Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Format Number :

Doc. Number :
Page :

Name : Andi setiawan Approved Checked Prepared


Shift : 2(Dua)
Day : Sabtu DAILY REPORT QC STAY SUPPLIER
Update : 16 Des 23
Supplier : PT. MPI Andi Setiawan

Total Check Total Defect


NG Pass
No Part Name Color Line Process Acc
Rate Rate
Qty Sample OK NG Bintik Serat Scratch Craters Sagging Tipis Overcut Absorb Burry

1 QUARTER, (Part MPI), RH XVB FINAL INSPECTION 162 100% 88 74 46% 54% 38 14 6 2 3 9 2 74

2 QUARTER, (Part MPI), LH XVB FINAL INSPECTION 200 100% 114 86 43% 57% 42 18 6 3 9 4 4 86

3 PILLAR C, (Part MPI), RH XVB FINAL INSPECTION 247 100% 120 127 51% 49% 55 24 8 3 4 9 3 21 127

4 PILLAR C, (Part MPI), LH XVB FINAL INSPECTION 308 100% 175 133 43% 57% 62 27 10 4 6 4 20 133

GRAND TOTAL 917 497 420 46% 54% 197 83 30 6 15 22 19 7 41 420

Remark / Problems / Differing Site Conditions / etc.

You might also like