STRUCTURE LENGTH

CONCRETE BRIDGE RAILING


APPROACH CONCRETE BARRIER 21000 8000 MIN. 8000 MIN. APPROACH CONCRETE BARRIER 21000

1000 500

500
500
C
L OF ROADWAY C
L OF ROADWAY

3500
TRAFFIC DIRECTION TRAFFIC DIRECTION

10000
3500
TRAFFIC DIRECTION TRAFFIC DIRECTION

500 1000

500
500

CONCRETE BARRIER AT BRIDGE APPROACH STRUCTURE


1 A1 = 1 : 150 (A3=2x)

C
L OF ABUTMENT
DRAIN HOLE @1000 DRAIN HOLE @1000 DRAIN HOLE @1000

ROADWAY SURFACE

5000
TRANSITION TO BRIDGE RAILING
APPPROACH CONCRETE BARRIER 21000 8000 MIN. BRIDGE
200
SIDE ELEVATION 2 CM. CHAMFER
2 A1 = 1 : 75 (A3=2x)
500
A 2 CM. CHAMFER
70 200 50 180

APPROACH TRAFFIC SIDE

N
RB ∅9 MM.

TIO
813

A
AT CORNERS (TYP.)

EV
EL
708

P
603
RB ∅9 MM. @200

TO
497

813
AFFROACH TRAFFIC SIDE 391
483

RB ∅9 MM. @200 286


180 ROADWAY SURFACE
ROADWAY SURFACE
75
813

2 CM. CHAMFER
200

0 3 6 9 12 15 18 21 M.
500

100
100

75
75
APPROACH CONCRETE BARRIER
255

80 80 ROADWAY SURFACE 600 2 CM. CHAMFER 500 10 A1 = 1 : 10 (A3=2x)


75

DRAIN HOLE @ 10.00 M.


A (IF NECESSARY)
30

100 100 NOTES


50 50
(100 MIN.)

SHEAR KEY 80x50x30 MM. 1. ALL DIMENSIONS ARE IN MILLIMETER, UNLESS OTHERWISE NOTED.
250

150 200 150


WITH 500 MM. LONG ALTERNATELY
IN CASE OF CONCRETE POURING
REINFORCEMENT DETAIL SIDE ELEVATION AT DRAIN HOLE SECTION A 2. CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF
NOT THE SAME TIME 4 A1 = 1 : 10 (A3=2x)
5 A1 = 1 : 10 (A3=2x)
6 A1 = 1 : 10 (A3=2x) 210 KSC. FOR 150X150X150 MM. CUBE AT 28 DAYS. AN APPROXIMATE MIX DESIGN

CONCRETE POURING AT THE SAME TIME PER CUBE METER IS SUGGESTED AS FOLLOWS :
40 60 NON-EXTRUDING JOINT FILLER PORTLAND CEMENT TYPE 1 350 KG. (MIN.)
400

DB ∅19 MM. 800 MM. LONG DOWEL DB 20 MM. 600 MM. LONG
500

DOWEL RB 25 MM. 600 MM. LONG SAND 0.43 M.3


∅0.10 MM. @1500 MM. SHEAR KEY (SEE DETAIL) 20
TOP OF CONCRETE BARRIER CRUSHED ROCK OR GRAVEL 0.86 M.3
HOLE UNDER BARRIER
20

CONCRETE SLUMP 10 CM. (MAX.)

213
30
3. CLEAR CONCRETE COVER SHALL BE 50 MM.

RUST-OLEUM PAINTED & GREASE 4. REINFORCEMENT STEEL SHALL CONFORM TO TIS.20 GRADE SR24 FOR ROUND BARS
813

400
FRON ELEVATION 300 300
120
80

STEEL OR P.V.C. CAP AND TIS.24 GRADE SD30 FOR DEFORMED BARS.
3 A1 = 1 : 10 (A3=2x) 5. REINFORCEMENT AND OTHER DETAILS OF APPROACH CONCRETE BARRIER
40
200
ROADWAY SURFACE LEVEL
SHALL BE THE SAME AS CONCRETE BARRIER.

100
250

DRAIN HOLE
20

6. CONSTRUCTION JOINT SHALL BE PROVIDED AT 10.00 M. INTERVAL.

60 7. EXPANSION JOINT WITH NON-EXTRUDING JOINT FILLER SHALL BE PROVIDED


600
AT 60.00 M. INTERVAL.
SHEAR KEY DETAIL CONSTRUCTION JOINT DETAIL EXPANSION JOINT DETAIL 8. APPROACH CONCRETE BARRIER SHALL BE PAINTED IN BLACK AND WHITE
7 A1 = 1 : 2 (A3=2x)
8 A1 = 1 : 20 (A3=2x)
9 A1 = 1 : 20 (A3=2x) STRIPE 0.50 M. WIDE, IN TWO COATS. THE PAINT SHALL CONFORM TO TIS.327.

