ITEM DESCRIPTION OF WORKS

A. SUB STRUCTURE
1 GENERAL STOR
2 BISCUIT PROCESING AREA
3 FLOUR` PROCESING AREA, STOR FOR WEIGNT AND FLOUR
4 OFFICE, COFFE HOUSE , REST ROOM AND GUARD HOUSE
5 TOILET AND SHOWER
6 GENERETER HOUSE
7 GARD HOUSE
8 SEPTIC TANK & WATER WELL
9 FANCE WORK
TOTAL
AMOUNT

3733117.64
79369.20
2218232.93
857680.70
258552.32
130195.27
87935.72
86803.23
655101.01
8106988.02
1.GENERAL STOR
ITEM DESCRIPTION OF WORKS AMOUNT
A. SUB STRUCTURE
1 EXCAVATION AND EARTH WORK 423629.74
2 CONCRETE WORK 635643.21
3 MASONRY WORK 147594.74
SUB TOTAL "A" 1206867.69
B. SUPER STRUCTURE
1 CONCRETE WORK 514164.23
2 BLOCK AND MASONRY WORK 218773.52
3 ROOFING WORK 281121.60
4 METAL WORK 1036658.87
5 FINISHING WORK 146982.11
6 PAINTING WORK 122881.04
7 GLAZING WORK 19421.18
8 SANITARY INSTALATION WORK
9 ELECTRICAL INSTALLATION 186247.40
SUB TOTAL "B" 2526249.95
GRAND TOTAL "A" & "B" 3733117.64

2.BISCUIT PROCESING AREA


ITEM DESCRIPTION OF WORKS AMOUNT
A. SUB STRUCTURE
1 EXCAVATION AND EARTH WORK 50028.40
2 CONCRETE WORK 29340.80
SUB TOTAL "A" 79369.20

3.FLOUR PROCESING AREA, STOR FOR WEIGNT AND FLOUR


ITEM DESCRIPTION OF WORKS AMOUNT
A. SUB STRUCTURE
1 EXCAVATION AND EARTH WORK 262111.65
2 CONCRETE WORK 431408.03
3 MASONRY WORK 114951.91
SUB TOTAL "A" 808471.60
B. SUPER STRUCTURE
1 CONCRETE WORK 303420.69
2 BLOCK AND MASONRY WORK 143925.05
3 ROOFING WORK 152264.73
4 METAL WORK 543121.24
5 FINISHING WORK 83574.48
6 PAINTING WORK 70028.47
7 GLAZING WORK 14584.35
8 SANITARY INSTALATION WORK
9 ELECTRICAL INSTALLATION 98842.32
SUB TOTAL "B" 1409761.33
GRAND TOTAL "A" & "B" 2218232.93
No L*W*D Qty

1 42.70
19.00 62.70

1 41.85
17.58
0.50 367.76

3 17.58

0.50

1.20 31.63
2 41.85
0.50

1.20 50.22
26 1.4
1.4
1.20 61.15
143.01

26 1.40
0.50
1.20 21.84
121.17

26 1.40
1.40

1.00 50.96

26 1.40
1.40

0.30 15.29

CONTRACTOR:-
LOCATION:-Shire Endaslasie Kebele 04
No L*W*D Qty

1 39.70
16.00
1.10 698.72
1,011.61
44.29
967.32

12.54
367.76

187.41
567.71
1 40.20
16.50 663.30
7 0.25
16.50 28.88
634.43

No L*W*D Qty

17 0.25
0.25
3.6 3.82
9 0.25
0.25
3.7 2.08
5.91

1 81.40
1 0.25

0.30 6.11
9 16.50
0.25

0.30 11.14
17.24
634.43

17 5.60
0.40 38.08
9 5.60
0.50 25.20
63.28

17 1.00
3.6 61.20

9 1.00
3.7 33.30

33.30

1 81.40
0.30 24.42

1 77.40
0.30 23.22
8 16.50
2 0.30 79.20
126.84

297.00
77.40
374.40

No L*W*D Qty

26 1.00
2 3.50
182.00

1 81.40
2 0.30 48.84

1 77.40
2 0.30 46.44
8 16.50
4 0.30 158.40
253.68

1 81.40
4.00 325.60
1 34.00
4.00 136.00

1 81.40
3.00 244.20

1 34.00
3.00 102.00
1 7.90
7.00 55.30

17.00
880.10

24 0.25

7.00 42

3 4.50

4.00 54

1.00 53.15
0.8 43
138.52
741.58

1 17.55
41.70 731.84

BISCUIT PROCESING AREA

1 32

5
0.5 80
1 32
5
0.25 40

1 32
5 160
1 32
5 160
GENERAL STOR
Description No L*W*D

A.SUB - STRUCTURE
1.excavation & earth work
1.1 site clear
m2 26 1.90

1.1 Bulk excavation in ordinary soil 1.90

2.50

M3 Net Total

1.2 Excavate in ordinary soil for


trench foundation up to 120 17 1.4
axis A-I 1.4

trunch 0.4

4 1.4
axis 1&5 1.4
0.5

pad
F1 & F2 26 0.25
0.25
M3 Net Total 3.20

Deduction For footing pad


f1 and f2 26 1.40
0.50
1.20
M3 Net Total

1.2 Excavate in ordinary soil for


trench foundation from 120-220
f1 and f2
2 39.70

M3 Net Total 0.50

1.2 Excavate in ordinary soil for


trench foundation from 220-300 1.20
F2C2 3 17.00
0.50

M3 Net Total 1.20

ndaslasie Kebele 04
Description No L*W*D
Fill Under hard core

D=ANGL0.6+BULK0.5=1.1
26 1.40
TOTAL 1.40
TOTAL DDT
TOTAL FILL 7 16.75
1.6 Cart away & spread surplus excavated 0.25
For site clear
For bulk Excavation 1 115.40

For Trench Excavation 0.50


M3 Total cart awey
25cm thick sound basaltic Hard Core

m2 17 1.40
ddt beam 1.40
0.40
m2 total hard core 9 1.40
1.40
0.50

Description No L*W*D
b) foundation column
F1
3.6 2 40.70
D=0.6+0.5+1.2+1+0.3 0.50
F2 1.65
D=0.6+0.5+1.2+1+0.4 3 16.00
0.50
M3 TOTAL FC 1.65

c) grade beam
AXIS 1 & 5
26 0.25

0.25
AXIS A-I 1.65

M2 TOTAL GB 2 40.70
d) 100mm thick mass concrete for ground floor 0.50
M2 Net Total 0.60
3 16.00
2.3 'Form Work 0.50
a) footing 0.60
F1

F2 26 0.25
0.25
M2 PAD FORM WORK 0.60

FOOTING COLOMUN
F1
D=0.6+0.5+1.2+1+0.3 26 0.25
2 0.25
F2 3.50
D=0.6+0.5+1.2+1+0.4

M3 TOTAL FC 1 81.40
GB FORM WORK 2 0.25
0.30
c) grade beam 9 16.50
external side 2 0.25
AXIS 1 & 5 0.30

external side

AXIS A-I
M2 TOTAL GB
d) 10mm thick chip wood for
Expansion joint

ml total

Description No L*W*D
form work
ELRVATIO COLOMUN 2 165.3

3 4.75
m3 4
intermdet beam beam
external side 1.00 53.15
AXIS 1 & 5 0.8

enternal side 35 25.05


2
18 40.7
AXIS A-I

M2 TOTAL GB 2 741.58
masnory work 1 7
HCB 20 16
AXIS 1 & 5
AXIS A-I 1 7
16

above beam

AT PARTION 1.00 52.6


0.8
FROM PARAPET WALL

A=1/2B*H== A= (8.5*2)*2
M2
ddt colomun

m2
DOOR

M2

WIDOW
P=4.75*9+5.2*2=53.15
M2
M2
M2 HCB 20
ROOFING WORK
EGA-500 T=0.3MM
M2

BISCUIT PROCESING AREA

bilk

fill

har core 20cm

mass concretr
Qty Description
1.5 Fill around footings and under
hardcore
Fill Around Footing
LFC1

234.65 Sub Total


Deduction
For footing pade

F1

13.33

F2

3.92

ddt
For Column
D=ANGL0.6+BULK0.5+ PIT EXN 2.5-0.4PAD=3.2
5.20 Sub Total

Deduction For masnory


LFC1

21.84
44.29 Total Deduction

Fill AROUND MASON

47.64

30.60
78.24 M3 Net Total

Qty Description
2.CONCRETE WORKS
2.1 50mm thick lean concrete in C-5
a) under footing pad
F1 & F2
50.96 M2 Total
b) under grade beam
axis B&C
29.31 M2 Total
UNDER MASNRY WALL
P=40.7*2+17*2

57.70
87.01 M2 Total
2.2 Reinforced concrete in class C-25
a) footing
F1

13.33
F2

8.82
22.15 M3 Net Total

Qty Description
3. MASONRY WORKS
A) below NGL from the reduced level
Axis 1& 5

67.16
Axis A!

39.60

106.76 total
ddt footing colomun
F1 & F2

2.68
104.07 M2

A) below NGL from the reduced level


Axis 1& 5
24.42
Axis A!

14.40
38.82 total
ddt footing colomun
F1 & F2

0.98
37.85 M2
SUPER STRUCTUE
elevation & intrmidate colomun

11.38 m3

intermdet & top tiebeam


AXIS 1 & 5

12.21
AXIS A-I

22.28
34.49 M2 TOTAL
Qty Description
G-30 DOUWN PIPE
330.60 ML
METAL WORK
SLIDING DOOR
57.00 M2
WIDOW
P=4.75*9+5.2*2=53.15
42.52 M2
PURLIN
1,753.50 ML RHS 60*60*3
9,414.54 KG
732.60 ML RHS 40*40*3
2,553.11 KG
FINISHING WORK
1,483.16 3 COAT OF PLASTERIN
ddt both side
112.00
1,371.16 total plastering
pointing
112.00 m2
painting work
same with plastering /2
685.58 m2 plastic
685.58 syntetic

634.43 cement screed


clear glass
P=4.7*9+5.1*2=52.6
42.08 M2
sanitery work

ELECTRICAL WORK
84.00 LIGHT POINT
14.00 SOCKET OUT LET
14.00 SOCKET FITING

14.00 2 WEY SWICH TYP


84.00 LIHNT FITING AND LAMP

1.00 MDB

1.00 SDB
34.48
FLUOR PROCSSING AREA
No L*W*D Qty Description No L*W*D Qty Description

A.SUB - STRUCTURE
1.excavation & earth work 1.6 Cart away & spread surplus excavated

1 44.00 1.1 site clear 11.30 For site clear

11.50 56.50 m2 217.37 For bulk Excavation

1.1 Bulk excavation in ordinary soil 139.05 For Trench Excavation

1 43.15 367.72 M3 Total cart awey

10.08 25cm thick sound basaltic Hard Core

0.50 217.37 M3 Net Total 1 41.50

1.2 Excavate in ordinary soil for


trench foundation up to 120 9 373.50 m2 total hard core

2 10.08 axis 1&10 2.CONCRETE WORKS

0.50 trunch 2.1 50mm thick lean concrete in C-5


1.20 12.09 a) under footing pad

2 42.15 axis A & C 22 1.40 F1

0.50 1.40 43.12 M2 Total

1.20 50.58 pad b) under grade beam

22 1.4 F1 8 9 axis B&C

1.4 0.25 18.00 M2 Total

1.20 51.74 M3 Net Total UNDER MASNRY WALL

114.41 1 101.00 P=40.7*2+17*2

Deduction For footing pad 0.50 50.50 M2 Total

22 1.40 f1 and f2

0.50 2.2 Reinforced concrete in class C-25

1.20 18.48 a) footing

95.93 M3 Net Total 22 1.40 F1

1.2 Excavate in ordinary soil for


trench foundation from 120-220 1.40

22 1.40 f1 and f2 0.35 15.09 M3 Net Total

1.40 b) foundation column

1.00 43.12 M3 Net Total 22 0.25 F1

1.5 Fill around footings and under


hardcore 0.25
Fill Around Footing 2.95 4.06 M3 TOTAL FC
22 1.90 PAD c) grade beam

1.90 1 84.00 AXIS A&C

2.20 174.72 Sub Total 0.25

Fill AROUND MASON 0.30 6.30

1 104.00 EXTERNAL SIDE 10 9.00 AXIS 1-10

0.25 0.25

1.15 29.90 0.30 6.75

1 99.00 INTERNAL SIDE 13.05 M2 TOTAL GB

0.25 2.3 'Form Work

1.15 28.46 a) footing

58.36 M3 Net Total 22 5.60 PAD FORM WORK

Fill Under hard core 0.35 43.12 M2

1 41.00 FOOTING COLOMUN

8.50 D=ANGL0.6+BULK0.5=1.1 22 1.00 F1

1.10 383.35 2.95 64.90 M2

616.44 TOTAL FILL c) grade beam

Deduction external side

pad 1 84.00 AXIS A & C

22 1.4 F1 0.30 25.20

1.4 external side

0.35 15.09 2 39.50 AXIS A & C

22 0.25 For Column 0.30 23.70

0.25 D=ANGL0.6+BULK0.5+ PIT EXN 2.2-0.35PAD=2.95 10 9.00 AXIS A-I


2.95 4.06 Sub Total 2 0.30 54.00

Deduction For masnory 102.90 M2 TOTAL GB


d) 10mm thick chip wood for
22 1.40 Expansion joint

0.50 162.00

1.20 18.48 79.00

37.63 M3 Total Deduction 241.00 ml total

578.81 TOTAL FILL d) 100mm thick mass concrete for ground floor

373.50 M2 Net Total


No L*W*D Qty Description No L*W*D Qty Description
3. MASONRY WORKS form work
A) below NGL from the reduced level ELRVATIO COLOMUN

