HACIENDA CONSUELO

FIELD ACCOMPLISHMENT REPORT


Crop Year 2024-2025

For the period of 03/19/2024 to 03/25/2024

No of Work Work Work Add'l


Field # Date Workers Work Description Rate Unit Volume Pay Pay
11-A Area: 1.8 Culture: New Plant Variety: 2007-66 Date Planted 12/1/2023
REGULAR
03-19-24 1 Operator-Service Spray(440.00 55.00 /hour 2 110.00 0.00
daily)
8 Spray Fiprol(440.00 daily) 55.00 /hour 16 880.00 0.00
Totals: 990.00 0.00 990.00

Field Total: 990.00


20-A Area: 3.17 Culture: New Plant Variety: 84-524 Date Planted 10/15/2023
REGULAR
03-19-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator Supply Irrigation 55.00 /hour 8 440.00 275.00
03-20-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator Supply Irrigation 55.00 /hour 8 440.00 275.00
03-21-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator Supply Irrigation 55.00 /hour 8 440.00 275.00
03-22-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator Supply Irrigation 55.00 /hour 8 440.00 275.00
03-23-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator Supply Irrigation 55.00 /hour 8 440.00 275.00
03-24-24 2 Sunday Rate 30% 132.00 /day 2 264.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator Supply Irrigation 55.00 /hour 8 440.00 275.00
Totals: 5,544.00 3,300.00 8,844.00

Field Total: 8,844.00


20-B Area: 0.6 Culture: New Plant Variety: 84-524 Date Planted 1/12/2024
REGULAR
03-19-24 1 Operator-Service Spray(440.00 55.00 /hour 2 110.00 0.00
daily)
8 Spray Fiprol(440.00 daily) 55.00 /hour 16 880.00 0.00
Totals: 990.00 0.00 990.00

Field Total: 990.00


22 Area: 4.27 Culture: New Plant Variety: 84-524 Date Planted 1/12/2024
REGULAR
03-19-24 1 Operator-Service Spray(440.00 55.00 /hour 4 220.00 0.00
daily)
8 Spray Fiprol(440.00 daily) 55.00 /hour 32 1,760.00 0.00
Totals: 1,980.00 0.00 1,980.00

Field Total: 1,980.00

/JP Document Date: 26-Mar-24 9:57:17 AM Page 1 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
27-B Area: 1.39 Culture: Ratoon 1 Variety: 2008-57 Date Planted 11/14/2023
REGULAR
03-19-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-20-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-21-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-22-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-23-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-24-24 1 Sunday Rate 30% 132.00 /day 0.5 66.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
Totals: 1,386.00 825.00 2,211.00

Field Total: 2,211.00


29-B Area: 0.99 Culture: New Plant Variety: 2007-66 Date Planted 1/23/2024
REGULAR
03-20-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
03-21-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
03-22-24 1 Application Fertilizer(F3)440.00 55.00 /hour 4 220.00 0.00
daily)
Totals: 1,980.00 275.00 2,255.00

Field Total: 2,255.00


30 Area: 2.92 Culture: New Plant Variety: 84-524 Date Planted 1/3/2024
REGULAR
03-19-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
1 Application Fertilizer(F2)440.00 55.00 /hour 8 440.00 0.00
daily
03-20-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
03-21-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
03-22-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
1 Application Fertilizer(F3)440.00 55.00 /hour 4 220.00 0.00
daily)
03-23-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
03-24-24 2 Sunday Rate 30% 132.00 /day 2 264.00 0.00
2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
7 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 0.48 866.40 0.00
by tama
Totals: 7,070.40 825.00 7,895.40

Field Total: 7,895.40


32 Area: 1.39 Culture: New Plant Variety: 84-524 Date Planted 12/29/2023
REGULAR
03-19-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.40
03-20-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
03-21-24 2 Irrigation(440.00 daily) 55.00 /hour 14 770.00 0.00
03-24-24 10 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 0.4 722.00 0.00
by tama
Totals: 3,252.00 274.90 3,526.90

