PROJECT:

PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17


DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

TENDER FORM K - HSSE

FOR

PROVISION OF FACILITY
(MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17)
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

PROJECT RISK ASSESSMENT


PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17) Engineer Site Construction Supervisor Site Nurse

Task: MATERIAL COLLECTION

PROBABILITY Severity
0 Non-Credible Occurrence 1 Slight Effect
A Rare Occurrence
B Unlikely Occurrence 2 Minor Effect
C Credible Occurrence 3 Major Effect
D Probable Occurrence 4 PTD or 1 Fatality
E Likely/Frequent Occurrence 5 Multiple Fatalities

Risk Level Rating Required Authority of Approval


Low Risk (L) SAFETY CO-ORD.- SIMOPS CO-ORD
Medium Risk (M) HSE SUPT – GAS SUPT - PROD SUPT
Medium High Risk (MH) HSE MANAGER – LAR MANAGER
High Risk (H) NOT APPROVED

A B C D E F G H I J

S/N TASK STEP Hazards/ Threats Top Event Consequence What/who Inherent Control Measures Recovery Action
Hazard may be Risk Measure Parties
Source harmed
1 LOAD H-05.03 T01) using of -Fall of - Personnel - personnel P4C C1- use only R1- First aid R1/C1:
MATERIALS Objects Faulty lifting object/material injury/fatality (M) certified Treatment
overhead equipment - Sling/ R2/C2:
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

AND belts/chain - Damage to equipment and R2- Use


EQUIPMENT T02) Unstable breakage asset - Equipment P2C inspect before use lifebuoys with
base/structural (L) lifelines C3/R3:
support - Damage to -Third party C2- Visually &medivac
environment checks on base Personnel
T03) Human prior to R3- Activate
error - Third party operation/proper emergency
injury/fatality supervision response plan.

C3- Use
experienced
personnel/proper
supervision.
H07.002 T04) Adverse - Man over - Personnel - Personnel P4C C4- Weather R4-First aid C4/R4
Water current, tide, board injury/fatality (H) information tidal Treatment
Transport Poor visibility, chart in place R5 Use lifebuoys R5/C5:
(boating) rain, dew, mist P 2A C5- Use with buoyant
- Collision with - Drowning - Equipment (M) competent lifelines R6/C6
T05) Other other objects on Personnel R6 – Activate
water way water ways - Damage to -Third party P5C C6- Follow barge Emergency R7/C7:
users. asset (H) loading plan response
C7- Local R7 – Activate
T06)Improper - Third party P5B Emergency
loading/vessel injury/fatality (H)
surveillance/loc response
overloading al security in procedure
place
T07) Militant
attack
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

H-07.001 T08) Journey Collision with personnel P5C C8- journey R9- Apply first
land Management other objects on Personnel (H) management plan aid Treatment C8/R8
Transport violation land injury/fatality in place which will R10- Medavic
(driving T9) Human P2A comply with SPDC Personnel C9 –
Error - Damage to - Equipment (L) journey plan.
T10) use of asset C9- Use R10a/R10b- C10a/R10b-
defective -Third party competent and Activate
Vehicle - Third party certified emergency
injury/fatality personnel. response
10a- Use premob procedure
vehicles only
C10b- Use
competent/certifie
d Personnel
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17) Engineer Site Construction Supervisor Site Nurse
Task: FABRICATION OF PLATFORM
A B C D E F G H I J
S/N TASK STEP Hazard/Haz Threats Top Event Consequence What’s /Who Inherent Control Measure Recovery Action
ard Sources May Be Risk Measure Parties
Hammered
2 GAS / DISC H-07.004 T1-Defective - Disc - Injury to Equipment P3C(M) C1- Inspect and R1(a-b)- Apply C1/R1-
CUTTING Equipment Equipment breakage/ personnel ensure machine First aid
with rotating T2 –Human shattering -Personnel A3C(L) guard is in place. treatment
parts error - Fatality C1b- Inspect disc R2- Medavic C2/R2-
T3-Flying R3C(M) prior to use personnel
particles/missile - Fire C2 use R3a: Apply first C3/R3-
s experienced Aid
personnel/proper R3b-c: Activate
supervision. emergency
C3a – Wear face response
shield, full length procedure
coverall.
C3b- Clear area of
flammable
material and gas.
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C3c- Confirm
rating and
compatibility of
disc and grinding
machine
H-10.013 T4 Exposure to -Exposure > - Noise - Personnel P3D C4- Wear Ear R4a- First aid C4/R4-
Noise excessive noise than Induced (L) muff/plugs treatment
from running Occupational Hearing Loss R4b- Alternate
engines & Exposure Limit - Disturbance/ personnel with
machinery (OEL) Nuisance/ other task
discomfort to
animals &
community
settlers
H-10.016 T5- Location of -electricity -Fire outbreak -Personnel P2B(L) C5- Cordon off hot R5- First Aid C5/R-
hot metal contact -Asset damage metal source Treatment.
(Pipe). -Spark -Injury to area/warning sign R6(a-b):
-Arc eye personnel C6- use Flash Activate
T6-Equipment -Fire back arrestor emergency C6/R6-
flashback -Explosion C6- Use fire response plan
- Exposure fighters & fire
extinguishers