2 42.00 Axis A&C 22 1.00

0.50 3.70

1.65 69.30 81.40 m3

2 8.50 Axis 1-10 intermdet beam beam

0.50 external side

1.65 14.02 1 84.00 AXIS 1 & 5

83.32 total 0.30 25.20

ddt footing colomun 1 80.00 enternal side

22 0.25 F1 & F2 0.30 24.00

0.25 10 9.00 AXIS 1-10

1.65 2.27 2 0.30 54.00

81.06 M2 103.20 M2 TOTAL GB

A) ANGL from the reduced level 22 1.00 intermdet colomun

2 42.00 Axis A&C 1.75

0.50 38.50 m3

0.60 25.20 top tie beam

2 8.50 Axis A! external side

0.50 1 84.00 AXIS A&C

0.60 5.10 0.25 21.00

30.30 total 1 80.00 enternal side

ddt footing colomun 0.25 20.00

22 0.25 F1 & F2 10 9.00 AXIS 1-10


0.25 2 0.25 45.00

0.60 0.83 86.00 M2 TOTAL GB

29.47 M2 masnory work


SUPER STRUCTUE 1 84.00 HCB 20

ELRVATION COLOMUN 3.70 310.80 AXIS A & C

22 0.25 1 18.00 AXIS 1& 10

0.25 3.75 67.50

3.70 5.09 m3 above beam

intermdet beam beam 1 84.00

1 84.00 AXIS A &C 1.75 147.00

1 0.25 1 18.00

0.30 6.30 1.75 31.50

10 9.00 AXIS 1-10 FROM PARAPET WALL

0.25 1 42.00

0.30 6.75 0.60 25.20

13.05 M2 TOTAL 582.00 M2

intermdet beam colomun ddt colomun

22 0.25 22 0.25

0.25 5.45 29.975 m2

1.75 2.41 m3 DOOR

top tie beam 2 4.40

TOP TIE beam 3.70 33 M2

1 84.00 AXIS 1 & 5 WIDOW

1 0.25 1.00 39.5 P=4.75*9+5.2*2=53.15

0.25 5.25 0.8 32 M2

10 9.00 AXIS A-I 94.14 M2

0.25 487.87 M2 HCB 20

0.25 5.63 ROOFING WORK


10.88 M2 TOTAL 1 42.00 EGA-500 T=0.3MM

9.50 399.00 M2
No L*W*D Qty Description No L*W*D Qty Description
G-30 DOUWN PIPE

1 165.3 165.30 ML
METAL WORK
2 4.40 DOOR

3.7 32.56 M2

WIDOW

1.00 39.5

0.8 31.60 M2

PURLIN

9 42 378.00 ML RHS 40*40*3

1,317.48 kg

35 25.05 876.75 ML RHS 60*60*3

1 4,703.59 kg
FINISHING WORK
2 487.87 975.73 3 COAT OF PLASTERIN

1 42.00 DDT

5.45 228.90 M2

746.83 total plastering

1 42 pointing
5.45 228.9

94.135 DDT DOR AND WONDOW

134.77 m2
painting work
746.83 m2 same with plastering

373.42 sentetic

373.42 plastic

373.50 cement screed

clear glass

1.00 39.5 P=4.7*9+5.1*2=52.6

0.8 31.60 M2

sanitery work
ELECTRICAL WORK
36.00 LIGHT POINT

10.00 SOCKET OUT LET 8.5

10.00 SOCKET FITING

10.00 2 WEY SWICH TYP

10.00 LIHNT FITING AND LAMP

1.00 MDB

1.00 SDB
No L*W*D Qty

1 18.25
6.60 25.85

1 16.83
5.175
0.50 43.53

2 16.83

0.50
1.20 20.19
2 3.60
0.50

1.20 4.32
10 1.4
1.4
1.20 23.52
48.03

10 1.40
0.50
1.20 8.40
39.63
10 1.40
1.40

0.80 15.68

10 1.90

1.90
2.00 72.20

1 42.70
0.25

1.15 12.28
1 37.70
0.25
1.15 10.84
23.12

1 15.25
3.60
1.10 60.39
155.71

10 1.4
1.4
0.4 7.84
10 0.25
0.25
2.75 1.72

10 1.40

0.50
1.15 8.05
17.61
138.10

No L*W*D Qty

2 16.25

0.50
1.65 26.81

2 3.60
0.50
1.65 5.94
32.75

10 0.25
0.25
1.65 1.03
31.72

2 16.25
0.50
0.60 9.75
2 3.60
0.50
0.60 2.16
11.91

10 0.25
0.25
0.60 0.38
11.54

A.SUB - STRUCTURE

20 0.25
0.25
2.90 3.63

1 32.50
2 0.25
0.30 4.88
5 4.10

2 0.25
0.30 3.07
7.95
2 16.75
4.6
0.15 23.12
1.92
2 0.36 0.72
1.8
4.44

20 1.00
2.90
58.00

1 32.50
2 0.30 19.50
1 15.00
2 0.30 9.00
10 4.10
2 0.30 24.60
53.10
2 15.50
4.10 127.10
2.00 4.20
2.00 16.80
OFFICE & WORKERS CAFFE...
Description No
A.SUB - STRUCTURE
1.excavation & earth work
1.1 site clear
m2
1.1 Bulk excavation in ordinary soil

M3 Net Total 1

1.2 Excavate in ordinary soil for


trench foundation up to 120
axis 1&10

trunch

axis A & C 10

pad
F1 3

M3 Net Total
1
Deduction For footing pad
f1 and f2

M3 Net Total 10
1.2 Excavate in ordinary soil for trench foundation from 120-220

f1 and f2

M3 Net Total 10

1.5 Fill around footings and under


hardcore
Fill Around Footing
PAD

1
Sub Total
Fill AROUND MASON
EXTERNAL SIDE 5

INTERNAL SIDE

M3 Net Total 10
Fill Under hard core

D=ANGL0.6+BULK0.5=1.1 10

TOTAL FILL
Deduction
pad 1
F1

2
For Column
D=ANGL0.6+BULK0.5+ PIT EXN 2-0.35PAD=2.75 5
Sub Total 2
Deduction For masnory

M3 Total Deduction
TOTAL FILL

Description No
3. MASONRY WORKS
A) below NGL from the reduced level 1
Axis A&b 2

5
2

Axis 1&5

20
total
ddt footing colomun
F1 & F2 1

M2 total BNGL 1
A) ANGL from the reduced level

Axis A&C
Axis A!
2

total
ddt footing colomun
F1 & F2 1

1
M2

STRUCTURE
ELRVATION COLOMUN 1

m3 2
intermdet beam & toptie beam
AXIS A &B
2

AXIS 1-5

M2 TOTAL
RC SLAB

stair
riser and tred
landing 1

m3
form work
ELRVATIO COLOMUN

m3
intermdet beam & toptie beam
AXIS A &B

external side
enternal side

AXIS 1-5

M2 TOTAL GB
suspended slab
M2
stair
m2
L*W*D Qty Description

1.6 Cart away & spread surplus excavated


5.17 For site clear
43.53 For bulk Excavation
55.31 For Trench Excavation
104.01 M3 Total cart awey
25cm thick sound basaltic Hard Core
15.75

4.1 64.57 m2 total hard core


2.CONCRETE WORKS

2.1 50mm thick lean concrete in C-5


a) under footing pad
1.40 F1
1.40 19.60 M2 Total

b) under grade beam


4.1 axis 2,3,4
0.25 3.07 M2 Total
UNDER MASNRY WALL
39.70 P=40.7*2+17*2
0.50 19.85 M2 Total

2.2 Reinforced concrete in class C-25


a) footing
1.40 F1
1.40
0.40 7.84 M3 Net Total
b) foundation column

0.25 F1

0.25
2.75 1.72 M3 TOTAL FC
c) grade beam

32.50 AXIS A&B


0.25
0.30 2.44
4.10 AXIS 1-5
0.25

0.30 1.54
3.97 M2 TOTAL GB
2.3 'Form Work
a) footing
5.60 PAD FORM WORK
0.35 19.60 M2
FOOTING COLOMUN
1.00 F1
2.75 27.50 M2
c) grade beam
external side
32.50 AXIS A & B
0.30 9.75
enternal side
15.00 AXIS A & B
0.30 9.00
4.10 AXIS 1-5
0.30 12.30
31.05 M2 TOTAL GB
d) 10mm thick chip wood for
Expansion joint

32.80
30.00
62.80 ml total
d) 100mm thick mass concrete for ground floor
64.57 M2 Net Total
L*W*D Qty Description
masnory work
36.60 HCB 20
2.90 212.28 AXIS A & b

4.10 AXIS 1& 10


2.90 118.90

331.18
ddt colomun
0.25
2.90 14.5 m2
DOOR
10.66 p=.8+1.01+.8+.8+.8+1.2+.85*2+0.95*3+0.7=10.66
2.90 31 M2
WIDOW
10.63 P=0.7+1.5*2+1+1.02+0.91+1.4*2+1.2=10.63
1.8 19 M2

64.55 M2
266.63 M2 total
HCB 15
at the partion
5.70
2.90 33.06 M2 total

G-30 DOUWN PIPE


35 35.00 ML
METAL WORK
10.66 DOOR
2.9 30.91 M2

WIDOW
10.63
1.8 19.13 M2
hand reil
6 12.00 m2

FINISHING WORK
41.70 3 COAT OF PLASTERIN
7.50 625.50
DDT door & colomun

64.548 M2
560.95 total plastering
painting work
560.952 m2 same with plastering
280.48 plastic
280.48 sentetic
64.57 cement screed
clear glass
10.63 P=4.7*9+5.1*2=52.6
1.6 17.01 M2
sanitery work
GSP
20.00 ML 1/2
30.00 ML 3/4
GET VALVES
6.00 ML 1/2
8.00 ML 3/4
5.00 CROW GET CETVALVE
4.00 HAND WASH
4.00 TURCKSH
4.00 SHOWER TREYY
4.00 SHOWER head
4.00 PAPER HOLDER
4.00 SOAP HOLDER
4.00 TOWEL HANGER
40.00 pvc 110
20.00 pvc 50
9.00 MIROR
ELECTRICAL WORK
19.00 LIGHT POINT
23.00 SOCKET OUT LET
23.00 SOCKET FITING
27.00 2 WEY SWICH TYP
27.00 LIHNT FITING AND LAMP
1.00 MDB
1.00 SDB
GENERAL STORE
Dia Length No of bars Sub total
Location Shape (mm) (m) No.ba Elem. T.No ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm
Footing pad F-1& F2 12 1.83 10.00 52.00 520.00 951.60
Footing column
C-1 16 5.14 6.00 26.00 156.00 801.84
C-1(stirup) 8 0.90 24.00 26.00 624.00 561.60
MESH from short 8 5.20 84.00 8.00 672.00 3,494.40
8 16.50 27.00 8.00 216.00 3,564.00
Grade beam GB
top & bottom
axis 1& 5 16 42.95 5.00 2.00 10.00 429.50
over lap 14 20.70 2.00 2.00 4.00 82.80
axis A & I 16 18.70 5.00 9.00 45.00 841.50
over lap 14 11.50 2.00 9.00 18.00 207.00
stirup
axis 1& 5 8 0.90 33.00 16.00 528.00 475.20
axis A & I 8 0.90 111.00 9.00 999.00 899.10
Total length (m) - 8,994.30 - 951.60 289.80 2,072.84 -
Unit weight (k.g) 0.222 0.395 0.617 0.889 1.210 1.580 2.469
Total wt (k.g) - 3,553.30 - 845.87 350.62 3,275.60 -
SUB - STRUCTURE ( TOTAL ) ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm
elevation colomn 16 4.80 6.00 26.00 156.00 748.80
C-1(stirup) 8 0.90 25.00 26.00 650.00 585.00
toper colomn 16 2.50 6.00 26.00 156.00 390.00
8 0.90 12.00 26.00 312.00 280.80
entermidet & top beam GB
axis 1& 5 16 42.95 5.00 4.00 20.00 859.00
over lap 16 20.70 2.00 2.00 4.00 82.80
axis A & I 16 18.70 5.00 18.00 90.00 1,683.00
over lap 16 11.50 2.00 18.00 36.00 414.00
stirup
axis 1& 5 8 0.90 33.00 16.00 528.00 475.20
axis A & I 8 0.90 111.00 9.00 999.00 899.10
Total length (m) - 2,240.10 - - - 4,177.60 -
Prepared By._____________ Unit weight (k.g) 0.222 0.395 0.617 0.889 1.210 1.580 2.469
Signiture_________________ Total wt (k.g) - 884.98 - - - 6,601.64 -