Field Total: 3,526.90

/JP Document Date: 26-Mar-24 9:57:17 AM Page 2 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
36 Area: 1.12 Culture: New Plant Variety: 2007-66 Date Planted 11/13/2023
REGULAR
03-19-24 2 Application Fertilizer(F4)440.00 55.00 /hour 16 880.00 0.00
daily
Totals: 880.00 0.00 880.00

Field Total: 880.00


39 Area: 4 Culture: New Plant Variety: 84-524 Date Planted 9/30/2023
REGULAR
03-20-24 10 Gupod Pamatdan @700.00/Lacsa 700.00 /Lacsa 3.88 2,716.00 0.00
3 205.00/lacsa(Hakot Patdan By 205.00 /lacsa 1.79 366.95 0.00
Trailer)Inside
4 440.00 Isip Patdan Daily 55.00 /hour 16 880.00 0.00
03-21-24 5 Gupod Pamatdan @700.00/Lacsa 700.00 /Lacsa 2.33 1,631.00 0.00
3 205.00/lacsa(Hakot Patdan By 205.00 /lacsa 3.43 703.15 0.00
Trailer)Inside
03-22-24 2 440.00 Isip Patdan Daily 55.00 /hour 8 440.00 0.00
Totals: 6,737.10 0.00 6,737.10

Field Total: 6,737.10


41-A Area: 5.06 Culture: New Plant Variety: 2007-66 Date Planted 10/25/2023
REGULAR
03-19-24 4 Road Repair(440.00 daily|) 55.00 /hour 16 880.00 0.00
3 Operator- Road Repair(440.00 55.00 /hour 9 495.00 0.00
daily)
Totals: 1,375.00 0.00 1,375.00

Field Total: 1,375.00


42-A Area: 2.66 Culture: New Plant Variety: 84-524 Date Planted 12/26/2023
REGULAR
03-19-24 4 Road Repair(440.00 daily|) 55.00 /hour 16 880.00 0.00
3 Operator- Road Repair(440.00 55.00 /hour 9 495.00 0.00
daily)
03-20-24 4 Road Repair(440.00 daily|) 55.00 /hour 28 1,540.00 0.00
3 Operator- Road Repair(440.00 55.00 /hour 12 660.00 0.00
daily)
Totals: 3,575.00 0.00 3,575.00

Field Total: 3,575.00


42-B Area: 2.93 Culture: New Plant Variety: 84-524 Date Planted 12/23/2023
REGULAR
03-21-24 5 Road Repair(440.00 daily|) 55.00 /hour 40 2,200.00 0.00
1 Operator- Road Repair(440.00 55.00 /hour 4 220.00 0.00
daily)
Totals: 2,420.00 0.00 2,420.00

Field Total: 2,420.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 3 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
43-A Area: 4.82 Culture: Ratoon 1 Variety: 84-524 Date Planted 12/16/2023
REGULAR
03-22-24 7 Road Repair(440.00 daily|) 55.00 /hour 21 1,155.00 0.00
28 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 2.47 4,458.35 0.00
by tama
Totals: 5,613.35 0.00 5,613.35

Field Total: 5,613.35


43-B Area: 5.18 Culture: New Plant Variety: 2007-66 Date Planted 1/25/2024
REGULAR
03-21-24 3 Irrigation(440.00 daily) 55.00 /hour 24 1,320.00 275.00
03-22-24 1 Irrigation(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
4 205.00/lacsa(Hakot Patdan By 205.00 /lacsa 3.13 641.65 0.00
Trailer)Inside
2 440.00 Isip Patdan Daily 55.00 /hour 8 440.00 0.00
03-23-24 3 Irrigation(440.00 daily) 55.00 /hour 24 1,320.00 412.50
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
7 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 0.58 1,046.90 0.00
by tama
03-24-24 4 Sunday Rate 30% 132.00 /day 3.5 462.00 0.00
3 Irrigation(440.00 daily) 55.00 /hour 24 1,320.00 275.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
Totals: 7,650.55 1,375.00 9,025.55