WELDING H-07.004 T1 – Defective -Missiles -Personnel -Equipment P4C C1a – Inspect and R1- First aid C1/R1 -
Equipment Equipment. contact with Injury/Fatality (M) ensure machine Treatment
with moving rotating part -asset damage -Personnel guard is in place R2- Activate
or rotating T2-Human error -Entanglement C1b-Inspect disk emergency C2/R2-
parts for signs of response plan
T3- Flying damage before R3- medavic
particles use personnel.
C1c – verifies disc C3/R3-
rating and
compatibility with
grinding machine
prior to usage
C2- Use
experienced
personnel/proper
supervision.
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C3- Use
appropriate PPE

H-09.001 T4- defective -Contact with -Personnel -Equipment P4C C4- Use certified R4- first aid C4/R4 –
Voltage > equipment. electricity Injury resulting H) premobed treatment
50V T5 – Exposed -Fire in fatality equipment R5- conduct
wire -Explosion -Personnel C5 Insulate cable CPR C5/R5 –
cable/improper -Personnel -Asset at exposed points R6- Activate
cable injury before use emergency C6/R6 –
termination C6- Inspect and response plan
T6- Changes to test equipment R7(a-b)-
existing -Asset damage C7- Inspect Medivac C7/R7 –
electrical equipment personnel
facilities connections
T7- Poor C7b: Use
earthing of wire appropriate PPE
H-10.003 T8- Welding arc -Direct contact -Eye strain -Equipment P2C C8- Use welding R8- first aid C8/R8 –
Visible light- T9- Flickering with the eye -Sight -Personnel (M) shield/dark goggle Treatment
Wavelenght T10- Too disorders for non welder, R9- Fire
C9/R9 –
400-140mm low/high -Personnel welding apron Extinguishers in
(non illumination injury C9-Competent place.
ionizing) T11- Variations welders/Awarenes R10- Activate C10/R10-
& ranges in s training. emergency
illumination C10 – Provide response plan C11/R11–
T12- Reflection adequate R11 – First aider
illumination R12- Ensure
C11 Keep safe clean water is
C12/R12–
distance for non- available.
welders.
C12- Use dark
goggles and
shielding boards
H-10.013 T13-Explosure - Exposure > - hearing loss - Personnel P3D C13 Wear Ear R13 – First aid C13/C14-
Noise to excessive than - (L) muff/plugs. treatment
noise from Occupational Disturbance/N
running engines Exposure Limit uisance/disco
& machinery mfort
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

H-10.016 T14-Location of - Fire - Body injuries - Equipment P2B C14a Cordon off R15a-first aid C15a/R15a –
Hot hot metal (pipe). - Contact with to personnel - Personnel (L) hot metal source Treatment
Temperatur the skin - Asset - Facility area/warning sign R15b- Standby C15b/R15b –
e damage C14b Wear fire fighters &
differentials appropriate PPE. fire

DYE Chemical T1- Exposure to Health Hazard Personnel P3A C1- use only R1- Emergency C1/R1 –
PENETRANT fume Incompetent Chemical fume (H) qualified NDT evacuation Plan
INSPECTION personnel _Third party personnel in place
C2/R2-
T2) C2b- Ensure use R2- Source leak
Uncalibrated of functional and emergency C3/R3-
equipment. calibrated contingency plan
equipment
T3)- defective
equipment C3a- Use Certified
premobed
equipment
C3b- Use
appropriate PPE

T1- Body itching Injury to Personnel C1- use only R1- Emergency C1/R1 –
BLAST Incompetent Flying particles personnel qualified evacuation Plan
personnel Dusty -Fatality _Third party personnel in place C2/R2-
environment
T2) Eye irritation C3a- Use Certified R2- Source leak C3/R3-
Uncalibrated premobed emergency
equipment. equipment contingency plan
C3b- Use
T3)- defective appropriate PPE
equipment
C3c- Position
warning signs and
cordon off areas
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

H-07.005 -Injury to P3C(M) C5c- Ensure R1-First aid


PAINT -Slip/Fall of personnel Personnel A2C(L) treatment
T4).Asphyxiatio E 1C(L
adequate
Paint fume n personnel, -Fatality
Rotating part material. ventilation and R2-Activate C4/R4-
T03)Human -injury /eye correct paint emergency
error irritation response
storage area C5/R5-
T1- procedure
C3-Use appropriate
Incompetent PPEs (PED, Coverall, C6/R6-
personnel Safety Shoe, Ear muff,
T3) – Slippery hand glove, Hard hat).
ground
C3c- Position
T5- PPE
warning signs and
violation
cordon off areas
C4- ensure and
observe good
Weather
information