FLOUR PROCSSING AREA


Dia Length No of bars Sub total
Location Shape (mm) (m) No.ba Elem. T.No ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm
Footing pad 12 1.83 10.00 44.00 440.00 805.20
Footing column
C-1 16 4.29 6.00 22.00 132.00 566.28
C-1(stirup) 8 0.90 20.00 22.00 440.00 396.00
MESH from short 8 4.45 46.00 9.00 414.00 1,842.30
8 9.00 24.00 9.00 216.00 1,944.00
Grade beam GB
top & bottom
axis A & C 16 43.65 5.00 2.00 10.00 436.50
over lap 14 23.00 2.00 2.00 4.00 92.00
axis 1-10 16 9.59 5.00 10.00 50.00 479.50
over lap 14 6.90 2.00 10.00 20.00 138.00
stirup
axis A&C 8 0.90 31.00 18.00 558.00 502.20
axis 1-10 8 0.90 61.00 10.00 610.00 549.00
Total length (m) - 5,233.50 - 805.20 230.00 1,482.28 -
Unit weight (k.g) 0.222 0.395 0.617 0.889 1.210 1.580 2.469
Total wt (k.g) - 2,067.56 - 715.73 278.27 2,342.37 -
SUB - STRUCTURE ( TOTAL )
elevation colomn 16 4.80 6.00 22.00 132.00 633.60
C-1(stirup) 8 0.90 25.00 22.00 550.00 495.00
toper colomn 16 2.50 6.00 22.00 132.00 330.00
8 0.90 12.00 22.00 264.00 237.60
entermidet & top beam
axis 1& 5 16 43.65 5.00 2.00 10.00 436.50
over lap 16 23.00 2.00 2.00 4.00 92.00
axis A & I 16 9.59 5.00 10.00 50.00 479.50
over lap 16 6.90 2.00 10.00 20.00 138.00
stirup
axis 1& 5 8 0.90 31.00 18.00 558.00 502.20
axis A & I 8 0.90 61.00 10.00 610.00 549.00
Total length (m) - 1,783.80 - - - 2,109.60 -
Prepared By._____________ Unit weight (k.g) 0.222 0.395 0.617 0.889 1.210 1.580 2.469
Signiture_________________ Total wt (k.g) - 704.71 - - - 3,333.69 -
OFFICE & WORKERS CAFFE...
Dia Length No of bars Sub total
Location Shape (mm) (m) No.ba Elem. T.No ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm
Footing pad 12 1.80 10.00 20.00 200.00 360.00
Footing column
C-1 16 4.13 6.00 10.00 60.00 247.80 5.59
C-1(stirup) 6 0.90 16.00 10.00 160.00 144.00 5.09
MESH from long dir 8 15.00 20.00 1.00 20.00 300.00
short 8 4.10 79.00 1.00 79.00 323.90
Grade beam GB
top & bottom
axis A & b 16 17.70 5.00 2.00 10.00 177.00
over lap 14 11.50 2.00 2.00 4.00 46.00
stirup 6 1.10 102.00 2.00 204.00 224.40
axis 1-5 16 5.34 5.00 5.00 25.00 133.50
over lap 14 3.26 2.00 5.00 10.00 32.60
stirup 6 1.10 29.00 5.00 145.00 159.50
Total length (m) 527.90 623.90 - 360.00 78.60 558.30 -
Unit weight (k.g) 0.222 0.395 0.617 0.889 1.210 1.580 2.469
Total wt (k.g) 117.31 246.48 - 320.00 95.10 882.25 -
SUB - STRUCTURE ( TOTAL )
elevation column ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm
ground & G+1
C-1 16 3.90 6.00 20.00 120.00 468.00
C-1(stirup) 6 0.90 18.00 20.00 360.00 324.00
colomun for water tanck 16 3.37 6.00 4.00 24.00 80.88
6 0.90 18.00 4.00 72.00 64.80
intermidet & top tie beam
axis A & b 16 17.70 5.00 4.00 20.00 354.00
over lap 14 11.50 2.00 4.00 8.00 92.00
stirup 6 1.10 102.00 4.00 408.00 448.80
axis 1-5 16 5.34 5.00 10.00 50.00 267.00
over lap 14 3.26 2.00 10.00 20.00 65.20
stirup 6 1.10 29.00 10.00 290.00 319.00
slab 8 8.17 70.00 1.00 70.00 571.90
over lap 10 2.55 70.00 1.00 70.00 178.50
8 17.71 28.00 1.00 28.00 495.88
over lap 10 10.20 28.00 1.00 28.00 285.60

Total length (m) 1,156.60 1,067.78 464.10 - 157.20 1,169.88 -


Prepared By._____________ Unit weight (k.g) 0.222 0.395 0.617 0.889 1.210 1.580 2.469
Signiture_________________ Total wt (k.g) 257.02 421.84 286.48 - 190.19 1,848.70 -
GENERAL STOR
Item Description Unit Qty Unit Price Amount

A. Sub structure
1.Excavation and Earth Work
1.1 Clear the site to remove top soil to an average depth of 20 cm. m2 62.70 14.75 924.83
Bulk excavation to a depth of 150cm from reduced ground level
m3 367.76 98.33 36,161.53
1.2 Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level. m3 121.17 118.00 14,297.71
1.3 Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level.
m3 50.96 147.50 7,516.60
Excavation trenches for foundation ,pit excavation to a depth fromn 220-300 cm starting from the reduced ground
level.
m3 15.29 0.00
1.4 Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/
m3 967.32 191.43 185,174.45
1.6

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site. m3 567.71 170.61 96,857.32
1.7
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm m2
634.43 130.35 82,697.30
Total Carried to Summary 423,629.74
2. Concrete Works
2.1
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m3 under footing
a) Under footing m2 50.96 46.88 2,389.00
c) Under Masonry & grade beam m2 87.01 46.88 4,079.15
2.2 Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately) 0.00
a. in foundation footings m3 22.15 2,333.84 51,689.89
b. in foundation column m3 5.91 2,333.84 13,784.24
c. in grade beam m3 17.24 2,333.84 40,241.24
d. 10 cm thick mass concrete floor slab. m2 634.43 183.38 116,340.86
2.3 Provide, cut and fix in position sawn zigba form work: 0.00
a. Foundation footing. m2 63.28 141.45 8,950.96
b. For foundation column m2 33.30 141.45 4,710.28
C. For grade beam m2 126.84 141.45 17,941.52
d) 10mm thick chip wood for Expansion joint ml 374.40 13.74 5,144.26
2.4
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing. 0.00
a. Diam.8mm deformed bar Kg 3,553.30 46.15 163,984.97
b. Diam.12mm deformed bar Kg 845.87 46.15 39,036.75
c. Diam.14mm deformed bar Kg 350.62 46.15 16,181.22
c. Diam.16mm deformed bar Kg 3,275.60 46.15 151,168.89
c. Diam.120mm deformed bar Kg 46.15 0.00
Total carried to summary 635,643.21
Item Description Unit Qty Amount
3. MASONRY WORK
3.1 50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4. m3 104.07 1,017.32 105,876.31
3.2 Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2) m3 37.85 1,102.35 41,718.44
Total carried to summary 147,594.74
B. SUPER STRUCTURE
concrete work
2.2 Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)

a. in elevation colomun m3 11.38 2,333.84 26,547.43


b. in beam m3 34.49 2,333.84 80,482.47
2.3 Provide, cut and fix in position sawn zigba form work: 0.00
a. in elevation colomun m2 182.00 141.45 25,743.90
b. in beam m2 253.68 141.45 35,883.04
2.4
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing. 0.00
a. Diam.8mm deformed bar Kg 884.98 46.15 40,841.72
b. Diam.12mm deformed bar
Kg - 46.15 0.00
c. Diam.14mm deformed bar Kg - 46.15
c. Diam.16mm deformed bar Kg 6,601.64 46.15 304,665.66
c. Diam.120mm deformed bar Kg 46.15 0.00
Total carried to summary 514,164.23
2. BLOCK WORK
2.1
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering. m2 741.58 295.01 218,773.52
Total carried to summary 218,773.52
3-ROOFING WORK
Supply and fix 0.4mm thick EGA 500 roof cover fixed to purlin with galvanized hook (J bolt) and asphalt washer.
Roof cover measured in horizontal projection and purlin measured separately.
m2 731.835 353.78 258,908.59
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints
towards to ground & shall inculds elbow & 3 coats oil paint. ml 330.60 67.19 22,213.01
Total carried to summary 281,121.60
4-METAL WORK
supply and fix in position sliding door fram CHS Tube dia 50 *2.0 mm thick and 1.25 mm thick flat metal sheet
cover , price including top and bottom U chanal 'rail bearing and Partion bracing, 38 mm 'T' shap metal & other
accessories (approved quality by the engineer)
M2 57.00 3690.41 210,353.37 2.75
supply and fix metal window shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ tubular
steel profile,left for glazing .including price c/c 15 cm vertical rows 20*20*1 mm SHS tube grill , hinges,
handle ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved by the
engineer)
M2 42.52 719.63 30,598.67
supply & fix SHS /Squar Hollow section tube (dia 60*60*3 mm)thicknes for
lower,upper,diagonal,vertical,horizontal truss ,purlins & other work KG 9,414.54 67.19 632,563.04
supply & fix SHS /Squar Hollow section tube (dia 40*40*1.5 mm)thicknes for
lower,upper,diagonal,vertical,horizontal truss ,purlins & other work KG 2,553.11 63.9 163,143.79
Total carried to summary 1,036,658.87
5- Finishing work
6.2 Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
m2
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case. 1,371.16 103.30 141,640.83
Apply Pointing to indicated external or internal stone masonry wall surface in cement mortar (1:3) m2 112.00 47.69 5,341.28
Total carried to summary 146,982.11
12 -PAINTING WORK
Apply 3 coats of approved type plastic paint to all indicated internal & external surface m2 685.58 33.6 23,035.49
Apply 3 coats of approved type syntheticpaint to all indicated internal & external surface m2 685.58 43.03 29,500.51
6.5 apply and lay 3cm cement screed with cement sand mortar m2 634.43 110.88 70,345.04
Total carried to summary 122,881.04
14- GLAZING WORK
4mm thick clear glass Cutting & fixing glazed to metal bends with putty m2 42.08 461.53 19,421.18
Total carried to summary 19,421.18
11. Electrical Installation
11.10 DISTRIBUTION BOARDS
Supply,install & connect Main distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=32mm conduit with 3x10A, 3/ph main breaker and also
16.21 consting of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories. NO 1.00 6,041.52 6,041.52
Supply,install & connect sub distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=36mm conduit with 3x10A, 3/ph main breaker and also consting
of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.25% reserve NO 1.00 12,199.90 12,199.90
Supply and install Flush mounted light points to be fed with 2 x 2.5 mm2 insulated conductor inside rigid PVC
conduit of 13.5mm diameter including junction boxes with covers , insulating screw caps & necessary switchs .
11.2 No 84.00 370.94 31,158.96
a)PHILIPS TCs 098/2.36 +2x'TL'D36w P(w)=2x36w No 84.00 1370.21 115,097.64
Flush mounted socket outlet points to be fed with 3 x 2.5 mm2, 3x4mm2 inslulated conductor inside rigid PVC
conduit of 16 mm diam. including junction boxes with covers single phase sockets with earthing contact
11.4 No 14.00 837.53 11,725.42
11.11 Power Feeder Cable (Measurement is tentative. ) 0.00
4x8mm2 ml 260.00 23.18 6,026.80
4x10mm2 ml 100.00 23.18 2,318.00
SOCKET FITINGS(approved quality by the engineer) 0.00
Supply and fix Flush or Surface mounting socket twin outlet 16-25 A/1ph no 14.00 54.32 760.48
Supply and fix flush or Surface mounted gange switch no 14.00 65.62 918.68
Total carried to summary 186,247.40
BISCUIT PROCESING AREA
Item Description Unit Qty Unit Price Amount
A. Sub structure
1.Excavation and Earth Work
Bulk excavation to a depth of 150cm from reduced ground level m3 80.00 98.33 7,866.40
1.4 Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/ m3 40.00 191.43 7,657.20
1.6

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site. m3 80.00 170.61 13,648.80
1.7
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm m2 160.00 130.35 20,856.00
Total Carried to Summary 50,028.40
2. Concrete Works
d. 10 cm thick mass concrete floor slab. m2 160.00 183.38 29,340.80
Total Carried to Summary 29,340.80
FLOUR PROCESING AREA, STOR FOR WEIGNT AND FLOUR

Item Description Unit Qty Unit Price Amount


A. Sub structure
1.Excavation and Earth Work
1.1 Clear the site to remove top soil to an average depth of 20 cm. m2 56.50 14.75 833.38
Bulk excavation to a depth of 150cm from reduced ground level m3 217.37 98.33 21,373.81
1.2 Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level. m3 95.93 118.00 11,320.21
1.3 Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level. m3 43.12 147.50 6,360.20
Excavation trenches for foundation ,pit excavation to a depth fromn 220-300 cm starting from the reduced ground
level. m3 - 0.00
1.4 Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/ m3
578.81 191.43 110,801.26
1.6

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site. m3
367.72 170.61 62,737.07
1.7
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm m2 373.50 130.35 48,685.73
Total Carried to Summary 262,111.65
2. Concrete Works
2.1
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m3 under footing
a) Under footing m2 43.12 46.88 2,021.47
c) Under Masonry & grade beam m2 68.50 46.88 3,211.28
2.2 Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately) 0.00
a. in foundation footings m3 15.09 2,333.84 35,222.31
b. in foundation column m3 4.06 2,333.84 9,466.64
c. in grade beam m3 13.05 2,333.84 30,456.61
d. 10 cm thick mass concrete floor slab. m2 373.50 183.38 68,492.43
2.3 Provide, cut and fix in position sawn zigba form work: 0.00
a. Foundation footing. m2 43.12 141.45 6,099.32
b. For foundation column m2 64.90 141.45 9,180.11
C. For grade beam m2 102.90 141.45 14,555.20
d) 10mm thick chip wood for Expansion joint m2 241.00 13.74 3,311.34
2.4
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing. 0.00
a. Diam.8mm deformed bar Kg 2,067.56 46.15 95,417.69
b. Diam.12mm deformed bar Kg 715.73 46.15 33,031.09
c. Diam.14mm deformed bar Kg 278.27 46.15 12,842.23
c. Diam.16mm deformed bar Kg 2,342.37 46.15 108,100.30
c. Diam.20mm deformed bar Kg - 46.15 0.00
Total carried to summary 431,408.03
Item Description Unit Qty Amount
3. MASONRY WORK
3.1 50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4. m3 81.06 1,017.32 82,460.14
3.2 Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2) m3 29.47 1,102.35 32,491.77
Total carried to summary 114,951.91
B. SUPER STRUCTURE
2.2 Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
a. in elevation colomun m3 5.09 2,333.84 11,873.41
b. in beam m3 26.33 2,333.84 61,452.92
2.3 Provide, cut and fix in position sawn zigba form work: 0.00
a. in elevation colomun m2 81.40 141.45 11,514.03
b. in beam m2 227.70 141.45 32,208.16
2.4
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing. 0.00
a. Diam.8mm deformed bar Kg 704.71 46.15 32,522.42
b. Diam.12mm deformed bar Kg - 46.15 0.00
c. Diam.14mm deformed bar Kg 46.15 0.00
c. Diam.16mm deformed bar Kg 3,333.69 46.15 153,849.74
c. Diam.120mm deformed bar Kg 46.15 0.00
Total carried to summary 303,420.69

