Professional Documents
Culture Documents
Csm Product Contexts
Csm Product Contexts
What's a Product? CYNEFIN COST OF DELAY HOW SCRUM HELPS IN MAXIMIZING ROI COST OF PRODUCTION
Confirming
Sunk Cost Inefficient Processes
Creating
PAINS GOALS
Cure for
that a person
ANALYZ is infected by
COVID-19 PROBE SENSE .... SENSE RESPOND
E COVID-19
Opportunity Cost REVENUE PROFIT
Inefficient Tools
OPTIMIZE FOR PRODUCT OPTIMIZE Penalty
NEEDS
LEARNING THINKING
PROJECT Inefficient Polices
(Requirements) FOR SKILLS THINKING
Cost of Quality EFFICIENT
USEFUL Inefficient Structures
SOLUTIONS
Requirements Solution
PRODUCT SYSTEM
NOT INEFFICIEN
OPTIMIZE FOR SURVIVAL OPTIMIZE FOR OPERATIONAL
Controlng SAFETY THINKING REPEATABILITY THINKING USEFUL T
Corona
outbreak
Sprint Sprint
Review Retro
SYSTEM
Fixed Bid Contracts Unnamed area
Standard Operating Procedure
PRODUCT LIST THE PROJECTS THAT FIT IN THE CONTEXT HERE
PROCESS STRUCTURE CONTRACT
A set process based on past A contract that is bound CONTEXT
experience which focuses on by time, cost and scope
optimizing for repeatability and (all three are fixed) MASS
CALL CENTER MAINTENANC
automation BEST FIXED PRODUCTION
OF CARS
OPERATIONS E LEVEL 1
OBVIOUS COMPONENT
PRACTICE BID
Novel Practices
500k OPPORTUNITY
COST
USD
A team that have only specialist Component Team Component Team Component Team
A team that has all the skill for a specific area of solution
sets required to build the like only analysts, only
solution end to end. Programmer Test Engineer Architect programmers etc.
Test Engineer Test Engineer Build &Release Build &Release
Architect Architect
UI Developer Build &Release Tech Writer Programmer Programmer Programmer Test Engineer Test Engineer
Architect Architect Build &Release
Painter Carpenter Designer