No. of workers : 005 Person in charge : 2nd Engineer
Check No. Check Items Yes No Make sure the engine that is being overhauled has the electrical and air control 1 systems LOCKED 2 Prepare all special tools Check all appropriateness of the "lifting equipment" . Such as SWL chain blocks, 3 wire slings, sacks, eye bolts, 4 Prepare the equipment and make sure the work area is not slippery 5 All overhaul personnel must wear complete PPE 6 Do not stand under equipment that is being lifted/hanging 7 Do not use worn keys When lifting objects that are being overhauled, try to have one command, so that 8 there are no misunderstandings. 9 Make sure the keys are not scattered 10 All components that are overhauled are stored in a neat place and not mixed up
Other
Specially requested matters :
Function Head of dept. Approved by (Master)
Name Darwis Anton Ashari Signature Date 18 Oct 2023 18 Oct 2023