2. BLOCK WORK
2.1
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering. m2 487.87 295.01 143,925.05
Total carried to summary 143,925.05
7-ROOFING WORK
Supply and fix 0.4mm thick EGA 500 roof cover fixed to purlin with galvanized hook (J bolt) and asphalt washer.
Roof cover measured in horizontal projection and purlin measured separately. m2 399.00 353.78 141,158.22
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints
towards to ground & shall inculds elbow & 3 coats oil paint. ml 165.30 67.19 11,106.51
Total carried to summary 152,264.73
METAL WORK
supply and fix in position sliding door fram CHS Tube dia 50 *1.5 mm thick and 11/4 mm thick flat metal sheet
cover , price including top and bottom U chanal 'rail bearing and Partion bracing, 38 mm 'T' shap metal & other
accessories (approved quality by the engineer) M2 32.56 3690.41 120,159.75
supply and fix metal window shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ tubular
steel profile,left for glazing .including price c/c 15 cm vertical rows 20*20*1 mm SHS tube grill , hinges,
handle ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved by the
engineer) M2 31.60 719.63 22,740.31
supply & fix SHS /Squar Hollow section tube (dia 60*60*3 mm)thicknes for
lower,upper,diagonal,vertical,horizontal truss ,purlins & other work KG 4,703.59 67.19 316,034.21
supply & fix SHS /Squar Hollow section tube (dia 40*40*3 mm)thicknes for
lower,upper,diagonal,vertical,horizontal truss ,purlins & other work KG 1,317.48 63.9 84,186.97
Total carried to summary 543,121.24
6 . Finishing work
6.2 Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
m2
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case. 746.83 103.30 77,147.54
Apply Pointing to indicated external or internal stone masonry wall surface in cement mortar (1:3) m2 134.77 47.69 6,426.94
Total carried to summary 83,574.48
12 -PAINTING WORK
Apply 3 coats of approved type plastic paint to all indicated internal & external surface m2 373.42 33.6 12,546.74
Apply 3 coats of approved type syntheticpaint to all indicated internal & external surface m2 373.42 43.03 16,068.05
6.5 apply and lay 3cm cement screed with cement sand mortar m2 373.50 110.88 41,413.68
Total carried to summary 70,028.47
14- GLAZING WORK
4mm thick clear glass Cutting & fixing glazed to metal bends with putty m2 31.60 461.53 14,584.35
Total carried to summary 14,584.35
11. Electrical Installation
11.10 DISTRIBUTION BOARDS
11.10 DISTRIBUTION BOARDS
Supply,install & connect Main distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=32mm conduit with 3x10A, 3/ph main breaker and also
16.21 consting of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories. NO 1.00 6,041.52 6,041.52
Supply,install & connect sub distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=36mm conduit with 3x10A, 3/ph main breaker and also consting
of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.25% reserve NO 1.00 12,199.90 12,199.90
Supply and install Flush mounted light points to be fed with 2 x 2.5 mm2 insulated conductor inside rigid PVC
conduit of 13.5mm diameter including junction boxes with covers , insulating screw caps & necessary switchs .
11.2 No 36.00 370.94 13,353.84
a)PHILIPS TCs 098/2.36 +2x'TL'D36w P(w)=2x36w No 36.00 1370.21 49,327.56
Flush mounted socket outlet points to be fed with 3 x 2.5 mm2,3x4mm2 inslulated conductor inside rigid PVC
conduit of 16 mm diam. including junction boxes with covers single phase sockets with earthing contact
11.4 No 10.00 837.53 8,375.30
11.11 Power Feeder Cable (Measurement is tentative. )
4x8mm2 ml 260.00 23.18 6,026.80
4x10mm2 ml 100.00 23.18 2,318.00
SOCKET FITINGS(approved quality by the engineer)
Supply and fix Flush or Surface mounting socket twin outlet 16-25 A/1ph no 10.00 54.32 543.20
Supply and fix flush or Surface mounted gange switch no 10.00 65.62 656.20
Total carried to summary 98,842.32
OFFICE, COFFE HOUSE , REST ROOM AND GUARD HOUSE
Item Description Unit Qty Unit Price Amount
A. Sub structure
1.Excavation and Earth Work
1.1 Clear the site to remove top soil to an average depth of 20 cm. m2 25.85 14.75 381.29
Bulk excavation to a depth of 150cm from reduced ground level m3 43.53 98.33 4,280.77
1.2 Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level. m3 39.63 118.00 4,676.34
1.3 Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level. m3 15.68 147.50 2,312.80
Excavation trenches for foundation ,pit excavation to a depth fromn 220-300 cm starting from the reduced ground
level. m3 - 0.00
1.4 Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/ m3 138.10 191.43 26,435.77
1.6

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site. m3
104.01 170.61 17,745.95
1.7
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm m2
64.57 130.35 8,417.35
Total Carried to Summary 64,250.26
2. Concrete Works
2.1
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m3 under footing
a) Under footing m2 19.60 46.88 918.85
c) Under Masonry & grade beam m2 22.93 46.88 1,074.72
2.2 Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately) 0.00
a. in foundation footings m3 7.84 2,333.84 18,297.31
b. in foundation column m3 1.72 2,333.84 4,011.29
c. in grade beam m3 3.97 2,333.84 9,277.01
d. 10 cm thick mass concrete floor slab. m2 64.57 183.38 11,841.76
2.3 Provide, cut and fix in position sawn zigba form work: 0.00
a. Foundation footing. m2 19.60 141.45 2,772.42
b. For foundation column m2 27.50 141.45 3,889.87
C. For grade beam m2 31.05 141.45 4,392.02
d) 10mm thick chip wood for Expansion joint m2 62.80 13.74 862.87
2.4
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing. 0.00
a. Diam.6mm deformed bar Kg 117.31 47.91 5,620.38
a. Diam.8mm deformed bar Kg 246.48 46.15 11,375.01
b. Diam.12mm deformed bar Kg 320.00 46.15 14,768.00
c. Diam.14mm deformed bar Kg 95.10 46.15 4,388.69
c. Diam.16mm deformed bar Kg 882.25 46.15 40,715.92
c. Diam.20mm deformed bar Kg - 46.15 0.00
Total carried to summary 134,206.13
Item Description Unit Qty Amount
3. MASONRY WORK
3.1 50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4. m3 31.72 1,017.32 32,270.66
3.2 Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2) m3 11.54 1,102.35 12,715.61
Total carried to summary 44,986.27
B. SUPER STRUCTURE
2.2 Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
a. in elevation colomun m3 3.63 2,333.84 8,460.17
b. in beam m3 7.95 2,333.84 18,554.03
c. in Rc slab m3 23.12 2,333.84 53,946.71
c. stair m3 4.44 2,333.84 10,362.25
2.3 Provide, cut and fix in position sawn zigba form work: 0.00
a. in elevation colomun m2 58.00 141.45 8,204.10
b. in beam m2 53.10 141.45 7,510.99
c. in Rc slab 127.10 209.83 26,669.39
c. stair 16.80 141.45 2,376.36
2.4
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing. 0.00
a. Diam.6mm deformed bar Kg 257.02 47.91 12,313.93
a. Diam.8mm deformed bar Kg 421.84 46.15 19,467.87
b. Diam.10mm deformed bar Kg 286.48 46.15 13,221.12
b. Diam.12mm deformed bar - 0.00
c. Diam.14mm deformed bar Kg 190.19 46.15 8,777.39
c. Diam.16mm deformed bar Kg 1,848.70 46.15 85,317.47
c. Diam.120mm deformed bar Kg - 46.15 0.00
Total carried to summary 275,181.79
2. BLOCK WORK
2.1
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering. m2 266.63 295.01 78,659.11
15 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering. m2 33.06 216.87 7,169.72
Total carried to summary 85,828.83
7-ROOFING WORK
Supply and fix 0.3mm thick EGA 500 roof cover fixed to purlin with galvanized hook (J bolt) and asphalt washer.
Roof cover measured in horizontal projection and purlin measured separately. m2 -
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints
towards to ground & shall inculds elbow & 3 coats oil paint. ml 35.00 67.19 2,351.65
Total carried to summary 2,351.65
METAL WORK
supply and fix metal doors shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes
LTZ tubular steel profile,partaly cover 1 mm thick flat or ribbed iron sheet and partaly left for
glazing .including price c/c 15 cm vertical raws 20*20*1 mm SHS tube grill hinges, cylindrical
locks ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved
by the engineer)
30.91 734.09 22,693.66
supply and fix in position sliding door fram CHS Tube dia 50 *1.5 mm thick and 11/4 mm thick flat metal sheet
cover , price including top and bottom U chanal 'rail bearing and Partion bracing, 38 mm 'T' shap metal & other
accessories (approved quality by the engineer) M2 - -
supply and fix metal window shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ tubular
steel profile,left for glazing .including price c/c 15 cm vertical rows 20*20*1 mm SHS tube grill , hinges,
handle ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved by the
engineer) M2 19.13 719.63 13,769.40
supply and fix for stair case & verenda Hand rail & balustrad made of RHS tube 40*20*2 mm for horizontal c/c
50 cm & vertical c/c 25 cm at the top hand rail 10*5*2.5 cm wood , inculding 3 coats oil paint (approved quality
by the engineer) 12.00 862.34 10,348.08
supply & fix SHS /Squar Hollow section tube (dia 60*60*3 mm)thicknes for
lower,upper,diagonal,vertical,horizontal truss ,purlins & other work KG - -
supply & fix SHS /Squar Hollow section tube (dia 40*40*3 mm)thicknes for
lower,upper,diagonal,vertical,horizontal truss ,purlins & other work KG - -
Total carried to summary 46,811.14
6 . Finishing work
6.2 Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
m2
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case. 560.95 103.30 57,946.34
Apply Pointing to indicated external or internal stone masonry wall surface in cement mortar (1:3) m2 - 0.00
Total carried to summary 57,946.34
12 -PAINTING WORK 0.00
Apply 3 coats of approved type plastic paint to all indicated internal & external surface m2 280.48 33.6 9,423.99
Apply 3 coats of approved type syntheticpaint to all indicated internal & external surface m2 280.48 43.03 12,068.88
6.5 apply and lay 3cm cement screed with cement sand mortar m2 64.57 110.88 7,160.08
Total carried to summary 28,652.95
14- GLAZING WORK
4mm thick clear glass Cutting & fixing glazed to metal bends with putty m2 17.01 461.53 7,849.70
Total carried to summary 7,849.70
9.Sanitary installation
Supply & install galvanized steel pipes for cold and hot water distribution to all sanitary fixtures according to the
drawing, complete with the necessary connection pieces such as bends, unions, etc. unit price shall include all the
necessary assistance to the installation of works such as chiselling of walls, slabs, beam, floors, etc. & closing them
with concrete or cement mortar, to normal condition; & excavation , back fiil for out side the installation shall be
tested at a presure of 10kg/cm2 by the expense of the contractor.(approved quality by the engineer)
9.1

a) Diam. 1/2 inch ml 20.00 114.13 2,282.60


a) Diam. 3/4 inch ml 30.00 160.25 4,807.50
Supply and fix European made gate valve approved by the client. Price includes all accessories 0.00
a) Diam. 1/2 inch no 6.00 185.44 1,112.64
9.2 a) Diam. 3/4 inch no 8.00 279.01 2,232.08
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints towards to
ground & shall inculds elbow & 3 coats oil paint. 0.00
- Dia. 110 mm ml 40.00 60.75 2,430.00
- Dia. 50 mm ml 20.00 28.59 571.80
Supply & fix PPR Chrome Valves complete with unions ,elastic water proofing &hand wheels all the necesssary
accessories no 5.00 307.55 1,537.75
Supply & fix Turkish with with all accessories no 4.00 478.38 1,913.52
Supply and instal shawer Tray units made of enamelled cast iron steel plate &fiber glass ,including
complete with all the accessories.(approved quality by the engineer) 0.00
Shower Tray steel Plate Complite Size 70*70Cm no 4.00 1329.71 5,318.84
Supply & fix Shower head made of metal type no 4.00 118.45 473.80
Supply & fix toilet paper holder including fastering screws and the necessary accessories (approved quality by the
engineer) no 4.00 255.31 1,021.24
Supply & fix soap holder including fastering screws and the necessary accessories(approved quality by the
engineer) no 4.00 240.09 960.36
Supply & fix standard towel hanger including fastering screws and the necessary accessories.(approved quality by
the engineer) no 4.00 288.20 1,152.80
Supply & fix glass mirror iincluding fastering screws and the necessary accessories.(approved
quality by the engineer) no 9.00 541.05 4,869.45
10.External sanitary installation 0.00
Total carried to summary 30,684.38
11. Electrical Installation
11.10 DISTRIBUTION BOARDS
Supply,install & connect Main distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=32mm conduit with 3x10A, 3/ph main breaker and also
16.21 consting of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories. NO 1.00 6,041.52 6,041.52
Supply,install & connect sub distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=36mm conduit with 3x10A, 3/ph main breaker and also consting
of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.25% reserve NO 1.00 12,199.90 12,199.90
Supply and install Flush mounted light points to be fed with 2 x 2.5 mm2 insulated conductor inside rigid PVC
conduit of 13.5mm diameter including junction boxes with covers , insulating screw caps & necessary switchs .
11.2 No 19.00 370.94 7,047.86
a)PHILIPS TCs 098/2.36 +2x'TL'D36w P(w)=2x36w No 19.00 1370.21 26,033.99
Flush mounted socket outlet points to be fed with 3 x 2.5 mm2,3x4mm2 inslulated conductor inside rigid PVC
conduit of 16 mm diam. including junction boxes with covers single phase sockets with earthing contact
11.4 No 23.00 837.53 19,263.19
11.11 Power Feeder Cable (Measurement is tentative. ) 0.00
4x8mm2 ml 260.00 23.18 6,026.80
4x10mm2 ml 100.00 23.18 2,318.00
SOCKET FITINGS(approved quality by the engineer)
Supply and fix Flush or Surface mounting socket twin fiting 16-25 A/1ph no 23.00 54.32
Supply and fix flush or Surface mounted gange switch no 27.00 65.62
Total carried to summary 78,931.26
No L*W*D Qty