C80- Availability of
appropriate
SHOC cards,
C3-Use only
competent
personnel
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17) Engineer Site Construction Supervisor Site Nurse
Task: MOBILIZATION TO SITE
A B C D E F G H I J
S/N TASK STEP Hazard/Haz Threats Top Event Consequence What’s /Who Inherent Control Measure Recovery Action
ard Sources May Be Risk Measure Parties
Hammered
H-05.03 T1)- faulty lifting - Slip/Fall of - Personnel - Equipment P4C C1 – Use only R1- First aid R1/C1-
3 MOBILIZATION Objects equipments material injury/fatality (M) certified crane Treatment
overheads T2)- Unstable - Drowning - Personnel slings and R2- Use – PFD C2/R2:
base - Fire -Damage to shackles. Also and adjust to fit
T3)- Human asset A2C (L) ensure R3 Use of life
error - Personnel appropriate colour buoys with the C3/R3
T4)- injury R3C(M) coding and inspect life lines.
Work/walking - Loss of Asset before use. R4- control C4/R4:
under C2- Visual checks access to lifting
suspended load. of base prior to areas with
operation barrier tape.
C3- Use
experienced
personnel/proper
supervision
C4- Conduct tool
box meeting and
cascade inherent
hazards.
H-05.03 T5) – Use of - Slip/Fall of - Personnel -Equipment P3C(M) C5-Use personnel R5- Activate C5/R5-
Water borne defective marine material Injury/fatality - Personnel and certified emergency
operation/ vessel - Drowning -Other water A2C(L) equipment and response C6/R6-
touchdown T6)- Marine - Man overboard - Damage to ways users inspect before procedure
activities on vessel asset (canoes, R3C(M) use. R6- Wear
swamp overloading - Personnel speed boats, C6-Follow safe PFD/use life
areas injury etc) loading plan of buoy with life
- loss of Asset marine vessels lines.
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

H-05.03 T5) –Engine - Helicopter - Personnel -Equipment P3C(M) C5-Use personnel R5- Activate C5/R5-
AIR travelling problem emergency Injury/fatality - Personnel and certified emergency
through - Human error ditching - Drowning -Other water A2C(L) equipment and response C6/R6-
Helicopter -Poor weather - Man overboard - Damage to ways users inspect before procedure
condition asset (canoes, R3C(M) use. R6- Wear
- Personnel speed boats, C6-Ensure PFD/use life
injury etc) availability of buoy with life
- loss of Asset Parasite on board lines.
C.7 Observe Poor
weather condition
-C8 SAS/HUET
training for
personnel
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
Task: SURVEY WORK
A B C D E F G H I J
S/N TASK STEP hazard/ha threats top events consequenc What/who Inhere Control measure Recovery Action
zard e may be nt risk measure parties
sources harmed
4 Locate F/L H07.005 T1)- Defective Slip/Fall of Personnel Equipment P3D (H) C1 – Use only R1- First aid R1/C1-
Row.And Use of tools personnel, Injury/fatality certified treatment
Existing F/L special T2)- Human material and - Drowning A3D (H) equipment/tools R2a- Adequate R2a/C2a-
,P/L & Fso instrument, error Equipment into - Damage to - Personnel and inspect before communication
facilities & River asset use. R2b- use R2b/C2b-
tools - Damage to C2a- Use PFD/adjust for
environment experienced snug fit.
personnel & R2c- Activate
ensure proper Emergency R2c/R2c-
supervision. Response.
C2b- Use probe
stick
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C2c- Adopt buddy


mate

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17) Engineer Site Construction Supervisor Site Nurse
Task :CUTTING AND GRINDING
A B C D E F G H I J
S/N TASK STEP Hazard threats Top event Consequen What/who Inhere Control measure Recovery Action
/hazards ce may be nt risk measure parties
sources harmed
5 GAS / DISC H-07.004 T1-Defective - Disc - Injury to Equipment P3C(M) C1- Inspect and R1(a-b)- Apply C1/R1-
CUTTING Equipment Equipment breakage/ personnel ensure machine First aid
with rotating T2 –Human shattering -Personnel A3C(L) guard is in place. treatment
parts error - Fatality C1b- Inspect disc R2- Medavic C2/R2-
R3C(M) prior to use personnel
- Fire
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