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
CONCRETE BARRIER AT BRIDGE TRANSITION
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0032 As indicated S3E_02

JVBP-009 : Rev.1 : 05-04-23


GENERAL SPECIFICATIONS

MATERIALS
1. FACING PANELS FOR THIS STRUCTURE ARE PRECAST CONCRETE PANELS. THE MATERIALS USED IN PRECASTING
PANELS SHALL BE COMPLYING WITH THE FOLLOWING CRITERIA.
1.1 CONCRETE
CONCRERT PANEL RETAINING
WATER - MINIMUM COMPRESSIVE STRENGTH SHALL BE 7 MPa AT 1 DAY AND 30 MPa AT 28 DAYS FOR
∅15x30 cm. CYLINDER COMPRESSIVE STRENGTH.
1.2 REINFORCING STEEL
300
- HIGH YIELD DEFORMED BAR GRADE SD40 ACCORDING TO TIS 24-2536 FOR ALL BARS WITH
(TYP) DIAMETER 12 mm OR GREATER. REINFORCING MESH SHALL BE CONFORMING TO ASTMA-82
1.3 TIE STRIPS
- TIE STRIPS SHALL BE HOT-DIP GALVANIZED SHALL COMPLY WITH ISO 1460&1461 GRADE 250
OR ACCORDING TO ASTM 570 GRADE 50 OR EQUIVALENT AS SHOWN IN DRAWING
2. EARTH REINFORCEMENT FOR THIS STRUCTURE (REINFORCING STRIP) IS GALVANISED STEEL HIGH ADHERENCE (HA) STRIP
1200 MM. (MIN) CONFORM TO ASTM A-572 GRADE 65 AS SHOWN IN DRAWING
IN FILL SOIL H 3. BOLTS & NUTS SHALL BE STRENGTH GRADE 8.8 TO BS 3692 OR EQUIVALENT, METRIC SIZE M12,
MATERRIAL WITH HOT-DIP GAVANIZED OR EQUIVALENT PROTECTIVE COATING.
V 4. FILTER FOR THE VERTICAL & HORIZONTAL JOINTS SHALL BE STRIPS OF GEOTEXTILE OR POLYURETHANE FOAM OR-
2 PAD PER JOINT RUBBER PADS EQUIVALENT, AS DETAILED ON THE DRAWINGS.
600 MM. (MIN) 5. RUBBER PADS CONFORMING TO ASTM D-2000 HAVING DUROMETER HARDNESS NOT LESS THAN 55 (IRDH),SIZE 100X80X20
STIR RB6 @ 0.20 6. THE FILL USED IN THE REINFORCED EARTH STRUCTURE SHALL BE A SELECT GRANULAR BACKFILL, GENERALLY
2DB16 COMPLYING WITH THE FOLLOWING CRITERIA.
(GEOTEXTILE)
200

- NO MATERIAL LARGER THAN 150 mm.


440 2DB16 - LESS THAN 15% PASSING A 75 um SIEVE
- pH BETWEEN 5 AND 10
PILE SQ 0.22x0.22 M. @ 2.00 M.
SAFE LOAD 4 TON/PILE - RESISTIVITY SHOULD BE GREATER THAN 5,000 ohm cm.
OTHER MATERIALS MAY BE ACCEPTABLE SUBJECTED TO FURTHER TESTING AND DESIGN REVIEW

DESIGN
1. THE DESIGNER RESPONSIBLE FOR THE INTERNAL & EXTERNAL DESIGN OF THE REINFORCED EARTH STRUCTURES.

DENSITY ANGLE OF INTERNAL COHESION


3 FRICTION
(kN/m ) (deg) (kPa)

SELECT GRANULAR BACKFILL 18-20 36 0


TING WAA'S EMBANKMENT JOINT DETAIL
1 A1 = 1 : 25 (A3=2x)
2 A1 = 1 : 25 (A3=2x)
GENERAL BACKFILL 20 30 0

FOUNDATION 20 30 0

A 1. MATERIAL WHICH WILL GENERATE HORIZONTAL PRESSURE EQUIVALENT TO OR LESS THAN A MATERIAL WITH STRENGTH
S3F_01 CHARACTERISTICS EQUAL TO THOSE ABOVE MAY BE USED FOR GENERAL BACKFILL.
2. THE STRUCTURE HAS BEEN DESIGNED FOR A 100 YEAR SERVICE LIFE.
3. THE STRUCTURE HAS BEEN DESIGNED TO CARRY A UNIFORM LIVE LOAD SURCHARGE OF 20 kPa TO ROAD
1500 1500 1500
SURFACE LEVEL.
4. CALCULATION BEARING PRESSURE AT WORKING STATE (AFTER MEYERHOFF) AT THE BASE OF THE STRUCTURE:

(TYP.)
365
(TYP.)

(TYP.)
1480
730

750
1480

20 140

(TYP.)
365
POLYMER CAP
POLYMER STRIP

(TYP.)
365
1480
20

CONCRETE PANAL RETAINING WALL

(TYP.)

(TYP.)
1480

750
SEE DETAIL "A"
STIR RB6 @ 0.20
2DB16
1480

20

GRADE 37.5 37.5 50 GRADE 50

200
(TYP.)
365
730

2DB16

A /4
TOP OF INFILL MATERIAL 440

PILE SQ 0.22x0.22 M. @ 2.00 M.


