Ship’s Name : KM Indira

CHECK LIST FOR OVERHAUL Voyage :


Date :
Description of work : Overhaul Main Engine

No. of workers : 005 Person in charge : 2nd Engineer


Check
No. Check Items
Yes No
Make sure the engine that is being overhauled has the electrical and air control
1
systems LOCKED
2 Prepare all special tools
Check all appropriateness of the "lifting equipment" . Such as SWL chain blocks,
3
wire slings, sacks, eye bolts,
4 Prepare the equipment and make sure the work area is not slippery
5 All overhaul personnel must wear complete PPE
6 Do not stand under equipment that is being lifted/hanging
7 Do not use worn keys
When lifting objects that are being overhauled, try to have one command, so that
8
there are no misunderstandings.
9 Make sure the keys are not scattered
10 All components that are overhauled are stored in a neat place and not mixed up

Other

Specially requested matters :

Function Head of dept. Approved by (Master)


Name Darwis Anton Ashari
Signature
Date 18 Oct 2023 18 Oct 2023

KSE-080(0/2010.7.15) INDIMATAN LINES