Field Total: 9,025.55


45-A Area: 9.27 Culture: New Plant Variety: 2007-66 Date Planted 12/11/2023
REGULAR
03-22-24 1 Hagbas Mayor Kalog (6.00) 6.00 /Fatt 42 252.00 0.00
Totals: 252.00 0.00 252.00

Field Total: 252.00


46 Area: 3.74 Culture: New Plant Variety: 84-524 Date Planted 12/8/2023
REGULAR
03-19-24 1 Hagbas Mayor Kalog (6.00) 6.00 /Fatt 60 360.00 0.00
03-20-24 1 Hagbas Mayor Kalog (6.00) 6.00 /Fatt 70 420.00 0.00
03-21-24 1 Hagbas Mayor Kalog (6.00) 6.00 /Fatt 50 300.00 0.00
03-22-24 1 Hagbas Mayor Kalog (6.00) 6.00 /Fatt 20 120.00 0.00
03-23-24 1 Hagbas Mayor Kalog (6.00) 6.00 /Fatt 127 762.00 0.00
Totals: 1,962.00 0.00 1,962.00

Field Total: 1,962.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 4 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
48 Area: 5.63 Culture: New Plant Variety: 84-524 Date Planted 1/25/2024
REGULAR
03-19-24 6 Spot Weeding(440.00 Daily) 55.00 /hour 48 2,640.00 0.00
03-20-24 5 Spot Weeding(440.00 Daily) 55.00 /hour 40 2,200.00 0.00
03-21-24 1 Operator -Backdose(440.00 daily) 55.00 /hour 4 220.00 0.00
3 Irrigation(440.00 daily) 55.00 /hour 20 1,100.00 275.00
03-22-24 1 Irrigation(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-23-24 11 Spot Weeding(440.00 Daily) 55.00 /hour 88 4,840.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-24-24 1 Sunday Rate 30% 132.00 /day 0.5 66.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
Totals: 12,166.00 687.50 12,853.50

Field Total: 12,853.50


49 Area: 3.01 Culture: Ratoon 1 Variety: 2007-66 Date Planted 12/5/2023
REGULAR
03-19-24 3 Irrigation(440.00 daily) 55.00 /hour 24 1,320.00 412.50
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
1 Application Fertilizer(F3)440.00 55.00 /hour 8 440.00 0.00
daily)
03-20-24 3 Irrigation(440.00 daily) 55.00 /hour 24 1,320.00 412.50
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
2 Application Fertilizer(Super Save 55.00 /hour 16 880.00 0.00
Urea)440 dailyl
03-21-24 1 Operator -Backdose(440.00 daily) 55.00 /hour 4 220.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
2 Application Fertilizer(Super Save 55.00 /hour 16 880.00 0.00
Urea)440 dailyl
03-22-24 7 Road Repair(440.00 daily|) 55.00 /hour 14 770.00 0.00
03-23-24 6 Road Repair(440.00 daily|) 55.00 /hour 24 1,320.00 0.00
Totals: 7,810.00 1,237.50 9,047.50

Field Total: 9,047.50


50 Area: 2.1 Culture: New Plant Variety: 84-524 Date Planted 1/19/2024
REGULAR
03-19-24 3 Irrigation(440.00 daily) 55.00 /hour 24 1,320.00 412.50
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-20-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-21-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
Totals: 1,980.00 825.00 2,805.00

Field Total: 2,805.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 5 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
51 Area: 1.96 Culture: New Plant Variety: 84-524 Date Planted 1/19/2024
REGULAR
03-19-24 3 Irrigation(440.00 daily) 55.00 /hour 12 660.00 137.50
03-20-24 6 Irrigation(440.00 daily) 55.00 /hour 32 1,760.00 412.50
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-22-24 7 Road Repair(440.00 daily|) 55.00 /hour 21 1,155.00 0.00
03-23-24 6 Road Repair(440.00 daily|) 55.00 /hour 24 1,320.00 0.00
Totals: 5,115.00 687.50 5,802.50