C /3
TOP OF INFILL MATERIAL SAFE LOAD 4 TON/PILE
GRADE 65 65 65 65 65 65

RETAINUNG WALL HEIGTH AND TEVELING SECTION A DETAIL "A"


3 A1 = 1 : 25 (A3=2x)
A A1 = 1 : 25 (A3=2x)
4 A1 = 1 : 15 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
CONSTRUCTION OF ASSEMBLY
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
MSE. WALL
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0033 As indicated S3F_01

JVBP-009 : Rev.1 : 05-04-23


C C
L OF ABUTMENT
L OF ABUTMENT
0.05 0.05

BRIDGE 1.50 THE LENGTH OF BEARING UNIT AS SPECIFIED IN THE DRAWING, L


BRIDGE 1.50 THE LENGTH OF BEARING UNIT AS SPECIFIED IN THE DRAWING, L
CONCRETE BARRIER AT BEARING UNIT STRUCTURE
SEE DETAIL "1" MSE WALL SYSTEM n1 @ 2.00=L1 n2 @ 2.00=L2 n @ 2.00=Ln 2.00
B (FIXED PILES)
S3F_02
0.50

0.50

0.50-1.00
L OF ROADWAY

ROADWAY WIDTH

L OF ROADWAY
VARIES
A

VARIES @ 2.00
C

S3F_02
0.50 ROADWAY WIDTH

0.50-1.00
CONCRETE BRIDGE RAILING CONCRETE BARRIER AT BEARING UNIT STRUCTURE MSE WALL SYSTEM

1 1 1 1 2 2 2 2 3 3 3 3 7 7 7 7 8 8 8 8

TYPICAL LAYOUT OF TRANSITION STRUCTURE PLAN INDICATION THE LOCATION OF PILE


1 2 A1 = 1 : 150 (A3=2x)
A1 = 1 : 150 (A3=2x)

C
L OF ROADWAY
C
L OF ABUTMENT
VARIES
0.05
0.50 ROADWAY WIDTH ROADWAY WIDTH 0.50
BRIDGE 1.50 THE LENGTH OF BEARING UNIT AS SPECIFIED IN THE DRAWING, L
50 MM. ASPHALTIC OVERLAY
250 MM. CONCRETE PAVEMENT CONCRETE BARRIER SEE DETAIL "2"
CONCRETE BRIDGE RAILING
SEE PAVEMENT STRUCTURE DWG. AT TRANSITION STRUCTURE
n1 @ 2.00=L1 n2 @ 2.00=L2 n @ 2.00=Ln 2.00
(FIXED PILES) APPROACH SLAB CONCRETE BARRIER AT BEARING UNIT STRUCTURE 2.0% 2.0%

MSE WALL SYSTEM


EMBANKMENT FILL

VARIES
EMBANKMENT FILL

0.23
FOOTING
0.44

0.50

0.50
0.20
0.20
8 8 8 8

7 7 7 7

3 3 3 3

2 2 2 2
0.50-1.00 2.00 2.00 2.00 2.00 2.00 0.50-1.00

I I 1 1 1 1 VARIES @ 2.00

SECTION A SECTION B
A B A1 = 1 : 70 (A3=2x)
A1 = 1 : 150 (A3=2x)

TABLE : THE LENGTH OF BEARING SLAB STRUCTURE PILES TABLE : DRAWING LIST OF BEARING SLAB STRUCTURE

THE LENGTH OF THE LENGTH OF TRANSITION STRUCTURE PILES (M.) STA. BEARING UNIT TYPE
ABUTMENT PILES (M.) TYPE
n n n n n n n n n E
l 1 2 3 4 5 6 7 8 9 1 2 3 4 5 5 5 5 5 126+625.000

22 < l < 24 22.00 20.00 18.00 16.00 14.00 12.00 10.00 8.00 6.00 4 4 4 4 4 4 4 4 4 A 133+557.000 E
135+533.000 D
20 < l < 18 20.00 18.00 16.00 14.00 12.00 10.00 8.00 6.00 - 4 4 4 4 4 4 4 4 - B
203+385.000 B
18 < l < 16 18.00 16.00 14.00 12.00 10.00 8.00 6.00 - - 4 4 4 4 4 4 4 - - C 328+886.840 E
16 < l < 14 16.00 14.00 12.00 10.00 8.00 6.00 - - - 4 4 4 4 4 4 - - - D

14 < l < 12 14.00 12.00 10.00 8.00 6.00 - - - - 4 4 4 4 4 - - - - E

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TRANSITION STRUCTURE (SHEET 1 OF 3)
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0034 As indicated S3F_02

JVBP-009 : Rev.1 : 05-04-23


0.25

DB16 @ 0.15

DB12 @ 0.20 INT. PILES INT. PILES EXT. PILES


2.00 2.00 2.00

1.00 1.00 1.00 1.00 1.50


COLUMN STRIP COLUMN STRIP COLUMN STRIP MIDDLE STRIP
MIDDLE STRIP
DB16 @ 0.15 4 DB12 CONT .(T)
4 DB12 CONT .(T)
VARIES
3 DB12x1.00 (T) 3 DB12x2.50 (T)

0.25
0.50

0.10
0.25 0.25
COMPACTED
0.80 2 DB12x1.50 (B) 2 DB12 CONT .(B)
DB12 @ 0.20 COARSE SAND
VARIES 2 DB12 CONT .(B)
4 DB16

C
L OF INT.PILES C
L OF INT.PILES C
L OF EXT.PILES 0.50SECO 2.00 2.00 2.00
0.50 2.00 2.00 2.00

1 2 SECTION INDICATING COLUMN STRIP REINFORCEMENT

L OF INT.PILES
4 DB12 CONT.(T) 4 DB12 CONT.(T)
0.50-1.00

3 DB12x1.00(T) 3 DB12x1.00(T) 3 DB12x2.50(T) 2

COLUMN STRIP
A1 = 1 : 30 (A3=2x)

