Western Dedicated Freight Corridor- Phase I- CTP 3R - (Iqbalgarh to Vadodara)

NAME OF ENGINEERING STATUS


SL.NO ISSUES AND AREAS TO BE DEVELOPED WAY FORWARD & SUGGESTION
PROJECT DESIGN STAGE STATUS DELAY REMARKS
PRELIMINARY Design: Design:
Completed 168
DESIGN  Varied structures to be taken for the design upon
 698 nos. of minor structures are receipt of proper variation instruction from Client.
approved  Delay in providing design input of existing IR bridges
structures.  Any variation if the design team is not solved, then
 193 No’s of major structures are  Delay in completion of Topo survey and Geotechnical management needs to take the issue with highest
approved Investigation due to non-availability of access to the level of the Client and support to be provided to
TECHNICAL Design team. Management shall emphasis on
In Progress - bridge locations.
DESIGN deploying strongly capable person at
 Balance 23 No’s of minor structures span  Delay in Geotechnical Investigation & Survey data to
not finalized by Employer for proposed GC/Engineer’s office.
design submission.
new structures at station/yard  Design & drawings shall be taken up internally
connecting road  Deviation from the scope of work. within L&T.
1  Additional requirements from the Client/Engineer, which  Exclusive resources shall be deployed for project
 22 No's of pipe culvert CDP needs to be are beyond the contractual and codal requirements. and there shall be maximum cutoff period to be
submitted by site (Technical design  Delay due to non-adherence of approved drawings at maintained for which the deployed resources to be
CDP In Progress -
Approved) site for construct retained and beyond the same and based on the
WDFC-CTP-  Delay incurred by the DDC. actual situation, resources to be planned.
3R  Dedicated surveyor to be posted and it shall be
 Resource Constraint at EDRC
verified and properly benchmarked in discussion
 610 No’s of structure base case  finalization of base case alignment (delayed by 4 years). with the Client/Engineer.
In Progress submitted, and other structure designs
Base case -  Denial of approved procedures due to change in  Base case shall be submitted and approval to be
(50 No’s) are in progress as per revised
Engineer representative obtained before submission of Technical designs &
scheduled.
drawings

 Method statement submitted to PMC as mitigation


CONSTRUCTION:
measure along with RFI
 Design revision due to Execution issues during piling and  Regular site visit to be conducted by the design
substructures team and in case of issues with quality &
2 Construction In Progress -  Design revision due to Execution issues in cross girder nonadherence of drawings NCR to be issued.
and bearing pedestal.
 Nonadherence of the approved drawings

Transportation Infrastructure – Special Bridges RREC L&T Construction | 1


Sensitivity: LNT Construction Internal Use
Western Dedicated Freight Corridor- Phase I- CTP 3R - (Iqbalgarh to Vadodara)

Transportation Infrastructure – Special Bridges RREC L&T Construction | 2


Sensitivity: LNT Construction Internal Use
Western Dedicated Freight Corridor- Phase I- CTP 3R - (Iqbalgarh to Vadodara)
Salient Features of Project
Ludhiana
Project Cost (in INR) 7746 crores (RCV) DFC-Route Map
Overall Alignment Length 342 kms

Duration of Project 48 months Dadri


Rewari Khurja
Contractual start date 6th Jun’16

Contractual completion date 31st May’20


Ajmer Kanpur
Extension of Time (Date) 17th Mar’23
Mughalsarai
Design Life & speed 100 yrs & 100 kmph
Somnagar
Type of Total scope Iqbalgarh
S. No
structures (No's)
1 Minor structures 376 Ahmedabad Dankuni
CTP 3R (288 km)
2 Minor RUB 271
Makarpura
3 Major bridge 113 (Vadodara)
4 major RUB 46 Sachin
5 important bridge 5
6 Rail fly over bridge 16 Vaitarna
7 Road over bridge 13
8 Pedestrian subway 10 JNPT
9 Foot over bridge -
CLIENT: ENGINEER: CONTRACTOR:
10 Track crossing 41
11 Minor structures for road 23
Total 914

Transportation Infrastructure – Special Bridges RREC L&T Construction | 3


Sensitivity: LNT Construction Internal Use
Western Dedicated Freight Corridor- Phase I- CTP 3R - ( Iqbalgarh to Vadodara)

DESCRIPTION – DESIGN STAGES TARGET DATE – SUBMISSION TARGET DATE - APPROVAL


SL.NO
(WITH PMC)
PLANNED ACTUAL PLANNED ACTUAL
1 Inception Stage 18.07.2016 18.07.2016 08.08.2016 25.02.2017
2 Technical Stage Design (TD) 29.12.2016 11.12.2016 29.06.2017 23.03.2023
3 Construction Design Package (CDP) 03.11.2016 06.01.2017 27.07.2017 Ongoing

Current Design Status


Approved Status
Type of Scope
S. No. Authority/ Technical Remark
structures (No's) CDP
Employer design
Minor
1 721 698 698 676 1. * Span not finalized by Employer for proposed new
structures
structures at station/yard connecting road (23 No’s).
Major 2. ** 22 No's of pipe culvert CDP needs to be submitted by site
2 193 193 193 193
structures (TD Approved)
Total 914 891 891* 869**

 As per Contract Design stage is only Coordination Event to the Construction Milestone

Transportation Infrastructure – Special Bridges RREC L&T Construction | 4


Sensitivity: LNT Construction Internal Use
Western Dedicated Freight Corridor- Phase I- CTP 3R - (Iqbalgarh to Vadodara)

Critical concerns for Design


 Delay in completion of Topo survey and Geotechnical Investigation by 6 Month due to non-availability of access to the bridge
locations.
 Delay in providing the data for parallel structures (parallel to IR Structures) like HFL, IR Completion plan, IR Bridge register, Spanning
Configuration, discharge, dimensions of existing IR bridges, etc., the complete design inputs were received after 1 year
 Delay in handing over the land to the Contractor by 8 month and Last 2km handed over on Oct 2019
 Delay in finalization of spanning arrangement for structures (structures proposed by Client in their documents are not considering
the requirements of concern authorities like IR/NHAI/SH/PWD/WRD/IOCL/etc.,)
 Frequent change in the span configuration and type superstructures by authority after approval as resulted in delay
 Delay in finalization of alignment which was due to issues in topo survey details and also due to changes in the bridge configuration
as per the concern authority’s requirements.
 Introduction of new (additional) structures (117 Nos.) in the Contractor’s Scope of work during the detail design stage. This is due to
the reason that feasibility study carried out by Client/PMC are not dually considering the Concern Authority’s requirements.
 Delay due to unreasonable requirements/demands by the PMC/Client.
 Delay due to non-adherence of approved drawings at site for construction.
 Delay due to submission by the Detailed Design Consultant.
Transportation Infrastructure – Special Bridges RREC L&T Construction | 5
Sensitivity: LNT Construction Internal Use
Western Dedicated Freight Corridor- Phase I- CTP 3R - ( Iqbalgarh to Vadodara)

Base Case Design Status


TARGET DATE – SUBMISSION TARGET DATE - APPROVAL
DESCRIPTION – DESIGN STAGES
SL.NO
(WITH PMC)
PLANNED ACTUAL PLANNED ACTUAL

1 Major Structures 31.10.2023 15.11.2023 31.12.2023 Ongoing


2 Minor Structures 31.10.2023 15.11.2023 31.12.2023 Ongoing

Critical concern for Base case design

 Delay in finalization of base case alignment (delayed by 4 years).


 Delay due to inadequate resource with EDRC and due to series of site related issues to be attended.
 Delay due to denial of approved procedures due to change in Engineer representative.