Field Total: 5,802.50


52 Area: 2.93 Culture: New Plant Variety: 84-524 Date Planted 1/16/2024
REGULAR
03-19-24 3 Irrigation(440.00 daily) 55.00 /hour 12 660.00 275.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-20-24 4 Irrigation(440.00 daily) 55.00 /hour 16 880.00 412.50
03-21-24 1 Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-22-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
Totals: 2,640.00 1,375.00 4,015.00

Field Total: 4,015.00


53 Area: 4.35 Culture: New Plant Variety: 84-524 Date Planted 1/14/2024
REGULAR
03-19-24 11 Weeding(440.00 daily) 55.00 /hour 88 4,840.00 0.00
03-21-24 8 Replanting Cnpts by Tama 1,685.00 /Lacsa 0.88 1,482.80 0.00
@1,685/Lacsa
1 Operator- Hi-Clearance (440.00 55.00 /hour 2 110.00 0.00
daily)
18 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 1.62 2,924.10 0.00
by tama
03-22-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-23-24 6 Irrigation(440.00 daily) 55.00 /hour 48 2,640.00 0.00
Totals: 12,216.90 137.50 12,354.40

Field Total: 12,354.40


54 Area: 2.22 Culture: New Plant Variety: 84-524 Date Planted 1/19/2024
REGULAR
03-19-24 3 Spot Weeding(440.00 Daily) 55.00 /hour 24 1,320.00 0.00
03-21-24 10 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 1.03 1,859.15 0.00
by tama
03-22-24 8 1,805.00 Replanting Canepoints 1,805.00 /Lacsa 0.85 1,534.25 0.00
by tama
03-23-24 1 Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-24-24 3 Sunday Rate 30% 132.00 /day 2.5 330.00 0.00
3 Irrigation(440.00 daily) 55.00 /hour 20 1,100.00 275.00
Totals: 6,363.40 412.50 6,775.90

Field Total: 6,775.90

/JP Document Date: 26-Mar-24 9:57:18 AM Page 6 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
56 Area: 2.49 Culture: New Plant Variety: 84-524 Date Planted 1/9/2024
REGULAR
03-19-24 2 Irrigation(440.00 daily) 55.00 /hour 16 880.00 137.50
Totals: 880.00 137.50 1,017.50

Field Total: 1,017.50


57-A Area: 2.98 Culture: Ratoon 1 Variety: 84-524 Date Planted 1/13/2024
REGULAR
03-19-24 3 Operator- Road Repair(440.00 55.00 /hour 6 330.00 0.00
daily)
03-20-24 3 Operator- Road Repair(440.00 55.00 /hour 12 660.00 0.00
daily)
03-21-24 1 Operator- Road Repair(440.00 55.00 /hour 4 220.00 0.00
daily)
Totals: 1,210.00 0.00 1,210.00

Field Total: 1,210.00


58 Area: 2.96 Culture: New Plant Variety: 84-524 Date Planted 1/5/2024
REGULAR
03-23-24 9 Weeding(440.00 daily) 55.00 /hour 72 3,960.00 0.00
Totals: 3,960.00 0.00 3,960.00

Field Total: 3,960.00


59 Area: 3.22 Culture: New Plant Variety: 84-524 Date Planted 1/4/2024
REGULAR
03-20-24 7 Weeding(440.00 daily) 55.00 /hour 56 3,080.00 0.00
1 Operator-Service Spray(440.00 55.00 /hour 4 220.00 0.00
daily)
4 Spray Foliar/Plant 55.00 /hour 32 1,760.00 0.00
Catalyst/Cambiar k/Silwet
Totals: 5,060.00 0.00 5,060.00

Field Total: 5,060.00


60 Area: 5.78 Culture: Ratoon 1 Variety: 84-524 Date Planted 1/8/2024
REGULAR
03-23-24 1 Operator-Service Spray(440.00 55.00 /hour 4 220.00 0.00
daily)
7 Spray Foliar(Fertilizer)440.00 daily 55.00 /hour 56 3,080.00 0.00
Totals: 3,300.00 0.00 3,300.00