1.00
2 DB12x1.50(B)
2 DB12 CONT.(B) 2 DB12 CONT.(B)

C
DB16 @ 0.15 VARIES(T) 3 DB12x1.00(T) 3 DB12x2.50(T)

MIDDLE STRIP
DB12 @ 0.20 VARIES(B) 2DB12x1.50(B)

1.00
2.00

2 DB12 CONT.(B) 4 DB12 CONT.(T)


0.50

L OF INT.PILES
GENERAL NOTES :
1. CONCRETE SHALL HAVE ULTIMATE COMPRESSIVE STRENGTH OF STANDARD

COLUMN STRIP
2
CUBE, 15x15x15 CM. AT 28 DAYS, NOT LESS THAN 350 KG./CM

1.00
0.50

3DB12x1.00(T)

3DB12x1.00(T)

3DB12x1.00(T)
2. .CONCRETE COVERING SHALL BE 4.5 CM. (TO THE OUTER SURFACE OF
DB12 @ 0.20 VARIES(B)

DB16 @ 0.15 VARIES(T)

REINFORCEMENT.

C
2 DB12 CONT.(B)

2 DB12 CONT.(B)

2 DB12 CONT.(B)

2 DB12 CONT.(B)
4 DB12 CONT.(T)

4 DB12 CONT.(T)

3. THE REINFORCEMENT AT THE MIDDLE STRIP AND COLUMN STRIP SHALL BE


2DB12x1.50(B)

2DB12x1.50(B)

2DB12x1.50(B)

2DB12x1.50(B)

MIDDLE STRIP
PLACED SIMILARLY IN BOTH DIRECTIONS (LONGITUDINAL AND TRANSVERSE).

1.00
2.00

4. THE REINFORCEMENT STEEL, RB SHALL CONFORM TO THE TIS STANDARD

L OF EXT.PILES
20-2515, SR 24 GRADE WHILE THE DEFORMED BAR (DB) SHALL CONFORM.
TO THE TIS STANDARD 24-2516, SD 30 GRADE.
3DB12x1.00(T)

3DB12x1.00(T)

3DB12x1.00(T)

3DB12x1.00(T)

COLUMN STRIP
5. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE STATED.

1.00
0.50-1.00

6. ANY ITEMS WHICH ARE NOT INDICATED HEREIN OR WOULD CREATE


PROBLEM IN CONSTRUCTION, SHALL BE UNDER THE JURISDICTION OF THE
SRT S LOCATION AND DESIGN DIVISION.

C
1 2 3
7. IN CASE
, OF SKEW BRIDGE, THE LENGTH OF BEARING UNIT (L) SHALL BE
1.00 1.00 1.00 1.00 1.50
0.25 MEASURED ALONG THE LINE AT THE MIDDLE OF THE WIDTH OF BEARING
UNIT. THE LENGTH OF BEARING UNIT ON THE SHORT SIDE SHALL NOT BE
LESS THAN (LS) AS SPECIFIED IN THE DRAWING.
PLAN INDICATING SLAB REINFORCEMENT NOTES FOR CONCRETE PILES
1 A1 = 1 : 40 (A3=2x)
DB16 @ 0.15
1. CONCRETE SHALL HAVE ULTIMATE COMPRESSIVE STRENGTH OF STANDARD
DB12 @ 0.20 INT. PILES INT. PILES EXT. PILES CUBE, 15x15x15 CM. AT 28 DAYS, NOT LESS THAN 200 KG./CM.2
2. THE REINFORCEMENT STEEL, RB SHALL CONFORM TO THE TIS STANDARD
2.00 2.00 2.00 20-2515, SR 24 GRADE WHILE THE DEFORME BAR, DB SHALL CONFORM.
TO TIS 24-2516, SD 30 GRADE.
1.00 1.00 1.00 1.00 1.50
3. IF THE PILE LENGTH IS MORE THAN 10.00 M., PILE EXTENTION METHOD
COLUMN STRIP COLUMN STRIP COLUMN STRIP MIDDLE STRIP
IS RECOMMENDED BY USING THE TWO PILES, EACH HAVING THE LENGTH OF
MIDDLE STRIP HALF OF THE REQUIRED PILE LENGTH.
DB16 @ 0.15 4. IN CASE OF SKEW BRIDGE, PILE SPACING FOR THE ADDITIONAL PART SHALL
VARIES BE 2.00 M. IN LONGITUDINAL DIRECTION BY MEASURING FROM ROW 1
3 DB12x1.00 (T) 3 DB12x1.00 (T) 3 DB12x2.50 (T)
TOWARD 2 FOR THE LAST PILE NEAR ROW 2, IF THE SPACING FROM

0.25
0.50

ROW 2 IS MORE THAN 2.00 M. BUT NOT OVER 4.00 M.,ONE PILE SHOULD
BE DRIVEN AT THE MID OF AVAILABLE SPACING.
5. PRESTRESSED CONCRETE PILE SHALL BE ALLOWED ONLY THOSE HAVING
0.25

