HHOG-PHC-ENG-2022-060-SHROMB GEOTECHNICAL LTD - Technical Tender - Form L
HHOG-PHC-ENG-2022-060-SHROMB GEOTECHNICAL LTD - Technical Tender - Form L
TABLE OF CONTENTS
1 INTRODUCTION .......................................................................................................... 4
PROJECT BACKGROUND ...............................................................................................4
OBJECTIVES ....................................................................................................................4
LANGUAGE.....................................................................................................................5
DEFINITION ......................................................................................................................5
REFERENCE .....................................................................................................................7
LIST OF TABLES
Table 3-1: Project Quality Plan Distribution and Involvement chart ......................................... 9
1 INTRODUCTION
PROJECT BACKGROUND
OBJECTIVES
The following are the minimum quality objectives which are to be achieved within
the CONTRACTOR contractual scope of work.
• Ensure that Procedures and work instruction are issued for the performance
of all running activities.
• Ensure by well-organized inspection Processes that work has been carried out
and inspected to the required level of quality.
• Demonstrate by means of documented quality records that the work has
been carried out and inspected to the required level of quality, as specified
in applicable QC procedure.
• Ensure that HSE plans are defined and implemented.
• Ensure that personnel are well trained and informed on personnel safety and
environmental protection rules as regards to daily activity.
These Objectives are to be achieved in conjunction with CONTRACTOR main
Objectives as defined in Project Quality Plan.
LANGUAGE
All documents and drawings submitted by vendor shall be in English.
DEFINITION
Within the body of this document, the following definitions and abbreviations shall
apply
TERM DEFINITION
REFERENCE
ASTM A193 Standard Specification for Carbon and Alloy Steel Bolting
Material for High Pressure and high Temperature Service
IEC 60298 AC Metal Enclosed switchgear and control gear for rated
Voltages above 1K and up to 32kV
2 RESPONSIBILTY OVERVIEW
PROJECT MANAGER
Shall be fully be in charge for the administration of the project and shall ensure that
clients aim and objective of project scope are met. He shall on regular basis, liaise
with CONTRACTOR on project matters and seek clarifications as applicable. He shall
be assisted by the QEM/QC Engineer, shall ensure that adequate awareness is given
to all involved personnel on the contents of this quality plan. Making sure that its
importance is well understood, and strict adherence by all personnel is pledged
QEMQC MANAGER
The QEM/QC manager is responsible for the preparation and administration of the
Project Quality Plan, project Quality Control Plan(s) and QEM/QC Procedures in
accordance with the Contract requirements, applicable codes, standards and
B+G&S quality criteria. The QEM/QC manager shall be responsible for verifying by
means of planned Project Internal Audit, that the established Project Quality
Program is being implemented and is being used to control/monitor the set
Objectives.
This Project Quality Plan is issued for this specific project as a controlled document
and is subject to CONTRACTOR’S approval prior to its final distribution and
implementation within the project organization.
Changes to the approved Project Quality Plan shall require further approval from
Project Manager and CONTRACTOR.
As a thumb rule, every controlled document holder shall take all necessary
measures in order to familiarize the personnel reporting to him, with the contents of
this Project Quality Plan.
The controlled copies of the Project Quality Plan are to be distributed to the involved
Project function/organizations as indicated in the table below (Project Quality Plan
Distribution/ and Involvement chart).
Hold
Prepared Controlled Implement
Organization/Function Checked Approved Info
Copy
CONTRACTOR ✓ ✓ ✓
SUB - CONTRACTORS ✓
DOCUMENT CONTROLLER ✓ ✓
PROJECT ENGINEER ✓
SUPERINTENDENTS ✓
QEM/QC ENGINEER ✓ ✓
PROJECT MANAGER ✓ ✓
COMPANY QUALITY ✓ ✓
MANAGER
Table 3-1: Project Quality Plan Distribution and Involvement chart
Note: The above chart defines the minimum requirements for distribution of the Project Quality Plan, in addition
specifying involvement.