1 9.40
5.30 15.70

1 7.40
3.3
0.50 12.21

2 7.40

0.50

1.00 7.40
2 2.30
0.50

1.00 2.30
9.70

1 21.80
0.25

0.95 5.18
1 17.40
0.25
0.95 4.13

9.31

1 7.00

2.90

1.10 22.33

31.64

3.14
12.21
9.70
25.05

1 7.00
2.9 20.30

1 2.8
0.25 0.70

1 19.40
0.50 9.70
1 14.80
0.20
0.20 0.59
3 2.80
0.20
0.20 0.34
0.93

No L*W*D Qty

1 14.80

2.70 39.96
3 2.90
2.70 23.49
63.45

6 0.20
2.70 3.24

1 2.00
2.70 5

1 2.4
0.5 1
9.84
53.61
1 9.75
2.70 26.33

1 7.40
3.85 28.49

29.60
29.60

8 7.80 62.40

8 1.20 9.60
8 2.20 17.60
27.20
1 7.40
3.90 28.86

1 12.6 12.60

1 2.00
2.7 5.40
1 4.8
2.7 12.96

2 1.2
0.5 1.20
toilet & shawer
Description No L*W*D

A.SUB - STRUCTURE

1.excavation & earth work


1.1 site clear
m2
1.1 Bulk excavation in ordinary soil 2 7.40

0.30
2 6.65
M3 Net Total 0.30

1.2 Excavate in ordinary soil for


trench foundation up to 120 3 2.80
0.30

trunch

pad
M3 Net Total 2 7.40
1.5 Fill around mason and under
hardcore 0.50
Fill AROUND MASON 0.95
EXTERNAL SIDE 2 2.30
0.50

0.95
INTERNAL SIDE
2 7.40

M3 Net Total 0.50


Fill Under hard core 0.60
2 2.30

D=ANGL0.6+BULK0.5=1.1 0.50

0.60

TOTAL FILL

1.6 Cart away & spread surplus excavated


For site clear 6 0.20
For bulk Excavation 0.20
For Trench Excavation 2.50
M3 Total cart awey
25cm thick sound basaltic Hard Core 2 7.60
0.20
m2 total hard core 0.20
2.CONCRETE WORKS 5 2.90
2.1 50mm thick lean concrete in C-5 0.20
b) under grade beam 0.20
M2 Total
UNDER MASNRY WALL

M2 Total 6 0.80
2.2 Reinforced concrete in class C-25 2.50
c) grade beam
long side

2 7.40
short side 0.20
2 6.80
0.20
M2 TOTAL GB 6 2.90

0.20

Description No L*W*D
masnory work
HCB 20 2 23.50

m2 3.00

m2

ddt colomun

m2
DOOR
p=1+1=2
M2
WIDOW
P=1.2+1.2=2.4 2 1.2
M2 0.5
M2
M2 total
HCB 10
at the partion
p=1.55+1.2+0.3+0.4+1.45+1.45+1.2+2.2=9.75
M2 total
ROOFING WORK
G-30 GIS
M2

5*7 PURLIN C/C 90CM


ML TOTAL
EQULIPTUS
dia 10mm truss horizontal
dia 8mm
ver & dia tertical

ml dia 8mm
chipwood 8mm c/c 60mm
m2
G-30 DOUWN PIPE
ML
METAL WORK
DOOR
external door
M2
enternal door
M2 total
WIDOW

M2
Qty Description

2.3 Form Work


c) grade beam
external side

4.44
enternal side
3.99

2.52

10.95 M2 TOTAL GB

d) 100mm thick mass concrete for ground floor


20.30 m2 mass concrete
3. MASONRY WORKS

A) below NGL from the reduced level


long side

7.03
short side

2.18
9.22 M3 total BNGL
A) ANGL from the reduced level
long side

4.44
short side

1.38

5.82 total

A.SUB - STRUCTURE
ELRVATION COLOMUN

0.60 m3
toptie beam
long side

0.61
short side

0.58
1.19 M2 TOTAL
form work
ELRVATIO COLOMUN

12.00 m2
toptie beam
long side
external side
2.96 m2
internal side
2.72
short side

3.48
9.16 M2 TOTAL GB

Qty Description
FINISHING WORK
3 COAT OF PLASTERIN

141
52.65 from partion
193.65
7 ddt dor
187.05 M2 total plastering
painting work
187.05 m2 same with plastering
93.53 internal
93.53 external
20.30 cement screed
clear glass

1.20 M2
sanitery work
GSP
12.00 ML 1/2
40.00 ML 3/4
GET VALVES
4.00 ML 1/2
4.00 ML 3/4
36.00 pvc 110
18.00 pvc 50
4.00 CROW GET CETVALVE

2.00 HAND WASH


6.00 TURCKSH
4.00 SHOWER TREYY
6.00 PAPER HOLDER
4.00 SOAP HOLDER
4.00 TOWEL HANGER
5.00 MIROR
ELECTRICAL WORK
10.00 LIGHT POINT

10.00 2 WEY SWICH TYP


10.00 LIHNT FITING AND LAMP
MDB
SDB
No L*W*D Qty

1 7.65
5.30 13.95

1 5.65
3.3

0.50 9.32

2 5.65

0.50
1.00 5.65
2 2.30
0.50

1.00 2.30
7.95

1 18.90
0.25

0.95 4.49
1 13.90
0.25
0.95 3.30

7.79

1 5.25

2.90

1.10 16.75

24.54

2.79
9.32
7.95
20.06

1 5.25
2.90 15.23

1 15.90
0.50 7.95

2 5.65
0.20
0.20 0.45
2 2.90
0.20
0.20 0.23
0.68

1 17.90
0.20 3.58

No L*W*D Qty

2 5.65

2.50 28.25
2 3.30
2.50 16.50
44.75

6 0.20
2.50 3

1 0.80
2.50 2

2 2.9
0.6 3
8.48
36.27
1 5.65
3.85 22
28.25
28.25

7 7.80 54.60

7 1.20 8.40
7 2.20 15.40
23.80
1 5.65
3.85 21.75

1 12.6 12.60

1 0.80
2.5 2.00

2 2.9
0.6 3.48
genetetor house
Description No L*W*D

A.SUB - STRUCTURE

1.excavation & earth work


1.1 site clear
m2
1.1 Bulk excavation in ordinary soil 1 17.10

0.20

M3 Net Total

1.2 Excavate in ordinary soil for


trench foundation up to 120

trunch
2 5.65
0.50
0.95

pad 2 2.30
M3 Net Total 0.50
1.5 Fill around mason and under
hardcore 0.95
Fill AROUND MASON
EXTERNAL SIDE
2 5.65

0.50
INTERNAL SIDE 0.60
2 2.30
0.50

M3 Net Total 0.60


Fill Under hard core

D=ANGL0.6+BULK0.5=1.1

6 0.20

TOTAL FILL 0.20

2.50

1.6 Cart away & spread surplus excavated


For site clear 2 5.65
For bulk Excavation 0.20
For Trench Excavation 0.20
M3 Total cart awey 2 2.90
25cm thick sound basaltic Hard Core 0.20
0.20
m2 total hard core
2.CONCRETE WORKS
2.1 50mm thick lean concrete in C-5
UNDER MASNRY WALL 6 0.80
2.50
M2 Total
2.2 Reinforced concrete in class C-25
c) grade beam
long side 1 17.90
0.20
1 17.10
short side 0.20

M2 TOTAL GB
2.3 Form Work
c) grade beam

external side

Description No L*W*D
masnory work
HCB 20 2 17.10

m2 2.70

m2

ddt colomun

m2
DOOR 2 2.8
p=0.8 0.5
M2
WIDOW
P=2.9
M2
M2
M2 total
ROOFING WORK
G-30 GIS
M2

5*7 PURLIN C/C 90CM


ML TOTAL
EQULIPTUS
dia 10mm truss horizontal

dia 8mm
ver & dia tertical

ml dia 8mm
chipwood 8mm c/c 60mm
m2
G-30 DOUWN PIPE
ML
METAL WORK
DOOR
external door
M2
WIDOW

M2
Qty Description

2.3 Form Work


c) grade beam
enternal side

3.42
7.00 M2 TOTAL GB

d) 100mm thick mass concrete for ground floor

15.23 m2 mass concrete


3. MASONRY WORKS

A) below NGL from the reduced level


long side

5.37

short side

2.18
7.55 M3 total BNGL
A) ANGL from the reduced level
long side

3.39
short side

1.38
4.77 total
A.SUB - STRUCTURE

ELRVATION COLOMUN

0.60 m3

toptie beam
long side

0.45
short side

0.23
0.68 M2 TOTAL
form work
ELRVATIO COLOMUN

12.00 m2
toptie beam
long side
external side
3.58 m2
internal side
3.42
7.00 M2 TOTAL

Qty Description
FINISHING WORK
3 COAT OF PLASTERIN

92.34
5 ddt dor
86.86 M2 total plastering
painting work
86.86 m2 same with plastering
15.23 cement screed
clear glass

2.80 M2
ELECTRICAL WORK
2.00 LIGHT POINT
2.00 socket
2.00 2 WEY SWICH TYP
2.00 LIHNT FITING AND LAMP
- MDB
1.00 SDB
No L*W*D Qty

1 5.40
5.40 11.80

1 3.20
3.2

0.50 5.12

2 3.20

0.50
1.00 3.20
2 2.20
0.50

1.00 2.20
5.40

1 13.80
0.25

0.95 3.28
1 8.80
0.25
0.95 2.09

5.37

1 2.80

2.80

1.10 8.62

13.99

2.36
5.12
5.40
12.88

1 2.80
2.80 7.84

1 10.80
0.50 5.40

2 3.20
0.20
0.20 0.26
2 2.80
0.20
0.20 0.22
0.48

1 12.80
0.20 2.56

No L*W*D Qty

2 3.20

3.00 19.20
2 2.80
3.00 16.80
36.00

4 0.20
3.00 2.4

1 0.90
3.00 3

2 1.8
0.6 2
7.26
28.74
1 3.75
3.20 12
16.00
16.00

3 7.50 22.50

3 2.50 7.50
3 2.50 7.50
15.00
1 3.20
3.75 12.00

1 8.4 8.40

1 0.90
3 2.70

2 1.8
0.6 2.16
gard house
Description No L*W*D

A.SUB - STRUCTURE

1.excavation & earth work


1.1 site clear
m2
1.1 Bulk excavation in ordinary soil 1 11.20

0.20

M3 Net Total

1.2 Excavate in ordinary soil for


trench foundation up to 120

trunch
2 3.20
0.50
0.95

pad 2 2.20
M3 Net Total 0.50
1.5 Fill around mason and under
hardcore 0.95
Fill AROUND MASON
EXTERNAL SIDE
2 3.20

0.50
INTERNAL SIDE 0.60
2 2.20
0.50

M3 Net Total 0.60


Fill Under hard core

D=ANGL0.6+BULK0.5=1.1

4 0.20

TOTAL FILL 0.20

3.00

1.6 Cart away & spread surplus excavated


For site clear 2 3.20
For bulk Excavation 0.20
For Trench Excavation 0.20
M3 Total cart awey 2 2.80
25cm thick sound basaltic Hard Core 0.20
0.20
m2 total hard core
2.CONCRETE WORKS
2.1 50mm thick lean concrete in C-5
UNDER MASNRY WALL 4 0.80
3.20
M2 Total
2.2 Reinforced concrete in class C-25
c) grade beam
1 12.80
0.20
1 11.20
short side 0.20

M2 TOTAL GB
2.3 Form Work
c) grade beam

external side

Description No L*W*D
masnory work
HCB 20 2 12.80

m2 3.00

m2

ddt colomun

m2
DOOR 2 1.7
p=0.8 0.5
M2
WIDOW
P=2.9
M2
M2
M2 total
ROOFING WORK
G-30 GIS
M2

5*7 PURLIN C/C 90CM


ML TOTAL
EQULIPTUS
dia 10mm truss horizontal

dia 8mm
ver & dia tertical

ml dia 8mm
chipwood 8mm c/c 60mm
m2
G-30 DOUWN PIPE
ML
METAL WORK
DOOR
external door
M2
WIDOW

M2
Qty Description

2.3 Form Work


c) grade beam
enternal side

2.24
4.80 M2 TOTAL GB

d) 100mm thick mass concrete for ground floor

7.84 m2 mass concrete


3. MASONRY WORKS

A) below NGL from the reduced level


long side

3.04

short side

2.09
5.13 M3 total BNGL
A) ANGL from the reduced level
long side

1.92
short side

1.32
3.24 total
A.SUB - STRUCTURE

ELRVATION COLOMUN

0.48 m3

toptie beam
long side

0.26
short side

0.22
0.48 M2 TOTAL
form work
ELRVATIO COLOMUN

10.24 m2
toptie beam
long side
external side
2.56 m2
internal side
2.24
4.80 M2 TOTAL