Field Total: 3,300.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 7 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
61 Area: 3.03 Culture: Ratoon 1 Variety: 84-524 Date Planted 1/28/2024
REGULAR
03-23-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
03-24-24 1 Sunday Rate 30% 132.00 /day 1 132.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
Totals: 1,012.00 550.00 1,562.00

Field Total: 1,562.00


62-A Area: 3.8 Culture: Ratoon 1 Variety: 2007-66 Date Planted 1/4/2024
REGULAR
03-19-24 4 Irrigation(440.00 daily) 55.00 /hour 32 1,760.00 275.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
03-20-24 4 Irrigation(440.00 daily) 55.00 /hour 32 1,760.00 275.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator- Hi-Clearance (440.00 55.00 /hour 4 220.00 0.00
daily)
1 Operator-Service Abono(440.00 55.00 /hour 4 220.00 0.00
daily)
2 Application Fertilizer(Super Save 55.00 /hour 16 880.00 0.00
Urea)440 dailyl
03-21-24 6 Irrigation(440.00 daily) 55.00 /hour 40 2,200.00 137.50
1 Ronda Irrigation(440.00 daily) 55.00 /hour 8 440.00 275.00
1 Operator- Hi-Clearance (440.00 55.00 /hour 2 110.00 0.00
daily)
2 Application Fertilizer(Super Save 55.00 /hour 16 880.00 0.00
Urea)440 dailyl
03-22-24 5 Irrigation(440.00 daily) 55.00 /hour 32 1,760.00 412.50
03-23-24 3 Irrigation(440.00 daily) 55.00 /hour 20 1,100.00 275.00
03-24-24 3 Sunday Rate 30% 132.00 /day 2.5 330.00 0.00
3 Irrigation(440.00 daily) 55.00 /hour 20 1,100.00 275.00
Totals: 13,640.00 2,475.00 16,115.00

Field Total: 16,115.00


63-A Area: 2.5 Culture: New Plant Variety: 84-524 Date Planted 1/29/2024
REGULAR
03-19-24 3 Spot Weeding(440.00 Daily) 55.00 /hour 24 1,320.00 0.00
03-20-24 8 Spot Weeding(440.00 Daily) 55.00 /hour 36 1,980.00 0.00
Totals: 3,300.00 0.00 3,300.00

Field Total: 3,300.00


65-A Area: 1.27 Culture: Ratoon 2 Variety: 2008-57 Date Planted 12/16/2023
REGULAR
03-21-24 2 Punong Kalog(440.00 daily) 55.00 /hour 8 440.00 0.00
Totals: 440.00 0.00 440.00

Field Total: 440.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 8 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
67 Area: 2.48 Culture: Ratoon 1 Variety: 2007-66 Date Planted 10/14/2023
REGULAR
03-23-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
03-24-24 1 Sunday Rate 30% 132.00 /day 0.5 66.00 0.00
1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.50
Totals: 506.00 275.00 781.00

Field Total: 781.00


68 Area: 3.77 Culture: Ratoon 1 Variety: 2007-66 Date Planted 11/10/2023
REGULAR
03-22-24 1 Ronda Irrigation(440.00 daily) 55.00 /hour 4 220.00 137.00
Totals: 220.00 137.00 357.00

