RFI Number: RFI-MEP-045


REQUEST FOR INSPECTION & TEST Submission Date 22-Mar-2023

Discipline: Civil / Architectural ✔ Mechanical / Plumbing / HVAC Electrical Hold


Attach Sketch to show the location(s): Drawing Ref No.: Method Statement ITP No.:
No.:
FLOOR NO.– FIRST FLOOR

Location / Date & Time Approval Status


Sr. No. Activity / Item To be Inspected and or Tested for Inspection
Building: A B C
Date
INSPECTION REQUEST FOR DRAINAGE 1ST FLOOR 23-Mar-2023
HIGH LEVEL WORKS AT 1ST FLOOR
INSIDE FLAT NO ( 1,2,4,5,6,7,8,9,10 AND
c c c
12 ) . AS PER THE ATTACHEDDRAWING. Time

03:00 PM

Independent Test Laboratory Test Results / Remarks: Passed c Failed c N.A. c

Report ref. No.: -

CLIENT / CONSULTANT Inspection: Approval Or Comments (If Any):

Legend: Approval Legend, A - Approved, B - Approved with Comments, C - Not Approved

Attendance Legend as per approved ITP: H – Hold Point, W – Witness Point, R – Record Review

SUB-CONTRACTOR CONTRACTOR CONSULTANT EMPLOYER

Signature:

Name: Eng.Ahmed Salama Eng.Majd Mohamed

Date:

Returned to CONTRACTOR: Signature: Date:

Form No. CVT/RFI/R0/120614


GENERAL NOTES...

PLOT NO. 6457890

PLOT PLOT LEGENDS...


LIMIT LIMIT
EX IST
G IN
RO

0
A

0
26 .
D

AD
RO

DEAD
SPACE

R
NTE
PLA

91
578
. 64
STAIR
CASE-02

T NO
PLO
PLOT
LIMIT

PLOT PLOT
LIMIT LIMIT

1 07-02-22 CONSULTANT COMMENTS INCORPORATED ADNAN

0 25-10-21 ISSUED FOR APPROVAL ADNAN

No Date Description By

R E V IS I O N S
CLIENT :

ROSE HOMES INVESTMENT LLC


& OSAMA NASSAR
PROJECT:
PROPOSED
RESIDENTIAL BUILDING
G+3P+10
LOCATION PLOT No

WADI AL SAFA 3 6457888


Consultant :

CVTEC-PLUS-Logo-01.png
CVTEC-PLUS-Logo-01.png

MAIN-CONTRACTOR:

SHEET TITLE:
FIRST FLOOR PLAN HIGH LEVEL
DRAINAGE SYSTEM LAYOUT
..
Farhan
CHECKED BY: APPROVED BY:

SCALE: JOB NO:


1:75 @A0 D-13/2020
DRAWN BY:
Adnan..
DRAWING NO: REVISION:

DATE
DEC.- 2021 DR - 105 01

logo copy.bmp
Engr.
Nahda
Drgs\Al
June-2020\Shop
BUILDING
G+6P+15
AC PLANS
Bldg-1
Tawoon
Shj Al
June-2020\P-353
Hvac
Bldgs.
Cont\SHJ
Kauther
D DRIVE\PD\Al
DATA
DATA\TECHNICAL
KHAN
C:\FARHAN

You might also like