T3-Flying C2 use R3a: Apply first C3/R3-


particles/missile experienced Aid
s personnel/proper R3b-c: Activate
supervision. emergency
C3a – Wear face response
shield, full length procedure
coverall.
C3b- Clear area of
flammable
material and gas.
C3c- Confirm
rating and
compatibility of
disc and grinding
machine
H-10.013 T4 Exposure to -Exposure > - Noise - Personnel P3D C4- Wear Ear R4a- First aid C4/R4-
Noise excessive noise than Induced (L) muff/plugs treatment
from running Occupational Hearing Loss R4b- Alternate
engines & Exposure Limit - Disturbance/ personnel with
machinery (OEL) Nuisance/ other task
discomfort to
animals &
community
H-10.016 T5- Location of -electricity -Fire outbreak -Personnel P2B(L) C5- Cordon off hot R5- First Aid C5/R-
hot metal (Pipe). contact -Asset metal source Treatment.
-Spark damage area/warning sign R6(a-b):
T6-Equipment -Arc eye -Injury to C6- use Flash Activate
flashback -Fire personnel back arrestor emergency C6/R6-
-Explosion C6- Use fire response plan
- Exposure fighters & fire
extinguishers
JHA Composition Team HSE Coordinator Project Engineer Site
Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS Construction Supervisor Site Nurse
IN OML-17)
Task: PIPE WELDING
A B C D E F G H I J
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

S/N TASK STEP Hazard Threats Top event Consequen What /who Inheren Control measure Recovery Action
/hazards ce may be t risk measure parties
sources harmed
6 WELD JOINTS H-07.004 T1 – Defective -Missiles -Personnel -Equipment P4C C1a – Inspect and R1- First aid C1/R1 –
Equipment Equipment. contact with Injury/Fatality (M) ensure machine Treatment
with moving rotating part -asset damage -Personnel guard is in place R2- Activate
or rotating T2-Human error -Entanglement C1b-Inspect disk emergency C2/R2-
parts for signs of response plan
T3- Flying damage before R3- medavic
particles use personnel.
C1c – verifies disc C3/R3-
rating and
compatibility with
grinding machine
prior to usage
C2- Use
experienced
personnel/proper
supervision.
C3- Use
appropriate PPE

H-09.001 T4- defective -Contact with -Personnel -Equipment P4C C4- Use certified R4- first aid C4/R4 –
Voltage > 50V equipment. electricity Injury resulting H) premobed treatment
T5 – Exposed -Fire in fatality equipment R5- conduct
wire -Explosion -Personnel C5 Insulate cable CPR C5/R5 –
cable/improper -Personnel -Asset at exposed points R6- Activate
cable injury before use emergency C6/R6 –
termination C6- Inspect and response plan
T6- Changes to test equipment R7(a-b)-
existing -Asset damage C7- Inspect Medivac C7/R7 –
electrical equipment personnel
facilities connections
T7- Poor C7b: Use
earthing of wire appropriate PPE
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

H-10.003 T8- Welding arc -Direct contact -Eye strain -Equipment P2C C8- Use welding R8- first aid C8/R8 –
Visible light- T9- Flickering with the eye -Sight -Personnel (M) shield/dark goggle Treatment
Wavelenght T10- Too disorders for non welder, R9- Fire
C9/R9 –
400-140mm low/high -Personnel welding apron Extinguishers in
(non ionizing) illumination injury C9-Competent place.
T11- Variations welders/Awarenes R10- Activate C10/R10-
& ranges in s training. emergency
illumination C10 – Provide response plan C11/R11–
T12- Reflection adequate R11 – First aider
illumination R12- Ensure
C11 Keep safe clean water is
C12/R12–
distance for non- available.
welders.
C12- Use dark
goggles and
shielding boards
H-10.013 T13-Explosure - Exposure > - hearing loss - Personnel P3D C13 Wear Ear R13 – First aid C13/C14-
Noise to excessive than - (L) muff/plugs. treatment
noise from Occupational Disturbance/N
running engines Exposure Limit uisance/disco
& machinery mfort

H-10.016 T14-Location of - Fire - Body injuries - Equipment P2B C14a Cordon off R15a-first aid C15a/R15a –
Hot hot metal (pipe). - Contact with to personnel - Personnel (L) hot metal source Treatment
Temperature the skin - Asset - Facility area/warning sign R15b- Standby C15b/R15b –
differentials damage C14b Wear fire fighters &
appropriate PPE. fire
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
Task: LOWERED & TIE IN
A B C D E F G H I J
S/N TASK STEP Hazard Threats Top event Consequenc What/who Inhere Control measure Recovery Action
/hazard e may be nt risk measure parties
sources harmed
7 ALIGN AND H07.00 T1- Defective -Disc Injury to - Equipment P4 C1-Inspect and R1- First aid C1/R1-
WELD Equipment Equipment breakage/Shatt personnel - Personnel C(M) ensure machine treatment C2/R2-
with moving T2 – Human ering guard is in R2- Activate
or rotating error - Fatality placeC1b-Inspect emergency C3/R3-
parts T3- Flying - Missiles disc prior to use response plan
particles contact with 2 use experienced R3- Medavic
body personnel/proper Personnel
-Entanglement supervision.
C3a. Wear face
shield, full length
coverall
C3b- clear area of
flammable
material and gas
C3c- Confirm
rating and
compatibility of
disc and grinding
machine
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

