KAIA WORKS LIMITED - CEC

Contract No: PPC OWDPC – PPC – COI – R&B 016/2023

Project Title: EMERGENCY ROAD MAINTENANCE & SEALING OF 7KM OF NORIKORI TO


KORONA IN OBURA WONENARA DISTRICT OF EASTERN HIGHLANDS PROVINCE

BILL OF QAUNTITIES

ITEM DESCRIPTION UNIT QTY

1 Group 1 – General Clauses


Allow for Insurance of the Works (Clause 21.22 & 24 of the Condition
1.1 LS 1.00
of Contracts)
Traffic control measures are in place at all times to ensure the safety
of both pedestrian and vehicular traffic as directed by the Employer's
1.2 LS 1.00
Superintendent and in accordance with Clause 1.7 of the DOW
Specifications.
Contractor's Environmental Management Plan (CEMP) in accordance
1.3 with Clause 1.16 of the DOW Specifications and as directed by the LS 1.00
Employer's Superintendent
Contractor's Quality Control Measures for both workmanship and
1.4 Month 6.00
construction materials
This provision allows for the engagement of Community or Public
1.5 LS 1.00
Relations Officer
This provision allows for the complete survey and design in
1.6 accordance with the Scope of Works and as specified and directed LS 1.00
by the Employer
Sub Total As - Bill No. 01

2 Group 2 – Establishment
2.1 Mobilisation of Contractor and its Site Establishment LS 1.00
2.2 Maintenance of Constrictor’s Site Establishment Month 6.00
2.3 Demobilisation and removal of all Site Establishments LS 1.00
Purchase a fully kitted Toyota Land Cruiser 4 Door complete with on-
2.4 No. 1.00
the-road-cost as project supervision vehicle.
2.5 Supply fuel and maintenance to Engineer's Supervision Vehicles Month 6.00

Supply Engineer's Communication Equipment and maintenance of


2.6 Month 6.00
communication systems as specified by the Engineer

2.7 Supply, erect and remove Project Notice Boards No. 2.00
Sub Total As - Bill No. 02

3 Group 3 – Clearing, Grubbing and Stripping of Topsoil

14/12/2023 BOQ_Norikori Korona Road_K92_Dec. 2023 1


ITEM DESCRIPTION UNIT QTY

Clearing & grubbing of right - off - way including the removal and
3.1 disposal of spoils, tree stumps and roots, and any other foreign Ha 1.40
material within the area of Work
Sub Total As - Bill No. 03

4 Group 4 – Earthworks
General Excavation of Type G material for both widening and slip
4.1 clearing including the carting and disposal to accepted disposal sites m3 4,013.49
in accordance with the CEMP

Excavate and repair soft spot with the supply, place and compacting
4.2 m3 1,697.38
of granular material the provision of geo fabric material

Supply, place, spread and compact select fill to designated washed


4.3 m3 2,126.25
out and depressed sections as directed by the Engineer

Construct earth drains and turn offs as directed by the Engineer at


4.4 m3 412.50
designated locations
Sub Total As - Bill No. 04

5 Group 5 – Base and Sub-Base Pavement Courses


Supply, place, spread and compact 200mm thick mountain gravel as
m3
5.1 Capping Layer material 2,800.00
Supply, place, spread and compact 200mm thick crushed river gravel
m3
5.2 sub base pavement course 6,825.00
Supply, place, spread and compact 150mm thick crushed river gravel
m3
5.3 road base pavement course 6,300.00
Sub Total As - Bill No. 05

6 Group 6 – Bituminous Surfacing

6.1 Prime pavement surface including the Provision of blotter material m2 42,000.00

Apply first coat seal using 19mm nominal size precoated sealing
6.2 m2 38,500.00
chips
Apply second coat seal using 14mm nominal size precoated sealing
6.3 m2 35,000.00
chips
Sub Total As - Bill No. 06

7 Group 7 – Drainage
Remove Existing Culverts <Ø1200 mm including excavation &
7.1 No. 8.00
backfilling
7.2 Supply and install new culverts (CMP)
a) Ø 450 mm m -
b) Ø 600 mm m 56.40
c) Ø 900 mm m 39.00
d) Ø 1200 mm m 7.80

14/12/2023 BOQ_Norikori Korona Road_K92_Dec. 2023 2


ITEM DESCRIPTION UNIT QTY

7.3 Supply and install new multi plate culverts


a) Ø 1500 mm m 15.00
7.4.1 End treatment works, Type A Headwalls
a) Ø 450 mm No. 2.00
b) Ø 600 mm No. 14.00
7.4.2End treatment works, Type G Headwalls, Wingwalls and Aprons
c) Ø 900 mm No. 6.00
d) Ø 1200 mm No. 4.00
Construct concrete headwalls, wingwalls and aprons as specified by
7.5 the Specific Contract Drawings and in accordance with the
Specifications
a) Ø 1500 mm No. 2.00
Construct concrete stone pitched open lined drains in accordance
7.6 with Clause 7.11 of the Specifications, including the supply of
workmanship and material
a) Type 3 m -
b) Type 4 m 1,242.00
c) Type 5 m -
d) Type 6 m 151.00
Construct sub soil drain with the provision of UPVC properly laid on a
7.7 m 666.00
well – prepared bedding
Sub Total As - Bill No. 07

8 Group 8 – Road Furniture and Markings

8.1 Steel beam guardrails and posts shall be constructed and erected in m 130.00
accordance with the Drawings or as directed by the Engineer
8.2 Pavement Markings
i) Edge Line m 14,000.00
ii) Broken & solid line m 1,650.00
Iii) Double barrier line m 1,670.00
iv) Hazard line m 200.00
v) Broken line m 3,480.00
Sub Total As - Bill No. 08

14 Group 14 – Concrete for Structures


Construct C200 Standard Bailey Bridge Abutment in accordance with
14.1 No. 2.00
the Specifications and Technical Drawings
Construct concrete drive over slabs in accordance with the Special
14.2 No. -
Provisions and as directed by the Engineer
Sub Total As - Bill No. 14

17 Group 17 – Miscellaneous Bridgeworks Items


Construct, maintain and remove temporary bypass to bridge
17.1 No. 1.00
construction sites as directed by the Engineer

14/12/2023 BOQ_Norikori Korona Road_K92_Dec. 2023 3


ITEM DESCRIPTION UNIT QTY

Remove existing steel bridge (5 bay standard bailey), including


17.2 clearing of site and disposing off all spoils as directed by the Engineer No. 1.00
in accordance with the CEMP

The Supplying, assembling and launching of Compact 100 Bailey


17.3 Bay 6.00
Bridges, including the provision of false work and counter weights

Sub Total As - Bill No. 17

18 Group 18 – River Training and Bed and Bank Protection


Construct gabion retaining structures to designated slip locations
18.1 m3 454.00
and as embankment protection works.
Execute river training works as directed by the Engineer at designated
18.2 m3 -
locations
Sub Total As - Bill No. 18

Sub - Total

CONTINGENCIES (5% of Sub Total)


VAT (10%)

TOTAL BID PRICE

The bid price is of ___________________________________ Kina and _____________ Toea


(PGK ____________) inclusive of 10% GST.

Name of Bidder: _____________________________________

Signature of Authorized Personnel _____________________________________

Date of Bid: ____________________________________

14/12/2023 BOQ_Norikori Korona Road_K92_Dec. 2023 4