771838060.doc Page 1 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
Note: The minimum cover shall be 1.22 meter (4 ft) for pipeline transporting LPG
or the other highly volatile liquids.
10.11 Pipeline crossing highways and railroads shall be cased if combined stress on
the pipeline caused by external compression and internal pressure is equal or
higher than the maximum allowable stresses for operating conditions. Casing
771838060.doc Page 2 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
shall extend beyond the toe of the road ditch back slopes and shall be installed
bare.
10.12 Vents shall be installed at each end of a cased crossing. Contractor shall cut vent
holes in casing pipe prior to installing carrier pipe. Vent pipe above ground shall
be painted in accordance with Burren Resources Petroleum Limited
Specification.
10.13 A vent cap fabricated from the vent pipe shall be installed on all casing vents and
a pipeline marker sign shall be bolted to vent cap using drilled and tapper holes
provided in vent cap.
771838060.doc Page 3 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
10.16 ANCHORING
Unless continuous concrete–weight coating is specified, concrete bolt–on or set–
on lights shall be furnished and installed by Contractor on marine installations,
rivers, swamps or poor drainage areas. The pipe shall be wrapped with 6.35
millimeters (¼ inch) thick rock shield before installing the weights. After protective
coating and concrete river weights have been applied, wooden strips shall be
installed between bolt–on weights and steel cable clamped to each weight to
prevent damage to the coating while the pipe is being pulled across the river or
stream.
10.17 CLEAN–UP
The banks of all streams and rivers shall be restored to their original or better
condition. When required, the banks shall also be properly rip–rapped with sacks
filled with soil, sand, or other suitable material and properly seeded. The beds of
all rivers shall be restored to their original elevations and grade, and spoil, debris,
and other obstructions interfering with normal water flow shall be removed from
the crossing. Spoil removed from the ditch shall be kept within the limits of the
right–of–way and other areas provided for construction. These areas shall be
properly cleaned up by Contractor following the backfilling operation.
771838060.doc Page 4 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
771838060.doc Page 5 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
3.05 m
3.05 m
1.22 m
0.91 m
NOTES:
1. Contractor to install pipeline under all public roads as shown in the sketch above,
or on approved construction drawings.
2. Pipeline undercrossings of all roads shall be installed in accordance with permit
requirements or specifications provided by APL.
3. The pipeline should cross as near to right angles as possible and economically
practical.
4. For uncased road crossings, the design factor for the carrier pipe shall extend
3.05 meter (10’- 0”) beyond each ROW line.
5. When casing pipe is required, it shall be installed as required by the permit or
extend from ROW to ROW.
771838060.doc Page 6 of 13
1.22 m. max.
771838060.doc Page 7 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
1.68 m
min
0.914 m
min
1.22 m.
1.22 m. 3.05 m. max. 3.05 m. max. max.
max.
771838060.doc Page 8 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
4.57 m.
min
1.22 m.
min
771838060.doc Page 9 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
1.52 m. min.
1.52 m. min.
1.22 m.
min.
NOTES:
1. Limits of boring to extend a minimum of 1.52 meter (5’-0”) beyond toe of slope on
each side of canal.
2. Contractor shall be responsible for any damage to canal and levees and shall
repair any damage to the satisfaction of the canal owner, or governing authority.
771838060.doc Page 10 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
771838060.doc Page 11 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
771838060.doc Page 12 of 13
Burun Field SPP Facility Upgrade /
Project Issue Date 7/11/2024
Expansion
Project No. 3681-002 Revision Date 11/20/2007
Document Piping Specifications Revision No. 0
9.53 mm thick