H-09.001 T4 Exposed -Contact with -Electric shock -Personnel P4 C4-Inspect and R4- First aid C4/R4-
Voltage>50v wire electricity -Personnel -Equipment C(M) test equipment Treatment/cond
cable/improper injury resulting -Asset C5- Insulate cable uct CPR C5/R5-
insulation in fatality at exposed point. R5- Activate
T5- Poor emergency
earthling/Incorre response plan
ct connections

H-05.004 T6- Absence of -Impact on -Fatality -Personnel P3C(M) C6- Obtain As- R6- First aid C6/R6-
Ground/slop As-built drawing existing facility. built treatment
e stability of existing -Slip/Fall of -Damage to A2C(L) drawing/location R7- Activate C7/R7-
facilities personnel, equipment/ -Equipment map from emergency
T7- Quick mud material & existing facility E 1C(L) Geomatics response C9/R9-
T8-Poor equipment into department procedure
supervision/ trench RC(L) C7- Rain R8- Adequate
Horseplay workforce on basic communication
swamp survival
strategies
(crawling in mud,
survival swimming
certification etc
C8- Use only
competent
personnel.

H-10.013 T9 Presence of -Exposure > -hearing loss -Personnel P3D C9a Wear Ear R9a- First aid C9a/R9a-
Noise running than -Disturbance/ (L) muff/plugs. treatment
machines Occupational Nuisance/ C9a – Equip R9b- Activate C9b/R9b-
Exposure Limit discomfort machines with emergency
mufflers/ silencers response
H-10.003 T10- Welding Arc eye (swollen -Eye strain - Equipment A2C(L) C10- Use welding R10 – First aid C10/R10-
Visible light- arc and rending of -Sight disorders - Personnel shield/dark goggle treatment
Wavelength T11- Too the) -Personnel for non welders, R11 – Activate C11/R11-
400-140mm low/high -Poor injury welding apron and emergency
(non illumination illumination use Competent response plan C12/R12-
ionizing) T12- Reflection welders/Awarenes R12- Use eye
s Raining wash system
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C11- Keep safe


distance for non-
welders and Use
dark goggles.

H-07.005 T13)- Defective -Body injury -Equipment P3C(M) C13- Inspect tools R13- First aid C13/R13-
Using tools -Damage to -Damage to -Personnel A2C(L) before usage treatment
hand/manual T14)- PPE tools & critical equipment/Exis E 1C(L) C14 Use R14- Activate C14/R14-
tools violation equipment ting facility appropriate PPEs. emergency
response plan

H-08.001 T15)- Winds, - Loss of man- - Fatality - Equipment P5B(L) C15 – Stop work R15 – Activate C15/R15-
Adverse temperature hour/Down time - Damage to - Personnel emergency
Weather extremes, rain, - loss of control equipment response
conditions storms, lighting
P4B(M) procedure

JHA Composition Team HSE Coordinator Project Engineer Site


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS Construction Supervisor Site Nurse
IN OML-17)
Task NDT
A B C D E F G H I J
S/N TASK STEP Hazard Threats Top event Consequenc What/who Inheren Control measure Recovery Action
/hazards e may be t risk measure parties
sources harmed
8 RADIOGRAPH H-10.010 T1- Exposure to Serious health Personnel P3A C1- use only R1- Emergency C1/R1 –
Y Gamma rays Incompetent gamma Impact (H) qualified NDT evacuation Plan
personnel radiation (Impotency _Third party personnel in place
and cell C2/R2-
T2)- damage C2a- Ensure X- R2- Source leak
Uncalibrated Ray bunker meets emergency
equipment. contingency plan C3/R3-
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

approved
T3)- defective standards
equipment
C2b- Ensure use
of functional and
calibrated
equipment

C3a- Use Certified


premobed
equipment
C3b- Use
appropriate PPE

C3c- Position
warning signs and
cordon off areas

DYE Chemical T1- Exposure to Serious health Personnel P3A C1- use only R1- Emergency C1/R1 –
PENETRANT fume Incompetent gamma Impact (H) qualified NDT evacuation Plan
INSPECTION personnel radiation (Impotency _Third party personnel in place
and cell C2/R2-
T2)- damage C2a- Ensure X- R2- Source leak
Uncalibrated Ray bunker meets emergency
equipment. approved contingency plan C3/R3-
standards
T3)- defective
equipment C2b- Ensure use
of functional and
calibrated
equipment