Field Total: 357.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 9 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
Admin Area: 0 Culture: Variety: Date Planted
REGULAR
03-19-24 1 Cabo(Sueta Philip) 428.57 /day 1 428.57 0.00
1 Cabo(Baliguat Marlon) 428.57 /day 1 428.57 0.00
1 Cabo(Llamera Criston) 428.57 /day 1 428.57 0.00
1 Field Checker (Policarpio, Manny) 600.00 /day 1 600.00 0.00
1 Warehouseman(Columnas, 457.14 /day 1 457.14 0.00
Arestio)
1 Office Clerk(Mondia, Harlene) 457.14 /day 1 457.14 0.00
1 Office Clerk(Palermo, Joseph) 500.00 /day 1 500.00 0.00
1 BackHoe Operator(495.00) 61.88 /hour 8 495.00 77.34
1 Shop Mechanic(Santillan, Julie) 500.00 /day 1 500.00 0.00
1 Gate Guard(Luna, Joery 428.57 /day 1 428.57 0.00
Mark)Mangkas Compound
1 Cabo-(Delos Santos Arnel) 428.57 /day 1 428.57 0.00
1 Tireman(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Shop Helper(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Field Ronda(440.00 daily) 55.00 /hour 8 440.00 0.00
2 Shop Welder(440.00 daily) 55.00 /hour 16 880.00 0.00
1 Cabo- (Villamor, Freddie) 428.57 /day 1 428.57 0.00
03-20-24 1 Cabo(Sueta Philip) 428.57 /day 1 428.57 0.00
1 Cabo(Baliguat Marlon) 428.57 /day 1 428.57 0.00
1 Cabo(Llamera Criston) 428.57 /day 1 428.57 0.00
1 Field Checker (Policarpio, Manny) 600.00 /day 1 600.00 0.00
1 Warehouseman(Columnas, 457.14 /day 1 457.14 0.00
Arestio)
1 Office Clerk(Mondia, Harlene) 457.14 /day 1 457.14 0.00
1 Office Clerk(Palermo, Joseph) 500.00 /day 1 500.00 0.00
1 BackHoe Operator(495.00) 61.88 /hour 8 495.00 77.34
1 Shop Mechanic(Santillan, Julie) 500.00 /day 1 500.00 0.00
1 Gate Guard(Luna, Joery 428.57 /day 1 428.57 0.00
Mark)Mangkas Compound
1 Cabo-(Delos Santos Arnel) 428.57 /day 1 428.57 0.00
1 Tireman(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Shop Helper(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Field Ronda(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Shop Welder(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Cabo- (Villamor, Freddie) 428.57 /day 1 428.57 0.00
03-21-24 1 Cabo(Sueta Philip) 428.57 /day 1 428.57 0.00
1 Cabo(Baliguat Marlon) 428.57 /day 1 428.57 0.00
1 Cabo(Llamera Criston) 428.57 /day 1 428.57 0.00
1 Field Checker (Policarpio, Manny) 600.00 /day 1 600.00 0.00
1 Warehouseman(Columnas, 457.14 /day 1 457.14 0.00
Arestio)
1 Office Clerk(Mondia, Harlene) 457.14 /day 1 457.14 0.00
1 Office Clerk(Palermo, Joseph) 500.00 /day 1 500.00 0.00
1 BackHoe Operator(495.00) 61.88 /hour 8 495.00 77.34
1 Shop Mechanic(Santillan, Julie) 500.00 /day 1 500.00 0.00
1 Gate Guard(Luna, Joery 428.57 /day 1 428.57 0.00
Mark)Mangkas Compound
1 Cabo-(Delos Santos Arnel) 428.57 /day 1 428.57 0.00
1 Tireman(440.00 daily) 55.00 /hour 8 440.00 0.00
3 Shop Helper(440.00 daily) 55.00 /hour 20 1,100.00 0.00
1 Field Ronda(440.00 daily) 55.00 /hour 8 440.00 0.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 10 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
1 Shop Welder(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Cabo- (Villamor, Freddie) 428.57 /day 1 428.57 0.00
2 440.00 Isip Patdan Daily 55.00 /hour 16 880.00 0.00
03-22-24 1 Cabo(Sueta Philip) 428.57 /day 1 428.57 0.00
1 Cabo(Baliguat Marlon) 428.57 /day 1 428.57 0.00
