6. Vol Pek Bawah TU - Jembatan Penghubung

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 18

VOLUME STRUKTUR BAWAH TERMINAL UTAMA

Volume Terminal
NO ITEM KERJAAN SATUAN TUU
Utama

A BORED PILE
1 Galian m3 4,597.40 2,206.75
2 Buang Lumpur m3 4,597.40 2,206.75
-
B PILE CAP -
1 Lantai Kerja m3 181.58 87.16
2 Pasir Urug m3 254.21 122.02
3 Galian m3 7,940.44 3,811.41
4 Urugan m3 2,980.40 1,430.59
5 Buang Tanah m3 4,960.05 2,380.82
6 Anti Rayap m2 8,351.86 4,008.89
-
C PLAT LANTAI -
1 Lantai Kerja m3 1,607.12 771.42
2 Pasir Urug m3 2,249.97 1,079.99
3 Galian m3 16,071.21 7,714.18
4 Urugan m3 8,230.42 3,950.60
5 Buang Tanah m3 7,840.79 3,763.58
6 Anti Rayap m2 20,428.75 9,805.80
-
D TIE BEAM -
1 Lantai Kerja m3 24.57 11.80
2 Pasir Urug m3 34.41 16.51
3 Galian m3 4,553.45 2,185.65
4 Urugan m3 2,567.44 1,232.37
5 Buang Tanah m3 1,986.01 953.28
6 Anti Rayap m2 13,911.25 6,677.40
-
D TUNNEL (BOX CULVERT) -
1 Lantai Kerja m3 178.48 85.67
2 Pasir Urug m3 249.88 119.94
3 Galian m3 18,455.07 8,858.43
4 Urugan m3 12,558.52 6,028.09
5 Buang Tanah m3 5,896.55 2,830.34
6 Anti Rayap m2 6,927.82 3,325.35
-
E FIT LIFT, SUMPIT, TRAVELATOR -
1 Lantai Kerja m3 5.96 2.86
2 Pasir Urug m3 8.35 4.01
3 Galian m3 149.74 71.87
4 Urugan m3 135.42 65.00
5 Buang Tanah m3 14.31 6.87
6 Anti Rayap m2 278.17 133.52

RESUME TOTAL
1 Lantai Kerja m3 1,997.72 958.90
2 Pasir Urug m3 2,796.80 1,342.47
3 Galian m3 51,767.30 24,848.30
4 Urugan m3 26,472.20 12,706.65
5 Buang Tanah m3 20,697.71 9,934.90
6 Anti Rayap m2 49,897.85 23,950.97
7 Buang Lumpur m3 4,597.40 2,206.75

Ref : DED Approve Terminal Utama


TUS

2,390.65
2,390.65
-
-
94.42
132.19
4,129.03
1,549.81
2,579.22
4,342.97
-
-
835.70
1,169.98
8,357.03
4,279.82
4,077.21
10,622.95
-
-
12.78
17.89
2,367.79
1,335.07
1,032.72
7,233.85
-
-
92.81
129.94
9,596.64
6,530.43
3,066.21
3,602.47
-
-
3.10
4.34
77.86
70.42
7.44
144.65

1,038.81
1,454.34
26,919.00
13,765.54
10,762.81
25,946.88
2,390.65
VOLUME STRUKTUR BAWAH TERMINAL UTAMA

Volume Terminal
NO ITEM KERJAAN SATUAN TUU
Utama

A PLAT LANTAI
1 Galian m3
2 Pemadatan Tanah Plat (SOG) m3
3 Urugan Kembali m3
4 Lantai Kerja m3
5 Pasir Urug m3
6 Anti Rayap m2

B PILE CAP
1 Galian m3
2 Buang Tanah m3
3 Urugan Kembali m3
4 Lantai Kerja m3
5 Pasir Urug m3
6 Anti Rayap m2

C TIE BEAM
1 Galian m3
2 Buang Tanah m3
3 Urugan Kembali m3
4 Lantai Kerja m3
5 Pasir Urug m3
6 Anti Rayap m2

D FIT LIFT
1 Galian m3
2 Buang Tanah m3
3 Urugan Kembali m3
4 Lantai Kerja m3
5 Pasir Urug m3
6 Anti Rayap m2
E TUNNEL
1 Galian m3
2 Buang Tanah m3
3 Urugan Kembali m3
4 Lantai Kerja m3
5 Pasir Urug m3
6 Anti Rayap m2
TUS
VOLUME GALIAN BORED PILE TERMINAL UTAMA

Item Elevasi

Elevasi + 0.00 : + 0.00 + 13.878


Tanah Existing : + 0.00 + 13.878
Top Plat SOG : -0.05 13.83
Top Pile Cap Striping Tanah : - 0.50 13.38
Top Pile Cap Lt 1 : -0.50 13.38
Top Pile Cap Bsm : -5.00 8.878
Top Pile Cap Fit Lift : -2.00 11.88
SFL Box Culvert : - 4.05 9.83
Top Bored Pile :