C3a- Use Certified


premobed
equipment
C3b- Use
appropriate PPE
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C3c- Position
warning signs and
cordon off areas
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17) Engineer Site Construction Supervisor Site Nurse
Task :JOINT COATING(SLEEVING)
A B C D E F G H I J
S/N TASK STEP Hazard/ha Threats Top event Consequen What/who Inhere Control measure Recovery Action
zards ce may be nt risk measure parties
sources harmed
9 Apply shrink H-07.005 T1-Human error -Ignition/fire -Skin Irritation Personnel P2C(L) C1- Use R1- First aid
sleeve on pipe Use hand/ -chemical - Injuries Materials & competent/experie treatment/ C2/R2-
and heat held l tools T2- Use of burns/injury facilities nced conduct CPR
Defective - Burns
- wounds personnel/proper C3a/R3a
equipment/Equip
Pressure ment failure - Fatality supervision R2 – Activate
gas cylinder - damage to C2- Inspection emergency
Temperatur equipment tools before response plan
e usage. R3a- Alert C3b/R3b-
C3-Use Clinic/Standby
appropriate PPEs medevac/evacu
(PED, Coverall, ate victim
Safety Shoe, Ear R3b- Activate
muff, hand glove, emergency
response plan
Hard hat). C80-
Availability of R3c-
Environmental
appropriate
SHOC cards,
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
Task: FLUSHING
S/N TASK STEP Hazard Threats Top event Consequen What/who Inheren Control measure Recovery Action
/hazards ce may be t risk measure parties
sources harmed
10 FILL H-04.002 T1-Human Spill -Injury to Personnel P4A C1- Use R1- First aid C4/R4 –
FLOWLINE Liquid under personnel/fat (M) experienced treatment/
WATER pressure
error -Loss of ality -Equipment personnel/proper conduct CPR C5/R5-
containment E 1 A(M) supervision
T2- Use of -Damage to -Facilities C2- Use only R2 – Activate
Defective -Coupling failure equipment premobed emergency
-Environment equipment response plan
equipment/Eq - C3a- Use R3a- Alert
uipment Environmenta appropriate PPEs Clinic/Standby
failure l impact including a medevac/evacu
certified PFD ate victim
R3b- Activate
T3-Hose burst C3b – Ensure emergency
PTW is in place & response plan
conduct tool box
meeting R3c-
Environmental
C3c- Ensure that barge/containme
gauges, hoses, nt barge
fitting, clips, are provided and
fitted activate spill
properly/tightened Remediation
& hoses are of
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

right pressure
ratings.

Use of hand T4)-Defective - Body injury - Damage to - Equipment P3C(M) C4 – Inspect tools R4- first aid C4/R4
tools tools - Damage to equipment/exi - Personnel A2C(L) before usage Treatment.
T5)-PPE tools & critical sting facility E 1C(L) C5- Use R5-Activate C5/R5-
violation equipment - injury to appropriate PPEs. emergency
personnel response plan

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
Task: HYDROTEST
A B C D E F G H I J
s/n TASK STEP Hazard Threats Top event Consequen What/who Inhere Control measure Recovery Action
/hazards ce may be nt risk measure parties
sources harmed
11 PRESSURISE H-04.002 T1-Human error Spill Injury to Personnel P4A C1- Use R1- First aid C1/R1-
WATER Liquid under personnel/Fata (M) experienced treatment/condu
FILLED pressure T2- Defective -Loss of lity -Equipment personnel/proper ct CPR C2/R2-
FLOWLINE. equipment/ containment E 1A supervision R2- Activate
Equipment -Damage to -Facility (M) C2- Use only emergency C3a/R13a-
failure equipment premobed response plan
-Environment equipment R3- Alert
T3- Hose burst C3a- Use Clinic/Standby
C3b/R3b-
appropriate PPEs medevac/evacu
including a ate victim
certified PFD C3c/R3c-
R3b-
C3b- Ensure PTW Environmental
is in place & barge/
conduct tool box containment
meeting barge provided
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C3c- Ensure that R3c- Spill


gauges, hoses, Remediation
fittings, clips, are
fitted
properly/tightened
& hoses are of
right pressure
ratings.
Depressure H-04.002 T1- Integrity of Equipment Injury to 2C (M) C1- Obtain R4- first aid C4/R4-
Line Liquid under facility failure personnel/ Personnel authorization Treatment
pressure, Fatality P4A before overriding R5- Activate C5/R5-
Bushy T2 - Drowning -Insects bite -Equipment (M) critical safety emergency
environment -Damage to devices/equipmen response plan
T3- Human -Reptile facility/ -Facility E1A (M) t. R6 – Adequate C6/R6-
error attacks Equipment C2- Use communication
-Environment appropriate PPEs
(PEP), coverall,
-Coupling -Environmental safety shoes,
failure impact hand grove, hard
hat).
C3- Use
experienced
personnel/proper
supervision