0.10
0.25 THE EFFECTIVE PERIMETER NOT LESS THAN THE VALUE INDICATED IN THE
0.80 2 DB12x1.50 (B) COMPACTED DRAWING WITH THE PRIOR APPROVAL OF THE DOH S LOCATION ANDDESIGN
COARSE SAND 2 DB12 CONT .(B)
DB12 @ 0.20 DIVISION ON CASE BY CASE BASIS.
VARIES 2 DB12 CONT .(B)
4 DB16 6. CALCULATION OF THE PILE LENGTH (AS INDICATED IN THE DRAWING) IS
BASED UPON THE GENERAL CHARACTERISTIC OF BANGKOK CLAY.
,
7. IF THE CONDITION OF SUBGRADE SOIL AT THE CONSTRUCTION SITE IS KNOW
0.50SECO 2.00 2.00 2.00 OR INVESTIGATED, THE PILE LENGTH AS SPECIFIED IN THE DRAWING MAY
BE CHANGED AND ADJUSTED TO SUIT THE LOCAL SOIL CONDITION, HOWEVER,
IT IS SUBJECT TO THE WRITTEN APPROVAL OF THE SRT S LOCATION AND
DESIGN DIVISION ON CASE BY CASE BASIS.
SECTION INDICATING MIDDLE STRIP REINFORCEMENT
3 A1 = 1 : 30 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TRANSITION STRUCTURE (SHEET 2 OF 3)
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0035 As indicated S3F_03

JVBP-009 : Rev.1 : 05-04-23


D D
0.15 1.50 VARIES 1.50 0.15

RB6 @25 MM. RB6 @75 MM. RB6 @150 MM. RB6 @75 MM. RB6 @25 MM. 50 MM. 50 MM. 70 MM. 70 MM.
C D
S3F_04 S3F_04 ∅1/2 PIPE END CLOSE

50 MM.

70 MM.
RB6 @150 MM.

D
PRESTRESSING
L < 21000 MM. FOR PILE SIZE 260x260 MM. SEE DETAIL "1"

70 MM.
50 MM.
L < 19000 MM. FOR PILE SIZE 220x220 MM.

SECTION OF RC. PILE SECTION C SECTION D


1 A1 = 1 : 15 (A3=2x)
C A1 = 1 : 5 (A3=2x)
D A1 = 1 : 5 (A3=2x)

RB12
R=25 MM.

50 MM.
2-DB12 U

500 MM.

150 MM.
3 MM.

100 MM.
100 MM. 100 MM.
50 MM.
9 MM. THICK PLATE

DETAIL "1" DETAIL "2"


2 A1 = 1 : 5 (A3=2x)
3 A1 = 1 : 5 (A3=2x)
D
0.02

L < 13000

2-DB12 U
0.793L 0.207L 0.50 0.43

9 MM. WELD AROUND 0.03 0.40

MSE WALL 30x30 MM.


HOT-POURED SEALANT
100 MM.

9 MM. THICK PLATE


SEE DETAIL "2" PREMOULDED
JOINT FILLER
1 LIFTING PIONT FILL WITH COMPRESSIBLE
100 MM.

9 MM. THICK PLATE 5 A1 = 1 : 40 (A3=2x)


RB9 @0.25
JOINT SEALANT 2.0%
4-RB9

0.25
RB12

0.40
L > 13000

0.207L 0.586L 0.207L


2-DB12 U TRANSITION STRUCTURE
0.13 0.13

0.25
0.14
500 MM. WIDTH

SECTION INDICATING SEE DETAIL "2" GEOTEXTILE SEPARATION SHEET

THE EXTENTION OF PILE 2 LIFTING PIONT


4 A1 = 1 : 5 (A3=2x)
6 A1 = 1 : 40 (A3=2x) DETAIL "1" DETAIL "2"
7 A1 = 1 : 5 (A3=2x)
8 A1 = 1 : 20 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
TRANSITION STRUCTURE (SHEET 3 OF 3)
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0036 As indicated S3F_04

JVBP-009 : Rev.1 : 05-04-23


C
L OF ABUTMENT C
L OF ABUTMENT
10000 5000 20 BRIDGE BRIDGE 20 5000 10000
ROAD PAVEMENT APPROACH SLAB APPROACH SLAB ROAD PAVEMENT
B MSE WALL
CONCRETE BARRIER AT TRANSITION STRUCTURE CONCRETE BRIDGE RAILING
S3G_01

500
APPROACH SLAB

APPROACH SLAB
5000

5000
A

10000
C
L OF ROADWAY

9000
S3G_01
APPROACH SLAB

APPROACH SLAB
5000

5000
500
CONCRETE BRIDGE RAILING CONCRETE BARRIER AT TRANSITION STRUCTURE
MSE WALL

TYPICAL LAYOUT OF APPROACH SLAB


1 A1 = 1 : 100 (A3=2x)

C
L OF ABUTMENT C
L OF ROADWAY
20 VARIES VARIES
5000 BRIDGE
APPROACH SLAB APPROACH SLAB
APPR CH SLAB
OA 2500
ROAD
2500 JOINT 20x20 MM.
DB12 @300 CONCRETE BARRIER
SEE DETAIL "1"
AT TRANSITION STRUCTURE
10 DB16 @300 500 DB12 @300
700 2-DB12
JOINT DB12 @300
DB12 @300 50 MM. ASPHALTIC OVERLAY

