Professional Documents
Culture Documents
SONATES INVESTMENT PROPOSAL TO DANGOTE PETROCHEMICALS FOR IMPLEMENTION AND ACCREDITATION TO ISO 17025 2017
SONATES INVESTMENT PROPOSAL TO DANGOTE PETROCHEMICALS FOR IMPLEMENTION AND ACCREDITATION TO ISO 17025 2017
REFINERY –SRIL/LMS/P-FZE/002
SUBMITTED TO
MAY 2024
1
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
CONTENTS
1 INTRODUCTION....................................................................................................................................3
1.1 General.........................................................................................................................................3
2 SCOPE OF WORK..................................................................................................................................3
4 EXECUTION PLAN.................................................................................................................5
4.1 General............................................................................................................................5
4.3 Methodology....................................................................................................................6
4.5 Communication/Reporting................................................................................................6
5 PROPOSAL PRICE................................................................................................................ 7
6 TERMS OF PAYMENT........................................................................................................................... 7
7 CLARIFICATION.................................................................................................................................... 7
8 VALIDITY.............................................................................................................................................. 8
9 CONCLUSION....................................................................................................................................... 8
10 THE COMPANY.................................................................................................................................... 9
2
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
1 INTRODUCTION
1.1 General
To comply with the International Organization for Standardization’s requirements on ISO/IEC
17025 General requirements for competence of testing and calibration laboratories) in
order to enhance the credibility, validity and accuracy of your testing your products . ISO/IEC
17025 is the international standard that sets out the general requirements for the competent,
impartial, and consistent operation of laboratories. It specifies the activities that must be included
in laboratory operations to promote confidence in its ability to produce valid and consistently
reliable testing, calibration, and sampling results.
Sonates Resources Investments Limited wishes to submit a proposal to the DANGOTE
PETROCHEMICAL FZE to provide technical support and advisory services for the implementation
of the above-mentioned standard in your organizational processes leading to accreditation of
your testing services.
3
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
2 SCOPE OF WORK
The scope of work covers gap analysis, creation of awareness, documentation, implementation
guidance and internal audit of ISO/IEC 17025 requirements within DANGOTE PETROCHEMICAL
FZE preparatory to accreditation by a competent accreditation body.
The details of the various activities containing methodologies, responsibilities time frames and
cost implications are provided below
4
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
5
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
the locations
Auditors Training conduct Auditors Course for days Consultants SON rate *
successful candidates from Why Can’t
the implementation course SONATES
OFFER
THIS?
@ 2,000,000
6
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
implementation course on
auditing skills (20 staff
only).
7
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
TOTAL 18,730,000
4 EXECUTION PLAN
4.1 General
The sections highlight the execution plan for the work scope to ensure effective
management of the execution process.
4.2 Structure and Responsibilities
While it’s the responsibility of Sonates to establish a workable assessment plan,
it’s the responsibility of Management of PETROCHEMICAL FZE to ensure full
cooperation of staff and availability of information. A detailed project plan following
the work breakdown structure shall be developed in consultation with
PETROCHEMICAL FZE Management
4.3 Methodology
Sonates will conduct gap analysis to establish current status of system
documentation and practices, create awareness, conduct trainings, develop
documentation and guide in conducting internal audit in line with the ISO standard
requirements and provide guidance for implementation of the standard within
PETROCHEMICAL FZE
Processes
4.5 Communication/Reporting
8
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
The Company shall nominate one focal representative for this service through
which Sonates shall communicate and/report on its activities. This does not
undermine formal reporting to Management if requested by Sonates or
PETROCHEMICAL FZE Laboratory Management.
5 PROPOSAL PRICE
1. Professional fee
4.
5.
TOTAL
9
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
6 TERMS OF PAYMENT
7 CLARIFICATION
(i) The financial implication of the proposal is as stated in this section. It excludes
the logistics for the consultants as this cannot be pre-determined.
(ii) It also excludes logistics of any staff of PETROCHEMICAL FZE whose service
may be required during the execution
(iii) Other logistics like photocopy of forms, printing, meeting venues, etc are the
responsibilities of PETROCHEMICAL FZE.
(iv) The stated dates are tentative and dependent on the date of contract approval.
8 VALIDITY
The proposal is valid for (3) three months.
9 CONCLUSION
This proposal has been carefully planned based on the experiences and expertise
of Sonates team of auditors/assessors/evaluators so as to ensure hitch free
10
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
11
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
10 THE COMPANY
Sonates Resources Investments Limited (SRIL) was formally registered with
Corporate Affairs Commission (CAC) as a business name in 2007 as Damager
Ventures. No sooner than it was registered that the company started attracting
customers from all over the country as consultant in Management Systems. In June
2015, the name of the company was changed to Sonates Resources Investments
limited and was re-registered with CAC as a limited liability company to allow for
expansion in the business scope, flexibility in its operations and to cope with the
ever-expanding clients’ data base. Registration was a turning point in the history of
the company as the name became a household name in its business areas. The
company which offers its customer excellent services based on four (4) operating
principles has one permanent objective-CUSTOMER DELIGHT. These principles
incidentally coincides with the company name are:
Speedy delivery
Reliability
Integrity
Leverage
PRODUCTS -The Company provides its esteemed customers with the following
products
12
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
13
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
Quality Inspection
General Engineering Contracts
IT Services (equipment supply, installation and maintenance)
Customized IT trainings
Internet Services Provision
Networking
Sonates has over ten lead auditors and other qualified auditors that have
distinguished themselves in the field using the classical trainings offered them
and their wealth of experience to achieve the above objective.
In addition, SRIL has recruited and trained scientists and engineers that manage
contracts and general supplies beyond the expectations of our customer.
OUR OBJECTIVE - Customer delight
14
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
15
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
16
PROPOSAL TO DANGOTE PETROLEUM
REFINERY –SRIL/LMS/P-FZE/002
Installation
Installation
Installation
17