STEEL CALCULATION

A) FOOTING
SR.NO. L B SPACING LENGTH OF BAR BAR QTY PER FOOTING
1.00 1.52 1.52 0.15 2.12 21.00
2.00 1.68 1.68 0.15 2.28 23.00

B) COLUMNS MAIN STEEL


SR.NO. L B SPACING LENGTH OF BAR BAR QTY PER COLUMN
1.00 0.38 0.23 0.15 7.93 6.00
2.00 0.46 0.23 0.15 7.93 8.00

C) COLUMNS STIRRUPS
SR.NO. L B SPACING LENGTH OF BAR BAR QTY PER COLUMN
1.00 0.38 0.23 0.15 1.52 52.85
2.00 0.46 0.23 0.15 1.68 52.85

D) PLINTH LEVEL MESH


SR.NO. L B SPACING LENGTH OF BAR BAR QTY PER FOOTING
1.00 11.13 9.76 0.3 11.73 75.00

E) SLAB STEEL
SR.NO. L B SPACING LENGTH OF BAR BAR QTY
1.00 11.13 9.76 0.15 12.33 149.00

B) BEAM MAIN STEEL


SR.NO. L B SPACING LENGTH OF BAR BAR QTY PER COLUMN
1.00 0.38 0.23 0.15 7.93 6.00
2.00 0.46 0.23 0.15 7.93 8.00
FOOTING QTY BAR SIZE WEIGHT
6 10 332.0
8 10 518.0
850.0 KG

COLUMN QTY BAR SIZE WEIGHT


6 12 254.0
8 12 451.0
705.0 KG

COLUMN QTY BAR SIZE WEIGHT


6 6 108.0
8 6 159.0
267.0 KG

FOOTING QTY BAR SIZE WEIGHT


1 6 196.0

196.0 KG

SLAB QTY BAR SIZE WEIGHT


1 8 726.0

726.0 KG

COLUMN QTY BAR SIZE WEIGHT


6 12 254.0
8 12 451.0
705.0 KG