Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SALVADOR, FRANGIE SAMOY NOVALICHES BUSINESS CENTER

0205 BLDG J ST QUIRINO


EL PUEBLO BAGBAG Q. C.-NOVALICHES
Q. C.-SAN BARTOLOME METRO MANILA TIN 000-101-528-000-VAT
Invoice No.: 2234057602660
Meter No.: 518BAL010316
Route Seq.: 2230 06 0005 Print Seq.: * Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1975824062 24 May 2024
13 Apr 2024 to 12 May 2024 13 May 2024
Date of Meter Reading Electric Meter Number
12 May 2024 518BAL010316 Please Pay
Date of Next Meter Reading Current Reading
12 Jun 2024
Customer Type -
10,335
Previous Reading
� 3,090. 03

Residential 10,072
=
Actual Consumption Bill Computation Summary
Your rate this month 263 kWh Remaining Balance from previous bill 0.00
� 11.75 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 3,090.03
Please see the back page of your bill for more details about your Generation 1,797.45
meter reading and consumption. Transmission 144.97
System Loss 162.69
Distribution (Meralco) 579.92
Subsidies 0.19
Your monthly consumption 30.4ºC Government Taxes
Universal Charges
324.67
70.57
Ave. temp this month 2.4 FiT-All (Renewable) 9.57
kWh deg higher than prev.

Total Amount Due � 3,090.03

kWh 174 260 183 251 263 - - - - - - -

55 82 92 108 244 275 204 187 88 75 146 232

Your consumption explained Your typical consumption


This bill is 5% higher (+12kWh) vs 195 kWh 8.77 kWh � 103
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 8% higher (+19kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
263 kWh 0.1873 tCO * 2 9 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ2RXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZ57XZlXZ accredited payment partner before the due date.
cbcSZZSbzbP
3piqdgC9mXX
33CR;tBtk0Z
1975824062 � 3,090.03
Zs:ZwQMtnAP
ucSZyep6eUR Bfw:eUZUwYZdwFEZJeqZcEIFUw
Payment made after 13 May 2024 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 24057478471 Local Application No.: 893760327 Billing Period: 13 Apr 2024 to 12 May 2024 Print Seq. * Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
13 Mar-12 Apr 2024 27 Apr 2024 Bayad Partner - Digital � 2,833.99 Equalization Taxes & Royalties 0.00
13 Feb-12 Mar 2024 26 Mar 2024 Bayad Partner � 2,189.75
FiT-All (Renewable) 0.31% 9.57
13 Jan-12 Feb 2024 05 Mar 2024 Citibank - Online � 3,185.93
13 Dec-12 Jan 2024 30 Jan 2024 Citibank - Online � 1,976.81 FiT-All (Renewable) 263 kWh 0.0364 9.57
13 Nov-12 Dec 2023 09 Jan 2024 Citibank - Online � 2,692.13
13 Nov-12 Dec 2023 13 Dec 2023 Meralco Headquarters � 0.38
Energy Bill Amount
Base VAT
What remains unpaid VAT Sales
VAT Zero Rated
Non-VAT
2,703.65
0.00
80.14
306.24

No unpaid bill, thank you!


Total Energy Amount 3,090.03
How your bill was computed Charges for this billing period � 3,090.03
Service ID Number: 355653070102
Contract Holder: SALVADOR, FRANGIE SAMOY
Additional Bill Information
Service Address: 0205 BLDG J EL PUEBLO BAGBAG Q. C.-SAN Voltage Level Class : Secondary

BARTOLOME METRO MANILA Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
Metering Information the PAG-ASA weather station in Quezon City, Metro Manila.
Previous Current
Meter Number Reading Reading Multi Registered
518BAL010316 10072 10335 1 263 kWh
Rate Components Base Price Amount
Generation 58.17% 1,797.45
Generation Charge (PhP/kWh) 263 kWh 6.8344 1,797.45
Power Act Reduction 0.00
Transmission 4.69% 144.97
Transmission Charge(PhP/kWh) 263 kWh 0.5512 144.97
System Loss 5.26% 162.69
System Loss Charge (PhP/kWh) 263 kWh 0.6186 162.69
Distribution (Meralco) 18.77% 579.92
Distribution Charge (PhP/kWh) 263 kWh 1.2908 339.48
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 263 kWh 0.3350 88.11
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 263 kWh 0.4979 130.95
Subsidies 0.01% 0.19
Lifeline Rate Subsidy (PhP/kWh 263 kWh 0.0006 0.16
Senior Citizen Subsidy 263 kWh 0.0001 0.03
Government Taxes 10.51% 324.67
Current RPT (PhP/kWh) 263 kWh 0.0060 1.58
Local Franchise Tax 2686.80 0.6270% 16.85
VALUE ADDED TAX
Generation Charge 1797.45 11.1100% 199.70
Power Act Reduction 0.00
Transmission Charge 144.97 11.4500% 16.60
System Loss Charge 162.69 11.1400% 18.12
Distribution Charge 579.92 12.0000% 69.59
Subsidies and Others 18.62 12.0000% 2.23
Universal Charges 2.28% 70.57
Missionary Elec for NPC-SPUG 263 kWh 0.2238 58.86
Missionary Elec for REDCI 263 kWh 0.0017 0.45
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 263 kWh 0.0428 11.26
DU Stranded Contract Costs 0.00

Reminders when paying Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bill's due date and remit the
All payments made via banks, e-wallets, and other authorized payment partners will be applied to payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
your oldest unpaid bill/s under your Meralco account. Please pay on or before the due date to avoid these accredited ADA partners.
any inconvenience.
Asia United Bank Rizal Commercial Banking Corporation (RCBC)
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of Banco de Oro (BDO) Robinsons Bank
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Chinabank Security Bank
Philippine National Bank Union Bank of the Philippines
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5397 to 98
consumer@erc.gov.ph (Office hours, Mon-Fri except holidays)

You might also like