H-04.002 T1- Integrity of Equipment -Injury to -Personnel P2C (M) C1- Obtain R1-first aid C1/R1-
Liquid under facility failure personnel/ authorization Treatment/cond
pressure, Fatality -Equipment P4A before overriding uct CPR C2/R2-
Bushy T2 - Drowning -Insects bite (M) critical safety R2- Medevac
environment -Damage to -Facility devices/equipmen victim
T3- Human -Reptile facility/ E1A (M) t. R3- Activate C3/R3-
error attacks Equipment -Environment C2- Use emergency
appropriate PPEs response plan
(PEP), coverall,
-Coupling -Environmental safety shoes,
failure impact hand grove, hard
hat).
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C3- Use
experienced
personnel/proper
supervision

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
Task PLATFORM AND HOOK-UP ARM INSTALLATION
A B C D E F G H I J
S/N TASK STEP Hazard/haz Threat Top event Consequence What/who Inheren Control measure Recovery Parties
ards may be t risk measure Action
sources harmed
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

12 Platform H-05.03 T01)Using of - Fall of - Personnel Personnel P4C C1 – use only R1- First aid R1/C1:
Installation & Objects Faulty lifting object/material Injury/fatality (M) certified treatment
Hook Up Arm Overhead equipments - Drowning -Equipment equipments and R2- Use R2/C2:
At Flowline - P2C inspect before lifebuoys with
End T02)Unstable Sling/belts/chai -Damage to -Third party (L) use. lifelines C3/R3:
base/structural n breakage asset &medivac
support C2- Visually Personnel
Damage to checks on base R3- Activate
T03)Human environment. prior to emergency
error operation/proper response plan
-Third party supervision
injury/fatality C3 – Use
experienced
personnel/proper
supervision
H-05.001 T4- Use of Slips / Falls -Injury to -Equipment P4C (M) C4-inspect R4-Standby C4/R4-
Personnel defective personnel platform before Medevac
Working at platforms Drowning -Personnel climbing R5- First aid C5/R5-
Height>2m -Loss material C5 Use Treatment
T5-slippery appropriate PPEs R6-Activate C6/R6-
surfaces (PFD, coverall, emergency
safety shoe, hand response
T6- PPE glove, hand hat). procedure
violation

JHA Composition Team HSE Coordinator Project


Engineer Site Construction Supervisor Site Nurse
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-
17)
Task CATHODIC PROTECTION
A B C D E F G H I J
S/N TASK STEP Hazard Threat Top event Consequenc What /who Inheren Control measure Recovery Action
/hazard e may be t risk measure parties
sources harmed
13 Installation of H-07.005 H-07.005 - Slipping of Injury to - Personnel P3C(M) C1- Use R1 – First aid C1/R1-
Anode Using hand Using hand hand tools personnel - Equipment A2C(L) competent/experie Treatment
tools/manual tools/manual E 1C(L) nced R2- Activate C2/R2-
tools tools personnel/proper emergency
supervision response plan C3/R3
C2- Inspection R3- adequate
tools before usage. communication
C3-Use appropriate
PPEs (PED,
Coverall, Safety
Shoe, Ear muff,
hand glove, Hard
hat).
Recoding H.13.002 T4)-Bushy - Bites - Personnel - Personnel P3D (H) C4a- Ensure buddy R5a – Activate C5a/R5a
potential from Animals and environment/mar injury/fatality. system is enforced emergency
transformer Reptiles ine environment A3D (H) on site. response C5b/R5b-
rectifier C4b-use of procedure.
insecticide/reptile R5b – First aid
repellant treatment
H-08.001 T5)-Winds, - Loss of man- - Fatality - Equipment P5B(L) C5 –Stop work R5- Activate C5/R5-
Adverse temperature hour/Down time - Damage to - Personnel Emergency
Weather extremes, rain, - loss of control equipment P4B(M) response
conditions storms, lighting. procedure
H-05.004 T6-Absence of - Impact on - Fatality - Personnel P3C(M) C6-Obtained As- R6-First aid C6/R6-
Ground/slope As-built drawing existing facility. built Treatment
stability of existing Slip/Fall of -LTI - Equipment A2C(L) drawing/location R7 – Activate C7/R7-
facilities personnel, map from Geomatics emergency
material & -Damage to E 1C(L) department response
C7-Rain workforce C8/R8-
T7-Quick mud equipment into equipment/exis procedure.
trench, ditches. ting facility RC(L) on basic swamp R8- Activate
survival strategies
Emergency
(crawling in mud,
response radio
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

T8-Poor survival swimming channels and


supervision/Hors certification etc. GSM numbers
eplay C8- Use only
competent
personnel