4 PROJECT ORGANISATION
The project safety organization chart is to be established by the health, safety and
Environmental department in conjunction with the Project Management Team.
The following chart will reveal the main project management activities, its related
responsibilities and applicable reference or project specific procedures and
documents.
The chart is fashion using the following quality management principles as referenced
in the ISO 9001:2015.
• Quality Management System
• Management Responsibilities
• Resources Management
• Product Realization
File Name: SGL-QEM-05-PLN-0001-PROJECT QUALITY PLAN
This documented is uncontrolled if printed
PROJECT: Page:
PROVISION OF FACILITIES (MECHANICAL MODIFICATION 11 of 38
AND UPGRADE WORKS) IN OML-17
DOCUMENT TITLE:
PROJECT QUALITY PLAN (PQP) Date:
DOCUMENT NO.: 20/02/24
CLIENT SGL-QEM-05-PRO-0001 CONTRACTOR
The charts will also show how details of the applicable elements of ISO 9001:2015
are addressed to control each task of the contractual scope of work.
The charts will also show how details of the applicable elements of ISO 9001:2015
are addressed to control each task of the contractual scope of work.
✓ Establish a control
system ✓ Review
for the following Documents
project documents: DC
Prepare
✓ Contract documents Document Control Procedure
(ii) Document PE PM
✓ Subcontract ✓ Control
Documentatio Control
documents PQE Doc. No. SGL-PR-05-PRO-0010
n Procedure Document
✓ Project
Requirements correspondences Documents Distribution Matrix
✓ Project technical
Create and ✓ Carry out
documents Doc. No. SGL-QEM-05-LST-XXXX
maintain file audits
✓ Project procurement
indexing
documents
✓ Certification records
✓ Inspection and test
records
HSE Plan
Doc. No. SGL-HS-05-PLN-0088
MANAGEMENT RESPONSIBILITY
MANAGEMENT RESPONSIBILITY
Establish the
quality Policy Project Quality Plan
Project Quality
(b) Quality Policy Outline
Plan Verify at Intervals PQE PM Doc. No. SGL-QEM-05-PLN-0035
project
organization
Project Execution Plan
Doc. No. SGL-PR-05-PLN-0001
Establish Project
Project Execution Review PM BUM
Execution Plan Project Coordination Procedure
Plan Doc. No. SGL-PM-02-PRO-0003
(c) Planning Project Execution Schedule
Doc. No. SGL-PR-05-SCH-0006
Outline project Organization
Review PM BUM
organization chart
Project Coordination Procedure
Doc. No. SGL-PR-05-PRO-0002
Review, Verify
Organize internal
Minutes of and Validate of
meeting for project PM PM Minutes of Meeting
Meeting Minutes of
kick off
meeting
MANAGEMENT RESPONSIBILITY
(d) Respon-
sibility, Approval of the
Project Execution Project Execution Schedule
Authority Project Work Review PCC PM
Schedule Doc. No. SGL-PR-05-PLN-0006
Schedule
MANAGEMENT RESPONSIBILITY
Review contract
Responsibility, documents on:
Authority Project Coordination Procedure
(contd.)
✓ Work scope
Doc. No. SGL-PM-02-PRO-0003
✓ Contract specifications Contract Review / Audits
✓ Relevant standards and Review CM PM Project Execution Plan
codes Comments Doc. No. SGL-PM-02-PLN-0002
✓ COMPANY policy and
objectives.
✓ Regulatory requirements
MANAGEMENT RESPONSIBILITY
Management
• Quality System review HSE Plan
Management Review HSE PM
Review Doc. No. SGL-HS-05-PLN-0088
• HSE Management review
(contd.)