DB12 @150 DB12 @300 250 MM. APPROACH SLAB


250

DOWELS DB25x400 LONG @1000


DB12 @150 DB20 @150 250 OR DB16 @300
I-GIRDER
600 600 LAMINATED ELASTOMERIC BEARING PAD
DB16 @150 2.0% 2.0%
DOWELS DB25x500 LONG @300 1000x125x10 MM.
PLASTIC SHEET - EMBANKMENT FILL - THROUGH ABUTMENT LENGTH
- EMBANKMENT FILL - 1.20 M. WIDTH - EMBANKMENT FILL -

MSE WALL
SECTION A
A A1 = 1 : 30 (A3=2x) DB12 @300 DOWELS DB25x500 LONG @300

DB20 @150 SEE PAVEMENT STRUCTURE DWG.


OR DB16 @150
0.01
DB25 @300 C/C
JOINT
500 MM. LONG
125

250

50 50 50 50
PLASTIC SHEET

300 300 600 MM. WIDTH

SECTION B NOTE :
DETAIL AT JOINT B A1 = 1 : 30 (A3=2x) 1. ALL DIMENSION ARE IN MILLIMETER UNLESS OTHERWISE INDICATED.
2 A1 = 1 : 5 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
CONCRETE APPROACH SLAB
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0037 As indicated S3G_01

JVBP-009 : Rev.1 : 05-04-23


NOTES FOR BEARING PAD
1. BEARING SHALL BE ELASTOMERIC LAMINATED BEARING TYPE, DESIGNED AND MANUFACTURED
IN ACCORDANCE WITH THE REQUIREMENTS OF BS 5400; SECTION 9.1.9.2
2. ELASTOMERIC LAMINATED BEARINGS SHALL MEET THE REQUIREMENTS AS FOLLOWS :
2.1 THE ELASTOMERIC USED IN THE MANUFACTURE OF THE BEARING
SHALL BE NATURAL RUBBER OR CHLOROPRENE RUBBER AND
HAVE THE MECHANICAL PROPERTIES AS FOLLOWS :
REQUIREMENT REQUIREMENT
FOR FOR
PROPERTY NATURAL RUBBER CHLOROPRENE RUBBER
1) HARDNESS, DETERMINED IN ACCORDANCE WITH METHOD N OF BS 903;PART A26 60±5 60±5
2) TENSILE STRENGTH AND ELONGATION AT BREAK, DETERMINED IN ACCORDANCE WITH BS 903; PAST A2
USING DUMB- BELL TEST PIECES : TENSILE STRENGTH, MINIMUM 15.5 N/mm ² 15.5 N/mm ²

: ELONGATION AT BREAK, MINIMUM 400% 350%

3) AGEING RESISTANCE, ACCELERATED AGEING IN AIR SHALL BE CONDUCTED IN ACCORDANCE WITH EITHER METHOD A
OR B OF BS 903; PART A 19 FOR 7 DAY AT 70±1°C
MAXIMUM CHANGE FROM INITIAL VALUE : HARDNESS 10 IRHD (MAX.) 15 IRHD (MAX.)

TENSILE STRENGTH 15% (MAX.) 15% (MAX.)


ELONGATION AT BREAK 20% (MAX.) 40% (MAX.)

4) COMPRESSION SET MAXIMUM, DETERMINED IN ACCORDANCE WITH METHOD A OF BS 903;PART A6, ATTEMPERATURE 30% (MAX.) 35% (MAX.)
70±1°C (NATURAL RUBBER) OR 100±1°C (CHLOROPRENE RUBBER)
5) OZONE RESISTANCE, DETERMINED IN ACCORDANCE WITH BS 903;PART A 43, USING AN OZONE CONCENTRATION
OF 25 PARTS PER HUNDRED MILLION BY VOLUME AT A TEMPERATURE OF 30±1°C AND A DURATION OF 96 HOUR;
WITH THE TEST PIECE AT AN ELONGATION OF 20% NO CRACKS NO CRACKS
6) BONDING OF ELASTOMER, TEST IN ACCORDANCE WITH METHOD B OF BS 903;PART A21,MINIMUM 7 N/mm ² 7 N/mm ²