Qty Description
FINISHING WORK
3 COAT OF PLASTERIN

76.80
5 ddt dor
71.94 M2 total plastering
painting work
71.94 m2 same with plastering
7.84 cement screed
clear glass

1.70 M2
ELECTRICAL WORK
1.00 LIGHT POINT
2.00 socket
2.00 2 WEY SWICH TYP
2.00 LIHNT FITING AND LAMP
- MDB
1.00 SDB
No L*W*D Qty

1 5.40
5.40 11.80

1 5.40
5.40
1.50 43.74

7.07

1.50 10.60
54.34

1 5.40
5.40

1.00 29.16
1 7.07
1.20 8.48
37.64
1 7.07
1.30 9.18
9.18

1 7.07

4.20 29.67

4 5.40

0.35

2.25 17.01

2.36
54.34
76.50
133.19
septic tanck & wate wall
Description No L*W*D

A.SUB - STRUCTURE

1.excavation & earth work


1.1 site clear
m2
1.1 Bulk excavation in ordinary soil 1 18.00

for septic tank 1.00

M3 Net Total

form water wall 2 3.50


area = 3.14*r2 0.50

0.30
M3 total bulck 2 2.50
0.50

1.2 Excavate in ordinary soil for


trench foundation up to 120 0.30

from septic tank


1 3.00

3.00
form water wall 0.15

M3 Net Total

1.2 Excavate in ordinary soil for


trench foundation from 120-220 1 14.00
form water wall 0.30

M3 Net Total

excavation rock 2 10.00

m3 0.30

1.5 Fill around mason and under


hardcore

Fill AROUND MASON 1 3.00

EXTERNAL SIDE 3.00

M3 Net Total

1.6 Cart away & spread surplus excavated 2 8.00


For site clear 0.75
For bulk Excavation 2.25
For Trench Excavation 2 3.00
M3 Total cart awey 0.75
2.25
Qty Description

2.CONCRETE WORKS
2.1 50mm thick lean concrete in C-5
UNDER MASNRY WALL

18.00 M2 Total
2.2 Reinforced concrete in class C-25
c) grade beam

1.05
short side

0.75

1.80 M2 TOTAL GB
slab

1.35
2.3 Form Work
c) grade beam

external side
4.20
2.3 Form Work
c) grade beam

enternal side

6.00

6.00 M2 TOTAL GB

suspended slab

9.00 m2

3. MASONRY WORKS
A) below NGL from the reduced level

long side

27.00
short side

10.13
37.13 M3 total BNGL
TOILET AND SHOWER
Item

1.1

1.2

1.3

1.4

1.6
1.7

2.1

2.2

2.3

Item

3.1

3.2
2.2

2.3

2.4

2.1
6.2

6.5

9.1
9.2

11.10

16.21
11.2

11.4

11.11

Item

Item

1.1

1.2

1.3

1.4

1.6

1.7
2.1

2.2

2.3

Item

3.1

3.2

2.2

2.3

2.4

2.1
6.2
6.5

11.10

16.21

11.2

11.4

11.11
Item

1.1

1.2

1.3

1.4

1.6

1.7

2.1

2.2

2.3

2.4

Item

3.1
3.2

2.2

2.3

2.4

2.1
6.2

6.5

11.10
11.2

11.4

11.11

Item

1.1

1.2

1.3

1.4

1.6

1.7

2.1
2.2

2.3

2.4

Item

3.1

3.2

Item

1.2

1.4

1.6

2.1

2.2
2.3

2.4

Item

3.1

3.2

2.2

2.3

2.4

2.1

6.2
TOILET AND SHOWER
Description

A. Sub structure
1.Excavation and Earth Work
Clear the site to remove top soil to an average depth of 20 cm.
Bulk excavation to a depth of 150cm from reduced ground level

Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth fromn 220-300 cm starting from the reduced ground
level.
Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site.
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm
Total Carried to Summary
2. Concrete Works
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m 3 under footing
A) Under Masonry & grade beam
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
c. in grade beam
d. 10 cm thick mass concrete floor slab.
Provide, cut and fix in position sawn zigba form work:
c. in grade beam
d) 10mm thick chip wood for Expansion joint

a. Diam.6mm deformed bar


b. Diam.12mm deformed bar
Total carried to summary

Description
3. MASONRY WORK
50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4.
Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2)
Total carried to summary
B. SUPER STRUCTURE
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
a. in elevation colomun
b. in beam
Provide, cut and fix in position sawn zigba form work:
a. in elevation colomun

b. in beam
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.6mm deformed bar
a. Diam.8mm deformed bar
b. Diam.12mm deformed bar
c. Diam.14mm deformed bar
c. Diam.16mm deformed bar
Total carried to summary
2. BLOCK WORK
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering.
10 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering.
Total carried to summary

7-ROOFING WORK

Roof covering in G-32 corrugated galavanized iron sheet including roof ridge cover fixed to purlin
with dome headed galvanized nails, purlin measured separetely and roof cover measured in
horziontal projection
Supply and fix 0.3mm thick EGA 500 roof cover fixed to purlin with galvanized hook (J bolt) and asphalt washer.
Roof cover measured in horizontal projection and purlin measured separately.
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints
towards to ground & shall inculds elbow & 3 coats oil paint.
4. CARPENTARY& JOINARY WORK
All structural members shall be well seasoned and free of harmful defects. Each truss shall be painte
anti- termite solution and firmly fixed to R.C beams with Dia 6mm plain bars
Diametr 10-12 cm eucalyptus upper & lower, members of truss
Diametr 8-10cm eucalyptus vertical & diagonal truss member
5x7cm sawn Zigba ,Tsid or equvalant wooden purlins
Supply & fix 8mm thick chip wood ceiling nailed to price includes (4x5)cm Zigba,Tsid or
equvalant wooden battens at c/c 60cm on both side & 2*4 cm corner list & battens.
Total carried to summary
METAL WORK
supply and fix metal doors shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ
tubular steel profile,partaly cover 1 mm thick flat or ribbed iron sheet and partaly left for
glazing .including price c/c 15 cm vertical raws 20*20*1 mm SHS tube grill hinges, cylindrical
locks ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved
by the engineer)
supply and fix in position sliding door fram CHS Tube dia 50 *1.5 mm thick and 11/4 mm thick flat metal sheet
cover , price including top and bottom U chanal 'rail bearing and Partion bracing, 38 mm 'T' shap metal & other
accessories (approved quality by the engineer)
supply and fix metal window shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ tubular stee
profile,left for glazing .including price c/c 15 cm vertical rows 20*20*1 mm SHS tube grill , hinges, handle ,one
coats of antrust & two coats oil paint.,with all its accessories( material quality approved by the engineer)

supply & fix SHS /Squar Hollow section tube (dia 60*60*3 mm)thicknes for lower,upper,diagonal,vertical,horizontal
truss ,purlins & other work
supply & fix SHS /Squar Hollow section tube (dia 40*40*3 mm)thicknes for lower,upper,diagonal,vertical,horizontal
truss ,purlins & other work
Total carried to summary
6 . Finishing work
Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case.
Apply Pointing to indicated external or internal stone masonry wall surface in cement mortar (1:3)
Total carried to summary
12 -PAINTING WORK
Apply 3 coats of approved type plastic paint to all indicated internal & external surface
Apply 3 coats of approved type syntheticpaint to all indicated internal & external surface
apply and lay 3cm cement screed with cement sand mortar
Total carried to summary
14- GLAZING WORK
4mm thick clear glass Cutting & fixing glazed to metal bends with putty
Total carried to summary
9.Sanitary installation
Supply & install galvanized steel pipes for cold and hot water distribution to all sanitary fixtures according to the
drawing, complete with the necessary connection pieces such as bends, unions, etc. unit price shall include all the
necessary assistance to the installation of works such as chiselling of walls, slabs, beam, floors, etc. & closing them
with concrete or cement mortar, to normal condition; & excavation , back fiil for out side the installation shall be
tested at a presure of 10kg/cm2 by the expense of the contractor.(approved quality by the engineer)
a) Diam. 1/2 inch
a) Diam. 3/4 inch
Supply and fix European made gate valve approved by the client. Price includes all accessories
a) Diam. 1/2 inch
a) Diam. 3/4 inch
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints towards to
ground & shall inculds elbow & 3 coats oil paint.
- Dia. 110 mm
- Dia. 50 mm
Supply & fix PPR Chrome Valves complete with unions ,elastic water proofing &hand wheels all the necesssary
accessories
Supply & fix Turkish with with all accessories
Supply and instal shawer Tray units made of enamelled cast iron steel plate &fiber glass ,including
complete with all the accessories.(approved quality by the engineer)
Shower Tray steel Plate Complite Size 70*70Cm
Supply & fix Shower head made of metal type
Supply & fix toilet paper holder including fastering screws and the necessary accessories (approved quality by the
engineer)
Supply & fix soap holder including fastering screws and the necessary accessories(approved quality by the engineer)

Supply & fix standard towel hanger including fastering screws and the necessary accessories.(approved quality by th
engineer)
Supply & fix glass mirror iincluding fastering screws and the necessary accessories.(approved qualit
by the engineer)
Total carried to summary
11. Electrical Installation
DISTRIBUTION BOARDS
Supply,install & connect Main distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=32mm conduit with 3x10A, 3/ph main breaker and also consting
of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.

Supply,install & connect sub distribution board MDB made of plastic with lockable door connected
to 4x10mm2 cable in f=36mm conduit with 3x10A, 3/ph main breaker and also consting of.

5pc ACB or Equivalent of 16A - 3ph


3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.25% reserve
Supply and install Flush mounted light points to be fed with 2 x 2.5 mm2 insulated conductor inside rigid PVC condu
of 13.5mm diameter including junction boxes with covers , insulating screw caps & necessary switchs .

a)PHILIPS TCs 098/2.36 +2x'TL'D36w P(w)=2x36w


Flush mounted socket outlet points to be fed with 3 x 2.5 mm2,3x4mm2 inslulated conductor inside rigid PVC condui
of 16 mm diam. including junction boxes with covers single phase sockets with earthing contact

Power Feeder Cable (Measurement is tentative. )


4x8mm2
4x10mm2
SOCKET FITINGS(approved quality by the engineer)
Supply and fix Flush or Surface mounting socket twin outlet 16-25 A/1ph
Supply and fix flush or Surface mounted gange switch
Total carried to summary

GENERETER HOUSE
Description
Description
A. Sub structure
1.Excavation and Earth Work
Clear the site to remove top soil to an average depth of 20 cm.
Bulk excavation to a depth of 150cm from reduced ground level
Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth fromn 220-300 cm starting from the reduced ground
level.
Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site.
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm
Total Carried to Summary
2. Concrete Works
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m 3 under footing
A) Under Masonry & grade beam
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
c. in grade beam
d. 10 cm thick mass concrete floor slab.
Provide, cut and fix in position sawn zigba form work:
c. in grade beam
d) 10mm thick chip wood for Expansion joint
a. Diam.6mm deformed bar
b. Diam.12mm deformed bar
Total carried to summary
Description
3. MASONRY WORK
50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4.
Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2)
Total carried to summary
B. SUPER STRUCTURE
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
a. in elevation colomun
b. in beam
Provide, cut and fix in position sawn zigba form work:
a. in elevation colomun
b. in beam
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.6mm deformed bar
a. Diam.8mm deformed bar
b. Diam.12mm deformed bar
c. Diam.14mm deformed bar
c. Diam.16mm deformed bar
Total carried to summary
2. BLOCK WORK
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering.
10 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering.
Total carried to summary
7-ROOFING WORK
Roof covering in G-32 corrugated galavanized iron sheet including roof ridge cover fixed to purlin
with dome headed galvanized nails, purlin measured separetely and roof cover measured in
horziontal projection
Supply and fix 0.3mm thick EGA 500 roof cover fixed to purlin with galvanized hook (J bolt) and asphalt washer.
Roof cover measured in horizontal projection and purlin measured separately.
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints
towards to ground & shall inculds elbow & 3 coats oil paint.
4. CARPENTARY& JOINARY WORK
All structural members shall be well seasoned and free of harmful defects. Each truss shall be painte
anti- termite solution and firmly fixed to R.C beams with Dia 6mm plain bars
Diametr 10-12 cm eucalyptus upper & lower, members of truss
Diametr 8-10cm eucalyptus vertical & diagonal truss member
5x7cm sawn Zigba ,Tsid or equvalant wooden purlins
Supply & fix 8mm thick chip wood ceiling nailed to price includes (4x5)cm Zigba,Tsid or
equvalant wooden battens at c/c 60cm on both side & 2*4 cm corner list & battens.
Total carried to summary
METAL WORK
supply and fix metal doors shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ
tubular steel profile,partaly cover 1 mm thick flat or ribbed iron sheet and partaly left for
glazing .including price c/c 15 cm vertical raws 20*20*1 mm SHS tube grill hinges, cylindrical
locks ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved
by the engineer)
supply and fix in position sliding door fram CHS Tube dia 50 *1.5 mm thick and 11/4 mm thick flat metal sheet
cover , price including top and bottom U chanal 'rail bearing and Partion bracing, 38 mm 'T' shap metal & other
accessories (approved quality by the engineer)
supply and fix metal window shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ tubular stee
profile,left for glazing .including price c/c 15 cm vertical rows 20*20*1 mm SHS tube grill , hinges, handle ,one
coats of antrust & two coats oil paint.,with all its accessories( material quality approved by the engineer)

supply & fix SHS /Squar Hollow section tube (dia 60*60*3 mm)thicknes for lower,upper,diagonal,vertical,horizontal
truss ,purlins & other work
supply & fix SHS /Squar Hollow section tube (dia 40*40*3 mm)thicknes for lower,upper,diagonal,vertical,horizontal
truss ,purlins & other work
Total carried to summary
6 . Finishing work
Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case.
Apply Pointing to indicated external or internal stone masonry wall surface in cement mortar (1:3)
Total carried to summary
12 -PAINTING WORK
Apply 3 coats of approved type plastic paint to all indicated internal & external surface
Apply 3 coats of approved type syntheticpaint to all indicated internal & external surface
apply and lay 3cm cement screed with cement sand mortar
Total carried to summary
14- GLAZING WORK
4mm thick clear glass Cutting & fixing glazed to metal bends with putty
Total carried to summary
11. Electrical Installation
DISTRIBUTION BOARDS
Supply,install & connect Main distribution board MDB made of plastic with lockable door
connected to 4x10mm2 cable in f=32mm conduit with 3x10A, 3/ph main breaker and also consting
of.
5pc ACB or Equivalent of 16A - 3ph
3pc ACB of 10A - 3ph
3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.