System review
Minute of PM Project QMS Management Review
Review PM
• Project review meeting meeting PE Meeting,
RESOURCE MANAGEMENT
Output Step to ensure Responsibility Reference
Document compliance
Requirement Input Activity
Prepare Prepare
(a) Selection of
Human Personnel Résumé
qualified key Training schedule PQE PM Personnel Records
Resources / certificates
Personnel
HSE Plan
Training Of Site Doc. No. SGL-HS-05-PLN-0088
Personnel Training
Personnel On Safety Training schedule PM
schedule HSE Safety Training Procedure
Implications Doc. No. SGL-HS-05-PRO-0094
(b)
Welders Personnel Qualification & NDE
Provision of Qualification Certification Procedure
resources Training and qualification Inspection/ QCS QCS
Records Doc. No. SGL-QEM-05-PRO-0017
of:
N.D.T. Personnel Review/validation
• Welders Organization and Training of Quality
Certificates
• Fitters and Grinders Department Personnel
Personnel
• NDT inspectors Doc. No. SGL-QEM-05-PRO-0116
Résumé/certific
PQE PM
• Quality personnel ate Welder’s Qualification Procedure
Doc. No. SGL-QEM-05-PRO-0039
Work space:
B+G&S Operations
(c) Establish Inspection and
• Project Base Office layout PM (Base)/(site)
Infrastructure Validation PQE
office
• Project site office
RESOURCE MANAGEMENT
Output Step to ensure Responsibility Reference
Document compliance
Requirement Input Activity
Prepare Prepare
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Document compliance
Requirement Input Activity
Prepare Prepare
Project Project Coordination Procedure
(i) Control Doc. No. SGL-PR-02-PRO-0002
Planning of Procedures;
product Project Execution Plan
Project execution plan Verification PM PM
Doc. No. SGL-PR-05-PLN-0001
realization
Fabrication
Fabrication Procedures
Procedures
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
Signature Matrix
Establish list signatories List Signatories Verification PE PM
Doc. No. SGL-PR-05-MAT-0121
PRODUCT REALIZATION
Qualification:
Pre-
Pre-qualify qualificati Review / External Pro. PM
subcontractor/and on report Audits Dept/ Vendor pre-qualification and qualification
suppliers on: External PQE procedure
✓ Quality requirements audits
(iv) ✓ Technical report Doc. No. SGL-PO-05-PRO-0122
Purchasing requirements
Logistic
Vendor pre-qualification and qualification
procedure
Prepare vendors List Vendors List Review &Verify Pro. M PM
Doc. No. SGL-PO-05-PRO-0122
Selection of PE Vendor pre-qualification and qualification
Approved procedure
subcontractor/
vendor list Review Pro.M PM Doc. No. SGL-PO-05-PRO-0122
supplier
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
Purchase Order:
✓Preparation of Purchase
Order Requisition and P.O Management
✓Verification of Purchase Doc. No. SGL-PO-05-PRO-0123
Purchases Order
Order Review/ Approval PE PM
(P.O)
✓Approval of Purchase
Pro.M
Order
Issue of Purchase Order to
Subcontractor/supplier
(iv)
Purchasing Inspection & Test Plan - Structural
Supplier Performance
(Contd) Control: Doc. No. No. SGL-QEM-05-PLN-0050
Daily reports Inspection & Test Plan – Piping
Measure and control work Corrective
Doc. No. No. SGL-QEM-05-PLN-0051
program Action
request PQE
✓ Monitor and control Project Quality Audits Procedure
Preventive
Work progress Pro.M PM Doc. No. SGL-QEM-05-PRO-0036
action
✓ Verify the completion PE
request
of the order Progress Measurement & Reporting
Events
✓ Monitor application of Inspection / DS Doc. No. SGL-PR-05-PRO-0003
reports
penalties quality Audits
Evaluate Vendor Non-Conformity Resolution Procedure
performance Doc. No. SGL-QEM-05-PRO-0037
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
WPS(s) Welding Procedure Specification
Qualification Doc. No. SGL-QEM-05-PRO-0038
Issue process control
Records
and operations Welding Procedure Qualification Record
procedures for Visual Doc. No. SGL-QEM-05-PRO-0040
special processes PE PQE
inspection
and perform relevant
(v) Inspection/audit DS PM
qualifications: procedure Welders Qualification Procedure
Production Doc. No. SGL-QEM-05-PRO-0038
NDT
and Service
Procedures
Provision ✓ Welding Welders - Welds Identification Procedure
Painting
(contd.) ✓ Non Destructive TBA
Procedures
Testing
✓ Painting and Non-Destructive Testing Plan - Piping
coating TBA
Painting Procedure
Doc. No. SGL-PI-05-PRO-0027
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
Welders Painting Procedure
Personnel
Doc. No. SGL-PI-05-PRO-0027
Qualifications: Qualification
For Special processes: Records Non-Destructive Testing Plan for Piping
TBA
✓ Welders Welders I.D.