2.2 REINFORCING STEEL PLATES USED IN THE MANUFACTURE OF THE BEARING SHALL
HAVE THE PROPERTIES AS FOLLOWS :
- CONFORMING TO BS 4360 GRADE 43A OR JIS G3101 GRADE SS41 OR ASTM A36, A570 OR EQUIVALENT.
- MINIMUM YIELD STRESS 245 N/ mm.²
- MINIMUM BREAKING STRENGTH 410-520 N/ mm. ²
- ELONGATION, MINIMUM 21%
2.3 THE MANUFACTURE HAS TO DO THE TEST OF ELASTOMERIC BEARING AS FOLLOWS:
- QUICK PRODUCTION TEST : FOR EVERY BEARING
- COMPRESSION STIFFNESS TEST : FOR EVERY BEARING TYPE, ±20% OF COMPRESSIVE STIFFNESS DESIGN (TABLE 1)
- SHEAR STIFFNESS TEST : FOR EVERY BEARING TYPE, ±20% OF SHEAR STIFFNESS DESIGN (TABLE 1)
OR SHEAR MODULUS TEST : FOR EVERY BEARING TYPE, 0.90 ±20% N/SQ.MM.
ALL TESTS HAVE TO FOLLOW THE SECTION 9.2 OF BS 5400 STANDARD AND UNDER THE APPROVAL OF THE PROJECT
ENGINEER.
3. THE ELASTOMERIC BEARING PAD SHALL BE TESTED BY THE DEPARTMENT OF SCIENCE SERVICE OR THAILAND INSTITUTE OF SCIENTIFIC
AND TECHNOLOGY RESEARCH (TISTR) LOCATED AT BANG POO INDUSTRIAL ESTATE OR OTHER AGENCIES THAT THE DEPARTMENT OF HIGHWAYS
HAS CERTIFIED. THE TEST SHALL BE COMPLETED WITHIN 6 MONTHS AFTER THE CONTRACT SIGNED.
4. THE CONTRACTOR MUST SUBMIT THE CERTIFICATE OF THE ELASTOMERIC BEARING PAD FOR EACH LOT OF MANUFACTORY
FOR THE PURPOSE OF THE ELASTOMERIC BEARING PAD INSPECTION.
5. THE BEARING OF OTHER SIZES OR DIMENSIONS (BUT NOT LESS THAN THE EXISTING SIZES OR DIMENSIONS) WHICH CAN ACCOMMODATE
THE LOADS AND MOVEMENTS AS REQUIRED IN TABLE 1 MAY BE USED WITH AN APPROVAL OF
THE BUREAU OF LOCATION AND DESIGN.
6. EPOXY MORTAR FOR LEVELING OVER THE BEARING AND EPOXY MOTAR OR
NON-SHRINK GROUTING MATERIAL FOR LEVELING UNDER THE BEARING
SHALL HAVE A STANDARD CYLINDER STRENGTH OF NOT LESS THAN 35 MPa. AT 24 HOURS.
7. BEARING INSTALLATION FOR UNIFORM LOAD, BEARING MUST CARRY THE UNIFORM
DISTRIBUTED LOAD (NO RATATION IN BEARING).
8. ALL BEARINGS MUST BE INSTALLED HORIZONTALLY
9. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE INDICATED.

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
CONCRETE PLINTH AND BEARING PAD
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
DETAILS (SHEET 2 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0038 1 : 100 S3G_02

JVBP-009 : Rev.1 : 05-04-23


C
L OF PIER B
C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER C
L OF GIRDER S3G_03 C
L OF GIRDER C
L OF GIRDER
A
S3G_03 300 500 300
S S S S
150 150
W1 300 W1 10 10 W1 300 W1
PVC. PIPE DIA. 2" X 0.45 M. LENGTH
FILL WITH ASPHALT W2 600 W2
W2 600 W2
END DIAPHRAGM
3-DB12 4-DB12

MIN.
30
FILL WITH ASPHALT 2 CM. THICK.
CONC. PLINTH

MIN.
30
MIN.
30
CHAMFER 2 CM.

400
~ END DIAPHRAGM ~ ~ END DIAPHRAGM ~

SEAL WITH
SEAL WITH

ASPHALT
ASPHALT
~ I-GIRDER ~ ~ I-GIRDER ~

20 GAP
20 GAP

400
3-DB12

400
3-DB12 ROUGH SURFACE 5-DB12

400
600
CONCRETE PLINTH 3-DB12
400

ROUGH SURFACE BEARING PAD


RB9 @150
600

DB25 (DOWEL) TOP PORTION IN PVC. PIPE


NON SHRINKAGE MORTAR 820
DB25 (DOWEL) PAINT WITH RED OXIDE 2 LAYER

CONCRETE PLINTH
660 660

400
ROUGH SURFACE BEARING PAD

600
NON SHRINKAGE MORTAR
DB25 (DOWEL)

CONCRETE PLINTH FOR SPAN 20.00 M. SECTION A


1 A1 = 1 : 20 (A3=2x)
A A1 = 1 : 20 (A3=2x)
TABLE 1
CONCRETE PLINTH FOR SPAN 30.00 M.
ROADWAY LANE S (MM.) W1 (MM.) W2 (MM.) 2 A1 = 1 : 20 (A3=2x)
2 LANES 2000 850 875

4 LANES 2050 700 725

W
W
C
L OF GIRDER 5 5
DIRECTION OF TRAFFIC. 5 5
STEEL PLATE 3 MM. THK.
300 500 300
5

150 150

5
10 10 t
PVC. PIPE DIA. 2" X 0.45 M. LENGTH t

T
FILL WITH ASPHALT t

5
END DIAPHRAGM
MIN.
30

FILL WITH ASPHALT 2 CM. THICK.


CONC. PLINTH
SECTION OF BEARING PAD
CHAMFER 2 CM. 4
400

A1 = 1 : 2 (A3=2x)

4-DB12
L

~ I-GIRDER ~ ~ I-GIRDER ~

RB9 @150
TABLE 2 LOADS & MOVEMENT OF BEARING
GIRDER VERTICAL LOADS HORIZONTAL MOVEMENT (mm.) SIGN CONVENTION
ROUGH SURFACE BEARING ROTATION:
400

SPAN (KN.) LONGITUDINAL + MEAN EXPANSION


600

5-DB12 TYPE (RAD.)


