LAPORAN INSTALASI PENGOLAHAN AIR

Bulan : APRIL 2023


Flow Prased Backwash Filter no. Drain Sed. I Drain Sed. II
No Hari/Tanggal
L/S Start Stop 1 2 3 4 5 6 7 8 9 10 11 12 Start Stop Start Stop
1 Sabtu 1-Apr-23
2 Minggu 2-Apr-23
3 Senin 3-Apr-23
4 Selasa 4-Apr-23 137.7 9:00 9:45 ü ü ü ü ü ü ü
5 Rabu 5-Apr-23 145.9 9:00 9:20 ü ü
6 Kamis 6-Apr-23 158.3 17:00 17:30 ü ü 14:40 14:50
7 Jumat 7-Apr-23
8 Sabtu 8-Apr-23 158.6 19:00 19:30 ü ü ü
9 Minggu 9-Apr-23 151.5 16:00 16:30 ü ü
10 Senin 10-Apr-23 155.8 9:00 9:30 ü ü
156.7 16:00 16:20 ü ü
11 Selasa 11-Apr-23
12 Rabu 12-Apr-23 151.7 17:00 17:45 ü ü ü

13 Kamis 13-Apr-23
14 Jumat 14-Apr-23 111.8 9:30 10:00 ü ü
151.3 17:00 18:00 ü ü ü ü ü ü ü
15 Sabtu 15-Apr-23
16 Minggu 16-Apr-23
17 Senin 17-Apr-23
18 Rabu 18-Apr-23
19 Kamis 19-Apr-23 157.7 10:00 11:30 ü ü ü ü ü ü
158.8 16:00 16:35 ü ü ü
20 Jumat 20-Apr-23
21 Sabtu 21-Apr-23
22 Minggu 22-Apr-23
23 Senin 23-Apr-23
24 Rabu 24-Apr-23 166.4 9:00 9:20 ü ü
25 Kamis 25-Apr-23 153.7 10:00 10:30 ü ü
153.8 16:30 17:00 ü ü ü
26 Jumat 26-Apr-23 145.9 16:00 16:15 ü ü ü ü
Flow Prased Backwash Filter no. Drain Sed. I Drain Sed. II
No Hari/Tanggal
L/S Start Stop 1 2 3 4 5 6 7 8 9 10 11 12 Start Stop Start Stop
27 Sabtu 27-Apr-23
28 Minggu 28-Apr-23

29 Senin 29-Apr-23
30 Rabu 30-Apr-23 131.9 18:00 18:45 ü ü ü

Mengetahui,

........................................
LAPORAN INSTALASI PENGOLAHAN AIR

Keterangan

11:00 Produksi Off (Bendungan Kempes)


20:00 Produksi On kembali
Keterangan

09:00 PRODUKSI OFF PIPA JDU BOCOR (TUKAD WOOSE)


22.00 PRODUKSI ON KEMBALI

Gianyar, 30 APRIL 2023,


Dibuat oleh:

I MADE ARYA DWIPA ADNYANA, S.M