4
335
300
500
250
550
2150
1900
ELVATION : STRUCTURE WITH FOUNDATION
DISTRICT OF ANDHRA PRADESH-DCR THIS DRAWING IS PROPERTY OF TATA POWER DISTRICT OF ANDHRA PRADESH-DCR
04.08.15 04.08.15 04.08.15 R0
for 24 Module mounting structure SOLAR SYSTEMS LTD,AND MAY NOT BE COPIED
UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE IN mm for 24 Module mounting structure
NAME OF THE PACKAGE:
DWG NUMBER-
(IN WHOLE OR IN PART) USED FOR MANUFACTURE
OR DISCLOSED WITHOUT PRIOR CONSENT TATA TOLERANCES
SCALE PART/DWG SHEET SIZE
± 1mm
ONE D.P.
± 0.5mm
TWO D.P.
± 0.25mm
ANGLES
± 0.5°
NTS
TPS023-CV-203-R1
A3
Embedment length for 96 x 48mm leg into the pile foe both uplift and Bending Moment
Tensile force exerted on 48mm face due to moment = Moment /Lever arm
Lever arm in the present case = distance between the 48mm face = 96mm
= 28.12 kN
Hence total ultimate tensile force acting on 48mm face = (2.72+28.12) x 1.5
= 46.26 kN
Hence Safe
However, in order to take care for the uncertainties in ensuring the compacted concrete inside