Supply,install & connect sub distribution board MDB made of plastic with lockable door connected
to 4x10mm2 cable in f=36mm conduit with 3x10A, 3/ph main breaker and also consting of.

5pc ACB or Equivalent of 16A - 3ph


3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.25% reserve
Supply and install Flush mounted light points to be fed with 2 x 2.5 mm2 insulated conductor inside rigid PVC condu
of 13.5mm diameter including junction boxes with covers , insulating screw caps & necessary switchs .

a)PHILIPS TCs 098/2.36 +2x'TL'D36w P(w)=2x36w


Flush mounted socket outlet points to be fed with 3 x 2.5 mm2,3x4mm2 inslulated conductor inside rigid PVC condui
of 16 mm diam. including junction boxes with covers single phase sockets with earthing contact

Power Feeder Cable (Measurement is tentative. )


4x8mm2
4x10mm2
SOCKET FITINGS(approved quality by the engineer)
Supply and fix Flush or Surface mounting socket twin outlet 16-25 A/1ph
Supply and fix flush or Surface mounted gange switch
Total carried to summary

gard house
Description
A. Sub structure
1.Excavation and Earth Work
Clear the site to remove top soil to an average depth of 20 cm.
Bulk excavation to a depth of 150cm from reduced ground level
Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth fromn 220-300 cm starting from the reduced ground
level.
Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site.
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm
Total Carried to Summary
2. Concrete Works
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m 3 under footing
c) Under Masonry & grade beam
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
c. in grade beam
d. 10 cm thick mass concrete floor slab.
Provide, cut and fix in position sawn zigba form work:
C. For grade beam
d) 10mm thick chip wood for Expansion joint
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.6mm deformed bar
a. Diam.8mm deformed bar
b. Diam.12mm deformed bar
Total carried to summary
Description
3. MASONRY WORK
50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4.
Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2)
Total carried to summary
B. SUPER STRUCTURE
CONCRETE WORK
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
a. in elevation colomun
b. in beam
Provide, cut and fix in position sawn zigba form work:
a. in elevation colomun
b. in beam
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.6mm deformed bar
b. Diam.12mm deformed bar
Total carried to summary

2. BLOCK WORK
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering.
Total carried to summary
7-ROOFING WORK
Roof covering in G-32 corrugated galavanized iron sheet including roof ridge cover fixed to purlin
with dome headed galvanized nails, purlin measured separetely and roof cover measured in
horziontal projection
Supply and fix 0.3mm thick EGA 500 roof cover fixed to purlin with galvanized hook (J bolt) and asphalt washer.
Roof cover measured in horizontal projection and purlin measured separately.
Supply & fix diameter 110 mm P.V.C pipe for Down pipe fixed to wall with metal straps welded joints
towards to ground & shall inculds elbow & 3 coats oil paint.
4. CARPENTARY& JOINARY WORK
All structural members shall be well seasoned and free of harmful defects. Each truss shall be painte
anti- termite solution and firmly fixed to R.C beams with Dia 6mm plain bars
Diametr 10-12 cm eucalyptus upper & lower, members of truss
Diametr 8-10cm eucalyptus vertical & diagonal truss member
5x7cm sawn Zigba ,Tsid or equvalant wooden purlins
Supply & fix 8mm thick chip wood ceiling nailed to price includes (4x5)cm Zigba,Tsid or
equvalant wooden battens at c/c 60cm on both side & 2*4 cm corner list & battens.
Total carried to summary
METAL WORK
supply and fix metal doors shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ
tubular steel profile,partaly cover 1 mm thick flat or ribbed iron sheet and partaly left for
glazing .including price c/c 15 cm vertical raws 20*20*1 mm SHS tube grill hinges, cylindrical
locks ,one coats of antrust & two coats oil paint.,with all its accessories( material quality approved
by the engineer)
supply and fix in position sliding door fram CHS Tube dia 50 *1.5 mm thick and 11/4 mm thick flat metal sheet
cover , price including top and bottom U chanal 'rail bearing and Partion bracing, 38 mm 'T' shap metal & other
accessories (approved quality by the engineer)
supply and fix metal window shall be fabricated from locally manufactured 3.8 *1.25 mm thicknes LTZ tubular stee
profile,left for glazing .including price c/c 15 cm vertical rows 20*20*1 mm SHS tube grill , hinges, handle ,one
coats of antrust & two coats oil paint.,with all its accessories( material quality approved by the engineer)

supply and fix for stair case & verenda Hand rail & balustrad made of RHS tube 40*20*2 mm for horizontal c/c 50
cm & vertical c/c 25 cm at the top hand rail 10*5*2.5 cm wood , inculding 3 coats oil paint (approved quality by the
engineer)
supply & fix SHS /Squar Hollow section tube (dia 60*60*3 mm)thicknes for lower,upper,diagonal,vertical,horizontal
truss ,purlins & other work
supply & fix SHS /Squar Hollow section tube (dia 40*40*3 mm)thicknes for lower,upper,diagonal,vertical,horizontal
truss ,purlins & other work
Total carried to summary
6 . Finishing work
Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case.
Total carried to summary
12 -PAINTING WORK
Apply 3 coats of approved type plastic paint to all indicated internal & external surface
Apply 3 coats of approved type syntheticpaint to all indicated internal & external surface
apply and lay 3cm cement screed with cement sand mortar
Total carried to summary
14- GLAZING WORK
4mm thick clear glass Cutting & fixing glazed to metal bends with putty
Total carried to summary
11. Electrical Installation
DISTRIBUTION BOARDS
Supply,install & connect sub distribution board MDB made of plastic with lockable door connected
to 4x10mm2 cable in f=36mm conduit with 3x10A, 3/ph main breaker and also consting of.

5pc ACB or Equivalent of 16A - 3ph


3pc ACB of 10A - 1ph
2pc ACB of 16A - 1ph
1pc ACB of 20A - 1ph
Complete with bus bar, earthing & other accessories.25% reserve
Supply and install Flush mounted light points to be fed with 2 x 2.5 mm2 insulated conductor inside rigid PVC condu
of 13.5mm diameter including junction boxes with covers , insulating screw caps & necessary switchs .

a)PHILIPS TCs 098/2.36 +2x'TL'D36w P(w)=2x36w


Flush mounted socket outlet points to be fed with 3 x 2.5 mm2,3x4mm2 inslulated conductor inside rigid PVC condui
of 16 mm diam. including junction boxes with covers single phase sockets with earthing contact

Power Feeder Cable (Measurement is tentative. )


4x8mm2
4x10mm2
SOCKET FITINGS(approved quality by the engineer)
Supply and fix Flush or Surface mounting socket twin fiting 16-25 A/1ph
Supply and fix flush or Surface mounted gange switch
Total carried to summary

SEPTIC TANK & waetr well

Description
A. Sub structure
1.Excavation and Earth Work
Clear the site to remove top soil to an average depth of 20 cm.
Bulk excavation to a depth of 150cm from reduced ground level
Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level.
Excavation trenches for foundation ,pit excavation to a depth from120 -220cm starting from the reduced ground
level.
ditto as but for the hard rook

Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site.
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished
thickness of 25 cm
Total Carried to Summary
2. Concrete Works
5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m 3 under footing
c) Under Masonry & grade beam
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
c. in grade beam
d. concrete slab.
Provide, cut and fix in position sawn zigba form work:
C. For grade beam
d) 10mm thick chip wood for Expansion joint
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.8mm deformed bar
b. Diam.12mm deformed bar
c. Diam.14mm deformed bar
c. Diam.16mm deformed bar
c. Diam.20mm deformed bar
Total carried to summary
Description
3. MASONRY WORK
50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4.
Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2)
Total carried to summary

fance work
Description
A. Sub structure
1.Excavation and Earth Work
Excavation trench foundation ,pit excavation to a depth of not exceeding 120cm starting from the reduced ground
level.
Backfill under hard core ,around foundation wall and footing colomun with selected materials & well compacted at
every 20 cm. select material /soil/from quary out of site/

Cart away surplus excavated material and spread on a chosen site at a distance not exceeding 2 km from site.
Total Carried to Summary
2. Concrete Works

5cm thick lean concrete in class C-5 with minimum cement content of 150 kg/m 3 under footing
c) Under Masonry & grade beam
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
c. in grade beam
Provide, cut and fix in position sawn zigba form work:
C. For grade beam
d) 10mm thick chip wood for Expansion joint
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.6mm deformed bar
a. Diam.8mm deformed bar
b. Diam.12mm deformed bar
Total carried to summary
Description
3. MASONRY WORK
50cm thick roigh hard trachytic stone foundation masonry wall bedded in cement sand mortar mix of 1:4.
Ditto as item 3.1 but semi-dressed stone masonry wall above N.G.L. up to grade beam & external side left for
pointing.(price includes pointing to external side of the wall with cement sand mortar of ratio 1:2)
Total carried to summary
B. SUPER STRUCTURE
Reinforced concrete in class C-25 with minimum cement content of 360 kg/ m 3 filled in to form work and vibrated
around steel reinforcement bar. (form work and reinforcement bar measured separately)
a. in elevation colomun
Provide, cut and fix in position sawn zigba form work:
a. in elevation colomun
Steel reinforceent bars price includes cutting, bending, placing in position and tying wires according to structural
drawing.
a. Diam.6mm deformed bar
b. Diam.12mm deformed bar
Total carried to summary

2. BLOCK WORK
20 cm thick class B .H.C.B wall bedded and jointed in cement and sand mortar 1:3 internal and external left for
plastering.
Total carried to summary
METAL WORK
supply and fix Main entrance Door made of vertical and horizontal frame (CHS)tube Diam 50 *1.
mm thick and (SHS ) tube 25x25x2mm c/c 15cm for vertical rows and for horzontal rows c/c 30
cm.price shall include30*30*50cm excavation and c-15 concrete iron mongory,lock and with all
accessories. (approved quality by the engineer)
Total carried to summary
6 . Finishing work
Apply 3 coats of plastering cement sand mortar (1:3) up to fine finish to all indicated internal & external Hollow
concrete block/HCB/ ,brick wall ,column,beam,linten,slab & stair case.
Apply Pointing to indicated external or internal stone masonry wall surface in cement mortar (1:3)
Total carried to summary
Unit Qty Unit Price Amount

m2 15.70 14.75 231.58

m3 12.21 98.33 1,200.61

m3 9.70 118.00 1,144.60

m3 147.50 0.00

m3 0.00

m3 31.64 191.43 6,056.85


m3 25.05 170.61 4,273.78

m2 20.30 130.35 2,646.11


15,553.52

m2 10.40 46.88 487.55

0.00
m 3
0.93 2,333.84 2,165.80
m2 20.30 183.38 3,722.61
0.00
m2 10.95 141.45 1,548.88
m2 0.00
Kg 34.47 47.91 1,651.30
Kg 93.33 46.15 4,307.33
13,883.48

Unit Qty Amount

m3 9.22 1,017.32 9,374.60


m 3
5.82 1,102.35 6,415.68
15,790.28

m3 0.60 2,333.84 1,400.30


m3 1.19 2,333.84 2,772.60
0.00
m2 12.00 141.45 1,697.40
m2 9.16 141.45 1,295.68

0.00
Kg 56.07 47.91 2,686.15
Kg - 46.15 0.00
Kg 162.67 46.15 7,507.07
Kg 46.15 0.00
Kg 46.15 0.00
17,359.21

m2 53.61 295.01 15,815.49

26.33 216.87 5,709.10

21,524.59

28.49 8,464.09
297.09
-
m2
846.59
ml 12.60 67.19
-
-

ml 62.40 39.85 2,486.64


ml 27.20 28.35 771.12
3,026.90
ml 29.60 102.26
ml 28.86 412.85 11,914.85
27,510.20

ml 18.36 734.09 13,477.89

M2 -

M2 1.20 719.63 863.56

KG -

KG -
14,341.45

m2
187.05 103.30 19,322.27
m2 47.69 0.00
19,322.27

m2 93.53 33.60 3,142.44


m2 93.53 43.03 4,024.38
m2 20.30 110.88 2,250.86
48,062.21

m2 1.20 46.53 55.84


55.84
ml 12.00 114.13 1,369.56
ml 4.00 160.25 641.00
0.00
no 4.00 185.44 741.76
no 4.00 279.01 1,116.04