1 Cabo(Llamera Criston) 428.57 /day 1 428.57 0.00
1 Field Checker (Policarpio, Manny) 600.00 /day 1 600.00 0.00
1 Warehouseman(Columnas, 457.14 /day 1 457.14 0.00
Arestio)
1 Office Clerk(Mondia, Harlene) 457.14 /day 1 457.14 0.00
1 Office Clerk(Palermo, Joseph) 500.00 /day 1 500.00 0.00
1 BackHoe Operator(495.00) 61.88 /hour 8 495.00 68.75
1 Shop Mechanic(Santillan, Julie) 500.00 /day 1 500.00 0.00
1 Gate Guard(Luna, Joery 428.57 /day 1 428.57 0.00
Mark)Mangkas Compound
1 Cabo-(Delos Santos Arnel) 428.57 /day 1 428.57 0.00
4 Gupod Pamatdan @700.00/Lacsa 700.00 /Lacsa 2.12 1,484.00 0.00
1 Operator-Hakot Patdan(440.00 55.00 /hour 8 440.00 0.00
daily)
1 Tireman(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Shop Helper(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Field Ronda(440.00 daily) 55.00 /hour 8 440.00 0.00
2 Shop Welder(440.00 daily) 55.00 /hour 16 880.00 137.50
1 Cabo- (Villamor, Freddie) 428.57 /day 1 428.57 0.00
03-23-24 1 Omitted (DTR 07/05/2021) 39.38 /Hour 0 0.00 0.00
1 Cabo(Sueta Philip) 428.57 /day 1 428.57 0.00
1 Cabo(Baliguat Marlon) 428.57 /day 1 428.57 0.00
1 Cabo(Llamera Criston) 428.57 /day 1 428.57 0.00
1 Field Checker (Policarpio, Manny) 600.00 /day 1 600.00 0.00
1 Warehouseman(Columnas, 457.14 /day 1 457.14 0.00
Arestio)
1 Office Clerk(Mondia, Harlene) 457.14 /day 1 457.14 0.00
1 Office Clerk(Palermo, Joseph) 500.00 /day 1 500.00 0.00
1 BackHoe Operator(495.00) 61.88 /hour 8 495.00 77.34
1 Shop Mechanic(Santillan, Julie) 500.00 /day 1 500.00 0.00
1 Gate Guard(Luna, Joery 428.57 /day 1 428.57 0.00
Mark)Mangkas Compound
1 Cabo-(Delos Santos Arnel) 428.57 /day 1 428.57 0.00
1 Tireman(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Shop Helper(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Field Ronda(440.00 daily) 55.00 /hour 8 440.00 0.00
2 Shop Welder(440.00 daily) 55.00 /hour 16 880.00 0.00
1 Cabo- (Villamor, Freddie) 428.57 /day 1 428.57 0.00
2 440.00 Isip Patdan Daily 55.00 /hour 16 880.00 0.00
1 Omitted Dtr(kokoy field 55.00 /hour 7 385.00 0.00
ronda)440.00 daily
03-24-24 1 Cabo(Sueta Philip) 428.57 /day 1 428.57 0.00
1 Cabo(Baliguat Marlon) 428.57 /day 1 428.57 0.00
1 Cabo(Llamera Criston) 428.57 /day 1 428.57 0.00
1 Field Checker (Policarpio, Manny) 600.00 /day 1 600.00 0.00
1 Warehouseman(Columnas, 457.14 /day 1 457.14 0.00
Arestio)
1 Office Clerk(Mondia, Harlene) 457.14 /day 1 457.14 0.00
1 Office Clerk(Palermo, Joseph) 500.00 /day 1 500.00 0.00
1 Shop Mechanic(Santillan, Julie) 500.00 /day 1 500.00 0.00

/JP Document Date: 26-Mar-24 9:57:18 AM Page 11 of 12


No of Work Work Work Add'l
Field # Date Workers Work Description Rate Unit Volume Pay Pay
1 Gate Guard(Luna, Joery 428.57 /day 1 428.57 0.00
Mark)Mangkas Compound
1 Sunday Rate 30% 132.00 /day 1 132.00 0.00
1 Cabo-(Delos Santos Arnel) 428.57 /day 1 428.57 0.00
5 Gupod Pamatdan @700.00/Lacsa 700.00 /Lacsa 0.78 546.00 0.00
1 Field Ronda(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Shop Welder(440.00 daily) 55.00 /hour 8 440.00 0.00
1 Cabo- (Villamor, Freddie) 428.57 /day 1 428.57 0.00
Totals: 49,396.20 515.61 49,911.81

Field Total: 49,911.81

Grand Total: 201,200.41

/JP Document Date: 26-Mar-24 9:57:18 AM Page 12 of 12