BOQ 123 Plain
600 mm diameter as
i m 9
indicated on drawings
22.07: Cast in situ concrete and formwork
Concrete Class 25 in
inlet, outlet structures
and surrounding,
ii m3 20
including formwork
and Class U2 surface
finish
Excavation for
b m3 348
concrete pitching
3600: Selecting and Utilizing Material From Borrow Pits and Cuttings
36.01: Excavations:
Improved subgrade
a m3 370
layer as specified in the
Drawings to require
minimum G15 quality
material
Improved subgrade
layer as specified in the
b Drawings to require m3 65
minimum G7 quality
material.
Cement Stabilizing
b Layer, Material Class m3 361
C1
MC-30 Cut-back
bitumen including
a Litres 2140
blinding
material(0.9litres/m2
4500: Double Surface Dressings
45.01: Double Surface Dressing Using:
Code/SN Description Unit of Measure Quantity Unit Rate
Upgrading to Double Surface Dressing along Mipingo Road and Jinjo Road in Ruangwa District.
SERIES 1000 : GENERAL
removal and/or
alteration to Services
provided by Agencies
for Electricity Supply,
Water Supply and
Telecommunication
Services.
Insurance of
c Constructional Plant & LS 1
Equipment
Special Tests on
Selected Construction
Materials and Road
a Furniture to be carried PS 1 2000000
out by an independent
laboratory chosen by
the Engineer
900mm diameter
ii reinforced concrete m 8
class 25
1200mm diameter
iii reinforced cocncrete m 16
class 25
Concrete Class 25 in
inlet, outlet structures
and surrounding,
ii m3 56
including formwork
and Class U2 surface
finish
Excavation for
b m3 2880
concrete pitching
Removal of Box
Culverts and Slabs
b No 2
including Headwlls,
Wingwall and Apron
3600: Selecting and Utilizing Material From Borrow Pits and Cuttings
36.01: Excavations:
Common excavation to
a m3 1000
spoil
Improved subgrade
layer as specified in the
a Drawings to require m3 959
minimum G15 quality
material
Improved subgrade
layer as specified in the
b Drawings to require m3 983
minimum G7 quality
material
Cement Stabilizing
b Layer, Material Class m3 913
C1
MC-30 Cut-back
bitumen including
a Litres 5405
binding
material(0.09litres/m2)
a: Common excavation in soft material situated within the following successive depth ranges:
Code/SN Description Unit of Measure Quantity Unit Rate
i 0 m up to 2 m m3 20
Series 6300: : Steel Reinforcement for Structures
63.01: Steel reinforcement for:
High-yield-stress-steel
ii tonnes 6.19
bars(460N/mm2)
Series 6400: : Series 6400: Concrete for Structures
64.01: Cast in situ concrete:
d Hardcore m3 35
Total
Total
Total
Total
Total
NE
Total
Total
Total
Total
Total
Total
Total
Total
ict.
Total
10,000,000
Total
Total
Total
Total
1,000,000
Total
2,000,000
Total
Total
Total
Total
Total
NE
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total