(m.) MAX. MIN. REVERSIBLE IRREVERSIBLE TRANS. - MEAN CONTRACTION
DB25 (DOWEL) TOP PORTION IN PVC. PIPE FX ±2
820 20.00 700 310 0.004
PAINT WITH RED OXIDE 2 LAYER
FR ±4 -10 ±2

660 660 FX ±2.7


30.00 1060 450
5

FR ±6.5 -13 ±2.7

SECTION B PLAN
B A1 = 1 : 20 (A3=2x)
3 A1 = 1 : 2 (A3=2x)

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
CONCRETE PLINTH AND BEARING PAD
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
DETAILS (SHEET 1 OF 2)
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0039 As indicated S3G_03

JVBP-009 : Rev.1 : 05-04-23


C C
L OF PIER
C
L OF PIER L OF ABUTMENT
1.00 1.00 PRECAST CONCRETE PANEL EXPANSION JOINT PRECAST CONCRETE PANEL
PRECAST CONCRETE PANEL Max. 105mm.
0.50 (Movement 90 mm.)

0.05 0.20 0.05


Min. 85mm.

0.05 0.20 0.05


0.05 0.20 0.05
20 MM. BOND BREAKER 20 MM. BOND BREAKER

APPROACH SLAB

MIN.

0.20
0.45
0.20

0.25
0.20 0.20
CAST IN-SITU
CAST IN-SITU CAST IN-SITU

0.25 0.35

1.10
1.10

1.10
END DIAPHRAGM
END DIAPHRAGM END DIAPHRAGM END DIAPHRAGM

0.30
0.30 0.30 0.30

1.00
I-GIRDER I-GIRDER
I-GIRDER
I-GIRDER I-GIRDER

2.65
0.40 0.80 0.80 0.40 0.40 0.80 0.80 0.40 BEARING PAD
BEARING PAD 0.35 0.31 0.29 BEARING PAD
NON SHRINKAGE MOTAR
NON SHRINKAGE MOTAR NON SHRINKAGE MOTAR
C
L C
L C C
C L L

1.05
BEARING BEARING L
BEARING BEARING BEARING

0.15 0.40 0.40

LINK SLAB DETAIL (LS) DIMENSION EXPANSION JOINT TYPE A (EJ.A) DIMENSION EXPANSION JOINT TYPE B (EJ.B) DIMENSION
1 A1 = 1 : 25 (A3=2x)
2 A1 = 1 : 25 (A3=2x)
3 A1 = 1 : 25 (A3=2x)

C C
L OF ABUTMENT C
L OF PIER L OF PIER
DB16@100 DB16@100
2-DB25 2-DB25 5-DB25 5-DB25 5-DB25
2.25 2.50 DB12@150 DB12@150
DB12@150

3-DB25 3-DB25 3-DB25

6-DB16 6-DB16 6-DB16 6-DB16 6-DB16

DB12@150 DB12@150 DB12@150 DB12@150 DB12@150


2-DB25 2-DB25 DB25 2-DB25 2-DB25

I-GIRDER
I-GIRDER I-GIRDER I-GIRDER I-GIRDER

C
L 0.80 0.80
BEARING
C
L C
L
BEARING BEARING

LINK SLAB DETAIL (LS) REINFORCEMENT EXPANSION JOINT TYPE A (EJ.A) REINFORCEMENT EXPANSION JOINT TYPE B (EJ.B) REINFORCEMENT
4 A1 = 1 : 25 (A3=2x)
5 A1 = 1 : 25 (A3=2x)
6 A1 = 1 : 25 (A3=2x)

20.00 120.00 MAX. (TYP.) 120.00 MAX. (TYP.) 120.00 MAX. (TYP.) 20.00

EJ.A EJ.B LS LS LS LS LS EJ.B LS LS LS LS EJ.B LS LS LS LS LS EJ.B EJ.A

P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 Pn-5 Pn-4 Pn-3 Pn-2 Pn-1 Pn

VARIES @200.00 VARIES @300.00 VARIES @200.00


NOTE :

1. ALL DIMENSION ARE IN METER UNLESS OTHERWISE INDICATED.


BRIDGE LENGTH = VARIES

REV. DATE DESCRIPTION APPROVED New Track Doubling of the Banphai – Mahasarakham – Roi Et – Contractor : Drawn By : Title : CROSSING NO.38 KM.150+800.000
Mukdahan – Nakhonphanom Section STATUS REVIEW
EXPANSION JOINT
Contract 1: Banphai to Nong Phok Section CHECKED BY APPROVED BY
....................................
DETAILS
Employer : Construction Supervision Consultant : Checked By :
Reference Contract Drawing :
1 = NO

2 = NC

3 = RR

4 = RJ

............................... ............................... ....................................


SPECIALIST ER. Approved By :
KINGDOM OF THAILAND AS-CH and Associates
MINISTRY OF TRANSPORT AND COMMUNICATIONS Joint Venture Drawing No. Scale : Sheet No.
STATE RAILWAY OF THAILAND DATE....................... DATE....................... .................................... W-OP07-ST-0040 As indicated S3G_04

JVBP-009 : Rev.1 : 05-04-23

You might also like