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
TASK PAINTING
A B C D E F G H I J
TASK STEP Hazard/hazar Threat Top event Consequence What /who Inheren Control measure Recovery Action parties
d sources may be t risk measure
harmed
15 PAINTING H-07.005 -Injury to P3C(M) C5c- Ensure R1-First aid
AND TORCH -Slip/Fall of personnel Personnel A2C(L) treatment
T4).Asphyxiatio E 1C(L
adequate
-UP Paint fume n personnel, -Fatality
Rotating part material . ventilation and R2-Activate C4/R4-
T03)Human -injury /eye correct paint emergency
error irritation response
storage area
T1- procedure
C3-Use appropriate C5/R5-
Incompetent PPEs (PED, Coverall,
personnel Safety Shoe, Ear muff,
T3) – Slippery C6/R6-
hand glove, Hard hat).
ground
C3c- Position
T5- PPE
warning signs and
violation
cordon off areas
C4- ensure and
observe good
Weather
information
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

C80- Availability of
appropriate
SHOC cards,
C3-Use only
competent
personnel

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML- Engineer Site Construction Supervisor Site Nurse
17)
TASK SITE CLEAN UP
A B C D E F G H I J
S/N TASK STEP Hazards Threat Top event Consequence What /who Inherent Control measure Recovery Action
/hazard may be risk measure parties
sources harmed
SITE CLEAN- H-07.005 T1-Defective - Injury Fatality Equipment P3C(M) C1- Inspect tools R1-First aid C1/R1
16 UP Using tools -Damage to -Personnel A2C(L) before usage treatment
hand/manual equipment/ -Existing E 1C(L) C2/R2-
tools T2- PEE existing facility facility C2- Use R2-Activate
violation appropriate PPEs emergency
response
procedure
H.05.004 T3- Absence of -Impact on -Fatality -Personnel P3C(M) C3-Obtain As-built R3-First aid C3/R3- C4/R4-
Grounding/sl As-built drawing existing facility drawing/location Treatment C5/R5
ope stability of existing -Slip/Fall of -LTI A2C(L) map from R4- activate
facilities personnel, -Equipment Geomatics emergency
material & -Damage to E 1C(L) department response
T4- Quick mud equipment/ procedure
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

equipment into existing facility RC(L) C4-Rain workforce R5-Medivac


T5-Poor trench, ditches. on basic swamp
supervision/ -Rapping in Mud survival strategies
Horseplay (crawling in mud,
survival swimming
certification etc
C5-Use only
competent
personnel

JHA Composition Team HSE Coordinator Project


Activity / Job PROVISION OF FACILITY (MECHANICAL MODIFICATION AND UPGRADE WORKS IN OML-17) Engineer Site Construction Supervisor Site Nurse
Task: DEMOBILIZATION TO SITE
A B C D E F G H I J
TASK STEP Hazard/Haz Threats Top Event Consequence What’s /Who Inherent Control Measure Recovery Action
ard Sources May Be Risk Measure Parties
Hammered
17 DEMOBILIZATION H-05.03 T1)- faulty lifting - Slip/Fall of - Personnel - Equipment P4C C1 – Use only R1- First aid R1/C1-
Objects equipments material injury/fatality (M) certified crane Treatment
overheads T2)- Unstable - Drowning - Personnel slings and R2- Use – PFD C2/R2:
base - Fire -Damage to shackles. Also and adjust to fit
T3)- Human asset A2C (L) ensure C3/R3
error appropriate colour
PROJECT:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION AND UPGRADE WORKS) IN OML-17
DOCUMENT:
19/02/24
INVITATION TO TENDER - HHOG-PHC-ENG-2022-060
TITLE:

CLIENT TENDER FORM K - HSSE CONTRACTOR

T4)- - Personnel R3C(M) coding and inspect R3 Use of life C4/R4:


Work/walking injury before use. buoys with the
under - Loss of Asset C2- Visual checks life lines.
suspended load. of base prior to R4- control
operation access to lifting
C3- Use areas with
experienced barrier tape.
personnel/proper
supervision
C4- Conduct tool
box meeting and
cascade inherent
hazards.
H-05.03 T5) – Use of - Slip/Fall of - Personnel -Equipment P3C(M) C5-Use personnel R5- Activate C5/R5- Peter
Water borne defective marine material Injury/fatality - Personnel and certified emergency
operation/ vessel - Drowning -Other water A2C(L) equipment and response C6/R6-
touchdown T6)- Marine - Man - Damage to ways users inspect before procedure
activities on vessel overboard asset (canoes, R3C(M) use. R6- Wear
swamp overloading - Personnel speed boats, C6-Follow safe PFD/use life
areas injury etc) loading plan of buoy with life
- loss of Asset marine vessels lines.