Buang
No Type Bored Pile QTY Galian
Lumpur

1 BP-TYPE A 44 328.13 328.13


2 BP-TYPE B 123 917.27 917.27
3 BP-TYPE C 2 14.92 14.92
4 BP-TYPE D 331 2,468.43 2,468.43
5 BP-TYPE E 180 859.10 859.10
6 BP-TYPE F 2 9.55 9.55
682 4,597.40 4,597.40
Item Elevasi

Elevasi + 0.00 : + 0.00 + 13.878


Tanah Existing : + 0.00 + 13.878
Top Plat SOG : -0.05 13.83
Top Pile Cap Striping Tanah : - 0.50 13.38
Top Pile Cap Lt 1 : -0.50 13.38
Top Pile Cap Bsm : -5.00 8.878
Top Pile Cap Fit Lift : -2.00 11.88
SFL Box Culvert : - 4.05 9.83
Top Bored Pile :

VOLUME GALIAN PILE CAP TERMINAL UTAMA

Urugan Buang
No Type Pile Cap qty Lantai Kerja Pasir Urug Galian
Kembali Tanah

1 P2C 1 0.43 0.60 19.09 8.81 10.28


2 P2D 88 38.02 53.22 1,679.87 775.51 904.36
3 P2E 66 21.12 29.57 969.15 490.79 478.37
4 P2F 1 0.32 0.45 14.68 7.44 7.25
5 P3D 50 49.16 68.82 2,176.31 871.63 1,304.68
6 P3E 16 10.02 14.02 486.20 224.06 262.14
7 P5A 4 7.55 10.56 302.33 73.20 229.13
8 P5B 21 38.34 53.68 1,539.44 377.47 1,161.96
9 P5D 1 1.83 2.56 73.31 17.97 55.33
10 P6B 3 6.00 8.40 266.88 63.70 203.18
10 P12A 2 8.80 12.32 413.19 69.83 343.36

181.58 254.21 7,940.44 2,980.40 4,960.05


Anti Rayap Anti Rayap
Samping Bawah

22.98 11.44
617.24 1,006.72
423.50 580.80
19.87 8.80
1,670.81 1,071.01
483.58 200.32
106.92 171.20
467.55 871.76
42.50 41.51
90.72 136.08
115.03 191.52

4,060.70 4,291.16
VOLUME GALIAN PLAT LANTAI

No Zona Qty Beton Tinggi Luas Keliling Pasir Urug Lantai Kerja

m3 m m2 m' m3 m3

1 Lantai 1 1 3983.6999 0.5 32,142.42 800.79 2,249.97 1,607.12

2,249.97 1,607.12
T LANTAI

Urugan Buang Anti Rayap Anti Rayap


Galian
Kembali Tanah Samping Bawah
m3 m3 m3 m2 m2

16,071.21 8,230.42 7,840.79 400.40 20,028.35

16,071.21 8,230.42 7,840.79 400.40 20,028.35


VOLUME GALIAN TIE BEAM TERMINAL UTAMA

Urugan
No Zona qty Pasir Urug Lantai Kerja Galian
Kembali

1 Zona 1
2 Zona 2
3 Zona 3
4 Zona 4
5 Zona 5
6 Zona 6

34.41 24.57 4,553.45 2,567.44


MINAL UTAMA

Anti Rayap
Buang Tanah Anti Rayap Bawah
Samping

1,986.01 9,816.88 4,094.37


VOLUME GALIAN TUNEL (BOX CULVERT) - TE

No Zona Qty Panjang Lebar Tinggi Luas Keliling

m m m m2 m'

1 Box Culvert 30 8 6.3 5.17 3,569.65 649.55


N TUNEL (BOX CULVERT) - TERMINAL UTAMA

Urugan Buang Anti Rayap


Pasir Urug Lantai Kerja Galian
Kembali Tanah Samping
m3 m3 m3 m3 m3 m2

249.88 178.48 18,455.07 12,558.52 5,896.55 3,358.17

249.88 178.48 18,455.07 12,558.52 5,896.55 3,358.17


Anti Rayap
Bawah
m2

3,569.65

3,569.65
VOLUME GALIAN SAMPIT & LIFT

No Zona Qty Panjang Lebar Tinggi Luas Keliling Pasir Urug

m m m m2 m' m3

1 Sumpit -
2 Fit Lift 6 3.94 3.50 1.5 13.80 14.89 5.80
3 Travelator 2 5.70 3.20 0.7 18.24 17.80 2.55

8.35
AMPIT & LIFT

Lantai Urugan Buang Anti Rayap Anti Rayap


Galian
Kerja Kembali Tanah Samping Bawah
m3 m3 m3 m3 m2 m2

- - - -
4.14 124.20 114.26 9.94 82.80 133.97
1.82 25.54 21.16 4.38 36.48 24.92

5.96 149.74 135.42 14.31 119.28 158.89

You might also like