Professional Documents
Culture Documents
MERALCO_Proof-of-Billing
MERALCO_Proof-of-Billing
Residential 10,072
=
Actual Consumption Bill Computation Summary
Your rate this month 263 kWh Remaining Balance from previous bill 0.00
� 11.75 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 3,090.03
Please see the back page of your bill for more details about your Generation 1,797.45
meter reading and consumption. Transmission 144.97
System Loss 162.69
Distribution (Meralco) 579.92
Subsidies 0.19
Your monthly consumption 30.4ºC Government Taxes
Universal Charges
324.67
70.57
Ave. temp this month 2.4 FiT-All (Renewable) 9.57
kWh deg higher than prev.
Payment Instruction
jcbZ2RXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZ57XZlXZ accredited payment partner before the due date.
cbcSZZSbzbP
3piqdgC9mXX
33CR;tBtk0Z
1975824062 � 3,090.03
Zs:ZwQMtnAP
ucSZyep6eUR Bfw:eUZUwYZdwFEZJeqZcEIFUw
Payment made after 13 May 2024 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005
16211
Bill Reference No.: 24057478471 Local Application No.: 893760327 Billing Period: 13 Apr 2024 to 12 May 2024 Print Seq. * Page 2 of 2
BARTOLOME METRO MANILA Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
Metering Information the PAG-ASA weather station in Quezon City, Metro Manila.
Previous Current
Meter Number Reading Reading Multi Registered
518BAL010316 10072 10335 1 263 kWh
Rate Components Base Price Amount
Generation 58.17% 1,797.45
Generation Charge (PhP/kWh) 263 kWh 6.8344 1,797.45
Power Act Reduction 0.00
Transmission 4.69% 144.97
Transmission Charge(PhP/kWh) 263 kWh 0.5512 144.97
System Loss 5.26% 162.69
System Loss Charge (PhP/kWh) 263 kWh 0.6186 162.69
Distribution (Meralco) 18.77% 579.92
Distribution Charge (PhP/kWh) 263 kWh 1.2908 339.48
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 263 kWh 0.3350 88.11
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 263 kWh 0.4979 130.95
Subsidies 0.01% 0.19
Lifeline Rate Subsidy (PhP/kWh 263 kWh 0.0006 0.16
Senior Citizen Subsidy 263 kWh 0.0001 0.03
Government Taxes 10.51% 324.67
Current RPT (PhP/kWh) 263 kWh 0.0060 1.58
Local Franchise Tax 2686.80 0.6270% 16.85
VALUE ADDED TAX
Generation Charge 1797.45 11.1100% 199.70
Power Act Reduction 0.00
Transmission Charge 144.97 11.4500% 16.60
System Loss Charge 162.69 11.1400% 18.12
Distribution Charge 579.92 12.0000% 69.59
Subsidies and Others 18.62 12.0000% 2.23
Universal Charges 2.28% 70.57
Missionary Elec for NPC-SPUG 263 kWh 0.2238 58.86
Missionary Elec for REDCI 263 kWh 0.0017 0.45
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 263 kWh 0.0428 11.26
DU Stranded Contract Costs 0.00