PE PQE
✓ ND T Operators
Tags Welders Qualification Procedure
✓ NDT Inspectors Review, DS PM
Doc. No. SGL-QEM-02-PRO-0039
NDT verification of
Painting and coating
(v) Personnel certificates
Inspectors Welders - Weld Identification Procedure
Production Certificates
TBA
and Service
Provision Calibration Procedure,
(contd.) Doc. No. SGL-QEM-02-PRO-0032
Material Log
Project Materials
Material Material Receiving & Inspection
Management Reports Review MS PM Procedure
Material Doc. No. SGL-QEM-05-PRO-0041
Record
Instrument
Verification of adequate Review QS PQE
log Equipment Calibration Procedure,
use of monitoring and
Calibration Doc. No. SGL-QEM-05-PRO-0049
measurement devices
log/Records
Project Document /work Document Review/ audits DC PQE Document Control Procedure,
Procedures availability register
Doc. No. SGL-PR-05-PRO-0010
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
PRODUCT REALIZATION
Output Step to ensure Responsibility Reference
Requirement Input Activity Document compliance
Prepare Prepare
Inspection (Project Materials
Review and MS
Materials): Inspection
Material Receiving & Inspection Procedure
✓ Materials log on Records Inspection QCS MS
Doc. No. SGL-QEM-05-PRO-0041
receipt Material
QC
✓ Collate log Inspection
(v)
Verify COMPANY certificates
Production
Supplied materials Non Conformity Resolution Procedure
and Service Record of Non QC MS Doc. No. SGL-QEM-05-PRO-0037
Provision conformance
(contd.)
Mechanical completion A-Check sheets CE Mechanical Completion Procedure,
activities
CM Doc. No. SGL-CO-05-PRO-0124
PE As-built Documentation Procedure, Doc.
No. SGL-PR-05-PRO-0018
Equipment Calibration
Calibration Log Equipment Calibration Procedure,
(vi) ✓ Selection of equipment QC
Calibration
Control of to be calibrated Doc. No. SGL-QEM-05-PRO-0049
certificates QCS PQE
Monitoring ✓ Perform Laboratory Review
Calibration Document Control Procedure
calibrations QCS
and
✓ Perform Site Calibrations Reports Doc. No. SGL-PR-05-PRO-0010
Measuring
devices ✓ Verify Calibration Calibration
Records/Certificates and book
logs certificates
RECORDS:
Project specific activities and its quality control plans are covered by the following
list of records. All are to be included in the As-Built Dossier Index, and the relevant
records included in the As-Built Dossier.
The Subcontractors or/and Suppliers are present their Inspection and Test Plan to
cover the assigned Work scope in accordance with the applicable contractual
terms and specifications. This will be review by the Project Quality Engineer,
ensuring that all inspection and tests required by CONTRACTOR and B+G&S NL are
explicitly defined and included.
Applicable project
Subcontractors
Procedures
Applicable project
Vendors
Procedures
Applicable project
Welding and NDE
Procedures
Applicable project
Fabrication
Procedures
Applicable project
Painting and Coating
Procedures
Applicable project
As-Built Documentation
Procedures