0.00
ml 36.00 60.75 2,187.00
ml 18.00 28.59 514.62

no 4.00 307.55 1,230.20


no 6.00 478.38 2,870.28

0.00
no 4.00 1329.71 5,318.84
no 4.00 118.45 473.80

no 6.00 255.31 1,531.86

no 4.00 240.09 960.36

no 4.00 288.20 1,152.80

no 5.00 541.05 2,705.25


22,813.37

NO 1.00 6,041.52 6,041.52


NO 1.00 12,199.90 12,199.90

No 10.00 370.94 3,709.40


No 10.00 1370.21 13,702.10

No 837.53

ml 160.00 23.18 3,708.80


ml 100.00 23.18 2,318.00

no
no 10.00 65.62 656.20
42,335.92

Unit Qty Unit Price Amount


Unit Qty Unit Price Amount

m2 13.95 14.75 205.76


m3 9.32 98.33 916.68

m3 7.95 118.00 938.10

m3 147.50 0.00

m3 0.00

m3 24.54 191.43 4,697.21

m3 20.06 170.61 3,422.86

m2 15.23 130.35 1,984.58


12,165.20
m2 7.95 46.88 372.70

0.00
m3 0.68 2,333.84 1,596.35
m2 15.23 183.38 2,791.96
0.00
m2 7.00 141.45 990.15
m2 0.00
Kg 25.91 47.91 1,241.40
Kg 67.91 46.15 3,134.10
10,126.65
Unit Qty Amount

m3 7.55 1,017.32 7,683.31

m3 4.77 1,102.35 5,258.21


12,941.52

m3 0.60 2,333.84 1,400.30


m3 0.68 2,333.84 1,596.35
0.00
m2 12.00 141.45 1,697.40
m 2
7.00 141.45 990.15

0.00
Kg 45.11 47.91 2,161.27
Kg - 46.15 0.00
Kg 130.84 46.15 6,038.47
Kg 46.15 0.00
Kg 46.15 0.00
13,883.95

m2 36.27 295.01 10,700.01

-
10,700.01
28.25 8,392.79

297.09
-
m2
846.59
ml 12.60 67.19
-
-

ml 62.40 39.85 2,486.64


ml 27.20 28.35 771.12
ml 29.60 102.26 3,026.90
11,914.85
ml 28.86 412.85
27,438.89

ml 2.00 734.09 1,468.18

M2 -

M2 3.48 719.63 2,504.31

KG -

KG -
3,972.49

m2
86.86 103.30 8,972.64
m2 0.00
8,972.64
m2 43.43 33.6 1,459.25
m2 43.43 43.03 1,868.79
m2 15.23 110.88 1,688.15
5,016.19

m2 2.80 461.53 464.33


464.33

NO 1.00 6,041.52 6,041.52

NO 1.00 12,199.90 12,199.90

No 2.00 370.94 741.88


No 2.00 1370.21 2,740.42

No 837.53

ml 60.00 23.18 1,390.80


ml 50.00 23.18 1,159.00

no 2.00 54.32 108.64


no 2.00 65.62 131.24
24,513.40

Unit Qty Unit Price Amount

m2 11.80 14.75 174.05


m3 5.12 98.33 503.45

m3 5.40 118.00 637.20

m3 147.50 0.00

m3 - 0.00

m3 13.99 191.43 2,678.39

m3 12.88 170.61 2,197.46

m2 7.84 130.35 1,021.94


7,212.49

m2 5.40 46.88 253.15

0.00
m3 0.48 2,333.84 1,120.24
m2 7.84 183.38 1,437.70
0.00
m2 4.80 141.45 678.96
m2 0.00

0.00
Kg 19.56 47.91 936.91
Kg 46.15 0.00
Kg 51.91 46.15 2,395.70
6,822.66
Unit Qty Amount

m3 5.13 1,017.32 5,218.85


m3 3.24 1,102.35 3,571.61
8,790.47

m3 0.48 2,333.84 1,120.24


m3 0.48 2,333.84 1,120.24
0.00
m2 10.24 141.45 1,448.45
m 2
4.80 141.45 678.96

0.00
Kg 36.36 47.91 1,741.79
98.13 46.15 4,528.85
10,638.54

m2 28.74 328.04 9,427.87


9,427.87

16.00 4,753.44

297.09
-
m2 -
564.40
ml 8.40 67.19
-
-

ml 22.50 39.85 896.63


ml 15.00 28.35 425.25
ml 16.00 102.26 1,636.16
4,954.20
ml 12.00 412.85
13,230.07
2.70 734.09 1,982.04

M2 - -

M2 2.16 719.63 1,554.40

KG -

KG - -
3,536.44

m2
71.94 103.30 7,431.40
7,431.40

m2 35.97 33.6 1,208.59


m2 35.97 43.03 1,547.79
m2 7.84 110.88 869.30
3,625.68

m2 1.70 461.53 784.60


784.60
NO 1.00 12,199.90 12,199.90

No 1.00 370.94 370.94


No 1.00 1370.21 1,370.21

No 2.00 837.53 1,675.06


0.00
ml 15.00 23.18 347.70
ml 10.00 23.18 231.80
0.00
no 2.00 54.32 108.64
no 2.00 65.62 131.24
16,435.49

Unit Qty Unit Price Amount

m2 11.80 14.75 174.05


m3 54.34 54.32 2,951.61

m3 37.64 118.00 4,441.28

m3 9.18 147.50 1,354.71

m3 9.18 210.71 1,935.27

m3 17.01 191.43 3,256.22

m3 133.19 170.61 22,724.06

m2 130.35 0.00
36,837.21

m2 18.00 46.88 843.84


0.00
m3 1.80 2,333.17 4,199.71
m2 1.35 183.38 247.56
0.00
m2 6.00 141.45 848.70
m2 9.00 13.74 123.66

0.00
Kg 37.93 46.15 1,750.28
Kg 90.67 46.15 4,184.27
Kg 46.15 0.00
Kg 46.15 0.00
Kg - 46.15 0.00
12,198.02
Unit Qty Amount

m3 37.13 1,017.32 37,768.01

m3 1,102.35 0.00
37,768.01

Unit Qty Unit Price Amount

m3 55.40 118.00 6,536.96

m3 50.78 191.43 9,721.10

m3 55.40 170.61 9,451.45


25,709.52

m2 92.33 46.88 4,328.43

0.00
m3 9.23 2,333.84 21,541.34
0.00
m 2
73.86 141.45 10,448.06
m2 0.00

0.00
Kg 184.80 47.91 8,853.77
Kg 46.15 0.00
Kg 570.49 46.15 26,328.06
71,499.67
Unit Qty Amount

m3 50.78 1,017.32 51,661.04

m3 27.70 1,102.35 30,533.99


82,195.03

m3 10.37 2,333.84 24,197.25


0.00
m2 138.24 141.45 19,554.05

0.00
Kg 193.60 47.91 9,275.38
441.60 46.15 20,379.84
73,406.52

m2 533.12 295.01 157,275.73


157,275.73

29.04 2,182.88 63390.8352


63,390.84

m2
1,758.22 103.30 181,623.71
m2 -
181,623.71
No L*W*D Qty

2 60.00
0.50

0.60 36.00
2 32.33
0.50

0.60 19.40
55.40

1 186.66
0.25

0.55 25.67
1 182.66

0.25
0.55 25.12

50.78

55.40

55.40
1 184.66
0.50 92.33

1 184.6

0.25

0.2 9.23

2 184.66
0.20 73.86

No L*W*D Qty

2 60.00
3.20 384.00
2 32.33
3.20 206.91
590.91

36 0.30
3.20 34.56
1 7.26
3.20 23
57.79
533.12

1 7.26

4 29.04
fance
Description No L*W*D

A.SUB - STRUCTURE

1.excavation & earth work


1.2 Excavate in ordinary soil for
trench foundation up to 120
2 60.00
trunch 0.50

0.55
2 32.33
0.50

0.55
M3 Net Total

1.5 Fill around mason and under


hardcore

Fill AROUND MASON 2 60.00


EXTERNAL SIDE 0.50
0.30

2 32.33
INTERNAL SIDE 0.50

0.30

TOTAL FILL
1.6 Cart away & spread surplus excavated

For Trench Excavation 36 3.20

M3 Total cart awey 0.30


2.CONCRETE WORKS 0.30
2.1 50mm thick lean concrete in C-5

UNDER MASNRY WALL


36 1.20
M2 Total 3.20

2.2 Reinforced concrete in class C-25

c) grade beam

p=60*2+33.3*2

2.3 Form Work

external & enternal side

Description No L*W*D
masnory work
HCB 20 2 590.91
m2 3.00

m2

ddt colomun

m2
DOOR
p=0.8
M2
M2
M2 total
METAL WORK
DOOR
external door

M2
Qty Description

A) below NGL from the reduced level


long side

33.00
short side

17.78
50.78 M3 total BNGL

A) ANGL from the reduced level

long side

18.00

short side

9.70
27.70 total
A.SUB - STRUCTURE
ELRVATION COLOMUN
10.37 M3 TOTAL
form work

ELRVATIO COLOMUN

138.24 m2

Qty Description
FINISHING WORK
3 COAT OF PLASTERIN
3,545.47
29 ddt dor
3,516.43 M2 total plastering
toilet & shawer

Dia Length No of bars


Location Shape (mm) (m) No.ba Elem. T.No
Grade beam GB
top & bottom
axis A & b 12 7.65 4.00 2.00 8.00
stirup 6 1.10 42.00 2.00 84.00
axis 1-5 12 3.65 4.00 3.00 12.00
stirup 6 1.10 19.00 3.00 57.00
Total length (m)
Unit weight (k.g)
Total wt (k.g)
SUB - STRUCTURE ( TOTAL )
elevation column
C-1 12 3.25 4.00 6.00 24.00
C-1(stirup) 6 0.90 18.00 6.00 108.00
top tie beam
12 7.65 4.00 2.00 8.00
stirup 6 1.10 42.00 2.00 84.00
12 3.65 4.00 3.00 12.00
stirup 6 1.10 19.00 3.00 57.00
Total length (m)
Prepared By._____________ Unit weight (k.g)
Signiture_________________ Total wt (k.g)

gene
Dia Length No of bars
Location Shape (mm) (m) No.ba Elem. T.No
Grade beam GB
top & bottom
axis A & b 12 5.90 4.00 2.00 8.00
stirup 6 1.10 33.00 2.00 66.00
axis 1-5 12 3.65 4.00 2.00 8.00
stirup 6 1.10 20.00 2.00 40.00
Total length (m)
Unit weight (k.g)
Total wt (k.g)
SUB - STRUCTURE ( TOTAL )
elevation column
C-1 12 2.95 4.00 6.00 24.00
C-1(stirup) 6 0.90 16.00 6.00 96.00
top tie beam
12 5.90 4.00 2.00 8.00
stirup 6 1.10 33.00 2.00 66.00
12 3.65 4.00 2.00 8.00
stirup 6 1.10 20.00 2.00 40.00
Total length (m)
Prepared By._____________ Unit weight (k.g)
Signiture_________________ Total wt (k.g)

gard house
Dia Length No of bars
Location Shape (mm) (m) No.ba Elem. T.No
Grade beam GB
top & bottom
axis A & b 12 3.65 4.00 2.00 8.00
stirup 6 1.10 20.00 2.00 40.00
axis 1-5 12 3.65 4.00 2.00 8.00
stirup 6 1.10 20.00 2.00 40.00
Total length (m)
Unit weight (k.g)
Total wt (k.g)
SUB - STRUCTURE ( TOTAL )
elevation column
C-1 12 3.25 4.00 4.00 16.00
C-1(stirup) 6 0.90 21.00 4.00 84.00
top tie beam
12 3.65 4.00 2.00 8.00
stirup 6 1.10 20.00 2.00 40.00
12 3.65 4.00 2.00 8.00
stirup 6 1.10 20.00 2.00 40.00
Total length (m)
Prepared By._____________ Unit weight (k.g)
Signiture_________________ Total wt (k.g)

septic tanck
Dia Length No of bars
Location Shape (mm) (m) No.ba Elem. T.No
Grade beam GB
top & bottom
axis A & b 12 4.25 6.00 2.00 12.00
stirup 8 1.50 16.00 2.00 32.00
axis 1-5 12 4.25 6.00 2.00 12.00
stirup 8 1.50 16.00 2.00 32.00
slab 10 6.55 24.00 2.00 48.00
Total length (m)
Unit weight (k.g)
Total wt (k.g)

fance
Dia Length No of bars
Location Shape (mm) (m) No.ba Elem. T.No
Grade beam GB
top & bottom
axis A & b 12 63.25 4.00 2.00 8.00
stirup 6 0.90 300.00 2.00 600.00
axis 1-5 12 33.95 2.00 2.00 4.00
stirup 6 0.90 162.00 2.00 324.00
Total length (m)
Unit weight (k.g)
Total wt (k.g)
SUB - STRUCTURE ( TOTAL )
elevation column
C-1 12 3.45 4.00 36.00 144.00
C-1(stirup) 6 1.10 22.00 36.00 792.00
Total length (m)
Prepared By._____________ Unit weight (k.g)
Signiture_________________ Total wt (k.g)
& shawer

Sub total
ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm

61.20
92.40
43.80
62.70
155.10 - - 105.00 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
34.47 - - 93.33 - - -

ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm


78.00
97.20

61.20
92.40
43.80
62.70
252.30 - - 183.00 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
56.07 - - 162.67 - - -

generetor house
Sub total
ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm

47.20
72.60
29.20
44.00
116.60 - - 76.40 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
25.91 - - 67.91 - - -

ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm


70.80
86.40

47.20
72.60
29.20
44.00
203.00 - - 147.20 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
45.11 - - 130.84 - - -

gard house
Sub total
ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm

29.20
44.00
29.20
44.00
88.00 - - 58.40 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
19.56 - - 51.91 - - -

ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm


52.00
75.60

29.20
44.00
29.20
44.00
163.60 - - 110.40 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
36.36 - - 98.13 - - -

septic tanck
Sub total
ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm

51.00
48.00
51.00
48.00
314.40
- 96.00 - 102.00 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
- 37.93 - 90.67 - - -

nce
Sub total
ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm

506.00
540.00
135.80
291.60
831.60 - - 641.80 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
184.80 - - 570.49 - - -

ø6mm ø8mm ø10mm ø12mm ø14mm ø16mm ø20mm


496.80
871.20
871.20 - - 496.80 - - -
0.222 0.395 0.617 0.889 1.210 1.580 2.469
193.60 - - 441.60 - - -
5.65
6.15
22.2222
1.3
3.95

You might also like