Professional Documents
Culture Documents
Hydraulic Calc_BISHANPUR.xlsx1
Hydraulic Calc_BISHANPUR.xlsx1
2) Existing Bridge:
i) There is no existing bridge at the proposed Bridge location.
From the above three data and also considering the suitable abutment location and site condition,the proposed
bridge has been fixed as the details given below:
Span Arrangement = RCC T Beam 16 mX 2
Type of structure = RCC. T-Girder Bridge.
Total Bridge length = 34.34 m